Attachment 9 Appendix D Kyle Fire Suppression Plan.pdf
PDF 490 KB Posted
- Attached to
- 75H70122R00050 Kyle-Wanblee Sprinkler Projects
- Solicitation number
- 75H70122R00050
About this file
This document includes a solicitation for a construction project and related project documents. The Indian Health Service is seeking proposals for a firm fixed price construction contract to design and install a fire sprinkler system at the Kyle Health Center in South Dakota and replace an existing dry sprinkler system at the Wanblee Health Center. The scope of work involves a fire suppression system meeting NFPA-13 standards along with local requirements. The period of performance is 360 calendar days from notice to proceed. The anticipated contract value is between $250,000 and $500,000. Proposals are due by the date and time listed in block 13 of the SF1442 form. Evaluation will be based on lowest price technically acceptable criteria. The selected contractor must be registered in the System for Award Management database.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STEVEN M.
TEBBEN
R E
G
IS
TE
RED PROFESSIONAL ENG
IN
EER
REG. NO.
S
O
U TH D A KO
T
A
DATE:
1 2 3
C
B
A
1.7
A.3
B.5
A.9
SLAB ON GRADE
MV
MV
MA
4" W
10" RD
W
0"
R D
5" RD
O R
D
4" W
CRAWLSPACE
NORTH
(ACTUAL)
NORTH
(REFERENCE)
ISSUES
SHEET NUMBER
SHEET TITLE
A
2 3
1 2 3
4 5
4 5
A
TSP, Inc.
PROJECT
600 Kansas City St.
Rapid City, SD 57701
(605) 343-6102 www.teamtsp.com
C C
B B
D D
© TSP, Inc. 2017
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LI
S
TE
D
D R
A W
IN
G
S S
C A
LE
(S
) U N
LE
S
S R
E D
U C
E D
F R
O M
O R
IG
IN
A L x
F O
R M
A T
CONSULTANTS
Architecture Engineering
Planning
KEY PLAN
EXTG. BLDG.
NEW ADDITION
/5
/2
:4
:3
P
M
I:
T S
P R e v it L o c a l\
D a k o ta P la in s
K y le
C lin ic M m a k s c h .r v t
OVERALL CRAWL
SPACE PIPING PLAN
M-100
F
IN
A L
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
Kyle, South Dakota
KYLE CLINIC HEALTH
CENTER ADDITION -
IHS
DAKOTA PLAINS
CHM05/08/2017
SMT03161153
SCALE: 1/8" = 1'-0"
A1
PLUMBING AND HYDRONIC PLAN - OVERALL CRAWLSPACE
KEYNOTES
1 DENTAL VACUUM AND AIR COMPRESSOR PIPING UP TO MECHANICAL ROOM.
COORDINATE SLAB PENETRATIONS AND FLOOR PATCHING WITH G.C.
2 GENERAL PIPE ROUTING, COORDINATE DENTAL EQUIPMENT CONNECTIONS AND
ROUGH-IN LOCATIONS WITH DENTAL EQUIPMENT PROVIDER.
MARK DATE DESCRIPTION
5/8/2017
STEVEN M.
TEBBEN
R E
G
IS
TE
RED PROFESSIONAL ENG
IN
EER
REG. NO.
S
O
U TH D A KO
T
A
DATE:
TT
T
T T
T
T T
T
T
T
1 2 3
C
B
A
1.7
A.3
B.5
A.9
2" CWR
2" CWS
4" FP
2" HWS
2 1/2" HWR
2" HWS
2 1/2" HWR 1 1/2" HWS
FDC 5
STORAGE
LKR.
JANITOR
DENT. OPER
DENT. OPER
EXAM
VITALS
EXAM
EXAM
CAST RM
PHYS. OFF.
CLEAN UTILITY
TLT
EXAM
RECORD STOR
PHARM OFF
CONSULT
PHARMACY
X-RAY
ST TLT
PHYS. OFF
DENTAL
RECEPT.
TREATMENT
N.S.
SUP.OFF.
SHARED STOR
SHARED
OFFICE
LOUNGE
EXAM
EXAM
MED. ALC.
N.S.
CLEAN
DENT. OPER
DENT. OPER
STORAGE
MECHANICAL
ELEC
EMG. GEN.
CORR.
CORR.
RECPT.
C-2
CORRIDOR
O.P.D SUB-WAIT
C-3
CORRIDOR
HALL
W.C. ALC.
DENT. OPER
DENT. OPER
SOIL
EXAM
EXAM
FAMILY TLT
OFFICE
TREAT/ PROC
NURSING
CORR.
LAB
GARAGE
ST TLT
C-10
CORR
MAIN PUBLIC
WAITING
HALL
VESTIBULE
323A
VEST.
CORR.
NORTH
(ACTUAL)
NORTH
(REFERENCE)
ISSUES
SHEET NUMBER
SHEET TITLE
A
2 3
1 2 3
4 5
4 5
A
TSP, Inc.
PROJECT
600 Kansas City St.
Rapid City, SD 57701
(605) 343-6102 www.teamtsp.com
C C
B B
D D
© TSP, Inc. 2017
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LI
S
TE
D
D R
A W
IN
G
S S
C A
LE
(S
) U N
LE
S
S R
E D
U C
E D
F R
O M
O R
IG
IN
A L x
F O
R M
A T
CONSULTANTS
Architecture Engineering
Planning
KEY PLAN
EXTG. BLDG.
NEW ADDITION
/8
/2
:0
:3
A
M
I:
T S
P R e v it L o c a l\
D a k o ta P la in s
K y le
C lin ic M m a k s c h .r v t
OVERALL BUILDING
PIPING PLAN
M-101
F
IN
A L
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
Kyle, South Dakota
KYLE CLINIC HEALTH
CENTER ADDITION -
IHS
DAKOTA PLAINS
CHM05/08/2017
SMT03161153
SCALE: 1/8" = 1'-0"
A1
PLUMBING PLAN - FIRST LEVEL
KEYNOTES
1 CONNECT 2" CWS/2" CWR TO EXISTING CHILLED WATER MAINS IN MECHANICAL
ROOM.
2 *FUTURE WORK* - DENTAL VACUUM AND AIR COMPRESSOR TO BE INSTALLED ON
FORMER MODULAR CHILLER PAD. INSTALL PER MANUFACTURER'S
RECOMMENDATIONS.
3 PROVIDE 4" WET TYPE FIRE SPRINKLER SYSTEM TO SERVE ENTIRE BUILDING,
EXISTING HEALTH CLINIC AND NEW ADDITION.
5 FIRE DEPARTMENT CONNECTION, COORDINATE LOCATION, THREADS, AND
CONNECTION TYPE WITH LOCAL FIRE DEPARTMENT.
SHEET GENERAL NOTES: FIRE SUPPRESSION
A. DESIGN A NEW FIRE SPRINKLER SYSTEM TO PROVIDE FULL COVERAGE TO THE ENTIRE
NEW, REMODELED, AND EXISTING AREA. ALL WORK SHALL COMPLY WITH NFPA-13,
LOCAL FIRE MARSHALL, AND OWNERS INSURANCE CARRIER REQUIREMENTS.
CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND OBTAINING ALL NECESSARY
PERMITS AND APPROVALS.
MARK DATE DESCRIPTION
5/8/2017
| Sheets |
| G-001 - COVER SHEET |
| G-101 - LIFE SAFETY & CONSTRUCTION TYPES |
File details come from the government source that posted it. Updated .