ATTACHMENT H.pdf
PDF 63 KB Posted
- Attached to
- DISTRICT 3 ON CALL PIPE REPAIR
- Solicitation number
- 5400030105
- Issued by
- Richland County, South Carolina
About this file
This is a Pipe Repair Notification form document for the South Carolina Department of Transportation (SCDOT) District 3 On Call Pipe Repair contract opportunity, covering six counties: Abbeville, Edgefield, Greenwood, Laurens, McCormick, and Saluda. The form serves as a notification and work record document for pipe repair projects across the district. The contract involves repair services for corrugated metal and reinforced concrete pipes of varying sizes and lengths at creek crossings along roadways. The work scope includes shotcrete application, flowable fill installation, neat grout application, and associated lane closure work on two-lane and multilane roadways as well as shoulder closures. The notification form captures project details including road number, mile point, pipe specifications, and type of lane closure required, with a lower section for contractors to document work commencement and completion dates.
Contractor qualifications require a minimum of five years of direct experience in the described work, with supporting documentation submitted at the time of bid. The contract utilizes a unit price structure with eight pay items: shotcrete of pipe per cubic yard, additional shotcrete per cubic yard, flowable fill per cubic yard, neat grout per cubic foot, mobilization per call, lane closure on two-lane roadways per call, lane closure on multilane roadways per call, and shoulder closure per call. The work must comply with SCDOT Standard Specifications and established traffic control standards as detailed in referenced standard drawings and work zone safety protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 1.pdf | ||
| ATTACHMENT D.pdf | ||
| ATTACHMENT I.pdf | ||
| ATTACHMENT G.pdf | ||
| ATTACHMENT F.pdf | ||
| ATTACHMENT E.pdf | ||
| ATTACHMENT J.pdf | ||
| ATTACHMENT K.pdf | ||
| SOLICITATION 5400030105.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 1 6/15/2020
PIPE REPAIR NOTIFICATION
Date of Notification: ______________________ Contractor: _______________________________
Requested by (RME): ___________________________
County (circle one): Abbeville--Edgefield--Greenwood--Laurens--McCormick--Newberry--Saluda
Road Number: ___________________________
Mile Point: ______________________________
Creek Crossing: ________________________________________________________
Type of Pipe (circle one): Corrugated Metal – Reinforced Concrete
Size of Pipe (diameter in inches): ________________________
Length of Pipe (feet): __________________________________
Type of Lane Closure Required: (circle one) Shoulder Closure Two Lane Roadway Lane Closure Multilane Roadway Lane Closure
Additional Comments:
ATTACH 8.5” x 11” LOCATION MAP
RME should fill out one sheet per pipe location and fax to the contractor and keep this sheet in a file as a record of notification and complete the lower portion as work is completed.
LOWER PORTION TO BE FILLED OUT AS WORK PROGRESSES:
Date contractor mobilized and began work: __________________________________
Date pipe repair was completed: ___________________________________________
List appropriate pay items and quantities here: ________________________________
Additional Comments:
ATTACHMENT H
| 2.0 Contractor Qualifications: |
| Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat... |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Previous Solicitation.pdf |
| Solicitation DRAFT |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Relevant Sections of the SCDOT Standard Specifications |
| Pages from SCDOT 2007 Standard Specs-2_Redacted |
| Pages from SCDOT 2007 Standard Specs_Redacted |
| SCDOT Pipe Drawing |
| G. Payment |
| I. Contract Time |
| Appendix 1 |
| Traffic Control Stnd Draw |
| 610-005-00.pdf |
| 610-005-10.pdf |
| 610-010-00.pdf |
| 610-025-00.pdf |
| 610-205-00.pdf |
| 610-210-00.pdf |
| 610-215-00.pdf |
| SCDOT Work Zone Safety |
| Damage Claim Form |
| D2 Engineers Contact List |
| Abbeville |
| Anderson |
| Edgefield |
| Greenwood |
| Laurens |
| McCormick |
| Newberry |
| Saluda |
| PIPE REPAIR NOTIFICATION |
| PIPE REPAIR NOTIFICATION |
| Date of Notification: ______________________ Contractor: _______________________________ |
| Requested by (RME): ___________________________ |
| ATTACH 8.5” x 11” LOCATION MAP |
| D2 Engineers Contact List (1).pdf |
| Abbeville |
| Anderson |
| Edgefield |
| Greenwood |
| Laurens |
| McCormick |
| Newberry |
| Saluda |
| Solicitation Just need page 1.pdf |
| 2.0 Contractor Qualifications: |
| Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat... |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
| Solicitation.pdf |
| 2.0 Contractor Qualifications: |
| B. Protection of Highway Traffic |
| C. Standards of Construction |
| D. Utility Location |
| E. Protection of Roadway |
| F. Pay Items and Descriptions |
| Item 1 – Shotcrete of Pipe per Cubic Yard (YD3) |
| Item 2 – Additional Shotcrete per Cubic Yard (YD3) |
| Item 3 – Flowable Fill per Cubic Yard (YD3) |
| Item 4 – Neat Grout per Cubic Feet (FT3) |
| Item 5 – Mobilization per call - EACH |
| Item 6 – Lane Closure on a Two Lane Roadway per call - EACH |
| Item 7 - Lane Closure on a Multilane Roadway per call - EACH |
| Item 8 – Shoulder Closure per call - EACH |
| G. Payment |
| I. Contract Time |
File details come from the government source that posted it. Updated .