B01 75H70122R00050.pdf

PDF 951 KB Posted

Attached to
75H70122R00050 Kyle-Wanblee Sprinkler Projects
Solicitation number
75H70122R00050
Issued by

About this file

This solicitation notice is for a construction project for the Indian Health Service to provide design and installation of fire sprinkler systems at two health centers in South Dakota. The project includes installing a new sprinkler system at the Kyle Health Center and replacing an existing dry sprinkler system at the Wanblee Health Center. The total firm fixed price for the project must be between $250,000 and $500,000. The solicitation will be procured as a 100% small business set-aside under NAICS code 236220 with a size standard of $39.5 million. The performance period is 360 calendar days from notice to proceed. Offerors must submit proposals by the due date indicated on the SF1442 form. The award will be made to the lowest priced technically acceptable offer based on the total firm fixed price.

View the file

Other files

File Type Posted
B05 Amendment 2 Wanblee Health Center Addition.pdf PDF
B05 Amendment 2 Kyle Health Center Addition.pdf PDF
B05 Amendment 2.pdf PDF
B05 Amendment 2 Kyle Hydrant Flow Test.pdf PDF
B05 Amendment 2 Schedule of Submissions.pdf PDF
B05 Amendment 2 Kyle Wet System.pdf PDF
B05 Amendment 1 Drawings Kyle Health Center.pdf PDF
B05 Amendment 1 Drawings Wanblee Health Center.pdf PDF
B05 Amendment 1.pdf PDF
Attachment 7 Appendix B Kyle Sprinkler Riser.pdf PDF
Attachment 2 Wage Determination - Wanblee.pdf PDF
Attachment 11 Appendix F Wanblee Demolition Plan.pdf PDF
Attachment 14 Appendix I Wanblee Existing Fire Suppression Plan.pdf PDF
Attachment 15 WH347 PAYROLL.pdf PDF
Attachment 4 Technical Experience Offeror Worksheet.docx DOCX document
Attachment 1 Wage Determination - Kyle.pdf PDF
Attachment 16 Release of Claims.pdf PDF
Attachment 3 Self Performed Calculation Sheet (Construction).docx DOCX document
Attachment 9 Appendix D Kyle Fire Suppression Plan.pdf PDF
Attachment 13 Appendix H Wanblee Existing Riser Nameplate.pdf PDF
Attachment 12 Appendix G Wanble Sprinkler Riser.pdf PDF
Attachment 8 Appendix C Kyle Existing Riser Nameplate.pdf PDF
Attachment 6 Appendix A Kyle Campus.pdf PDF
Attachment 10 Appendix E Wanblee Campus.pdf PDF
Attachment 5 Past Performance Questionnaire.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

75H70122R00050

TBD

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

Indian Health Service - Seattle Area Office is issuing RFP 75H70122R00050

Project: Kyle & Wanblee Sprinkler Projects

Location(s): Kyle Health Center 1000 Health Ctr Rd, Kyle, SD 57752 & Wanblee Health Center 210 1st St, Wanblee, SD 57577

This RFP is being solicited as 100% Small Business Set Aside under NAICS 236220, Commercial and Institutional Building Construction. Size standard $39.5M. See Section M.

Magnitude of Construction is $250,000.00 to $500,000.00

U.S. Department of Labor Wage Determination: SD20220022 & SD20220017, dated 7/1/2022 are applicable to this solicitation

Site Visit: See FAR 52.236-27, Site Visit Construction.

TERO Contact: Robert Lafferty, TERO Director Oglala Sioux Tribe, see Section B.6

See Item 7

TBD

Thupten Tsering 206-615-2452

GP21KY501C6 & GP21WB500C6

1 4710/27/2022

11/28/2022

12:00PM

FAR 52.211-10

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

B.10

See Item 7 IHS - Great Plains 115 4th Avenue SE, Room 309 Aberdeen, SD 57401

Andrew Hart, Supervisory Contracting Officer

Kyle-Wanblee Sprinkler Projects GP21KY501C6 (Kyle) & GP21WB500C6 (Wanblee) Solicitation No. 75H70122R00050 3

SECTION B. PRICE SCHEDULE

B.1. PRICE SCHEDULE (Offeror fill-in)

The contractor shall provide all labor, materials, supplies, and services to complete work in accordance with the SOW, specifications, drawings, and other documents incorporated into this contract. Proposed prices are considered fully burdened and inclusive of all overhead, profit, taxes, and fees:

CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE

0001 Kyle

General Requirements/Conditions 1 LS Plumbing 1 LS Electrical 1 LS Fire Suppression 1 LS Design 1 LS

0002 Wanblee

General Requirements/Conditions 1 LS Plumbing 1 LS Electrical 1 LS Fire Suppression 1 LS Design 1 LS

Total Firm Fixed Price KEY: LS = Lump Sum

SCHEDULE NOTES

B.2. Definitions: For purposes of this solicitation, the terms Offer, Offeror, or Offerors are synonymous with the terms Bid, Bidder, or Bidders.

B.3. Disclosure of the Magnitude: In accordance with FAR 36.204, this project is estimated to be between $250,000.00 and $500,000.00

B.4. Incidental Payment Items: The intent of this effort is to provide for the complete work of the project described in Section C.

Unless specifically directed otherwise, the contractor shall furnish all labor, materials, equipment, tools, transportation, supplies, and services, and perform all work required to complete the project in accordance with the drawings, specifications, and provisions of the contract. Payment for contract work will be made for and under those pay items included in the Price Schedule (which is the sum total Firm-Fixed Price (FFP) of the contract). All other work and materials will be considered as incidental to and included in the payment for items shown

B.5. Taxes & Fees: Offerors are responsible for allowing for all applicable state, local and tribal (where applicable) taxes and fees within their proposals and to perform their own due diligence in ascertaining them. The contractor is responsible to pay all applicable Tribal fees and/or taxes, or applicable requirements that may be incurred as a result of this project. Failure on the part of the successful Offeror not to include these fees or the appropriate impacts will not constitute a request for an equitable adjustment to the contract price.

B.6. TERO: TERO is applicable. TERO contact: Robert Lafferty (605) 867-5167, rlafferty.osttero@gmail.com

B.7. Pricing Data Submission: In accordance with FAR 15.403-3(a)(ii), Requiring Data Other Than Certified Cost or Pricing Data, the Contracting Officer may request, and offerors must be prepared to submit, pricing data to show a further breakdown of costs for the above CLIN(s). This may be requested so that the determination of a fair and reasonable price can be made by the Contracting Officer. For example, the price breakdown must have the direct labor cost and the direct material cost broken out.

B.8. Wage Determination: Davis-Bacon wages shall be paid for all applicable labor categories for each price schedule line item and should be included in all pricing in accordance with FAR 52.222-6, Construction Wage Rate Requirements. The applicable Wage Determination is included as Attachment 1 in Section J. The most current version of the applicable Wage Determination will be included at time of award.

B.9. HHSAR 352.232-71, Electronic Submission of Payment Requests (Mar 2022): This clause has been added in full text at Section I.

Solicitation No. 75H70122R00050 4

B.10. Other Important Information: Under no circumstances will any oral statements made be binding upon the Government unless such statements or agreements are issued in writing by the Contracting Officer.

Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed within the change and shall immediately notify the Contracting Officer.

END OF SECTION

Solicitation No. 75H70122R00050 5

SECTION C. STATEMENT OF WORK

Solicitation No: 75H70122R00050 Project Name: Kyle-Wanblee Sprinkler Projects Project Location: Kyle and Wanblee Health Centers, South Dakota IHS Project No: GP21KY501C6 (Kyle) & GP21WB500C6 (Wanblee)

1. Project Description The project defined within this Scope of Work is the design and installation of a fire sprinkler system for the Kyle Health Center and the replacement of a dry sprinkler system for the Wanblee Health Center. The Kyle Health Center installation shall include the sprinkler piping, sprinkler heads, sprinkler system components, fire pump, sprinkler riser(s), and all other appurtenances required to install a new sprinkler system in an existing building. The Wanblee Health Center dry sprinkler system replacement shall include new sprinkler piping, new sprinkler heads, dry system components and all other appurtenances required to make the new sprinkler system fully functional. All existing sprinkler piping, and sprinkler components shall be removed and disposed of at the contractor’s expense. Contractor shall install products following all manufacturer’s specifications.

2. Background: The Kyle Health Center had a wet sprinkler system installed in the new addition constructed in 2019. The new fire sprinkler system shall tie into the existing system and provide coverage for the existing area of the building to meet NFPA requirements. The Wanblee Health Center has a dry system and the dry sprinkler piping is 20 years old. The dry piping needs to be removed and replaced and all sprinkler heads changed to be uniform throughout the building.

3. Related Documents

a. This SOW and any other standard government or IHS documents are included and considered a part of this contract.

b. IHS Architecture and Engineering Design Manual – 2019

c. FGI 2018 – Healthcare Facility Design Guide

d. NFPA 101 Life Safety Code – 2012

e. NFPA 99 Health Care Facilities Code - 2012

f. NFPA 70 National Electric Code (NEC) – 2011

g. NFPA 110 Standard for Emergency and Standby Power Systems – 2010

h. ASHRAE 170

i. ASHRAE Fundamentals Handbook 2017

j. NFPA 13 Standard for the Installation of Sprinkler Systems - 2010

k. NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems – 2011

l. NFPA 72 National Fire Alarm and Signaling Code – 2010

m. NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection

4. Common Acronyms or Definitions

a. IHS – Indian Health Service

b. CMS – Centers for Medicare & Medicaid Services

c. KY – Kyle

d. WB - Wanblee

e. CO – Contracting Officer

f. COR – Contracting Officer’s Representative

g. IGCE – Independent Government Cost Estimate

h. BIM – Building Information Model

i. LOD – Level of Design

j. CAD – Computer Aided Design

k. RFI – Request For Information

l. ICRA – Infection Control Risk Assessment

m. PCRA – Pre-Construction Risk Assessment

n. HSPD 12 – Homeland Security Presidential Directive 12

5. Scope of Work (SOW) The contractor shall provide all engineering, design, material, labor, equipment and supervision required to accomplish the following; to include all demo, installation, and clean up for work described below.

a. Design:

Solicitation No. 75H70122R00050 6

i. Kyle Health Center: Contractor shall design a sprinkler system for the remaining portion of the health center. The new sprinkler system shall be tied into the existing sprinkler system riser. Shop drawings shall be signed and sealed by the qualified professional responsible for their preparation. See Appendix E for fire suppression plan. Shop drawings shall be electronically submitted in .pdf format. The shop drawings include the following:

1. All applicable information listed in NFPA 13.

2. An isometric riser diagram of the sprinkler system, existing and new, showing all fittings, valves, and devices.

3. Sprinkler legend on each sheet with a total sprinkler count, coverage type (standard, extended, ect.), SIN, response-type, temperature rating, finish, color, k-factor (where applicable), maximum spacing calculated and used for extended coverage sprinklers (where permitted), and orientation.

4. Where flexible sprinkler drops are used, indicated on the drawings the manufacturer, maximum length, maximum number of bends, and equivalent length used at each location.

5. Sprinkler layout and location throughout the health center.

6. Hydraulic calculations in accordance with NFPA 13.

b. Wanblee Health Center: Contractor shall provide shop drawings of the dry sprinkler system. Shop drawings shall be signed and sealed by the qualified professional responsible for their preparation. Shop drawings shall include the existing wet system for a complete Fire Suppression plan. See Appendix K for fire suppression plan. Shop drawings shall be electronically submitted in .pdf format. The shop drawings include the following:

1. All applicable information listed in NFPA 13.

2. An isometric riser diagram of the sprinkler system, existing and new, showing all fittings, valves, and devices.

3. Sprinkler legend on each sheet with a total sprinkler count, coverage type (standard, extended, ect.), SIN, response-type, temperature rating, finish, color, k-factor (where applicable), maximum spacing calculated and used for extended coverage sprinklers (where permitted), and orientation.

4. Where flexible sprinkler drops are used, indicated on the drawings the manufacturer, maximum length, maximum number of bends, and equivalent length used at each location.

5. Sprinkler layout and location throughout the health center.

6. Hydraulic calculations in accordance with NFPA 13.

Item Duration Period

Contract Award/NTP 0 Start of NTP

Pre-Design Submittal 5 Calendar days after NTP

10% Schematic Design Submittal 7 Calendar days after Pre-Design Submittal

Government Review 5 Calendar days after receipt

65% Construction Documents Submittal 7 Calendar days after 10% review

Government Review 5 Calendar days after receipt

95% Construction Documents Submittal 7 Calendar days after 65% review

Government Review 5 Calendar days after receipt

Final Construction Documents Submittal 5 Calendar days after 95% review

Construction 314 Days

TOTAL CONSTRUCTION DURATION 360 Days

6. Demolition:

a. Wanblee Health Center: Contractor shall demo existing sprinkling piping and appurtenances at the Wanblee Health Center.

Contractor shall ensure all water is drained from the system prior to demolition. Contractor shall access attic and crawlspace using designated entry points. Contractor shall ensure all water is contained while taking the piping apart. Wanblee Health Center sprinkler piping will be removed and disposed of at the contractor’s expense. See Appendix H for demolition plan.

7. Fire Suppression:

a. Kyle Health Center: Contractor shall install fire suppression system per design and shop drawings. Material list will go as followed:

i. Pipe and Fittings:

1. All pipe and pipe fittings shall comply with the materials listed in NFPA 13 and ASTM standards.

Solicitation No. 75H70122R00050 7

a. Grooved end pipe, fittings, couplings, and flanges.

b. Dielectric fittings to be used if applicable.

2. Flexible connectors shall have material suitable for system fluid Include a 175-psig minimum working-pressure rating and ends according to the following:

a. NPS 2 inch or smaller: grooved.

b. NPS 2 ½ inch or larger: flanged.

c. Option for NPS 2 ½ inch or larger: grooved for use with grooved-end-pipe couplings.

d. Stainless steel.

ii. Valves:

1. All valves shall be UL listed, with 175-psig minimum pressure rating.

2. All valves shall be the same manufacture for consistency.

a. Gate valves.

b. Ball valves.

c. Butterfly valves.

d. Check valves.

e. Indicating valves.

iii. Backflow Preventers:

1. Reduced pressure, fire-protection backflow preventers.

2. Standard ASSE 1047 and FMG approved or UL listed.

3. Continuous-pressure application.

4. 12 psig maximum pressure loss.

5. Cast iron with interior lining complying with AWWA C550 or Steel with interior lining complying with AWWA C550.

6. Straight through flow configuration.

7. Flanged end connections.

iv. Drain:

1. Provide a drain valve on the main service, if applicable, and discharge to the exterior.

v. Pressure Gauges:

1. UL listed 3 ½ - to – 4 ½ inch diameter, dial pressure gauge with range 0 to 175 psig.

a. Water system piping: include caption “WATER” on dial face.

b. Date of installation shall be labeled on gauges, month and year.

vi. Sprinklers:

1. Sprinklers shall be UL listed, with 175 psig minimum pressure rating.

2. Sprinklers shall be the same manufacture for consistency.

3. All sprinklers shall be Quick Response.

4. Sprinkler types, features, and options as follows:

a. Recessed sprinklers, including escutcheon.

b. Sidewall sprinklers.

c. Sidewall, dry-type sprinklers.

d. Upright sprinklers.

Solicitation No. 75H70122R00050 8

5. Sprinkler finishes:

a. Finished ceiling: white.

b. Exposed: bronze or brass.

c. Nickel-plated Teflon coating for corrosive environments.

6. Sprinkler Escutcheons:

a. Material, types, and finishes for the following sprinkler mounting applications. Escutcheons for concealed, flush, and recessed-type sprinklers are specified with sprinklers.

b. Ceiling mounting: steel, which one piece, flat.

c. Sidewall mounting: steel, white, one piece, flat.

7. Sprinkler Guards:

a. Wire cage type, including fastening device for attaching to sprinkler. Sprinkler guards shall be listed, supplied, and approved for use with the sprinkler, by the sprinkler manufacturer.

8. Sprinkler Inventory:

a. Inventory of all sprinkler heads shall be completed and submitted with the following information:

i. SIN

ii. General Description – type, coverage, k-factor, orientation

iii. Temperature Rating

iv. Quantity

v. Thread Size

vi. Location

vii. Fire Department Connections:

1. Sprinkler system shall be tied into the existing fire department connection.

viii. Alarm Devices:

1. Alarm device types shall match piping and equipment connections.

2. All alarm devices shall be UL listed.

a. Water flow switch.

b. Pressure switch.

c. Valve supervisory switch.

d. Indicator-post supervisory switch.

e. All devices shall be connected to the existing fire alarm system and contain an address.

ix. Sprinkler Cabinet:

1. Finished, wall mounted, steel cabinet with hinged cover.

2. Include number of spare sprinklers required by NFPA 13 and sprinkler wrench.

3. Provide laminated sprinkler inventory of sprinklers stored in the sprinkler cabinet, in accordance with NFPA 13, and adhere the list to the inside of the cabinet. System Identification:

a. System Identification:

i. Furnish and install metal, engraved signs identifying each sprinkler zone and valve, the area it controls, and the hydraulic design data.

ii. Furnish and install metal, engraved signs identifying the inspectors test connections and which zones they service.

iii. Installation of the hydraulic design information sign and valves shall be in accordance with NFPA 13.

Solicitation No. 75H70122R00050 9

x. Fire Pump (TBD if applicable):

1. Shall be installed per NFPA 20

2. Operating conditions shall vary based on design

3. Pump type shall be designed in design and approved during submittal stage

4. Piping shall be sized per NFPA 20

5. All associated components shall be UL Listed and in accordance with NFPA 20

b. Wanblee Health Center: Contractor shall install fire suppression system per shop drawings. Material list will go as followed:

i. Pipe and Fittings:

1. All pipe and pipe fittings shall comply with the materials listed in NFPA 13 and ASTM standards.

a. Grooved end pipe, fittings, couplings, and flanges.

b. Dielectric fittings to be used if applicable.

2. Flexible connectors shall have material suitable for system fluid Include a 175-psig minimum working-pressure rating and ends according to the following:

a. NPS 2 inch or smaller: grooved.

b. NPS 2 ½ inch or larger: flanged.

c. Option for NPS 2 ½ inch or larger: grooved for use with grooved-end-pipe couplings.

d. Stainless-steel only.

ii. Valves:

1. All valves shall be UL listed, with 175-psig minimum pressure rating.

2. All valves shall be the same manufacture for consistency.

a. Gate valves.

b. Ball valves.

c. Butterfly valves.

d. Check valves.

e. Indicating valves.

iii. Backflow Preventers:

1. Reduced pressure, fire-protection backflow preventers.

2. Standard ASSE 1047 and FMG approved or UL listed.

3. Continuous-pressure application.

4. 12 psig maximum pressure loss.

5. Cast iron with interior lining complying with AWWA C550 or Steel with interior lining complying with AWWA C550.

6. Straight through flow configuration.

7. Flanged end connections.

iv. Drain:

1. Provide a drain valve on the main service, if applicable, and discharge to the exterior.

v. Pressure Gauges:

1. UL listed 3 ½ - to – 4 ½ inch diameter, dial pressure gauge with range 0 to 175 psig.

Solicitation No. 75H70122R00050 10

a. Air system piping: include caption “AIR” and “WATER” on dial face.

b. Date of installation shall be labeled on gauges, month and year.

vi. Sprinklers:

1. Sprinklers shall be UL listed, with 175 psig minimum pressure rating.

2. Sprinklers shall be the same manufacture for consistency.

3. All sprinklers shall be Quick Response.

4. Sprinkler types, features, and options as follows:

a. Recessed sprinklers, including escutcheon.

b. Sidewall sprinklers.

c. Sidewall, dry-type sprinklers.

d. Upright sprinklers.

5. Sprinkler finishes:

a. Finished ceiling: white.

b. Exposed: bronze or brass.

c. Nickel-plated Teflon coating for corrosive environments.

6. Sprinkler Escutcheons:

a. Material, types, and finishes for the following sprinkler mounting applications. Escutcheons for concealed, flush, and recessed-type sprinklers are specified with sprinklers.

b. Ceiling mounting: steel, which one piece, flat.

c. Sidewall mounting: steel, white, one piece, flat.

7. Sprinkler Guards:

a. Wire cage type, including fastening device for attaching to sprinkler. Sprinkler guards shall be listed, supplied, and approved for use with the sprinkler, by the sprinkler manufacturer.

8. Sprinkler Inventory:

a. Inventory of all sprinkler heads shall be completed and submitted with the following information:

i. SIN

ii. General Description – type, coverage, k-factor, orientation

iii. Temperature Rating

iv. Quantity

v. Thread Size

vi. Location

vii. Dry System:

1. Dry-Pipe Valves:

a. UL Listed

b. Differential type

c. Bronze or brass set with Nitrile O-ring seals

d. Single hinge pine and latch design

e. Quick opening devices

f. Trim sets for air supply

g. Drain

Solicitation No. 75H70122R00050 11

h. Priming level

i. Alarm connections

j. Ball drip valves

k. Pressure gauges

l. Priming chamber attachment and fill line attachment

m. Minimum required air pressure is 13 psi with low pressure actuator and 300 psig maximum water pressure rating

n. Valve internal components shall be replaceable without removing the valve from the installed position and shall be externally resettable

o. Valve shall be supplied completely assembled without shutoff valve, pre-set pressure switches, and drain kit

p. Recommended dry system valve is Tyco DPV-1.

2. Air-Maintenance Device:

a. Shall have air pressure switch

b. 175 PSI service pressure

c. UL Listed

d. Field adjustable cut-in and cut-out pressure setting

e. Furnish a Central Accelerator if the dry pipe sprinkler system capacity exceeds 750 gallons.

3. Drum Drip:

a. Contractor shall install a low point drum drip where necessary.

b. Drum drip shall be labeled.

viii. Fire Department Connections:

1. Sprinkler system shall be tied into the existing fire department connection.

ix. Alarm Devices:

1. Alarm device types shall match piping and equipment connections.

2. All alarm devices shall be UL listed.

a. Water flow switch.

b. Pressure switch.

c. Valve supervisory switch.

d. Indicator-post supervisory switch.

e. All devices shall be connected to the existing fire alarm system and contain an address.

3. Sprinkler Cabinet:

a. Finished, wall mounted, steel cabinet with hinged cover.

b. Include number of spare sprinklers required by NFPA 13 and sprinkler wrench.

c. Provide laminated sprinkler inventory of sprinklers stored in the sprinkler cabinet, in accordance with NFPA 13, and adhere the list to the inside of the cabinet.

4. System Identification:

a. Furnish and install metal, engraved signs identifying each sprinkler zone and valve, the area it controls, and the hydraulic design data.

b. Furnish and install metal, engraved signs identifying the inspectors test connections and which zones they service.

c. Installation of the hydraulic design information sign and valves shall be in accordance with NFPA 13.

8. Electrical:

Solicitation No. 75H70122R00050 12

a. Kyle Health Center: All electrical installations associated with this project shall be installed by licensed electricians in the state of South Dakota. The Kyle Health Center fire sprinkler system shall be connected to the existing EST fire alarm system, managed by Amick Sound. Contractor is responsible for proper communication and coordination with Amick Sound for disconnection and reconnection of the existing fire alarm systems. All wiring shall be approved by the COR. Installation shall follow the design and manufactures’ recommendations.

b. Wanblee Health Center: All electrical installations associated with this project shall be installed by licensed electricians in the state of South Dakota. The Wanblee Health Center fire sprinkler system shall be connected to the existing IFC-320 fire alarm system, managed by Johnson Controls. Contractor is responsible for proper communication and coordination with Johnson Controls for disconnection and reconnection of the existing fire alarm systems. All wiring shall be approved by the COR. Installation shall follow the design and manufactures’ recommendations.

9. Additional Facility Requirements: Contractor shall comply with the requirements of the hospital’s Facility Manager, Infection Control Officer and Safety Officer. All requirements will be instructed to the contractor during the pre-construction meeting and will include providing a separated negatively pressurized work space, vented to the outside. All permits and requirements documents to include risk assessment documents are the responsibility of the contractor. The ICRA documents will include the project description, type of construction project activity, patient risk, and class of precautions. The PCRA documents will include fire safety, utilities, and security checklists.

10. Inspection and Testing: Contractor shall perform final inspection and testing on the fire sprinkler systems in both locations.

Contractor shall perform leak tests on sprinkler system in both locations. Documentation shall be provided. Kyle and Wanblee fire sprinkler systems are currently inspected and tested by Service First Fire Sprinkler out of Sioux Falls, SD.

11. Submittals

a. Submittals and/or shop drawings shall be submitted for at least the following items and shall be delivered electronically to the COR for final approval before ordering any new material or equipment.

1. Design/Shop Drawings

2. Pipe, fittings, couplings, nipples, valves, gauges

3. Sprinklers

4. Electrical Components

5. Air Compressor

6. Air-Maintenance Device

7. Fire Pump (TBD)

8. O&M Manuals for new equipment

9. Hydraulic calculations

10. Inspection and Testing reports

11. Sprinkler inventory

12. Sprinkler cabinet

13. Sprinkler Identification

14. Project Schedule

12. Schedule/Meetings

a. Pre-Construction Meeting: One Pre-Construction meeting shall be conducted prior to the start of the construction of the contract.

b. Progress Meetings: Progress meetings shall be conducted at regular intervals as merited by the progress of the work.

c. Substantial Completion: One substantial completion meeting shall be held following notification of the COR by the General Contractor that the project is Substantially Complete.

d. Final Completion: One final completion meeting shall be held following determination that the project is complete.

13. Miscellaneous

a. Security Requirements. Security: HSPD-12 clearance is required for all personnel assigned to project that will be onsite.

The contractor shall be responsible for completing all necessary paperwork to obtain security clearances and badges for construction personnel who will work on the project.

b. Workers without complete security clearances must be directly supervised by the project superintendent. The project superintendent must obtain the proper clearances.

c. All contractors are required to check-in with the facility manager/maintenance staff before commencing work on any project.

Solicitation No. 75H70122R00050 13

d. The contractor will be responsible for the security of the work site. The hospital and the Indian Health Service staff shall not be responsible for the security of the contractor’s tools, equipment, or material during the course of the project.

14. Correspondence. All correspondence shall be addressed to the COR. Each letter, document, etc., shall contain the following information:

a. Date

b. Project Numbers, Contract Number, Delivery Order Number and Service Unit Name/Location.

c. Name of those who were sent copies.

15. Tribal Requirements

a. The Contractor and all subcontractors engaging in work on the Pine Ridge Indian Reservation will be required to comply with the Indian preference and Indian preference program requirements administered by the Oglala Sioux Tribe Tribal Employment Rights Office (TERO).

b. Before commencing work, contractors and sub-contractors are required to submit an acceptable “Compliance Agreement” to the TERO office. Copies of this form can be obtained from the TERO office. Typical requirements of TERO include a fee of 4% on the total contract price, and submission of weekly certified payroll reports to TERO.

c. Additionally, the rules and regulations of the TERO Ordinance require that no person who is not a local Indian shall be employed by a covered employer until a work permit has been obtained for them from TERO. The annual work permit fee for each employee is $250.00.

d. Contractors are strongly encouraged to contact the TERO office at (605) 867-5167 for an explanation of tribal requirements.

Other fees may apply.

16. Construction Materials and Storage

a. All materials shall be stored and handled according the manufacturers’ recommendations.

b. All materials shall be submitted and approved by the COR prior to ordering.

c. The contractor(s) shall be present and on site to receive all construction material, equipment, or products. IHS staff will not be present, responsible, nor receive, or provide any type of offloading equipment for construction materials, products, or equipment. It is solely the contractor(s) responsibility to properly receive any and all construction equipment, products, and materials on site.

d. The contractor(s) shall provide their own means of storing any and all construction materials, products, or equipment required for installation. IHS staff will not be responsible or provide any means of storing construction material, products, or equipment before or during construction. All material, products, or equipment remain the contractor(s) property until the project has been deemed substantially completed by all parties.

Solicitation No. 75H70122R00050 14

SECTION D. PACKAGING AND MARKING

All shipments of materials, equipment and/or supplies to the project site must be addressed to the contractor and not the Indian Health Service. Preservation, packaging and packing must be in accordance with industry standard packaging appropriate for the item(s) involved. The Indian Health Service is not responsible in any manner for deliveries intended for the project that are not generated by the Indian Health Service.

Equipment and materials provided by the contractor must be new and, where appropriate, must arrive on-site sealed in original manufacturer’s containers. The Government reserves the right to refuse any items it determines to not meet these requirements.

Material shall be stored in an enclosed and dry area protected from damage and soiling. The contractor shall coordinate a suitable storage area with the COR.

Solicitation No. 75H70122R00050 15

SECTION E. INSPECTION AND ACCEPTANCE

All work under this contract is subject to inspection and final acceptance by the Contracting Officer or the duly authorized representative of the government.

The Government’s Contracting Officer’s Representative (COR) is a duly authorized representative of the government and is responsible for inspection and acceptance of all items to be delivered under this order.

The following clauses are incorporated by reference (see FAR 52.252-2):

FEDERAL ACQUISITION REGULATION (FAR)

CLAUSE

NUMBER

TITLE DATE

52.246-12 Inspection of Construction AUG 1996

Solicitation No. 75H70122R00050 16

SECTION F. DELIVERIES OF PERFORMANCE

F.1. 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(s): https://www.acquisition.gov/far/

(End of clause)

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

Number Title Date 52.242-14 Suspension of Work Apr 1984

FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to

(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work within 360 calendar days of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises. Performance time will include submittals and approvals.

(End of Clause)

F.1. SUPERINTENDENT ON SITE

The contractor shall ensure that the Project Superintendent is on site at all times work is being performed by the contractor or subcontractor(s). They shall directly oversee all apprentice and subcontractor work. The Project Superintendent is also responsible to ensure all labor and safety requirements are complied with; and ensure that the worksite is cleaned up at the end of each work day.

All communications between the IHS and contractor concerning the day-to-day workmanship on the project will be handled through the Project Superintendent and they must have the authority to act on behalf of the Contractor in all contractual matters.

F.2. REMOVAL OF PERSONNEL

The Contracting Officer may require the contractor to remove from the job any employee who endanger persons or property; those who manufacture, distribute, dispense, possess or use controlled substances at the worksite (FAR 52.223-6, Drug-Free Workplace);

and those whose continued employment under this contract is inconsistent with the interest of security or for any and all other reasons as determined by the Contracting Officer as objectionable.

Solicitation No. 75H70122R00050 17

SECTION G. CONTRACT ADMINISTRATION DATA

G.1. CONTRACTING OFFICER’S AUTHORITY

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.

G.2. CONTRACTING OFFICER’S REPRESENTATIVE

(a) [TO BE ASSIGNED BY SEPARATE LETTER AT CONTRACT AWARD] is hereby designated as the Contracting Officer’s Representative (COR). The COR may be changed at any time by the Government without prior notice to the Contractor by a unilateral modification to the contract. The COR is located at: see separate letter at contract award

(b) The responsibilities and limitations of the COR are as follows:

(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.

The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the Contractor.

G.3. PAYMENT PROCESS

(a) FAR 52.232-5, Payments Under Fixed Price Construction Contracts, requires that before the first progress payment under the contract is submitted, the contractor shall prepare a proposal with value(s) for each principal category of the work which when added together equal the total contract price. A sample format is available from the Contracting Officer upon request. The following is the detail required by the Contracting Officer:

(1) The principle categories of work shall be broken into line items of sufficient detail to allow meaningful measurement of the work on a monthly basis as determined by the COR. Units of measure appropriate to the type of work shall be used. “Lump sum” pricing of line items shall be avoided except where payment for that line item is to be requested based on 100% completion of that line item or where there is no other practical unit of measure.

(2) The cost of preparatory work (e.g., shop drawings or product submittals), field and home office overhead, profit, insurance, taxes, warranties, as built drawings, etc., shall be pro-rated into items of physical work and not listed as separate line items. Cost of Performance and Payment Bonds may be listed as a single line item and not pro-rated. Also, cost of mobilization and demobilization relating to transportation or installation costs associated with such items as site trailers, heavy equipment, temporary batch plants, temporary on site manufacturing and assembly facilities, temporary on site quarter’s facilities, temporary sanitation facilities, temporary utility connections, and/or temporary secured storage facilities may be listed as line items and not pro-rated. If mobilization is listed separately, a line item for demobilization must be included and shall be at least 20 percent of the mobilization cost. A detailed listing of the items included and the individual cost for each item shall be provided in support of proposed amounts for mobilization and demobilization.

(b) Material stored on site may be included in earned progress if the contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform in contract.

(c) The following are instructions for submitting pay requests:

(1) Requests are to be submitted with signature for the contractor certification statement (scanned signature okay) to the Designated Billing Office. Use of a format that complies with all of the requirements of the “Payments” clause of the contract is mandatory. A sample format is available from the Contracting Officer.

(2) The contractor is responsible for delivery of each request for payment to the billing office. Hand delivery to the COR in the field does not constitute delivery to the billing office.

(3) If the contractor wishes to inquire concerning the status of any pay request, the contractor should contact the billing office.

Solicitation No. 75H70122R00050 18

(4) A completed Release of Claims that complies with the requirements of the “Payments” clause must be submitted with the request for final payment. A sample format is available from the Contracting Officer.

(d) The final payment request will be rejected and returned to the contractor if all items required under the contract have not been completed, submitted, approved, and accepted prior to the receipt of the request; e.g., deficient work items, as built, payrolls, reports, O&M manuals, delivery of extra stock material, etc.

G.4. CERTIFICATION OF PAYMENTS – RELEASE OF CLAIMS (ROC)

The Contractor, when submitting final payment under this contract, shall submit to the Contracting Officer:

(a) A certification that the Contractor has made payment from proceeds of prior payments, or that he will make timely payment from the proceeds of the progress or final payment then due him, to any subcontractors and suppliers in accordance with established contractual arrangements; and

(b) A properly executed Contractor's Release. The Release of Claims form is available from the Contracting Officer. Failure to submit this completed release will result in a delay of final payment.

G.5. INVOICE REQUIREMENTS

(a) Invoices must be prepared and submitted and will be paid in accordance with the following FAR clauses specified in Section I:

(1) FAR 52.232-5, Payments Under Fixed -Price Construction Contracts (May 2014)

(2) FAR 52.232-27, Prompt Payment for Construction Contracts (Jan 2017)

(3) FAR 52.232-33, Payment by Electronic Funds Transfer-- System for Award Management (Oct 2018)

(4) FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Nov 2021)

(b) The Designated Billing Office for this contract is the same as the address for correspondence, sent to the attention of the Contracting Officer. Invoices for payment shall be sent via e-mail to the COR and CO for processing and approval.

(c) Progress payments will be authorized for this project.

(d) The final invoice must be marked “Final” and be accompanied by a Release of Claims form, which states the final payment as outstanding, in the Remarks field. The Release of Claims form is available from the CO. Final payment will be made within 30 Calendar days upon receipt of a properly executed invoice.

(e) The contractor will contact the Designated Billing Office with any payment issues or concerns.

Note: In accordance with FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Nov 2021)—Upon receipt of accelerated payments from the Government, the contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor. This applies to all small business subcontractors at all tier levels.

G.6. ADDRESS FOR CORRESPONDENCE

It is the intent of the Government to use electronic means as much as possible while administering this contract.

Most correspondence should be sent via email directly to the Contracting Officer and COR. If sending documents via postal mail, include the Contract Number on all correspondence. Overnight Mail and U.S. Mail must be sent to the Contracting Officer, unless otherwise specified, at the following address:

Indian Health Service 701 5th Ave. STE 1600 Seattle, WA 98104

Solicitation No. 75H70122R00050 19

SECTION H. SPECIAL CONTRACT REQUIREMENTS

H.1. SUBCONTRACTS

(a) Nothing contained in the contract shall be construed as creating any contractual relationship between any subcontractor and the Government. The divisions or sections of the specifications are not intended to control the contractor in dividing the work among subcontractors, or to limit the work performed by any trade.

(b) The contractor shall be responsible to the Government for acts and omissions of his own employees, and of subcontractors and their employees. He shall also be responsible for the coordination of the work of the trades, subcontractors, and suppliers.

(c) The Government will not undertake to settle any differences between or among the contractor and his subcontractors or suppliers.

(d) The contractor shall, without additional expense to the Government employ specialty subcontractors where required by the specifications. “Specialty Subcontractors,” when specified as a requirement, means a subcontractor regularly engaged in the manufacture or installation of the contract items. The specialty subcontractor shall select and combine the materials involved, maintain and have available for the purpose, workmen skilled in the specified work. The specialty subcontractor shall be the manufacturer, be licensed by the manufacturer as an installer, or work under direct supervision of the manufacturer.

H.2. SUBCONTRACTING

(a) In connection with the performance of work under this contract, the contractor shall not subcontract with any subcontractor who, at the time of subcontract award, is listed as an excluded party within the System for Award Management (SAM) unless otherwise authorized by the Government in accordance with Subpart 9.4 of the Federal Acquisition Regulations.

(b) The List of Parties Excluded from Procurement and Non-Procurement Programs is available at: https://www.sam.gov/SAM/

(c) In the event of the contractor’s noncompliance with the foregoing requirements, the Government may terminate this contract for default or take other appropriate action, including, but not limited to, requiring the contractor to terminate any such subcontract and substitute an eligible subcontractor in lieu thereof, at no increase in the contract price or time for performance.

(d) The term “subcontractor,” as used in this clause, shall mean the individual or firm with whom the contractor proposes to enter into a subcontract for manufacturing, fabricating, installing, or otherwise performing work under this contract.

(e) Within ten days after contract award, the contractor shall furnish to the Contracting Officer in writing a list of all subcontractors scheduled to perform work under the contract on Form SF-1413.

(f) The contractor shall include the provisions of paragraphs a., b., and d. of this clause in every subcontract hereunder.

H.3. STANDARD REFERENCES

(a) Any materials, equipment, or workmanship specified by reference to the number, symbol, or title of any specific standard shall comply with the latest edition or revision thereof, and any amendment or supplement thereto, in effect on the date of the solicitation, except as limited to type, class or grade, or modified in the specifications.

(b) Standards referred to in the plans and specifications, except as modified, shall have full force and effect as though printed in the plans and specifications.

(c) The contractor shall maintain on the site, a complete current set of manufacturers’ and standards referenced from work under the contract.

H.4. WORK HOURS AND ACTIVE GOVERNMENT OPERATIONS

Normal work days and hours are Monday through Friday, 8:00 am to 5:00pm excluding federal holidays for occupied facilities and no set times or days for unoccupied spaces. The contractor shall notify the COR a minimum of 72 hours in advance of arriving on site to complete work and check in with the COR upon arrival. A minimum of 72 hours of advance notice is required for special request to work outside of normal work hours.

Note: Four (4) day work weeks will be considered upon written request and must be clearly identified in the project schedule.

(a) The Government only recognizes the following legal holidays established by federal statue:

New Year's Day January 1 Birthday of Martin Luther King, Jr. Third Monday in January

Solicitation No. 75H70122R00050 20

Washington’s Birthday Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25

(b) Any of the legal holidays falling on Saturday will be observed on the preceding Friday; legal holidays falling on Sunday will be observed on the following Monday.

(c) The contractor should not perform work on observed legal holidays unless authorized by the Contracting Officer. In the event work is authorized on observed legal holidays, the contractor shall pay all applicable overtime and/or holiday pay rates required by law.

H.5. MATERIALS ON SITE

Unless otherwise provided in the specifications or drawings, materials removed and not reused under the contract shall become the property of the contractor. The contractor shall remove the materials from the work site. Storage or sale of the materials on the site will not be permitted.

H.6. OPERATION AND STORAGE AREAS

Reference FAR 52.236-10 Operations and Storage Areas.