bid-2922-24-award.pdf
PDF 123 KB Posted
- Solicitation number
- Bid 2922-24
- Issued by
- Merrimack County, New Hampshire
About this file
This is a Bid Summary and Award document issued by the State of New Hampshire's Division of Procurement Support Services for Cleaver Brooks Boiler Preventative Maintenance and Repair Services (RFB #2922-24). The procurement encompasses comprehensive steam heating system maintenance and inspection services for multiple state facilities located in Concord, including the Department of Corrections, Department of Health and Human Services, and various Administrative Services buildings at 33 Green Street, 29 Hazen Drive, 281 North State Street, and 11 Institute Drive. Required services include annual preventative maintenance, boiler draining and inspection, safety control testing, equipment tuning for optimal efficiency, and detailed written reports following each service visit. The bid closing and award date was June 27, 2024, at 9:00 AM. The contract term is three years with an option to extend for two additional years. Two sourced bidders were selected for evaluation, and one non-responsive bid was received.
Industrial Steel & Boiler Services, Inc. was awarded the statewide contract with a recommended total term price of $309,758.75, comprised of $247,807.00 for Years 1 and 2 annually and $259,620.00 for Year 3 annually. Alternative bidders included Blake Thermal Sales and Service Inc. at $82,602.33 estimated annual spend and Cleaver Brooks at higher annual rates of $31,250.00 for Years 1 and 2 and $32,553.00 for Year 3. The method of payment is through P-card or ACH, with FOB delivery terms. This is designated as a new statewide contract with no incumbent vendor noted. The procurement checklist was completed, and a Dun & Bradstreet report was attached to the award documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| attachment_1_bid_2922_24.xlsx | XLSX spreadsheet | |
| attachment_2_bid_2922_24.pdf | ||
| attachment_5_bid_2922_24.pdf | ||
| bid_2922_24.pdf | ||
| Addendum_1_bid_2922_24.pdf | ||
| attachment_4_bid_2922_24.pdf | ||
| attachment_3_bid_2922_24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Procurement Support Services Bureau of Purchase Property
RFB Bid Summary
Gary S. Lunetta Director
(603) 271-2201
Agency
Requisition# Bid Closing
Indicates Award:
Annual Rate Annual Rate Annual Rate Annual Rate Year 1 & 2 Year 3 Year 1 & 2 Year 3 $31,250.00 $32,553.00 $95,053.00 $28,780.00 $31,035.00 $88,595.00 $25,300.00 $26,355.00 $76,955.00 $23,990.00 $25,815.00 $73,795.00 $22,400.00 $23,334.00 $68,134.00 $26,335.00 $28,390.00 $81,060.00 $2,520.00 $2,625.00 $7,665.00 $5,260.00 $5,650.00 $16,170.00
$247,807.00 $259,620.00 $82,602.33
$247,807.00 $61,951.75
$309,758.75
Method of Payment (P-card/ACH) FOB Delivered Expiring Contract Price Limitation
3 years w/option to extend for two years
Statewide
33 Green Street, Concord 29 Hazen Drive, Concord 281 North State Street, Concord
11 Institute Drive, Concord
N/A
Bid Description
RFB#
Agent Name
Cleaver Brooks Boiler Preventative Maintenance and Repair Services
2922-24 Jonah Rosa
Term Total
Industrial Steel & Boiler Services, Inc.
Statewide Contract or Amendment
P-37 Checklist Complete D&B Report Attached
Price Limitation Term of Contract
Number of Solicitations Received Number of Sourced bidders Number of NIGP Vendors Sourced Number of non-responsive bidders
Sub Total
Blake Thermal Sales and Service Inc.
Address
Special Notes:
Recommendation Summary
6/27/2024 @ 9:00 am
Recommended price limitation Add allowance for balance of product line
Estimated term spend
$309,758.75
Statewide Contract
N/A - new contract Yes Both Yes Yes
Estimated annual spend
Term Total
Page 1/1
RFB Bid Tabulation
File details come from the government source that posted it. Updated .