The file's text, extracted by GovTribe without its formatting.
DISTRICT 3 ENGINEERS
COUNTY CONTACT LIST
Greenville Stephen Shehan Phone: (864) 241-1224
13 Saluda Dam Rd Greenville, SC 29611 29611
FAX: (864) 295-8347
Pickens Colt Greene Phone: (864) 777-5000
975 Breazeale Rd Liberty, SC 29657
FAX: (864) 859-4766
Oconee Randy Russell Phone: (864) 613-1029
150 Richland Rd Westminster, SC 29693
FAX: (864) 647-0885
Spartanburg Jeff Cochran Phone: (864) 587-4725
8890 Fairforest Rd Spartanburg, SC 29303
FAX: (864) 587-4733
ATTACHMENT I
| 2.0 Contractor Qualifications: |
| Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat... |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Previous Solicitation.pdf |
| Solicitation DRAFT |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Relevant Sections of the SCDOT Standard Specifications |
| Pages from SCDOT 2007 Standard Specs-2_Redacted |
| Pages from SCDOT 2007 Standard Specs_Redacted |
| SCDOT Pipe Drawing |
| G. Payment |
| I. Contract Time |
| Appendix 1 |
| Traffic Control Stnd Draw |
| 610-005-00.pdf |
| 610-005-10.pdf |
| 610-010-00.pdf |
| 610-025-00.pdf |
| 610-205-00.pdf |
| 610-210-00.pdf |
| 610-215-00.pdf |
| SCDOT Work Zone Safety |
| Damage Claim Form |
| D2 Engineers Contact List |
| Abbeville |
| Anderson |
| Edgefield |
| Greenwood |
| Laurens |
| McCormick |
| Newberry |
| Saluda |
| PIPE REPAIR NOTIFICATION |
| PIPE REPAIR NOTIFICATION |
| Date of Notification: ______________________ Contractor: _______________________________ |
| Requested by (RME): ___________________________ |
| ATTACH 8.5” x 11” LOCATION MAP |
| D2 Engineers Contact List (1).pdf |
| Abbeville |
| Anderson |
| Edgefield |
| Greenwood |
| Laurens |
| McCormick |
| Newberry |
| Saluda |
| Solicitation Just need page 1.pdf |
| 2.0 Contractor Qualifications: |
| Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat... |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Solicitation.pdf |
| 2.0 Contractor Qualifications: |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |