Attachment 4 Technical Experience Offeror Worksheet.docx

DOCX document 13 KB Posted

Attached to
75H70122R00050 Kyle-Wanblee Sprinkler Projects
Solicitation number
75H70122R00050
Issued by

About this file

This document provides details for a federal construction solicitation for fire sprinkler and dry cooler replacement projects at two Indian Health Service facilities in South Dakota. The solicitation will be awarded as a 100% small business set-aside and seeks a contractor to design and install a new fire sprinkler system at the Kyle Health Center and replace an existing dry sprinkler system at the Wanblee Health Center. Offerors must propose fixed prices for a 360-day period of performance. The anticipated construction value is between $250,000 and $500,000. Questions are due by the date specified in the solicitation, with price proposals due shortly after. The contract will be awarded based on lowest price among technically acceptable offers. Registration in the System for Award Management is required for consideration.

View the file

Other files

File Type Posted
B05 Amendment 2.pdf PDF
B05 Amendment 2 Wanblee Health Center Addition.pdf PDF
B05 Amendment 2 Kyle Health Center Addition.pdf PDF
B05 Amendment 2 Kyle Wet System.pdf PDF
B05 Amendment 2 Kyle Hydrant Flow Test.pdf PDF
B05 Amendment 2 Schedule of Submissions.pdf PDF
B05 Amendment 1 Drawings Kyle Health Center.pdf PDF
B05 Amendment 1.pdf PDF
B05 Amendment 1 Drawings Wanblee Health Center.pdf PDF
Attachment 1 Wage Determination - Kyle.pdf PDF
Attachment 16 Release of Claims.pdf PDF
Attachment 3 Self Performed Calculation Sheet (Construction).docx DOCX document
Attachment 7 Appendix B Kyle Sprinkler Riser.pdf PDF
Attachment 2 Wage Determination - Wanblee.pdf PDF
Attachment 11 Appendix F Wanblee Demolition Plan.pdf PDF
Attachment 14 Appendix I Wanblee Existing Fire Suppression Plan.pdf PDF
Attachment 15 WH347 PAYROLL.pdf PDF
Attachment 13 Appendix H Wanblee Existing Riser Nameplate.pdf PDF
Attachment 12 Appendix G Wanble Sprinkler Riser.pdf PDF
Attachment 8 Appendix C Kyle Existing Riser Nameplate.pdf PDF
Attachment 6 Appendix A Kyle Campus.pdf PDF
B01 75H70122R00050.pdf PDF
Attachment 10 Appendix E Wanblee Campus.pdf PDF
Attachment 5 Past Performance Questionnaire.docx DOCX document
Attachment 9 Appendix D Kyle Fire Suppression Plan.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 5 TECHNICAL EXPERIENCE - OFFEROR WORKSHEET

Contract Number / Task Order

Project Title

Award Value

Period of Performance

Prime Contractor or Subcontractor
☐ Prime ☐ Subcontractor

If subcontractor percentage of overall work completed

Agency or Entity Name and Address

Agency or Entity POC Name, email, phone #

Detailed Description of Project and Responsibilities (expand as needed)

Relevance (check all that apply)
☐ Award value of at least $500,000.00

☐ Primary scope involved replacement of dry coolers

If the team is proposing as a joint venture, the team will be required to discuss if the joint venture has experience working together in the past. If a team is proposing as a joint venture, the team will be required to provide a copy of the joint venture agreement.