ATTACHMENT J.pdf
PDF 67 KB Posted
- Attached to
- DISTRICT 3 ON CALL PIPE REPAIR
- Solicitation number
- 5400030105
- Issued by
- Richland County, South Carolina
About this file
This is an attachment document outlining contractor qualifications and scope of work requirements for the South Carolina Department of Transportation (SCDOT) District 3 On Call Pipe Repair contract opportunity. The project involves pipe repair services across multiple counties in District 3, including Abbeville, Anderson, Edgefield, Greenwood, Laurens, McCormick, Newberry, and Saluda. The scope of work encompasses shotcrete application for pipe repair, flowable fill installation, neat grout work, mobilization, and lane/shoulder closures on various roadway types. The contract includes eight primary pay items: Shotcrete of Pipe per cubic yard, Additional Shotcrete per cubic yard, Flowable Fill per cubic yard, Neat Grout per cubic feet, Mobilization per call, Lane Closure on Two Lane Roadways per call, Lane Closure on Multilane Roadways per call, and Shoulder Closure per call.
Vendors must submit documentation with their bid demonstrating a minimum of five years of direct experience related to the work described. Required documentation shall include dates and locations of previous relevant projects. The contract requires adherence to SCDOT Standard Specifications and includes provisions for highway traffic protection, construction standards, utility location procedures, and roadway protection protocols. Supporting materials include SCDOT Standard Specifications (2007), traffic control standard drawings, work zone safety guidelines, and a pipe repair notification form with contact information for District 3 engineers across all affected counties.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 1.pdf | ||
| ATTACHMENT F.pdf | ||
| ATTACHMENT E.pdf | ||
| ATTACHMENT I.pdf | ||
| ATTACHMENT G.pdf | ||
| ATTACHMENT D.pdf | ||
| ATTACHMENT H.pdf | ||
| ATTACHMENT K.pdf | ||
| SOLICITATION 5400030105.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J
| 2.0 Contractor Qualifications: |
| Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat... |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Previous Solicitation.pdf |
| Solicitation DRAFT |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Relevant Sections of the SCDOT Standard Specifications |
| Pages from SCDOT 2007 Standard Specs-2_Redacted |
| Pages from SCDOT 2007 Standard Specs_Redacted |
| SCDOT Pipe Drawing |
| G. Payment |
| I. Contract Time |
| Appendix 1 |
| Traffic Control Stnd Draw |
| 610-005-00.pdf |
| 610-005-10.pdf |
| 610-010-00.pdf |
| 610-025-00.pdf |
| 610-205-00.pdf |
| 610-210-00.pdf |
| 610-215-00.pdf |
| SCDOT Work Zone Safety |
| Damage Claim Form |
| D2 Engineers Contact List |
| Abbeville |
| Anderson |
| Edgefield |
| Greenwood |
| Laurens |
| McCormick |
| Newberry |
| Saluda |
| PIPE REPAIR NOTIFICATION |
| PIPE REPAIR NOTIFICATION |
| Date of Notification: ______________________ Contractor: _______________________________ |
| Requested by (RME): ___________________________ |
| ATTACH 8.5” x 11” LOCATION MAP |
| D2 Engineers Contact List (1).pdf |
| Abbeville |
| Anderson |
| Edgefield |
| Greenwood |
| Laurens |
| McCormick |
| Newberry |
| Saluda |
| Solicitation Just need page 1.pdf |
| 2.0 Contractor Qualifications: |
| Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat... |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Solicitation.pdf |
| 2.0 Contractor Qualifications: |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
File details come from the government source that posted it. Updated .