ATTACHMENT H.pdf

PDF 63 KB Posted

Attached to
DISTRICT 3 ON CALL PIPE REPAIR
Solicitation number
5400030105
Issued by
Richland County, South Carolina

About this file

This is a Pipe Repair Notification form document for the South Carolina Department of Transportation (SCDOT) District 3 On Call Pipe Repair contract opportunity, covering six counties: Abbeville, Edgefield, Greenwood, Laurens, McCormick, and Saluda. The form serves as a notification and work record document for pipe repair projects across the district. The contract involves repair services for corrugated metal and reinforced concrete pipes of varying sizes and lengths at creek crossings along roadways. The work scope includes shotcrete application, flowable fill installation, neat grout application, and associated lane closure work on two-lane and multilane roadways as well as shoulder closures. The notification form captures project details including road number, mile point, pipe specifications, and type of lane closure required, with a lower section for contractors to document work commencement and completion dates.

Contractor qualifications require a minimum of five years of direct experience in the described work, with supporting documentation submitted at the time of bid. The contract utilizes a unit price structure with eight pay items: shotcrete of pipe per cubic yard, additional shotcrete per cubic yard, flowable fill per cubic yard, neat grout per cubic foot, mobilization per call, lane closure on two-lane roadways per call, lane closure on multilane roadways per call, and shoulder closure per call. The work must comply with SCDOT Standard Specifications and established traffic control standards as detailed in referenced standard drawings and work zone safety protocols.

View the file

Other files

File Type Posted
AMENDMENT 1.pdf PDF
ATTACHMENT D.pdf PDF
ATTACHMENT I.pdf PDF
ATTACHMENT G.pdf PDF
ATTACHMENT F.pdf PDF
ATTACHMENT E.pdf PDF
ATTACHMENT J.pdf PDF
ATTACHMENT K.pdf PDF
SOLICITATION 5400030105.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 1 6/15/2020

PIPE REPAIR NOTIFICATION

Date of Notification: ______________________ Contractor: _______________________________

Requested by (RME): ___________________________

County (circle one): Abbeville--Edgefield--Greenwood--Laurens--McCormick--Newberry--Saluda

Road Number: ___________________________

Mile Point: ______________________________

Creek Crossing: ________________________________________________________

Type of Pipe (circle one): Corrugated Metal – Reinforced Concrete

Size of Pipe (diameter in inches): ________________________

Length of Pipe (feet): __________________________________

Type of Lane Closure Required: (circle one) Shoulder Closure Two Lane Roadway Lane Closure Multilane Roadway Lane Closure

Additional Comments:

ATTACH 8.5” x 11” LOCATION MAP

RME should fill out one sheet per pipe location and fax to the contractor and keep this sheet in a file as a record of notification and complete the lower portion as work is completed.

LOWER PORTION TO BE FILLED OUT AS WORK PROGRESSES:

Date contractor mobilized and began work: __________________________________

Date pipe repair was completed: ___________________________________________

List appropriate pay items and quantities here: ________________________________

Additional Comments:

ATTACHMENT H

2.0 Contractor Qualifications:
Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat...
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time
Previous Solicitation.pdf
Solicitation DRAFT
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time
Relevant Sections of the SCDOT Standard Specifications
Pages from SCDOT 2007 Standard Specs-2_Redacted
Pages from SCDOT 2007 Standard Specs_Redacted
SCDOT Pipe Drawing
G. Payment
I. Contract Time
Appendix 1
Traffic Control Stnd Draw
610-005-00.pdf
610-005-10.pdf
610-010-00.pdf
610-025-00.pdf
610-205-00.pdf
610-210-00.pdf
610-215-00.pdf
SCDOT Work Zone Safety
Damage Claim Form
D2 Engineers Contact List
Abbeville
Anderson
Edgefield
Greenwood
Laurens
McCormick
Newberry
Saluda
PIPE REPAIR NOTIFICATION
PIPE REPAIR NOTIFICATION
Date of Notification: ______________________ Contractor: _______________________________
Requested by (RME): ___________________________
ATTACH 8.5” x 11” LOCATION MAP
D2 Engineers Contact List (1).pdf
Abbeville
Anderson
Edgefield
Greenwood
Laurens
McCormick
Newberry
Saluda
Solicitation Just need page 1.pdf
2.0 Contractor Qualifications:
Vendor shall provide, WITH THEIR BID, the SCDOT with sufficient proof and documentation of a minimum of five years of experience directly related to the work described here in. Documentation submitted for review shall at minimum include: dates, locat...
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time
Solicitation.pdf
2.0 Contractor Qualifications:
B. Protection of Highway Traffic
C. Standards of Construction
D. Utility Location
E. Protection of Roadway
F. Pay Items and Descriptions
Item 1 – Shotcrete of Pipe per Cubic Yard (YD3)
Item 2 – Additional Shotcrete per Cubic Yard (YD3)
Item 3 – Flowable Fill per Cubic Yard (YD3)
Item 4 – Neat Grout per Cubic Feet (FT3)
Item 5 – Mobilization per call - EACH
Item 6 – Lane Closure on a Two Lane Roadway per call - EACH
Item 7 - Lane Closure on a Multilane Roadway per call - EACH
Item 8 – Shoulder Closure per call - EACH
G. Payment
I. Contract Time

File details come from the government source that posted it. Updated .