C.3 Attachment C_MSR-CCRS-ERM-CDRL-0002-_09-07-2021.pdf
PDF 296 KB Posted
- Attached to
- MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS) EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM) Request for Proposals Amendment 5 Federal contract opportunity
- Solicitation number
- 80GSFC21R0039
About this file
This document outlines a solicitation for a Spin Eject Mechanism as part of NASA's Mars Sample Return Capture, Containment and Return System Earth Entry System project. The solicitation seeks proposals for the preliminary design, final design, fabrication, integration and testing, delivery and post-delivery support of the Spin Eject Mechanism. Offerors must submit proposals no later than October 12, 2021. The contract will be awarded as a cost-plus-fixed-fee completion contract with a period of performance through 27 months from the effective date. The work will be performed offsite at the contractor's facilities. The North American Industry Classification System code for this requirement is 336414 and the small business size standard is 1,250 employees. Questions regarding the solicitation must be submitted to the Contracting Officer by September 24, 2021.
View the file
Other files for this federal contract opportunity
Show all 50
MARS SAMPLE RETURN (MSR) CAPTURE, CONTAINMENT AND RETURN SYSTEM (CCRS) EARTH ENTRY SYSTEM (EES) SPIN EJECT MECHANISM (SEM) Request for Proposals Amendment 5 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective Date: September 07, 2021 Expiration Date: September 07, 2026
Check https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use
400-FORM-0002 (4/16/2014)
National Aeronautics and Space Administration
Goddard Space Flight Center Greenbelt, Maryland
MSR-CCRS-ERM-CDRL-0002, Revision -
Mars Sample Return - Capture, Containment and Return System (MSR- CCRS) Project
NASA/GSFC Code 435
Spin Eject Mechanism (SEM)
Deliverable Items List and Schedule
(DILS)
MSR-CCRS CMO
September 07, 2021
RELEASED
https://ipdtdms.gsfc.nasa.gov/
MSR CCRS SEM DILS MSR-CCRS-ERM-CDRL-0002
Revision -
Effective Date: 09/07/2021 i
Spin Eject Mechanism (SEM) Deliverable Items List and Schedule (DILS)
Signature/Approval Page
Prepared by:
[signature on file]
Charlie Wang CCRS Spin Eject Mechanism RE Code 544
Reviewed by:
Chanel Duncan CCRS Chief Safety and Mission Assurance Officer
Code 383
Brendan Feehan CCRS Project Systems Engineer Code 599
Charles Bacon CCRS GSFC Flight Manager Code 435
Russell Stein CCRS Spin Eject Mechanism PDL Code 540
Approved by:
David Littmann CCRS Project Manager Code 435
*** Electronic signatures are available on-line at: https://ipdtdms.gsfc.nasa.gov*** ii
Preface This document is a Mars Sample Return (MSR) Capture, Containment and Return System (CCRS) Project configuration control board (CCB) controlled document. Changes to this document require prior approval of the CCB Chairperson or designee. Proposed changes shall be submitted in the Technical Data Management System (TDMS) via a configuration change request (CCR) along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.
All of the requirements in this document assume the use of the word "shall" unless otherwise stated.
Questions or comments concerning this document should be addressed to:
CCRS Configuration Management Office Mail Stop: 435 Goddard Space Flight Center Greenbelt, Maryland 20771 GSFC-DL-CCRS-TDMSCM-Admin@mail.nasa.gov iii
Change History Log
Revision Effective Date Description of Changes (Reference the CCR Approval Date)
Revision - 09/07/2021 Released per MSR-CCRS-CCR-0048; 09/07/2021 iv
Table of TBDs/TBRs/TBSs
Action Item No.
Location Summary Individual/ Organization
Actionee v
Table of Contents
1 INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 Related Documentation
1.3.1 Applicable Documents
1.3.2 Reference Documents
2 DELIVERABLES
Appendix A Abbreviations and Acronyms
List of Tables
Table 1. Hardware Delivery Schedule Table 2. Data Delivery Documentation and Schedule
1 INTRODUCTION
1.1 Purpose
This document is the Mars Sample Return (MSR) Capture, Containment and Return System (CCRS) Spin Eject Mechanism (SEM) Deliverable Items List and Schedule (DILS).
1.2 Scope
This document lists all of the deliverables for the SEM, the SOW paragraph number where the deliverable is described further, the type of response required from NASA GSFC, the format of the deliverable, and the schedule for delivery. The information in this document will be copied into the Section B.2 Table of the RFP.
1.3 Related Documentation
The latest revision of the applicable and reference documents at the time of contract execution shall be used unless otherwise specified.
1.3.1 Applicable Documents
The following documents are referenced within this document and are directly applicable or contain policies or other directive matters that are binding for the contents of this document. In the event of conflict between an Applicable Document and the content of this document, this document will govern, with the exception of the Statement of Work, MSR-CCRS-ERM-SOW- 0001, in which case the SOW takes precedence.
The contractor shall notify the Contracting Officer of any inconsistency in this contract, including all attachments and applicable documents.
Document Number Title
MSR-CCRS-ERM-
SOW-0001 Rev. -
Mars Sample Return (MSR) Capture, Containment and Return System (CCRS) Spin Eject Mechanism (SEM) Statement of Work
(SOW)
MSR-CCRS-SMA-
REQ-0003 Rev. -
Mars Sample Return (MSR) Capture, Containment and Return System (CCRS) Mission Assurance Requirements (MAR)
1.3.2 Reference Documents
The following documents are referenced herein and amplify or clarify the information presented in this document.
Document Number Title
MSR-CCRS-ERM-
SPEC-0002 Rev. -
Mars Sample Return (MSR) Capture, Containment and Return System (CCRS) Spin Eject Mechanism (SEM) Technical Specification
2 DELIVERABLES
The following are definitions of the table header used in Table 1 and Table 2:
Description: This provides the Title of the deliverable item.
Reference: This provides the reference back to the pertinent document calling out the deliverable.
Category:
A = Approval – Items in this category require approval from the National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) Contracting Officer (CO). In general, documents may be provided in contractor format as long as required content is addressed. The NASA GSFC CO reserves the time-limited right of disapproval for each submission. The time-limited period is twenty (20) working days from receipt of documents.
R= Review – Items in this category do not require formal NASA GSFC CO approval but will be reviewed by the GSFC or its designated representatives in order to determine contractor effectiveness in meeting contract objectives. When Government review reveals inadequacies, the contractor may be requested to correct the inadequacies. GSFC will review and comment within twenty (20) working days of receipt.
I = Information – Items in this category are informal and are for information only.
Format: This provides the format for the deliverable. For documents, the following format applies:
E = Electronic – Provide submittal in electronic format to the CCRS Project Library, COR, and Contracting Officer. The contractor and COR shall jointly determine the type of electronic format (e.g., Word, Excel, PowerPoint, PDF, MATLAB) acceptable for each deliverable.
Quantity: This provides the required number of copies for the deliverable. All data is required to be submitted electronically. The number in the quantity column refers to the number of hard copies required.
Delivery Date: This provides the fixed or relative date or time that the deliverable is required.
Table 1. Hardware Delivery Schedule
Item
Description Reference Quantity Delivery Date
1 Flight Model (FM) SOW 3.1 1 Twenty-four (24) months after contract award
2 Flight Spare SOW 3.1 1 Three (3) months after FM delivery
3 Engineering Test Unit (ETU) SOW 3.1 1 Eighteen (18) months after contract award
4 Engineering Development Unit (EDU)
SOW 3.1 1 Twelve (12) months after contract award
5 Assembly Integration and Test Model (AM)
SOW 3.1 2 Eighteen (18) months after contract award
6 Spare Parts Kit SOW 3.2 As Required With FM
7 Mechanical Ground Support Equipment (MGSE) and Electrical Ground Support Equipment (EGSE)
SOW 3.3 As Required With each hardware deliverable the
MGSE/EGSE is used for
Table 2. Data Delivery Documentation and Schedule
Description Reference Category Format Quantity Delivery Date
8 SOW Compliance Matrix
SOW A Electronic
1 With Proposal
9 Preliminary Technical Requirements Compliance Matrix
SOW 7.1 A Electronic
10 Mission Assurance Compliance Matrix
SOW 7.2 A Electronic
Description Reference Category Format Quantity Delivery Date
11 Time phased cost plan by element of cost.
SOW 2.2
A Electronic
12 Project Top Level Schedule
SOW 4.1 R Electronic
13 Technical Requirements Compliance Matrix Updates
SOW 7.1 A
Electronic
5 Part of SRR, PDR and CDR, MRR and PSR package
14 Monthly Status Reports and Mass Report Updates
SOW 7.11 R Electronic
Per month
Fourteen (14) calendar days following the month being reported.
15 Cost and Schedule
Report
SOW 2.5
R Electronic
Per month Part of Monthly Status Report
16 Kick Off Meeting
(KOM)
SOW 2.6
R Virtual or in person at NASA
GSFC
1 Within Five (5) workdays after contract award
17 Kick Off Meeting Package
SOW 2.6
R Electronic
1 Three (3) workdays before
KOM
18 Systems
Requirements Review (SRR)
SOW 2.7
R In person at
Contractor Facility.
1 Twenty (20) workdays after contract award
19 Systems Requirements Review (SRR)
SOW 2.7
R
1 Eight (8)
SRR
20 Preliminary Design Review (PDR)
SOW 2.8 A Virtual or in person at Contractor Facility.
1 Six (6) months after contract award
21 Preliminary Design Review (PDR)
SOW 2.8 R Electronic
1 Ten (10)
PDR
Description Reference Category Format Quantity Delivery Date
22 Preliminary Design Review (PDR) Package - Final
SOW 2.8 A Electronic
1 Five (5) workdays after PDR
23 Contamination Control Plan - Preliminary
SOW 7.3 R Electronic
1 Part of PDR package
24 Safety and Reliability Documentation – Preliminary
SOW 7.4 R
25 Master EEE Parts List – Preliminary
SOW 7.5 R Electronic
26 Materials Identification and Usage List (MIUL)
– Preliminary
SOW 7.6 R
27 Stress and Mechanisms Report
– Preliminary
SOW 7.7 R Electronic
28 Dynamic Analysis –
SOW 7.8 R Electronic
29 Interface Control Drawings –
SOW 7.9 R Electronic
30 Mechanical CAD Models, FEM and Thermal Models – Preliminary
SOW 7.10 R
package with updates as required
31 Top Level Assembly Drawing -
SOW 2.8 R Electronic
32 Critical Design Review (CDR)
SOW 2.9 A Virtual or in person at Contractor Facility.
1 Fourteen (14) months after contract award
Description Reference Category Format Quantity Delivery Date
33 Critical Design Review (CDR)
SOW 2.9 A Electronic
1 Ten (10)
CDR
34 Critical Design Review (CDR) Package - Final after CDR
35 Contamination Control Plan - Final
SOW 7.3 A Electronic
1 Part of CDR
36 Safety and Reliability
Documentation – Final
SOW 7.4 A
37 Master EEE Parts List – Final
SOW 7.5 A Electronic
38 Materials Identification and Usage List (MIUL)
– Final
SOW 7.6 A
39 Stress and Mechanisms Report
– Final
SOW 7.7 A Electronic
40 Dynamic Analysis – Final
SOW 7.8 A Electronic
41 Interface Control Drawings – Final
SOW 7.9 A Electronic
42 Mechanical CAD Models, FEM and Thermal Models – Final
SOW 7.10 A
43 Top Level Assembly Drawing - Final
44 FM Manufacturing Readiness Review
(MRR)
SOW 2.10 A Virtual or in person at
1 Seven (7) calendar days before commence of manufacturing.
Description Reference Category Format Quantity Delivery Date
45 Pre-Environmental Review (PER)
SOW 2.11 R Virtual or in person at
As needed
Seven (7) calendar days before start of environmental testing on first Flight Unit
46 Pre-Environmental Review Presentation
SOW 2.11 R Electronic
At PER
47 Test Readiness Review (TRR)
SOW 2.12 A Virtual or in person at Contractor Facility.
As needed
Prior to the commencement of each environmental test
48 Hardware Deliverables Pre- Ship Review (PSR)
SOW 2.13 A Virtual or in person at Contractor Facility.
As needed
Seven (7) calendar days prior to delivery of each Hardware
Deliverable 49 Hardware
Deliverables Pre- Ship Review Presentation Package
SOW 2.13 R
At PSR
50 Hardware Deliverables End Item Data Packages
(EIDP)
SOW 7.12 A
With each delivered Hardware
Deliverable and available at PSR
51 Technical Requirements Compliance Matrix
– Final
SOW 7.1 A
following the PSR
52 CDRL Package - Final
SOW 7 A Electronic
1 With FM delivery
Appendix A Abbreviations and Acronyms
AM AI&T Model CCRS Capture, Containment and Return System CDR Critical Design Review CDRL Contract Data Requirements List DILS Deliverable Items List and Schedule EAR Export Administration Regulations EDU Engineering Development Unit EIDP End Item Data Package EM Engineering Model ETU Engineering Test Unit KOM Kickoff Meeting MAR Mission Assurance Requirements MGSE Mechanical Ground Support Equipment MIUL Materials Identification and Usage List MRR Manufacturing Readiness Review MSR Mars Sample Return (Campaign) PDR Preliminary Design Review PER Pre-Environmental Review PFM Proto-Flight Model PSR Pre-Ship Reviews PT Prototype SEM Spin Eject Mechanism SOW Statement of Work SRR System Requirements Review TBD To Be Determined TRR Test Readiness Review
| 1 Introduction |
| 1.1 Purpose |
| 1.2 Scope |
| 1.3 Related Documentation |
| 1.3.1 Applicable Documents |
| 1.3.2 Reference Documents |
| 2 Deliverables |
| Appendix A Abbreviations and Acronyms |
File details come from the government source that posted it. Updated .