attachment_3_bid_2922_24.pdf

PDF 175 KB Posted

Attached to
CONTRACT: Cleaver Brooks Boiler Preventative Maintenance and Repair Services
Solicitation number
Bid 2922-24
Issued by
Merrimack County, New Hampshire

About this file

This document is a Scope of Services for a Request for Bids (RFB) 2922-24 for Cleaver Brooks Boiler Maintenance and Repair Services for the Department of Health and Human Services, Central Facilities Bureau in Concord, New Hampshire. The contractor will be responsible for providing steam heating system maintenance and inspection services for three Cleaver Brooks boilers and associated equipment located at 29 Hazen Drive. This includes draining, inspecting, and flushing the boilers, replacing worn parts, testing safety controls, tuning the boilers for optimal efficiency, and providing written reports. The contractor must use mechanics certified to repair and maintain Cleaver Brooks steam boiler systems. The state will provide lockout/tagout, scheduling the state boiler inspector, operating the condensate return and feedwater systems, and ensuring a full steam load is available for tuning the boilers.

The contract does not include specific pricing terms, set-asides, or funding details. Replacement parts must be new and of the same quality as the original equipment. The contractor must provide a written summary of the work performed after each scheduled or emergency service call and obtain the contracting officer's signature.

View the file

Other files

File Type Posted
bid-2922-24-award.pdf PDF
attachment_1_bid_2922_24.xlsx XLSX spreadsheet
attachment_2_bid_2922_24.pdf PDF
attachment_5_bid_2922_24.pdf PDF
bid_2922_24.pdf PDF
Addendum_1_bid_2922_24.pdf PDF
attachment_4_bid_2922_24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3: Scope of Services RFB 2922-24 Cleaver Brooks Boiler Maintenance and Repair Services

Contractor Initials: _______

Date: __________

1. The Contractor shall provide “steam heating system maintenance and inspection services” for Cleaver Brooks boilers and associated steam heating system equipment located at 29 Hazen Drive, Concord, NH for the Department of Health and Human Services, Central Facilities Bureau.

2. The term “steam heating system maintenance and inspection services” as used above shall include providing all supervision, materials, equipment, labor, and transportation necessary for the successful completion of the work under the terms and conditions contained herein. The equipment covered by this agreement is as follows:

Boiler Model Serial Date Input Nat. Gas Manifold gas pres.

Max Pressure

1 CBLE-200-200-150ST T2587-1-1 2011 8165000 btu/hr 7.6 in.wc 150 2 CB-500-200 L-63154 1978 8,369,000 btu/hr 150 3 CB-558-200 L-52858 1971 8,369,000 btu/hr 150

Kunkle Relief Valve Size Capacity KUN6010GFE01 6010GFW01AAM 1-1/4” x 1-1/2” MxF 3,593 LBS/HR @ 125 PSIG KUN6010HGE01 6010HGE01AAM 1-1/2” x 2” MxF 5,598 LBS/HR @ 125 PSIG

Note: Two valves each for each boiler.

2.1. One valve on each boiler shall be replaced every two years are required.

3. The term “steam heating system maintenance and inspection services,” as used above shall mean inspecting and servicing the equipment list above as described herein according to manufacturer’s recommendations.

3.1. Summer Maintenance (before end of May):

3.1.1. Drain and open boilers fire and waterside for inspection.

3.1.2. Inspect pressure vessel for cracks, visible corrosion, and scale.

3.1.3. Inspect attaching mechanisms.

3.1.4. Inspect boiler for any visible signs of hot spots and discoloration.

3.1.5. Inspect fireside of boilers, clean heat exchanger surfaces as needed to be free of soot.

3.1.6. Inspect the refractory and insulation for wear.

3.1.7. Open waterside manholds and handholds for inspection.

3.1.8. Inspect and flush water side of boilers with water.

3.1.9. Have boiler opened and available for inspection by State boiler inspector.

3.1.10. Replace water column and gauge glass for wear and etching.

3.1.11. Open and inspect internals of low water cutoff equipment.

3.1.12. Provide fireside and waterside gaskets.

3.1.13. Reseal boiler access panels both fireside and water side.

3.1.14. Blow down the gauge glass & assembly.

3.1.15. Inspect and flush pressure control tree as needed.

3.1.16. Perform a low drain test of low water cutoff.

3.1.17. Perform ASME Gas Train Safety Test on Gas Valves

3.1.18. Test operation of safety controls.

3.1.19. Test flame failure detection system for pilot & main fuels.

Attachment 3: Scope of Services RFB 2922-24 Cleaver Brooks Boiler Maintenance and Repair Services

Contractor Initials: _______

Date: __________

3.1.20. Test flame failure safety shutdown timing.

3.1.21. Test fuel train interlocks.

3.1.22. Test temperature/pressure interlocks.

3.1.23. Test operating and high limit control functionality.

3.1.24. Test trial for ignition and full sequence timing.

3.1.25. Inspect the feed water valve and controls for proper operation.

3.1.26. Inspect blowdown valve and equipment for leakage and wear.

3.1.27. Set Boiler Combustion and Record Results

3.1.28. Shipco Feedwater System:

3.1.28.1. flush surfaces, level controls and blowdown column.

3.1.28.2. Inspect anode. Replace, if necessary, with State supplied anode

3.1.28.3. Provide gaskets and close

3.1.28.4. Test operation of water level control system.

3.1.28.5. Feeedwater tank online.

3.2. Winter Maintenance (before end of December):

3.2.1. Tune boilers for optimum efficiency and provide written report of combustion results for each boiler.

4. The Contractor shall, in performing the services as described herein utilize mechanics certified to repair and maintain Cleaver Brooks steam boilers systems and associated equipment and controls.

5. All replacement parts shall be new and of the same quality and brand name as that being replaced. All supplies such as oils and gaskets shall be as specified by the equipment manufacturer. Substitutions will be permitted only with prior authorization of the Contracting Officer or his designated representative.

6. The Contractor shall, after each scheduled or emergency call and before leaving the job site, present a written summary of the work performed and obtain the contracting officer’s signature thereon.

7. The State will:

7.1. Shut down and cool the steam heating equipment prior to Contractor’s arrival.

7.2. Lockout and tag out all equipment.

7.3. Schedule State boiler inspector.

7.4. Operate condesate Return System and boiler feedwater system

7.5. Be able to provide full steam load to tune boilers.

7.6. Examine any documents submitted by the Contractor and rendering decisions pertaining there to promptly to avoid delay in the progress of the Contractor’s work.

1. The Contractor shall provide “steam heating system maintenance and inspection services” for Cleaver Brooks boilers and associated steam heating system equipment located at 29 Hazen Drive, Concord, NH for the Department of Health and Human Services,...
2. The term “steam heating system maintenance and inspection services” as used above shall include providing all supervision, materials, equipment, labor, and transportation necessary for the successful completion of the work under the terms and cond...
3. The term “steam heating system maintenance and inspection services,” as used above shall mean inspecting and servicing the equipment list above as described herein according to manufacturer’s recommendations.
4. The Contractor shall, in performing the services as described herein utilize mechanics certified to repair and maintain Cleaver Brooks steam boilers systems and associated equipment and controls.
5. All replacement parts shall be new and of the same quality and brand name as that being replaced. All supplies such as oils and gaskets shall be as specified by the equipment manufacturer. Substitutions will be permitted only with prior authorizati...
6. The Contractor shall, after each scheduled or emergency call and before leaving the job site, present a written summary of the work performed and obtain the contracting officer’s signature thereon.
7. The State will:

File details come from the government source that posted it. Updated .