BAA-10-RD-01-CALL 0007 Attach 4 CDRLs.pdf
PDF 223 KB Posted
- Attached to
- SUPER Novel Optically diVerse Applications (SUPERNOVA) Federal contract opportunity
- Solicitation number
- BAA-10-RD-01
About this file
CALL 0007 - ATTACH 4
View the file
Other files for this federal contract opportunity
Show all 50
SUPER Novel Optically diVerse Applications (SUPERNOVA) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A
CONTRACT DATA REQUIREMENTS LIST (Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commends regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that, notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO
NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. .... : 0002 D. SYSTEM/ITEM .... : CORA
B. EXHIBIT .................................... : A E. CONTRACT/PR NO. : TBD
C. CATEGORY .............................. : OTHER F. CONTRACTOR ... : TBD
1. DATA ITEM NO. ...................... : A002
2. TITLE OF DATA ITEM ........... : Presentation Material
3. SUBTITLE ................................. :
4. AUTHORITY............................. : DI-ADMN-81373 (Tailored)
5. CONTRACT REFERENCE ..... : :
6. REQUIRING OFFICE .............. : AFRL/RDS 9. DIST. STATEMENT REQUIRED .... : C (See Block 16) 12. DATE OF FIRST SUBMISSION: (See Block 16)
7. DD 250 REQ ............................... : LT 10. FREQUENCY ..................................... : (See Block 16) 13. DATE OF SUBSEQUENT SUBM.: (See Block 16)
8. APP CODE ................................. : N/A 11. AS OF DATE ...................................... : (See Block 16)
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL RDS 1
ACO Lt
AFRL RDK PCO Lt
AFRL RDSM 1
15. TOTAL: 2
16. REMARKS
BLK 4: Contractor format, upon approval of RDS Program Manager, acceptable. The most current version of the Data Item Description is to be used.
BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors ; Critical Technology; Nov 1, 2011 Other requests for this document shall be referred to the Air Force Research Lab RDS, 3550 Aberdeen Dr. SE, Kirtland AFB, NM 87113.
EXPORT CONTROL WARNING: All technical data must be marked as follows: ―WARNING – This document contains technical data whose export is restricted by the Arms Export Control
Act (Title 22, U.S.C., Sec. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et seq. violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.‖
Presentation material shall be marked with the appropriate distribution statement and any restrictive legends that apply. If restrictive legends are not evident, the data may be treated as unrestricted
BLKS 10, 12, 13: As required by Govt Program Manager, Technical Interchange meetings to be held at the location designated by assigned Govt Program Manager, and will be to support program, technical and financial reviews. Copies of presentation material will be provided after the meeting.
BLK 14: An electronic copy of the presentation shall be delivered. One CD-ROM (CD-R), properly labeled, is an acceptable media for submittal. The most current version of MS Word or
PowerPoint shall be used. Submission via unencrypted or unsecure email is not permitted.
17. PRICE GROUP: 18.ESTIMATED TOTAL PRICE:
G. PREPARED BY:
Michael Mendoza
I. APPROVED BY: KIM KINIFICK
H. DATE: 11/01/2011 J. DATE: 1 Nov 11
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 5 Pages
BAA-10-RD-01 Call 0007 Solicitation: Attachment 4
Exhibit A to the Contract
CONTRACT DATA REQUIREMENTS LIST (Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commends regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that, notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO
NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. .... : 0002 D. SYSTEM/ITEM .... : CORA
B. EXHIBIT .................................... : A E. CONTRACT/PR NO. : TBD
C. CATEGORY .............................. : OTHER F. CONTRACTOR ... : TBD
1. DATA ITEM NO. ...................... : A003
2. TITLE OF DATA ITEM ........... : Status Report
3. SUBTITLE ................................. :
4. AUTHORITY............................. : DI-MGMT-80368A/T
5. CONTRACT REFERENCE ..... : :
6. REQUIRING OFFICE .............. : AFRL/RDS 9. DIST. STATEMENT REQUIRED: C (See Block 16) 12. DATE OF FIRST SUBMISSION: (See Block 16)
7. DD 250 REQ ............................... : LT 10. FREQUENCY .............................. : (See Block 16) 13. DATE OF SUBSEQUENT SUBM.: (See Block 16)
8. APP CODE ................................. : N/A 11. AS OF DATE ................................ : (See Block 16)
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL RDS 1
ACO Lt
AFRL RDK PCO 1
AFRL RDSM 1
15. TOTAL: 3
BLK 4: Contractor format, upon approval of RDS Program Manager, acceptable. The most current version of the Data Item Description is to be used. Tailoring of DID requirements:
Report to include program and financial Status and performance. In addition, if so requested by assigned Govt Program Manager to include: Scientific and Technical reporting for journal articles; conference proceedings; and/or documentation of technical progress.
BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors ; Critical Technology; Nov 1, 2011. Other requests for this document shall be referred to the Air Force Research Lab/RDS 3550 Aberdeen Dr. SE, Kirtland AFB NM, NM 87113.
EXPORT CONTROL WARNING: All technical data must be marked as follows: ―WARNING – This document contains technical data whose export is restricted by the Arms Export Control
Act (Title 22, U.S.C., Sec. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50,U.S.C. App 2401 et seq. violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.‖
Reports shall be marked with the appropriate distribution statement and any restrictive legends that apply. If restrictive legends are not evident, the data may be treated as unrestricted
BLK 10: Monthly
BLK 12, 13: Provide monthly status reports (to include technical and cost /financial performance data by AFRL/RDS approved format) NLT fifteen (15) calendar days following the close of the contractor’s monthly accounting period through completion of the award technical period of performance. The first report is due after the first full month of performance of each award.
Provide summary quarterly status reports NLT fifteen (15) calendar days following the end of each quarter through completion of the award technical period of performance. The first report is due after the first full quarter of performance of each award.
BLK 14: An electronic copy of the report shall be delivered to RDS, RDSM and the COR. One CD-ROM (CD-R), properly labeled, is an acceptable media for submittal. One paper copy of the report shall be delivered to AFRL/RDKB. The most current version of MS Word shall be used. Submission via unencrypted or unsecure email is not permitted.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
G. PREPARED BY:
Michael Mendoza
I. APPROVED BY: KIM KINIFICK
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 5 Pages
D. CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: CORA
E. CONTRACT/PR NO. TBD
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A001
2. TITLE OF DATA ITEM............: COMPUTER SOFTWARE END ITEMS
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-MCCR-80700 (Tailored)
5. CONTRACT REFERENCE......:
6. REQUIRING OFFICE..............: AFRL/RDS.
7. DD250 REQ................................: Lt
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Block 16
10. FREQUENCY......................................: See Block 16
11. AS OF DATE........................................: See block 16
12. DATE OF FIRST SUBMISSION: See Block 16
13. DATE OF SUBSEQUENT SUBM.: See Block 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DraftDr af Final
ACO Lt Lt
AFRL/RDK PCO Lt Lt
AFRL/RDSM 1 1
15. TOTAL: 1 1
BLOCK 4: TAILORING: The required software documentation shall include appropriate documentation/source/object and executables as well as operation guidance and algorithms developed under this contract effort. CONTRACTOR FORMAT IS PREFFERRED.
BLOCK 9: All documentation shall be marked I.A.W. DoDD 5230.24 using the DISTRIBUTION STATEMENT “F” and EXPORT CONTROL WARNING:
DISTRIBUTION STATEMENT: Further dissemination only as directed by Air Force Research Laboratory /RDSM 4600 Randolph Ave SE, (Bldg 760) Kirtland AFB, NM 87117-577; (as determined 10/31/2011) or higher DoD authority. Critical Technology; 31 Oct 2011.
EXPORT CONTROL WARNING: All Technical data must be marked as follows: ―WARNING – This document contains technical data whose export is restricted by the Arms Export
Control Act (title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended (Title 50, U.S.C., App. 2401, et. seq.). Violations of these export law are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.‖
.BLOCKS 10, 12, and 13: The contractor shall submit the draft source code, executables, and associated documentation 10 days after completion. The government will provide comments within 10 days. The contractor shall provide the final version 30 days after completion.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Michael Mendoza I. APPROVED BY: KIM KINIFICK
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 5 Pages
E. CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: CORA
E. CONTRACT/PR NO. TBD
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A004
2. TITLE OF DATA ITEM............: Scientific and Technical Report and Checklist
3. SUBTITLE..................................: Final Report
4. AUTHORITY.............................: DI-MISC-80711A
5. CONTRACT REFERENCE......:
6. REQUIRING OFFICE..............: AFRL/RDS
7. DD250 REQ................................: DD
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Block 16
10. FREQUENCY......................................: See Block 16
FINAL CRC
AFRL RDK PCO Lt Lt
AFRL RDS 1 1
AFRL RDSM PM 1 1
15. TOTAL: 2 2
THE REPORT WILL BE PUBLISHED WITH THE DEFENSE TECHNICAL INFORMATION CENTER (DTIC) BY AFRL STINFO OFFICE. Under no circumstances shall the contractor submit either the final report or the camera-ready technical report to DTIC.
Blk 4: GUIDANCE FOR PREPARATION OF THE REPORT: The Scientific and Technical Report shall be prepared I.A.W. the most current AFRL ANSI/NISO Standard Z39.18-2005 located at:
http://www.kirtland.af.mil/prs The contractor shall complete and submit an SF 298 Report Documentation Page, with the final report. The SF 298 is available at:
http://www.kirtland.af.mil/shared/media/document/AFD-070425-037.doc. The contractor shall complete the following blocks of the SF298: Blocks 2-5a, 6, 7, 8 and 13 (if applicable), 14-16c.
The contractor shall complete and sign the most current AFRL Form 25, AFRL Quality Final Technical Report Checklist, and submit it with the final report. The checklist is available at: http://www.kirtland.af.mil/prs. If the completed and signed AFRL Form 25 does not accompany the final report, the deliverable is considered incomplete. Incomplete final reports will be immediately returned to the contractor. Following AFRL technical and STINFO reviews, any revisions required will be returned to the contractor.
The contractor shall deliver editable electronic copies of the final report. The electronic copies shall be an editable .pdf file and the most current version of Microsoft Word. A
CD-ROM (CD-R) is the acceptable media for submittal. (CD-RWs are not acceptable.) Electronic media shall be marked IAW the AFRL ANSI/NISO Standard Z39.18-2005 guidelines.
Submission via unencrypted or unsecure email is not permitted.
Blk 7: Submit Final Report with letter of transmittal and the DD 250 to the designated project manager. In preparing the final DD 250 for the contract, code the shipment number with a ―Z‖.
Blk 9: All technical data containing unlimited rights data (including electronic media) shall be marked I.A.W. DoDD 5230.24 with Distribution Statement F : Distribution authorized, but only as directed by AFRL/RDSM; Program Manager AFRL/RDSM requires aspects of this effort which contain critical technology, to remain controlled under AFRL/RDSM discretion.. [author fill in date of report (ddmmmyy)]. Other requests for this document shall be referred to AFRL/RDS, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776. ADD THIS ENTIRE
DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF298.
Blk 9: EXPORT CONTROL WARNING: All technical data (including electronic media) shall be marked as follows: ―WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.‖
All technical data (including electronic media) shall be marked with the following statement: ―DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.‖
Blks 10 - 13: The contractor shall deliver the Scientific and Technical Report, in final format, no later than the date specified in the Schedule. The USAF will review and, if necessary, return the final report with comments no later than the date specified in the Schedule. If the report is returned to the contractor with comments, the contractor shall deliver the camera-ready copy of the report no later than the date specified in the Schedule.
NOTE: Headings in Block 14B, Copies, have been changed. ―Draft‖ is changed to ―Final‖ and ―Final‖ (in second column) is changed to ―CRC‖ (camera-ready copy).
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 5 Pages
F. CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: CORA
E. CONTRACT/PR NO. TBD
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A005
2. TITLE OF DATA ITEM............: Technical Report Test Plan
3. SUBTITLE..................................: Test Plan
4. AUTHORITY.............................: DI-NDTI-80566A
5. CONTRACT REFERENCE......: See Block 16
6. REQUIRING OFFICE..............: AFRL/RDS.
7. DD250 REQ................................: Ltr
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Block 16
10. FREQUENCY......................................: See Block 16
DraftDr af Final
AFRL/RDK PCO Lt Lt
AFRL/RDSM 1 1
http://www.kirtland.af.mil/prs http://www.kirtland.af.mil/shared/media/document/AFD-070425-037.doc http://www.kirtland.af.mil/
15. TOTAL: 1 1
Blk 4: This document or set of documents will consist of a test plan. This test plan shall be approved by AFRL/RDSM prior to executing any of the planned testing and test reports which will document the results of the planned tests. Test Reports, at a minimum, shall document test results based on criteria established in the Test Plan.
Blk 9: All documentation shall be marked I.A.W. DoDD 5230.24 using the DISTRIBUTION STATEMENT “F” and EXPORT CONTROL WARNING:
Blk 9: All technical data containing unlimited rights data (including electronic media) shall be marked I.A.W. DoDD 5230.24 with Distribution Statement F : Distribution authorized, but only as directed by AFRL/RDSM; Program Manager AFRL/RDSM requires aspects of this effort which contain critical technology, to remain controlled under AFRL/RDSM discretion.. [author fill in date of report (ddmmmyy)]. Other requests for this document shall be referred to AFRL/RDS, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776. ADD THIS ENTIRE
DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF298.
EXPORT CONTROL WARNING: All Technical data must be marked as follows: ―WARNING – This document contains technical data whose export is restricted by the Arms Export
Control Act (title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended (Title 50, U.S.C., App. 2401, et. seq.). Violations of these export law are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.‖
.BLOCKS 10, 12, and 13: The contractor shall submit the associated documentation 10 days after completion. The government will provide comments within 10 days. The contractor shall provide the final version 30 days after completion.
H. DATE: 12/01/2011 J. DATE: 2 Dec 11
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 5 Pages
File details come from the government source that posted it. Updated .