ATTACHMENT I.pdf

PDF 262 KB Posted

Attached to
DISTRICT 3 ON CALL PIPE REPAIR
Solicitation number
5400030105
Issued by
Richland County, South Carolina

About this file

This attachment document provides the District 3 Engineers County Contact List for the South Carolina Department of Transportation (SCDOT) District 3 On Call Pipe Repair contract opportunity. The document lists regional contacts for four counties: Greenville (Stephen Shehan, 864-241-1224), Pickens (Colt Greene, 864-777-5000), Oconee (Randy Russell, 864-613-1029), and Spartanburg (Jeff Cochran, 864-587-4725). The contract involves pipe repair services with pay items including shotcrete of pipe, additional shotcrete, flowable fill, neat grout, mobilization, and lane closures on two-lane roadways, multilane roadways, and shoulder closures. Contractors must demonstrate a minimum of five years of experience directly related to the work, with supporting documentation submitted alongside their bid including dates and locations of previous projects.

The contract scope requires adherence to SCDOT Standard Specifications, protection of highway traffic standards, utility location procedures, and roadway protection protocols. Additional documentation requirements include SCDOT pipe drawings, traffic control standards, work zone safety procedures, and damage claim forms. The document references multiple supporting exhibits and appendices, including traffic control standard drawings and SCDOT 2007 Standard Specifications. Contractors must maintain contact with District 3 Engineers in their respective counties and provide pipe repair notifications with location maps to the requesting Resident Maintenance Engineer prior to commencing work. Payment terms and contract duration specifics are referenced but not detailed in this attachment.

View the file

Other files

File Type Posted
AMENDMENT 1.pdf PDF
ATTACHMENT F.pdf PDF
ATTACHMENT E.pdf PDF
ATTACHMENT J.pdf PDF
ATTACHMENT D.pdf PDF
ATTACHMENT H.pdf PDF
ATTACHMENT G.pdf PDF
ATTACHMENT K.pdf PDF
SOLICITATION 5400030105.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRICT 3 ENGINEERS

COUNTY CONTACT LIST

Greenville Stephen Shehan Phone: (864) 241-1224

13 Saluda Dam Rd Greenville, SC 29611 29611

FAX: (864) 295-8347

Pickens Colt Greene Phone: (864) 777-5000

975 Breazeale Rd Liberty, SC 29657

FAX: (864) 859-4766

Oconee Randy Russell Phone: (864) 613-1029

150 Richland Rd Westminster, SC 29693

FAX: (864) 647-0885

Spartanburg Jeff Cochran Phone: (864) 587-4725

8890 Fairforest Rd Spartanburg, SC 29303

FAX: (864) 587-4733

ATTACHMENT I

2.0 Contractor Qualifications:
Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat...
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time
Previous Solicitation.pdf
Solicitation DRAFT
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time
Relevant Sections of the SCDOT Standard Specifications
Pages from SCDOT 2007 Standard Specs-2_Redacted
Pages from SCDOT 2007 Standard Specs_Redacted
SCDOT Pipe Drawing
G. Payment
I. Contract Time
Appendix 1
Traffic Control Stnd Draw
610-005-00.pdf
610-005-10.pdf
610-010-00.pdf
610-025-00.pdf
610-205-00.pdf
610-210-00.pdf
610-215-00.pdf
SCDOT Work Zone Safety
Damage Claim Form
D2 Engineers Contact List
Abbeville
Anderson
Edgefield
Greenwood
Laurens
McCormick
Newberry
Saluda
PIPE REPAIR NOTIFICATION
PIPE REPAIR NOTIFICATION
Date of Notification: ______________________ Contractor: _______________________________
Requested by (RME): ___________________________
ATTACH 8.5” x 11” LOCATION MAP
D2 Engineers Contact List (1).pdf
Abbeville
Anderson
Edgefield
Greenwood
Laurens
McCormick
Newberry
Saluda
Solicitation Just need page 1.pdf
2.0 Contractor Qualifications:
Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat...
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time
Solicitation.pdf
2.0 Contractor Qualifications:
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time

File details come from the government source that posted it. Updated .