Atch_No. 1.docx

DOCX document 63 KB Posted

Attached to
SUPER Novel Optically diVerse Applications (SUPERNOVA) Federal contract opportunity
Solicitation number
BAA-10-RD-01
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Attachment No. 1

View the file

Other files for this federal contract opportunity

Other files attached to SUPER Novel Optically diVerse Applications (SUPERNOVA), newest first.
File Type Posted
CALL_0011_ORCA_Q A_3.pdf PDF
CALL_0012_Questions_ _Answers_(2).docx DOCX document
CALL_0011_ORCA_Q A_1.pdf PDF
Attach_1a_BASIC_SOO.docx DOCX document
Attach_7_Government_Furnished_Property_Listing.xls XLS spreadsheet
Attach_1b_TO1_SOO.docx DOCX document
Attach_1d_TO3_SOO.docx DOCX document
Attach_4_Represenstations_and_Certifications.docx DOCX document
Attachment_4_-_Cost_Proposal_Instructions_NON-APC.pdf PDF
Attachment_2_-_Thermal_SSA_CDRLS.pdf PDF
Attach_5_BAA_Proposal_Content_Checklist.doc DOC document
Attach_1_SOO_CASE.docx DOCX document
Attach_2_CDRLS_JAN_08_2015_V3.doc DOC document
Attachment_6_-_Represenstations_and_Certifications.docx DOCX document
Attach_3_DD_Form_254.pdf PDF
BAA_CALL_0010_11_March_2015.pdf PDF
Cost_Proposal_Instructions_(Non-APC)_Jun_2014.docx DOCX document
Cost_Proposal_Instructions_APC_BAAs-SBIRs(Apr_13).docx DOCX document
BAA_Reps_and_Certs.docx DOCX document
BAA_Proposal_Content_Checklist.doc DOC document
STAB-C Amend01.docx DOCX document
Atch_No. 2.doc DOC document
BAA-10-RD-01-CALL 0008 CALL0008_SSA_SAR_BAA Final - 4.5.12.docx DOCX document
BAA-10-RD-01-CALL 0008 Attach 4 CDRLs A001-A005.doc DOC document
BAA-10-RD-01-CALL 0007 Attach 4 CDRLs.pdf PDF
BAA-10-RD-01-CALL 0007 Attach 3 BAA Reps and Certs.docx DOCX document
BAA-10-RD-01-CALL 0007 Attach 5 GFP Scanned w ltr.pdf PDF
BAA-10-RD-01-CALL 0007 Attach 6 DD 254 dtd DEC072011a.pdf PDF
UpdatedCDRL Package SUPERNOVA CALL.doc DOC document
CDRL Package SUPERNOVA CALL.doc DOC document
Attachment No. 3.docx DOCX document
Attachment No. 2.docx DOCX document
AttachmentNo. 1.doc DOC document
Attachment No. 4.doc DOC document
CPI - FAR-AFPAC 2 Nov 10.docx DOCX document
Atch_3.docx DOCX document
Atch_1.doc DOC document
Atch_5.pdf PDF
SUPERNOVACALL5.doc DOC document
Atch_3.pdf PDF
attch_3.pdf PDF
Attachment 3_Proposal Content Checklist.doc DOC document
Attachment 1_Cost Proposal Instruction - FAR Contracts.doc DOC document
SUPERNOVA CALL 0003 TOPIC AREA 2 Advanced Sensors and Laser Intelligence.docx DOCX document
Attachment 2_BAA Reps and Certs —
atch_1-Proposal Content Checklist.pdf PDF
atch_4-CDRLs.pdf PDF
call_2.pdf PDF
atch_4-CDRLs.pdf PDF
atch_2.pdf PDF
Show all 50

SUPER Novel Optically diVerse Applications (SUPERNOVA) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Det 8, AIR FORCE RESEARCH LABORATORY AFRL/PK

(FAR CONTRACTS)

1. Offerors shall:

a. Ensure the attached DET 8 AFRL Air Force Adequacy Checklist (AFPAC) be completed and submitted as part of your proposal. In addition, it is highly recommended that you flow this checklist to your subcontractors/affiliates where certified cost and pricing data is required and that you use the elements of the AFPAC to evaluate the adequacy of a subcontractor/affiliate proposal.

You are advised that the contracting officer may determine costs associated with revising/reworking inadequate cost proposals as unreasonable, and must consider the nature and extend of any proposal inadequacies when assessing/negotiating profit.

b. Prepare and submit cost or pricing data and supporting attachments in accordance with Table 15-2 of FAR 15.408. Further, the offeror shall (1) include the attached Air Force Proposal Adequacy checklist (AFPAC) in pre-submission proposal quality reviews, and (2) furnish the completed checklist as part of their proposal submission.

c. Provide these Cost Proposal Instructions to all subcontractors. Proprietary subcontractor data may be submitted directly to the Government in accordance with Proposal Preparation Instructions in this announcement.

d. Furnish Tables 1 thru 4 (examples attached) for the entire performance period (supported by rationale required by paragraph 2) in hard copy and on CD as IBM PC compatible, Microsoft Excel, to include all cell formulas. Include a separate Cost Element Summary by Offeror Fiscal Year (OFY) for the basic and each option or task order as proposed. Identify when the OFY begins and ends.

e. Ensure that all rate data and estimating factors used in the proposal have been submitted for review to the cognizant Defense Contract Audit Agency (DCAA) and Defense Contract Management Agency (DCMA) prior to cost proposal submission.

f. Provide copies of recent audits or Forward Pricing Rate Recommendations (FPRRs), Forward Pricing Rate Agreements (FPRAs) etc. to support proposed rates and factors and evidence to support the adequacy of accounting, estimating, and purchasing systems as applicable.

g. Provide the following information as the first page of the proposal for the Prime and Each Subcontractor.
i.Name, title, telephone and fax numbers and e-mail address of offeror’s point of contactii.Amount proposed for basic effort and each option
iii.Name, address and telephone number of the cognizant DCMA and DCAA officesiv.Name, title, signature of authorized representative
v.Date offer is submitted and expiration date of offer
vi. DUNS Number
vii. CAGE Code

2. Using the format in Table 1, submit a cost element summary by major cost element by OFY for each contract line item (CLIN) (i.e. basic period of performance and each option (if applicable) and/or Task, etc.). The detail required for each major cost element is described below. Address all cost elements applicable to the proposed effort and provide a narrative to support the basis of estimate.

a. Direct Labor. As part of Table 1, list the proposed hours, rates, and calculated amounts for each direct labor category by OFY, by CLIN. As part of the basis of estimate narrative, provide rationale for proposed hours and labor mix, and provide the base labor rates for each category. Identify the source of the base rates and explain the methodology used to project each rate for subsequent years. If applicable, identify the proposed escalation factors applied to future estimates and rationale for the proposed factors.
Note: If temporary or part-time labor is proposed, explain the differences between the pay rates for full-time and temporary or part-time workers, and the impact of those differences on the direct rates proposed. Identify all uncompensated labor (straight time and/or overtime) included in this cost element, and explain the impact of uncompensated time on direct rates proposed.

b. Indirect Cost Rates and/or Factors. As part of Table 1, list the proposed base, rate/factor and calculated amount for each indirect cost by OFY, by CLIN. As part of the basis of estimate narrative, identify all indirect cost rates/factors (such as fringe benefits, labor overhead, material overhead, G&A, Cost of Money (COM), etc.) and applicable allocation bases by OFY. If composite rates are used, provide the calculations used in deriving the composite rates. Identify the basis of proposed rates (e.g., FPRA and date of agreement, bidding rates and submission date, actual rates and effective date, billing rates and approval date, etc.).

c. Subcontracts/Interorganizational Transfers (IOTs). As part of Table 1, list each subcontractor/IOT cost separately by OFY by CLIN. Obtain fully disclosed cost proposals from each subcontractor and IOT (those actually performing labor hours) using the same cost element breakout required for Table 1 by OFY for each CLIN. Provide a list of anticipated subcontractors/IOTs using Table 2. As part of the basis of estimate narrative, IAW FAR 15.404-3(b) perform and provide evaluation results of cost/price analysis for each subcontract proposal. If subcontractors were selected on a sole-source basis, provide the rationale for this decision. Differences between the subcontractor/IOT proposed amounts and the prime contractor proposed amounts must be fully explained. If decrement factors are used, explain their development and application. If the proposed subcontractor’s fee rate is higher than the Prime’s fee, provide rationale as to why the subcontractor’s risk is greater than the Prime’s. NOTE: Fully disclosed Subcontractor/IOT proposals (including Tables 1 thru 4) are due by the closing date identified in this announcement.

In accordance with FAR 52.215-22, Limitations on Pass-Through Charges - Identification of Subcontract Effort: The contractor shall utilize Table 2 to identify the cost of work to be performed by each subcontractor by contract or task order as applicable. If the offeror subcontracts more than 70 percent of the total cost of work to be performed the contractor must comply with the requirements of the provision.

d. Material/Equipment. As part of Table 1, list material/equipment costs by OFY by CLIN. Using Table 4, provide a consolidated priced summary of individual material/equipment quantities and the basis for pricing (vendor quotes, invoice prices, etc.) by OFY by CLIN. For all items proposed, identify the item and show the source, quantity and price. As part of the basis of estimate narrative, provide information regarding the rationale/methodology used to derive the proposed material/equipment estimate.
e. Travel. As part of Table 1, list travel costs by OFY by CLIN. Using Table 3, separately identify costs for travel including the purpose and number of trips, origin and destination(s), duration, and travelers per trip by OFY by CLIN. Note that Table 3 is a summary format and may be expanded to include more detailed travel rate information and calculations. As part of the basis of estimate narrative, provide a listing of all proposed travel rates (if not already provided as part of Table 3). Provide the basis for the proposed travel rates and rationale for the proposed trips.

f. Other Direct Costs (ODCs). As part of Table 1, list ODC costs by OFY by CLIN. As part of the basis of estimate narrative, separately identify other direct costs to include consultants. Provide rationale for proposed other direct costs. Also, provide the source, quantity, price, and rationale for each of the proposed ODCs. If proposing consultants, provide consultant agreements to validate proposed rates and a determination by the offeror that the rate proposed is comparable to other consultant rates for work of similar nature. Substantiate the need for proposed consultant services.

g. Cost of Money (COM). Reference paragraph 2b above. Also, refer to FAR 52.215-16, Facilities Capital Cost of Money. Provide form CASB-CMF which contains proposed cost of money (COM) factors, if applicable, to include a display of all individual bases for the COM amounts. A DD Form 1861 for each OFY must be submitted if proposing COM.

h. Fee. Reference paragraph 2b above. Identify proposed fee base and rate.
i. New Mexico Gross Receipts Tax (NMGRT). Reference paragraph 2b above. NMGRT may be applicable to the proposed effort. For assistance in determining the extent to which NMGRT may apply and applicable rates, contact the New Mexico Taxation and Revenue Department, 5301 Central Ave., NE, PO Box 8485, Albuquerque, NM 87198, (505) 841-6200, http://www.tax.newmexico.gov/All-Taxes/Pages/Gross-Receipts-Tax.aspx. Identify the cost elements and amounts included in the NMGRT base, if applicable. Demonstrate the method of calculating total tax dollars included in the proposal.

ATCH: Det 8 AFRL AFPAC

TABLE 1

COST ELEMENT SUMMARY

NOTE: THIS IS A SAMPLE TABLE - ALL OFFERORS SHOULD PROPOSE IN ACCORDANCE WITH THEIR APPROVED ACCOUNTING PRACTICES.

COST ELEMENT

OFY 1

BASE

OFY 1

RATE

OFY 1

AMT

OFY 2

BASE

OFY 2

RATE

OFY 2

AMT

TOTAL

BASE

AMOUNT

TOTAL

PROPOSED

AMOUNT

DIRECT LABOR

(List each direct labor category separately.)

XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
TOTAL DIRECT LABOR
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
TOTAL LABOR OVERHEAD
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX

SUBCONTRACTS, IOTS, CONSULTANTS

(List Separately)

XXXX

XXXX
XXXX
XXXX

MATERIAL

XXXX

XXXX
XXXX
XXXX
MATERIAL OVERHEAD
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX

TRAVEL

XXXX

XXXX
XXXX
XXXX

ODCs

XXXX

XXXX
XXXX
XXXX
G&A
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX

SUBTOTAL COSTS

XXXX

XXXX
XXXX
XXXX

COST OF MONEY

(See DD Form 1861)

XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
FEE
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX

TOTAL COST & FEE

XXXX

XXXX
XXXX
XXXX
NMGRT (IF APPLICABLE)
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX

TOTAL PRICE

XXXX

XXXX
XXXX
XXXX

*Submit a cost element summary by OFY for each CLIN, basic, option and each Task Order, as appropriate, for each year of performance.

TABLE 2

SUBCONTRACT/INTERORGANIZATIONAL TRANSFERS & CONSULTANTS

PRICE SUMMARY

SUBCONTRACTOR NAME
SUBCONTRACTOR TASKS**
SUBCONTRACT TYPE
SUBCONTRACTOR QUOTED PRICE
SUBCONTRACTOR COST AS EVALUATED BY PRIME
DIFFERENCE

TOTALS

**Identify Statement of Work or Work Breakdown Structure or provide a narrative explanation as an addendum.

TABLE 3

TRAVEL SUMMARY

OFY
FROM
TO
PURPOSE
# TRIPS
# TRVLRS
# DAYS
TOTAL $

TABLE 4

BILL OF MATERIALS/EQUIPMENT

Item
OFY
Description
Qty
Unit Price
Total Price
Vendor/Source (Company Name, Website URL, Etc)
Basis of Estimate (Quote, PO, Eng Est, Etc.)
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
TOTAL
0

Revised 2 Nov 10

Attachment No. 1 Air Force Proposal Adequacy Checklist (AFPAC)

ITEM #
ITEM DESCRIPTION
FAR

REFERENCE

Y
N

or N/A

PROVIDE EXPLANATION IF EITHER “NO or N/A” (use continuation page if necessary)
PROP REF PG
1
Is there a properly completed first page of the proposal in accordance with Table 15-2 I.A or as specified by the Contracting Officer (CO) in the solicitation?
FAR 15.408, Table 15-2 I.A
2
Is an Index, appropriately referenced, of all cost or pricing data and information accompanying or identified in the proposal, provided?
FAR 15.408, Table 15-2 I.B
3
Are there any exceptions to submission of certified cost or pricing data pursuant to FAR 15.403-1(b)? If so, is supporting documentation included in the proposal? Refer to checklist items 15, 16 and 17.
FAR 15.403-1(b)
4
Does the proposal include EXCEL spreadsheets of all applicable tables, on CD ROM WITH FORMULAS?
5
Is there a TABLE 1 cost element summary by major cost element by Offeror Fiscal Year (OFY) for each contract line item (CLIN) (i.e. basic period of performance and each option (if applicable) and/or Task, etc.). (Breakdowns for each cost element must be consistent with your cost accounting system.)
FAR 15.408, Table 15-2 I.D & E
6
If more than one CLIN (Contract Line Item Number) or sub-CLIN (Sub Line Item is proposed as required by the RFP, are there summary total amounts covering all line items for each element of cost and is it cross-referenced to the supporting cost or pricing data?
FAR 15.408, Table 15-2, I. D & E
7
Is total price by cost element provided by each OFY?
8
Are CLIN prices by cost element provided by each OFY?

Are all cost element breakdowns provided using TABLE 1?

FAR 15.408, Table 15-2

10
Does the proposal reflect all specific requirements established by the CO?
11
If an incentive contract type, is contract geometry included (e.g. contractor proposed target cost, target profit or fee, min/max, ceiling, share ratio)?

MATERIAL

Note
Consolidated Bill of Material (CBOM). A CBOM is a consolidated priced summary of individual material quantities and subcontract items included in the various tasks, orders, or contract line items being proposed and the basis for pricing (negotiated/invoice prices, vendor quotes, average unit pricing, prior purchase history, long term agreements, etc). The offeror’s CBOM shall include estimated raw materials, parts, components, assemblies, subcontracts and services to be produced or performed by others, identifying as a minimum; the item, source, quantity and cost.
12
As part of Table 1 is material/equipment listed by OFY by CLIN?
FAR 15.408, Table 15-2 II A.
12.1
Is there a completed Table 4 priced summary of individual material/equipment quantities and the basis for pricing (vendor quotes, invoice prices, etc.) provided by OFY by CLIN? For all items proposed are the items, sources quantity and prices identified? Is a basis of estimated narrative provided with information regarding the rationale/methodology used to derive the proposed material/equipment estimate?

SUBCONTRACTS (Purchased material or services)

13
Are fully disclosed subcontractor/IOT proposals (Including Tables 1 through 4) submitted to the government by the closing date identified in the RFP?
FAR 15.404-3(c)
13.1
Is Table 2 completed identifying the cost of work to be performed by each subcontractor by contract or task order as applicable
13.2
Does the proposal include the prime contractor’s evaluation and results of cost/price analysis establishing the reasonableness of each subcontract proposals?
FAR 15.404-3(b)
Note
Analyses not provided with the proposal may result in a delay to audit, fact-finding and negotiations. Analyses not included with the proposal shall be provided as soon as possible after the proposal submission date and shall be accomplished in sufficient time to support the definitization/contract award schedule.
13.3
If the subcontractors were selected on a sole-source basis, is the rationale for this decision provided?
13.4
If differences between the subcontractor/IOT proposed amount and prime contractor proposed amounts exist, is the reason for the difference fully explained?
13.5
Are decrement factors development and application fully explained?
13.6
Does the proposal identify those actions where assist audits have been requested by the prime or sub-tier contractors and identify the request date and scheduled receipt date?
Note
The need for assist audits resulting from proprietary data rights assertions at any tier must be identified to the CO as soon as possible in the proposal build cycle. Notwithstanding assist audits performed by the government, contractors must still perform and provide Price/Cost Analysis.

INTERORGANIZATIONAL TRANSFERS

14
For inter-organizational transfers proposed at cost, does the proposal include a complete fully disclosed cost proposal in compliance with Table 15-2 and this checklist?
FAR 15.408, Table 15-2 II.A.(2)
Note
Inter-organizational work is considered to be part of the certified cost or pricing data submission of the prime. As such, the prime contractor’s responsibility for conducting subcontractor Cost/Price Analysis does not apply to inter-organizational transfers. However, prior to the submission of the proposal, the prime contractor shall (a) ensure that all statement of work tasks are addressed without duplication and are consistent with the overall program performance schedule and, (b) ensure ground rules and assumptions are consistent with the prime proposals.
15
For inter-organizational transfers proposed at price in accordance with FAR 31.205-26(e), does the proposal provide an analysis by the prime that supports the exception from certified cost or pricing data in accordance with FAR 15.403-1 (reference checklist items 15, 16, and 17 below)?
FAR 31.205-26(e), FAR 15.403-1

ADEQUATE PRICE COMPETITION

16
Does the proposal support the degree of competition and the basis for establishing the source and reasonableness of price for each subcontract or purchase order priced on a competitive basis exceeding the threshold for certified cost or pricing data?
FAR 15.408, Table 15-2 II.A.(1)

COMMERCIAL ITEM DETERMINATIONS

17
Is the contractor proposing commercial items either at the prime or subcontractor level that would be exempt from certified cost or pricing data requirements?
FAR 2.101,

FAR 15.403-1 (b)(3) or (b)(5)

Note
If you are modifying a commercial item or are providing a modified commercial item, there may be circumstances that require the submission of certified cost or pricing data (see Note to checklist item 17.3 below).
17.1
Has the contractor provided support for prime contractor assertions of commerciality and any subcontractor Commercial Item Determinations (CIDs) addressing, at a minimum, the following:
Note
A subcontractor CID includes the following information/data in addition to the prime contractor’s independent price analysis and conclusion of the subcontractor’s commerciality assertion. (checklist item 17.5.D)
17.2
Has the contractor provided a description of supplies or services and the basis for which the supply or service meets the Government’s requirements?
17.3
Has the contractor specifically identified the type of commercial item claim (FAR 2.101 commercial item sub-definitions (1) through (8)), and the basis on which the item meets the definition?
FAR 2.101
17.4
For modified commercial items (commercial item sub definition) (3); did the contractor classify the modification(s) as either:

A. Of a type customarily available in the commercial marketplace (FAR 2.101 commercial item sub-definition (3)(i)) or

B. A minor modification (FAR 2.101 commercial item sub-definition (3)(ii)) of a type not customarily available in the commercial marketplace made to meet Federal Government requirements not exceeding the thresholds in FAR 15.403-1(c)(3)(iii)(B)? (see note below)

FAR 2.101

FAR 15.403-1

Note
Modifications that do not qualify as “minor” under FAR 2.101 sub-definition (3) or modifications that qualify as “minor” where the total price of all such modifications exceeds the greater of the threshold for certified cost or pricing data (FAR 15.403-4) or 5% of the total price of the contract at the time of contract award are NOT exempt from the submission of certified cost or pricing data. Where the contractor is proposing a modified commercial item, the CO should, in every case, be consulted as soon as possible before the proposal is submitted.
17.5
Technical Assessment: For proposed commercial items “of a type”, or “evolved” or modified (FAR 2.101 commercial item sub-definitions (1) through (3)), did the contractor provide a technical description of the differences between the proposed item and the comparison item(s)?
FAR 2.101
17.6
Price Reasonableness: Has the contractor provided, or made available, data other than certified cost or pricing data to establish price reasonableness of the proposed commercial item (to include any modifications not subject to certified cost or pricing data (ref. Note under checklist item 17.3 above) by supplying:

A. Information/data related to competition (refer to checklist item 15), B. Information/data related to prices (sales data, market price assessments, etc.), C. cost data (cost elemental breakdown and supporting documentation not subject to certification in accordance with FAR 15.406-2), and D. for subcontractor assertions, the prime contractor’s price analysis/price reasonableness determination?

FAR 15.402(a)(2), FAR 15.403-1(c)(3)(ii), FAR 15.403-3(c), FAR 15.404-3(b) FAR 15.404-3(c)

FAR 15.406-2

Note
The preferred method to establish the price reasonableness of commercial items is to obtain commercial sales data. It is recognized that other methods, such as market price assessments data or cost data not subject to certification, are also acceptable when prior sales data cannot be obtained. Sales data must (1) demonstrate sales to the general public, (2) be current and where possible, (3) in like quantities. Items sold to state, local or foreign governments or items sold with applications only to state, local, foreign government or the US government end items, are not considered to be sales to the general public unless the proposed commercial item meets the commercial item definition FAR 2.101 commercial item sub-definition (8).

LABOR

18
As part of Table 1, was a list provided of the proposed hours, rates and calculated amounts for each direct labor category by OFY by CLIN?
19
As part of the basis of estimate narrative was rationale provided for the proposed hours and labor mix? Is the source of the base rates and methodology used to project each rate for subsequent years fully explained? Are the proposed escalation factors applied to future estimates identified and rationale for the proposed factors provided?

OTHER DIRECT COSTS

20
Does the proposal include other direct costs and the basis for pricing by OFY by CLIN? Is there a fully completed Table 3 listing all proposed travel, by basic, each option or task order (as applicable) by OFY? If travel is discretely estimated does the proposal include number of trips, number of people, number of days per trip, locations, and rates (e.g. airfare, per diem, hotel, car rental, etc)? Does the proposal identify the basis for the proposed travel rates and rationale for the proposed trips? If consultants are proposed, does the proposal include a copy of the consultant agreements? Are the proposed consultant rates comparable to other consultant rates for work of similar nature? Is the need for the proposed consultant services substantiated?
FAR 15.408, Table 15-2 II.D

NEW CONTRACTS (INCLUDING LETTER CONTRACTS)

21
Does the proposal identify actual hours, and cost incurred as well as hours/cost to complete and the time phasing associated with these hours/costs? This information/data is to be provided consistent with cost element summaries as identified in checklist item 9.
FAR 15.408, Table 15-2, III

CHANGE ORDERS, MODIFICATIONS AND CLAIMS

22
If the proposal is for a modification or change order, have cost of work deleted (credits) and cost of work added (debits) been provided in the format described in FAR 15.408, Table 15-2.III.B?
FAR 15.408, Table 15-2 III.B

PRICE REVISIONS/REDETERMINATIONS

23
For price revisions/redeterminations, does the proposal follow the format in FAR 15.408, Table 15-2.III.C?
FAR 15.408, Table 15-2 III.C

FACILITIES COST OR MONEY

24
If facilities capital cost of money is proposed, does the proposal include a schedule of COM factors? submission of Form CASB-CMF or reference to an FPRP/FPRA and show the calculation of the proposed amount?
FAR 31.205-10 FAR Table 15-2,II.F

RATES AND FACTORS

25
Does the proposal include all rates and factors by year that are utilized in the development of the proposal and the basis of those rates and factors (FPRA/FPRP)? Identify the official submittal of such rate and factor data.

OTHER

26
Does the proposal identify the location and point of contact for any certified cost or pricing data which is referenced, but not included, in the proposal?
27
Does the proposal disclose the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data?
FAR 15.408, Table 15-2, I.C.(2)(i)
28
Does the proposal disclose the nature and amount of any contingencies included in the proposed price?
FAR 15.408, Table 15-2 I.C.(2)(ii)
29
If Royalties exceed $1,500 does the proposal provide the information/data identified in FAR 15.408, Table 15-2 Paragraph II. E.?
FAR 15.408, Table 15-2 II. E.

w

30
If Economic Price Adjustments are being proposed, does the proposal show the rationale and application for the proposed indices?
FAR 16.203-4(a)(1)
31.1
Is the contractor proposing Performance-Based Payments?
FAR 32.10
31.2
If so, has the contractor provided an expenditure profile, proposed events and their projected dates, proposed values for each event, completion criteria, and identification of which events are severable or cumulative?
FAR 32.10
32
Excessive Pass-through Charges – Identification of Subcontract Effort, if the offeror intends to subcontract more than 70% of the total cost of work to be performed, does the proposal identify: (i) the amount of the offeror’s indirect costs and profit applicable to the work to be performed by the subcontractor(s); and (ii) a description of the added value provided by the offeror as related to the work to be performed by the subcontractor(s)?
FAR 15.408(n) DPAP Memo 23 Dec 2009 (DARS Tracking Number 2009-O0015)
33
Does the proposal explain the basis of all cost estimating relationships (CERs) (labor hrs or material) proposed on other than a discrete basis?
Note
Calculations/formulas/logic made to generate “CER” costs should be presented with proposal.
34
Does the proposal identify the need for government furnished material/tooling/test equipment? Include the lending contract number and CO contact information if known.
FAR 15.408, Table15-2, I A. (7)
35
Does the proposal include identification of any CAS non-compliances, or other estimating deficiencies that may impact the proposed price?
FAR Table 15-2.I.A.(8)

image1.gif

File details come from the government source that posted it. Updated .