ATTACHMENT L During Solicitation Substitution Request Form~58.pdf

PDF 74 KB Posted

Attached to
25-0016 Bethany ES Student Restrooms State and local contract opportunity
Solicitation number
S-P34048-00015531
Issued by
Washington County, Barlow City, Oregon

About this file

This is a Substitution Request Form used in the bidding process for the Westview High School Team Rooms project, prepared by Convergence Architecture for the State of Oregon. The form provides a standardized procedure for contractors to request approval of substitute materials or products that differ from those specified in the original contract documents. The form requires submitting detailed documentation including product descriptions, specifications, drawings, photographs, and performance data to support the substitution request.

The form establishes specific certifications that the submitting contractor must affirm, including that the proposed substitution does not affect drawing dimensions, that the contractor assumes responsibility for any resulting changes to building design and construction costs, and that the substitution does not negatively impact other trades, the construction schedule, or warranty requirements. The contractor must also certify that maintenance and service parts are available locally or readily obtainable, and that the proposed substitution is equivalent or superior in function, appearance, and quality to the originally specified item. The form provides space for the submitter's signature, firm name, address, and contact information, and includes an approval section for the architect or engineer to mark as approved, approved as noted, not approved, or received too late, with space for remarks.

View the file

Other files for this state and local contract opportunity

Other files attached to 25-0016 Bethany ES Student Restrooms, newest first.
File Type Posted
ATTACHMENT I Sample Contract~67.pdf PDF
Addendum 3~2.pdf PDF
Revised Notice of Intent 25-0016 - signed.pdf PDF
25-0016 Bethany ES- Student Restrooms.pdf PDF
Addendum 1~9.pdf PDF
ATTACHMENT K Bethany ES Specifications.pdf PDF
Addendum 2~5.pdf PDF
Notice of Intent 25-0016 - signed.pdf PDF
ATTACHMENT J Bethany ES_Drawings.pdf PDF
ATTACHMENT J REVISED Bethany ES-RR CD_DRAWINGS.pdf PDF
25-0016 Site Walk Attendance12.22.25.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BDS – WESTVIEW HIGH SCHOOL TEAM ROOMS Print Date:8/22/20

Issue Set: BID Package

Convergence Architecture 01 25 00-3 Substitution Procedure www.convergencearch.com

TO:

PROJECT:

SPECIFIED ITEM:

Section Page Paragraph Description

PROPOSED SUBSTITUTION:

Attached data includes product description, specifications, drawings, photographs, performance and test data adequate for evaluation of request including identification of applicable data portions. Attached data also includes description of changes to Contract Documents and proposed substitution requires for proper installation.

Undersigned certifies following items, unless modified by attachments, are correct:

1. Proposed substitution does not affect dimensions shown on drawings.

2. Undersigned pays for changes to building design, including engineering design, detailing, and construction costs caused by proposed substitution.

3. Proposed substitution has no adverse effect on other trades, construction schedule, or specified warranty requirements.

4. Maintenance and service parts available locally or readily obtainable for proposed substitution.

Undersigned further certifies function, appearance, and quality of proposed substitution are equivalent or superior to specified item.

Undersigned agrees, if this page is reproduced, terms and conditions for substitutions found in Bidding

Documents apply to this proposed substitution.

Submitted by:

Name (Printed or typed) General Contractor (if after award of Contract)

For use by A/E

Approved Approved as noted

Not Approved Received too late

By

Date

Remarks

The Construction Specifications Institute

September 1997

Northwest Region

Signature

Firm Name

Address

City, State, Zip

Date

Tel: Fax:

smithel Rectangle smithel Rectangle smithel Image

File details come from the government source that posted it. Updated .