This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract No. CN208. The document modifies Task Assignment No. 12 for the Bill Baggs Cape Florida State Park Lighthouse Rejuvenation project (Project No. 61346C). The consultant performing the work is Calvin, Giordano & Associates, Inc., represented by James Messick, P.E. The FDEP Contract Manager is Jim McGuire, and the Contract Authority is Michael W. Foster Jr., P.E. The change order was executed in November 2023 with digital signatures from all required parties.
The change order is a time-only extension with no adjustment to the task amount, maintaining the original task cost of $47,951.14. The modification extends the task completion date by 365 days, moving the deadline from December 31, 2023, to December 31, 2024. The extension was requested to perform administration tasks and was necessitated by project delays during the bidding process and subsequent postponement of the construction start date. No additional reimbursement or fixed fees are associated with this change order, and the net change in the task amount remains $0.00.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN208-CMC1.pdf | ||
| CN-370000-CN208-CMC3.pdf | ||
| CN-370000-CN208-T12.pdf | ||
| CN-370000-CN208-T14.pdf | ||
| CN-370000-CN208-T6CO1.pdf | ||
| CN-370000-CN208-T7CO1.pdf | ||
| CN-370000-CN208-T9.pdf | ||
| CN-370000-CN208-T2.pdf | ||
| CN-370000-CN208-T4.pdf | ||
| CN-370000-CN208-T5.pdf | ||
| CN-370000-CN208-CMC4.pdf | ||
| CN-370000-CN208-T10.pdf | ||
| CN-370000-CN208-T13.pdf | ||
| CN-370000-CN208-T7CO2.pdf | ||
| CN-370000-CN208-T9CO1.pdf | ||
| CN-370000-CN208-TA8.pdf | ||
| CN-370000-CN208.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN208-A1.pdf | ||
| CN-370000-CN208-CMC2.pdf | ||
| CN-370000-CN208-T1.pdf | ||
| CN-370000-CN208-T11.pdf | ||
| CN-370000-CN208-T13CO1.pdf | ||
| CN-370000-CN208-T3.pdf | ||
| CN-370000-CN208-T5-CO1.pdf | ||
| CN-370000-CN208-T6.pdf | ||
| CN-370000-CN208-T7.pdf | ||
| CN-370000-CN208-T9CO2.pdf | ||
| CN-370000-CN208-T9CO2.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN208.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
Required Signatures: Adobe Signature
FDEP Contract No.:
I
Task Assignment No.: Change Order No.:
I Project No.:
CN208 12 01 61346C
Project Location: Project Name:
Bill Baggs Cape Florida State Park Lighthouse Rejuvenation Consultant Name:
Calvin, Giordano & Associates, Inc.
Consultant Representative: Phone: Email:
James Messick (954) 921-7781 JMessick�cgasolutions.com FDEP Contract Manager: Phone: Email:
Jim McGuire 772-380-6938 Jim.mcguire@floridadep.gov Description and Justification of Change:
Time only extension needed to perform administration tasks. See backup dated 11/8/2023.
ChanRe in Task Amount:
Item Reimbursement
Original Task Amount: $ 47.951.14 Task amount includin� all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders: $0.00
Chan11e in Task Time:
Original Task Execution Date:
Original Task End Date: 12/31/2022
Present Task End Date: 12/31/2023
Net Change in Days: 36S
New Task End Date: 12/31/2024
Approval Signtnlu,fifllii signed by Tamika
T "k B Bass 8ml 8 8SS Date: 2023.11.14
11:19:45-05'00'
Signature Digitally signed by Jim
J• M G ·
McGuire 1m C uire Date:2023.11.14 15:40:45 -05'00'
Signature
Signature
Signature
Tamika Bass Budget Representative, FDEP
Jim McGuire Project Manager, FDEP
Michael W Foster Jr., P.E.
Contract Manager, FDEP
James Messick P.E.
Consultant
Michael W. Foster Jr. P. E.
Contract Authority, FDEP Signature
Project# Grant# On Code Cat/Year Fund Module
29 Dieit FLAIR Code:
(Revised 9-26-2018)
Fixed Fee
$0.00
Date
Date
Date
Date
Date
ObJectCode EO
Total:
Total
$ 47.951.14 $ 47.951.14
$0.00 $ 47 951.14
Amount
S0.00
Michael W.
Foster Jr., P.E.
Digitally signed by Michael W. Foster Jr., P.E.
Date: 2023.11.15 11:01:17 -05'00'
James Messick Digitally signed by James Messick DN: CN=James Messick, dnQualifier=A01410C00000187B3819DDC0002E39E, O=CALVIN GIORDANO AND ASSOCIATES INC, C=US
Date: 2023.11.15 15:58:02-05'00'
Michael W.
Foster Jr., P.E.
Digitally signed by Michael W. Foster Jr., P.E.
Date: 2023.11.21 11:11:05 -05'00'