ATTACHMENT E.pdf

PDF 203 KB Posted

Attached to
DISTRICT 3 ON CALL PIPE REPAIR
Solicitation number
5400030105
Issued by
Richland County, South Carolina

About this file

This attachment provides contractor qualification requirements and pay item specifications for the South Carolina Department of Transportation (SCDOT) District 3 On Call Pipe Repair contract opportunity. The project involves pipe repair services across multiple counties in South Carolina's District 3 region, including Abbeville, Anderson, Edgefield, Greenwood, Laurens, McCormick, Newberry, and Saluda. The scope of work encompasses shotcrete application, flowable fill installation, neat grout placement, mobilization, and various lane and shoulder closure activities. Bidders must demonstrate a minimum of five years of direct experience in work related to pipe repair and highway construction, with sufficient documentation provided at the time of bid submission. The contract specifies standard SCDOT construction specifications, traffic control requirements, utility location procedures, and roadway protection standards as outlined in the 2007 SCDOT Standard Specifications.

The pay items for this contract include shotcrete of pipe measured per cubic yard, additional shotcrete per cubic yard, flowable fill per cubic yard, neat grout per cubic feet, mobilization per call, lane closures on two-lane roadways per call, lane closures on multilane roadways per call, and shoulder closures per call. Documentation required from vendors includes project dates, locations, and specific evidence of relevant experience. The contract includes supporting materials such as SCDOT traffic control standard drawings, work zone safety requirements, and a pipe repair notification form with site mapping requirements. Reference materials and contact lists for District 3 engineers are provided to support contractor coordination and project execution.

View the file

Other files

File Type Posted
AMENDMENT 1.pdf PDF
ATTACHMENT F.pdf PDF
ATTACHMENT J.pdf PDF
ATTACHMENT I.pdf PDF
ATTACHMENT G.pdf PDF
ATTACHMENT K.pdf PDF
SOLICITATION 5400030105.pdf PDF
ATTACHMENT D.pdf PDF
ATTACHMENT H.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT E

2.0 Contractor Qualifications:
Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat...
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time
Previous Solicitation.pdf
Solicitation DRAFT
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time
Relevant Sections of the SCDOT Standard Specifications
Pages from SCDOT 2007 Standard Specs-2_Redacted
Pages from SCDOT 2007 Standard Specs_Redacted
SCDOT Pipe Drawing
G. Payment
I. Contract Time
Appendix 1
Traffic Control Stnd Draw
610-005-00.pdf
610-005-10.pdf
610-010-00.pdf
610-025-00.pdf
610-205-00.pdf
610-210-00.pdf
610-215-00.pdf
SCDOT Work Zone Safety
Damage Claim Form
D2 Engineers Contact List
Abbeville
Anderson
Edgefield
Greenwood
Laurens
McCormick
Newberry
Saluda
PIPE REPAIR NOTIFICATION
PIPE REPAIR NOTIFICATION
Date of Notification: ______________________ Contractor: _______________________________
Requested by (RME): ___________________________
ATTACH 8.5” x 11” LOCATION MAP
D2 Engineers Contact List (1).pdf
Abbeville
Anderson
Edgefield
Greenwood
Laurens
McCormick
Newberry
Saluda
Solicitation Just need page 1.pdf
2.0 Contractor Qualifications:
Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat...
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time
Solicitation.pdf
2.0 Contractor Qualifications:
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time

File details come from the government source that posted it. Updated .