bid-2922-24-award.pdf

PDF 123 KB Posted

Attached to
CONTRACT: Cleaver Brooks Boiler Preventative Maintenance and Repair Services
Solicitation number
Bid 2922-24
Issued by
Merrimack County, New Hampshire

About this file

This is a Bid Summary and Award document issued by the State of New Hampshire's Division of Procurement Support Services for Cleaver Brooks Boiler Preventative Maintenance and Repair Services (RFB #2922-24). The procurement encompasses comprehensive steam heating system maintenance and inspection services for multiple state facilities located in Concord, including the Department of Corrections, Department of Health and Human Services, and various Administrative Services buildings at 33 Green Street, 29 Hazen Drive, 281 North State Street, and 11 Institute Drive. Required services include annual preventative maintenance, boiler draining and inspection, safety control testing, equipment tuning for optimal efficiency, and detailed written reports following each service visit. The bid closing and award date was June 27, 2024, at 9:00 AM. The contract term is three years with an option to extend for two additional years. Two sourced bidders were selected for evaluation, and one non-responsive bid was received.

Industrial Steel & Boiler Services, Inc. was awarded the statewide contract with a recommended total term price of $309,758.75, comprised of $247,807.00 for Years 1 and 2 annually and $259,620.00 for Year 3 annually. Alternative bidders included Blake Thermal Sales and Service Inc. at $82,602.33 estimated annual spend and Cleaver Brooks at higher annual rates of $31,250.00 for Years 1 and 2 and $32,553.00 for Year 3. The method of payment is through P-card or ACH, with FOB delivery terms. This is designated as a new statewide contract with no incumbent vendor noted. The procurement checklist was completed, and a Dun & Bradstreet report was attached to the award documentation.

View the file

Other files

File Type Posted
attachment_1_bid_2922_24.xlsx XLSX spreadsheet
attachment_2_bid_2922_24.pdf PDF
attachment_5_bid_2922_24.pdf PDF
bid_2922_24.pdf PDF
Addendum_1_bid_2922_24.pdf PDF
attachment_4_bid_2922_24.pdf PDF
attachment_3_bid_2922_24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Procurement Support Services Bureau of Purchase Property

RFB Bid Summary

Gary S. Lunetta Director

(603) 271-2201

Agency

Requisition# Bid Closing

Indicates Award:

Annual Rate Annual Rate Annual Rate Annual Rate Year 1 & 2 Year 3 Year 1 & 2 Year 3 $31,250.00 $32,553.00 $95,053.00 $28,780.00 $31,035.00 $88,595.00 $25,300.00 $26,355.00 $76,955.00 $23,990.00 $25,815.00 $73,795.00 $22,400.00 $23,334.00 $68,134.00 $26,335.00 $28,390.00 $81,060.00 $2,520.00 $2,625.00 $7,665.00 $5,260.00 $5,650.00 $16,170.00

$247,807.00 $259,620.00 $82,602.33

$247,807.00 $61,951.75

$309,758.75

Method of Payment (P-card/ACH) FOB Delivered Expiring Contract Price Limitation

3 years w/option to extend for two years

Statewide

33 Green Street, Concord 29 Hazen Drive, Concord 281 North State Street, Concord

11 Institute Drive, Concord

N/A

Bid Description

RFB#

Agent Name

Cleaver Brooks Boiler Preventative Maintenance and Repair Services

2922-24 Jonah Rosa

Term Total

Industrial Steel & Boiler Services, Inc.

Statewide Contract or Amendment

P-37 Checklist Complete D&B Report Attached

Price Limitation Term of Contract

Number of Solicitations Received Number of Sourced bidders Number of NIGP Vendors Sourced Number of non-responsive bidders

Sub Total

Blake Thermal Sales and Service Inc.

Address

Special Notes:

Recommendation Summary

6/27/2024 @ 9:00 am

Recommended price limitation Add allowance for balance of product line

Estimated term spend

$309,758.75

Statewide Contract

N/A - new contract Yes Both Yes Yes

Estimated annual spend

Term Total

Page 1/1

RFB Bid Tabulation

File details come from the government source that posted it. Updated .