ATTACHMENT E.pdf
PDF 203 KB Posted
- Attached to
- DISTRICT 3 ON CALL PIPE REPAIR
- Solicitation number
- 5400030105
- Issued by
- Richland County, South Carolina
About this file
This attachment provides contractor qualification requirements and pay item specifications for the South Carolina Department of Transportation (SCDOT) District 3 On Call Pipe Repair contract opportunity. The project involves pipe repair services across multiple counties in South Carolina's District 3 region, including Abbeville, Anderson, Edgefield, Greenwood, Laurens, McCormick, Newberry, and Saluda. The scope of work encompasses shotcrete application, flowable fill installation, neat grout placement, mobilization, and various lane and shoulder closure activities. Bidders must demonstrate a minimum of five years of direct experience in work related to pipe repair and highway construction, with sufficient documentation provided at the time of bid submission. The contract specifies standard SCDOT construction specifications, traffic control requirements, utility location procedures, and roadway protection standards as outlined in the 2007 SCDOT Standard Specifications.
The pay items for this contract include shotcrete of pipe measured per cubic yard, additional shotcrete per cubic yard, flowable fill per cubic yard, neat grout per cubic feet, mobilization per call, lane closures on two-lane roadways per call, lane closures on multilane roadways per call, and shoulder closures per call. Documentation required from vendors includes project dates, locations, and specific evidence of relevant experience. The contract includes supporting materials such as SCDOT traffic control standard drawings, work zone safety requirements, and a pipe repair notification form with site mapping requirements. Reference materials and contact lists for District 3 engineers are provided to support contractor coordination and project execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 1.pdf | ||
| ATTACHMENT F.pdf | ||
| ATTACHMENT J.pdf | ||
| ATTACHMENT I.pdf | ||
| ATTACHMENT G.pdf | ||
| ATTACHMENT K.pdf | ||
| SOLICITATION 5400030105.pdf | ||
| ATTACHMENT D.pdf | ||
| ATTACHMENT H.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT E
| 2.0 Contractor Qualifications: |
| Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat... |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Previous Solicitation.pdf |
| Solicitation DRAFT |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Relevant Sections of the SCDOT Standard Specifications |
| Pages from SCDOT 2007 Standard Specs-2_Redacted |
| Pages from SCDOT 2007 Standard Specs_Redacted |
| SCDOT Pipe Drawing |
| G. Payment |
| I. Contract Time |
| Appendix 1 |
| Traffic Control Stnd Draw |
| 610-005-00.pdf |
| 610-005-10.pdf |
| 610-010-00.pdf |
| 610-025-00.pdf |
| 610-205-00.pdf |
| 610-210-00.pdf |
| 610-215-00.pdf |
| SCDOT Work Zone Safety |
| Damage Claim Form |
| D2 Engineers Contact List |
| Abbeville |
| Anderson |
| Edgefield |
| Greenwood |
| Laurens |
| McCormick |
| Newberry |
| Saluda |
| PIPE REPAIR NOTIFICATION |
| PIPE REPAIR NOTIFICATION |
| Date of Notification: ______________________ Contractor: _______________________________ |
| Requested by (RME): ___________________________ |
| ATTACH 8.5” x 11” LOCATION MAP |
| D2 Engineers Contact List (1).pdf |
| Abbeville |
| Anderson |
| Edgefield |
| Greenwood |
| Laurens |
| McCormick |
| Newberry |
| Saluda |
| Solicitation Just need page 1.pdf |
| 2.0 Contractor Qualifications: |
| Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat... |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Solicitation.pdf |
| 2.0 Contractor Qualifications: |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
File details come from the government source that posted it. Updated .