AMENDMENT 1.pdf
PDF 351 KB Posted
- Attached to
- DISTRICT 3 ON CALL PIPE REPAIR
- Solicitation number
- 5400030105
- Issued by
- Richland County, South Carolina
About this file
This amendment document modifies Invitation for Bid 5400030105 issued by the South Carolina Department of Transportation for on-call pipe repair services in District 3. The scope of work involves structural rehabilitation of corrugated metal and reinforced concrete pipes through cleaning, installation of wire mesh reinforcement, and application of shotcrete lining. The solicitation includes eight unit-price line items: 200 cubic yards of shotcrete pipe repair, 150 cubic yards of additional shotcrete, 50 cubic yards of flowable fill, 80 cubic feet of neat grout, 10 mobilization calls, 5 two-lane lane closures, 3 multilane lane closures, and 6 shoulder closures. Offers are due September 25, 2026 at 2:30 PM, with questions required by September 10, 2026 at 12:00 PM. No pre-bid conference or site visit is scheduled. Award will be posted October 14, 2026, and the contract term extends five years from October 28, 2026 through October 27, 2031.
Amendment 1 approves two alternative lining systems in response to bidder questions: a geopolymer with less than 8,000 psi strength at structurally engineered thickness of 1.5 to 2 inches, and Quadex GeoKrete, both acceptable provided they meet all project requirements and specifications. The original specifications require 4,000 PSI shotcrete at 4 inches minimum thickness, ACI C 660 Shotcrete Nozzleman Certification, and adherence to SCDOT Standard Specifications (2025 edition) and current ACI Shotcrete construction standards. Contractors must mobilize within 20 calendar days of notification and complete work within 7 calendar days of beginning repairs at each location, with liquidated damages assessed per Section 108.09 for delays. All work includes labor, materials, equipment, traffic control, debris removal, and erosion control at the contractor's expense. Payment is made upon invoice submission after work completion and acceptance by the SCDOT District 3 Engineering Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT I.pdf | ||
| ATTACHMENT G.pdf | ||
| ATTACHMENT K.pdf | ||
| SOLICITATION 5400030105.pdf | ||
| ATTACHMENT F.pdf | ||
| ATTACHMENT E.pdf | ||
| ATTACHMENT J.pdf | ||
| ATTACHMENT D.pdf | ||
| ATTACHMENT H.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAP
State of South Carolina
Invitation For Bid
EXEMPT
AMENDMENT 1
Solicitation:
Date Issued:
Procurement Officer:
Phone:
E-Mail Address:
Mailing Address:
5400030105 09/11/2026 Tamika Thomas 864-239-6027
THOMASTS@SCDOT.ORG
SCDOT Procurement Office 955 Park St., Room 101 Columbia, SC 29201
DESCRIPTION: *DISTRICT 3 ON CALL PIPE REPAIR
USING GOVERNMENTAL UNIT: SC Department of Transportation
SUBMIT YOUR OFFER ON-LINE AT THE FOLLOWING URL: http://www.procurement.sc.gov SUBMIT OFFER BY (Opening Date/Time): 09/25/2026 @ 14:30:00 (See "Deadline For Submission Of Offer" provision) QUESTIONS MUST BE RECEIVED BY: 09/10/2026 @ 12:00:00 EXPIRED (See "Questions From Offerors" provision)
NUMBER OF COPIES TO BE SUBMITTED: ONE COPY
CONFERENCE TYPE: Not Applicable
DATE & TIME:
(As appropriate, see "Conferences - Pre-Bid/Proposal" & "Site Visit" provisions)
LOCATION: Not Applicable
AWARD &
AMENDMENTS
Award will be posted on 10/14/2026. The award, this solicitation, any amendments, and any related notices will be posted at the following web address: http://www.procurement.sc.gov
You must submit a signed copy of this form with Your Offer. By signing, You agree to be bound by the terms of the Solicitation. You agree to hold Your Offer open for a minimum of thirty (30) calendar days after the Opening Date. (See "Signing Your Offer" provision.)
NAME OF OFFEROR
(full legal name of business submitting the offer)
Any award issued will be issued to, and the contract will be formed with, the entity identified as the Offeror. The entity named as the offeror must be a single and distinct legal entity. Do not use the name of a branch office or a division of a larger entity if the branch or division is not a separate legal entity, i.e., a separate corporation, partnership, sole proprietorship, etc.
AUTHORIZED SIGNATURE
(Person must be authorized to submit binding offer to contract on behalf of Offeror.)
DATE SIGNED
TITLE
(business title of person signing above)
STATE VENDOR NO.
(Register to Obtain S.C. Vendor No. at www.procurement.sc.gov)
PRINTED NAME
(printed name of person signing above)
STATE OF INCORPORATION
(If you are a corporation, identify the state of incorporation.)
OFFEROR'S TYPE OF ENTITY: (Check one) (See "Signing Your Offer" provision.)
___ Sole Proprietorship ___ Partnership ___ Other_____________________________
___ Corporate entity (not tax-exempt) ___ Corporation (tax-exempt) ___ Government entity (federal, state, or local)
COVER PAGE - ON-LINE ONLY (MAR. 2015)
mailto:THOMASTS@SCDOT.ORG http://www.procurement.sc.gov/
AMENDMENTS TO SOLICITATION
(a) The Solicitation may be amended at any time prior to opening. All actual and prospective Offerors should monitor the following web site for the issuance of Amendments: www.procurement.sc.gov (b) Offerors shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on Page Two, (3) by letter, or
(4) by submitting a bid that indicates in some way that the bidder received the amendment. (c) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
QUESTIONS FROM OFFERORS - AMENDMENT (JUN 2017)
THE SOLICITATION IS AMENDED AS PROVIDED HEREIN. INFORMATION OR CHANGES RESULTING
FROM QUESTIONS WILL BE SHOWN IN A QUESTION-AND-ANSWER FORMAT. ALL QUESTIONS
RECEIVED HAVE BEEN REPRINTED BELOW. THE “STATE’S RESPONSE” SHOULD BE READ WITHOUT REFERENCE TO THE QUESTIONS. THE QUESTIONS ARE INCLUDED SOLELY TO PROVIDE A CROSS-
REFERENCE TO THE POTENTIAL OFFEROR THAT SUBMITTED THE QUESTION. QUESTIONS DO NOT
FORM A PART OF THE CONTRACT; THE “STATE’S RESPONSE” DOES. ANY RESTATEMENT OF PART OR ALL OF AN EXISTING PROVISION OF THE SOLICITATION IN AN ANSWER DOES NOT MODIFY THE
ORIGINAL PROVISION EXCEPT AS FOLLOWS: UNDERLINED TEXT IS ADDED TO THE ORIGINAL
PROVISON. STRICKEN TEXT IS DELETED. [02-2A097-1]
The following question was received regarding this solicitation. The response from SCDOT is below in red text.
The following changes have been made to Section III SCOPE OF WORK/SPECIFICATIONS AND SECTION VIII
BIDDING SCHEDULE: CORRECTIONS IN RED TEXT IS ADDED TO THE ORIGINAL PROVISON.
Question 1:
Rather than a 4,000-psi shotcrete at 4", would the Owner consider a < 8,000 psi geopolymer at a structurally engineered thickness? To achieve an equivalent design to shotcrete, those thickness designs will be 1.5-2"; and will far exceed what shotcrete could ever become and provide a completely structurally independent, new culvert at a thickness of 4".
SCDOT Response:
Change: Yes, the proposed geopolymer system is acceptable as an alternative, provided it meets all project requirements and specifications.
Question 2:
Would the owner/engineer consider Quadex GeoKrete an approved alternative lining system for this project?
SCDOT Response:
Change: Yes, the proposed Quadex GeoKrete is acceptable as an alternative, provided it meets all project requirements and specifications.
SAP
III. SCOPE OF WORK/SPECIFICATIONS
On-Call District 3 Pipe Repair (Shotcrete, Gunite)
1.0 Intent of Contract:
The intent of this contract is to structurally rehabilitate the full length of the invert of corrugated metal pipes and reinforced concrete pipes as needed. The work includes the cleaning of the pipe invert of all loose and foreign debris installing a minimum of 2”X2”-#12 galvanized welded wire mesh and then apply 4000 PSI shotcrete to fill all voids and form a new minimum 4-inch thick monolithic lining. RCP repair shall also include sealing the entire circumference of the pipe at each joint of pipe. See appendix for drawing showing typical repair. This is an “ON CALL” contract, the contractor shall be notified by the Department when a pipe is need of repair, and the contractor shall have a maximum of 20 Calendar days to mobilize and begin repairs on the pipe(s) which are in need of repair as indicated by the SCDOT. All work shall conform to the SCDOT Standard Specification (latest edition), the SCDOT Standard Drawings for Road Construction, current ACI Shotcrete construction standards, and these supplemental specifications. https://www.scdot.org/business/standard-specifications.html
SCDOT will consider a geopolymer with a strength of less than 8,000 psi at a structurally engineered thickness.
To provide an equivalent design to shotcrete, the engineered thickness shall be 1.5 to 2 inches. This is provided that it meets all project requirements and specifications.
SCDOT will consider Quadex GeoKrete acceptable as an alternative, provided it meets all project requirements and specifications. This is provided that it meets all project requirements and specifications.
2.0 Responsibilities:
A. SCDOT is responsible for:
1. Notifying by fax or mail the locations of pipe(s) in need of repair using the attached form: “Pipe Repair Notification”, which shall be accompanied by a location map. (Maps will be provided after the contract is awarded).
2. Inspecting all aspects of work on the project, as well as keeping accurate records of each day’s work.
3. Reviewing all invoices received from the vendor for accuracy before submitting for payment.
4. Monitoring and managing the resolution of any damage claims that may be received due to work done by this contract.
B. Vendor is responsible for:
1. Providing all materials, equipment, tools, labor, traffic control, personnel, reports, project management, and other incidentals (including but not limited to: cost for license, permits, insurance, certifications, and taxes) necessary to perform the work as described here in.
2. Providing ACI C 660 Shotcrete Nozzleman Certified labor to perform nozzelman duties when making shotcrete repair on all pipes.
3. Providing traffic control in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) and NCHRP 350 Standards. See appendix for detailed traffic control typical drawings and supplemental specifications for acceptable work zone traffic control devices.
4. Provide personnel with personal protective equipment to use while performing work. Failure to provide proper PPE shall be grounds for the project engineer to suspend work until compliance is met.
5. Complying with all federal, state, and local laws.
6. Protecting adjacent property at all times. Any damage to adjacent property caused by the vendor’s operations shall be repaired and restored to the satisfaction of the project engineer at the vendor’s expense. Damage Claims shall be handled as outlined in Section 4.0-B of this contract. Failure of the vendor to resolve damage claim issues in an appropriate and timely manner as determined by the project engineer shall serve as grounds for suspending work and placing the vendor in delinquent status until such issues have been resolved.
https://www.scdot.org/business/standard-specifications.html
7. Notifying the appropriate resident maintenance engineer a minimum of forty-eight (48) hours in advance of mobilizing to begin work.
3.0 Contract Details:
A. Definitions:
1. Project Engineer – the Resident Maintenance Engineer or his designee.
2. Delinquent Status – the vendor will be declared “delinquent” if the completion date passes and the vendor has not completed specified work, or the vendor fails to meet his responsibilities as outlined in these specifications. Liquidated damages will be charged in accordance with section
108.09 of the Standard Specifications for each calendar day the vendor is in delinquent status.
3. Vendor – contractor awarded the bid for this contract
B. Responsibility for Damage Claims:
A. Section 107.18, 107.21, 107.22 of the Standard Specifications shall apply.
1. When the Resident Maintenance Engineer (RME) receives a complaint he must:
a. Initiate a damage claim including claimants name, phone number, address, date of incident, time of incident and location of incident.
b. Determine if the Contractor’s personnel were working in the area of the incident on the date claimed. If the Contractor’s employees were performing work in the area of the incident on the date claimed the RME would provide the claimant the Contractor’s name, address and phone number.
c. Send e-mail to SCDOT Director of Procurement notifying of claim.
OR-
d. Determine if SCDOT personnel were performing work in the area of the incident on the date claimed. If SCDOT personnel were performing work in the area of the incident on the date claimed the RME would initiate a SCDOT internal damage claim.
2. When the Contractor receives a complaint:
a. The contractor must ensure that the damage claim form (see appendix Attachment H for SCDOT Contract Service Damage Claim Form) if completed and within the same business day send a copy to the Director of Procurement in the SCDOT Procurement office.
SCDOT
Attn: Director of Procurement PO Box 191 (Room 101) Columbia, SC 29202-0191 Fax: 803-737-2046
b. The Contractor, once a claim is received, will have 10 days to review and investigate the claim and make a determination of the validity of the claim. The Contractor will then send written notice to the Director of Procurement as to the disposition of the claim. If the claim is not paid and is disputed by the claimant, the Contractor must give compelling information as to why the claim was not paid and meet with the Director of Procurement and review the claim. The review meeting will be held in the location of the claim and all people involved in the claim will be present.
B. Protection of Highway Traffic
Adequate provisions shall be made for the protection of the highway traffic at all times. Necessary traffic control, detours, lights, signs barricades, warning signs, and flagmen shall be provided by, and at the expense of the contractor and shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD), SCDOT Standard Drawings for Road Construction, and NCHRP 350 standards.
The work shall be planned and carried out so that there will be the least possible inconvenience to the highway traffic. The vendor agrees to observe all rules and regulations of the Department while carrying on the work described herein, and take all other precautions that circumstances warrant. Adequate provisions shall be made for the proper drainage of the highway. The vendor shall be responsible for leaving work area safe to motorists and pedestrians during non-working hours.
C. Standards of Construction
All work shall be performed in accordance with the Department’s Standard Specifications for Highway Construction-Edition of 2007 2025 and Standard Drawings for Road Construction, current ACI Shotcrete construction standards and these supplemental specifications. All work shall conform to recognized standards of construction and shall be performed in a workmanlike manner. All work shall be subject to the supervision and satisfaction of the Department.
D. Utility Location It is the vendor’s responsibility to have all utilities located prior to beginning any work. It is also the vendor’s responsibility to contact Palmetto Utility Protection Service within the required time period prior to beginning work.
E. Protection of Roadway The contractor shall take special care during the course of his operations to avoid damage to the existing roadway surface. Any damage caused by the contractor’s operations shall be repaired at his expense.
The contractor shall also take special care to avoid damage to existing roadway shoulders, side ditches, outfalls, other watercourses and drainage structures. Any damage caused by the contractor’s operation shall be repaired at his expense. Damage in this case shall include the filling of previously open ditches, water courses or drainage structures with soil or debris.
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) Includes all labor, equipment, and material necessary to line the entire length of pipe with monolithic 4 inch thick shotcrete (gunite) and reinforcing wire, including splash pads as shown in the attached detailed drawings. The Unit Price for Item 1 shall also include removing and disposing of debris, and cleaning the pipe to the satisfaction of the SCDOT Engineer prior to placing shotcrete.
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Includes all labor, equipment, and material necessary to place shotcrete in voids above and beyond the 4 inch thick monolithic pipe lining as directed by the SCDOT Engineer.
Item 3 – Flowable Fill per Cubic Yard (YD3)
Includes all labor, equipment, and material necessary to place flowable fill as directed by the SCDOT Engineer to fill large voids and/or repair shoulders and slopes.
Item 4 – Neat Grout per Cubic Feet (FT3)
Includes all labor, equipment, and material necessary to grout joints in RCP as directed by the SCDOT Engineer.
Item 5 – Mobilization per call - EACH
Includes all labor, equipment, and material necessary for the contractor to mobilize to each pipe location. Unit price for Mobilization shall be paid for each pipe location unless two or more pipes are located within one mile of each other, in this instance, the contractor shall be paid mobilization only once for all pipes located in the one mile length.
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Includes all labor, equipment, and material to properly setup and maintain a lane closure on a two-lane roadway as shown on the attached typical drawing. Contractor shall be paid for ONE lane closure per pipe location as required, regardless of the number of days work is being done at that location.
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Includes all labor, equipment, and material to properly setup and maintain a lane closure on a multilane roadway as shown on the attached typical drawing. Contractor shall be paid for ONE multilane closure per pipe location as required, regardless of the number of days work is being done at that location.
Item 8 – Shoulder Closure per call - EACH Includes all labor, equipment, and material to properly setup and maintain a shoulder closure on a roadway as shown on the attached typical drawing if there is enough shoulder to work without a lane closure. Contractor shall be paid for ONE shoulder closure per pipe location as required, regardless of the number of days work is being done at that location.
G. Payment
Once all work is complete and accepted by the Department, the contractor shall submit an invoice to: (email preferred method of submitting invoices)
SCDOT District 3 Engineering Administration Attn: Michael Anders Email: AndersMA@scdot.gov 252 S. Pleasantburg Drive Greenville, SC 29607
Invoices may be sent monthly for work completed during a one-month period.
H. Construction Requirements All pipes shall be completely cleaned of debris to the satisfaction of the engineer prior to placing the 4” thick monolithic shotcrete lining or the alternatives listed in question 1 on this Amendment 1. It shall be the contractor’s responsibility to dispose of all debris from the project.
Shotcrete shall be placed in accordance to the attached drawings.
The contractor is responsible for maintaining erosion control throughout duration of project. Any damage caused to adjacent properties including failure to prevent erosion control shall be the contractor’s responsibility to repair at his expense.
All work and equipment shall be contained within the work zone established by the Traffic Control setup.
I. Contract Time This is an “ON CALL” Contract, all work required by this contract shall be completed within 7 calendar days of beginning pipe rehab work at a specific location. Contractor must mobilize and begin work within 20 calendar days of notification of a deficient pipe by the Department. For each calendar day that the contractor fails to mobilize and begin work after 20 calendar days of notification from the Department, the contractor shall be charged liquidated damages according to section 108.09 of the Standard Specifications. For each calendar day that any work shall remain uncompleted after 7 calendar days of starting work at a specific pipe location, the contractor shall be charged liquidated damages according to section 108.09 of the Standard Specifications. In the case that the contractor is notified of multiple pipe repair locations at one time, the contractor shall mobilize within 20 days to start the first pipe repair and complete all pipe repairs before demobilizing unless written permission is given by the engineer. Should the contractor demobilized before work is completed without written permission from the engineer, liquidated damages will be charged accordingly. The Department reserves the right to prioritize the order in which pipe repairs are made.
K. Attachments D - K
1. SCDOT Standard Specifications for Highway Construction 2007
2. SCDOT Pipe Repair Typical Drawing
3. SCDOT Traffic Control Standard Drawings
4. SCDOT Work Zone Safety Guidelines
5. NCHRP 350 Approved Products List for Traffic Control Devices in Work Zones – July 2018
6. SCDOT Damage Claim Form
7. SCDOT Resident Engineer Contact List – District 3
8. SCDOT Pipe Repair Notification Form
ATTACHMENT D Relevant sections of the SCDOT Standard Specifications for Highway Construction 2025 ATTACHMENT E SCDOT Pipe Repair Typical Drawing ATTACHMENT F SCDOT Traffic Control Standard Drawings ATTACHMENT G SCDOT Work Zone Safety Guidelines mailto:AndersMA@scdot.gov
ATTACHMENT H SCDOT Damage Claim Form ATTACHMENT I SCDOT Resident Engineer Contact List – District 3 ATTACHMENT J SCDOT Pipe Repair Notification Form ATTACHMENT K NCHRP 350 Approved Products List for Traffic Control Devices in Work Zones – July 2018 (attached separately in SCEIS)
SEE BIDDING SCHEDULE
See Bidding Schedule
DELIVERY/PERFORMANCE LOCATION -- PURCHASE ORDER
After award, all deliveries shall be made and all services provided to the following address, unless otherwise specified:
Throughout SCDOT Engineering District 3
DELIVERY DATE -- 20 DAYS ARO (MODIFIED)
Unless otherwise specified herein, all items shall be delivered no later than twenty (20) days after contractor's receipt of the purchase order and SCDOT Contact approval of shop drawing. If the using governmental unit requests delivery sooner than the time specified, contractor may invoice the ordering entity any additional shipping charges approved by the ordering entity on the purchase order.
SAPVIII. BIDDING SCHEDULE / PRICE-BUSINESS PROPOSAL
BIDDING SCHEDULE
Line Number Quantity Unit of Measure Unit Price Extended Price
0001 200 Cubic Yard
Product Catg.: 93462 - Pipe and Pipe Fittings Maintenance and Repair
Item Description: Shotcrete Pipe Repair (Gunite 4000 PSI) or a < 8,000 psi geopolymer at a structurally engineered thickness. Those thickness designs will be 1.5-2" or Quadex GeoKrete acceptable as an alternative, provided it meets all project requirements and specifications. This is provided that it meets all project requirements and specifications.
Tendering Text: Includes all labor, equipment, and material necessary to line the entire length of pipe with monolithic 4 inch thick shotcrete (gunite) and reinforcing wire, including splash pads as shown in the attached detailed drawings. The Unit Price for Item 1 shall also include removing and disposing of debris and cleaning the pipe to the satisfaction of the SCDOT Engineer prior to placing shotcrete.
0002 150 Cubic Yard
Item Description: Shotcrete - Filling Void
Tendering Text: Includes all labor, equipment, and material necessary to place shotcrete in voids above and beyond the 4 inch thick monolithic pipe lining as directed by the SCDOT Engineer.
0003 50 Cubic Yard
Item Description: Flowable Fill
Tendering Text: Includes all labor, equipment, and material necessary to place flowable fill as directed by the SCDOT Engineer to fill large voids and/or repair shoulders and slopes.
0004 80 Cubic Feet
Item Description: Neat Grout
Tendering Text: Includes all labor, equipment, and material necessary to grout joints in RCP as directed by the SCDOT Engineer.
0005 10 Each
Item Description: Mobilization Per Call
Tendering Text: Includes all labor, equipment, and material necessary for the contractor to mobilize to each pipe location. Unit price for Mobilization shall be paid for each pipe location unless two or more pipes are located within one mile of each other, in this instance, the contractor shall be paid mobilization only once for all pipes located in the one mile length.
0006 5 Each
Item Description: Lane Closure 2-Lane Per Call
Tendering Text: Includes all labor, equipment, and material to properly setup and maintain a lane closure on a two-lane roadway as shown on the attached typical drawing. Contractor shall be paid for ONE lane closure per pipe location as required, regardless of the number of days work is being done at that location.
0007 3 Each
Item Description: Lane Closure Multi-Lane Per Call
Tendering Text: Includes all labor, equipment, and material to properly setup and maintain a lane closure on a multilane roadway as shown on the attached typical drawing. Contractor shall be paid for ONE multilane closure per pipe location as required, regardless of the number of days work is being done at that location.
0008 6 Each
Item Description: Shoulder Closure Per Call
Tendering Text: Includes all labor, equipment, and material to properly setup and maintain a shoulder closure on a roadway as shown on the attached typical drawing if there is enough shoulder to work without a lane closure. Contractor shall be paid for ONE shoulder closure per pipe location as required, regardless of the number of days work is being done at that location.
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| It is the vendor’s responsibility to have all utilities located prior to beginning any work. It is also the vendor’s responsibility to contact Palmetto Utility Protection Service within the required time period prior to beginning work. |
| E. Protection of Roadway |
| The contractor shall take special care during the course of his operations to avoid damage to the existing roadway surface. Any damage caused by the contractor’s operations shall be repaired at his expense. The contractor shall also take special ca... |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |