Attachment E FY27 Restoration & Repair Material Price Sheet.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
AHEC-27701-R ON-CALL SERVICE PROVIDERS/SMALL CONSTRUCTION
Solicitation number
RFP GMAA 2026000197 2
Issued by
Denver County, Denver City, Colorado

About this file

This is a Restoration & Repair Material Price Sheet for AHEC's on-call service provider contract AHEC-27701-R in Colorado. The rate sheet establishes the pricing structure for restoration and repair services to be performed during the fiscal year July 1, 2026 through June 30, 2027. Offerors seeking consideration under the Restoration & Repair trade must complete this form with all required rates, which will remain firm throughout the contract term. The sheet covers an extensive range of services and materials including drywall installation, carpet cleaning and deodorization, insulation, suspended ceiling installation and maintenance, water extraction and remediation, mold and asbestos services, demolition, painting, and various equipment rental periods measured in 24-hour increments.

The rate sheet requires offerors to provide unit-based pricing across multiple categories of labor, materials, and services, with compensation structured variously per square foot, linear foot, hour, and per-service-call basis. Specific labor categories include Environmental Project Director, Project Manager, Project technician, Mold or Asbestos Supervisor and Technician positions, with differentiated rates for after-hours services (defined as Saturday, Sunday, and non-regular business hours outside Monday-Friday 6:00 AM to 6:00 PM). All rates must be submitted using the provided rate sheet format; altered formats or rates submitted on company letterhead will not be accepted. AHEC reserves the right to negotiate rates upon contractor selection and at contract renewal. The completed, signed rate sheet must be submitted with the response under Tab 4: Personnel.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attach E - Restoration & Repair Attachment E - Restoration & Repair Rate Sheet

This form is to be completed ONLY by Offerors seeking consideration under the Restoration & Repair trade.

Rates must be provided using this Rate Sheet; altered or rates provided on Company letterhead will NOT be accepted. All rates must remain firm for the contract term (July 1, 2026 through June 30, 2027).

DescriptionRateUnit of Measure
5/8" drywall - hung, taped, ready for texture$per SF
Air mover - No monitoring$per 24 hour period
Air mover axial fan - No monitoring$per 24 hour period
Apply plant-based anti-microbial agent$per SF
Batt insulation - 6" - R19 - unfaced batt$per SF
Clean and deodorize carpet$per SF
Clean and deodorize carpet$per SF
Clean suspended ceiling grid$per SF
Clean the floor with pressure steam$per SF
Content. Water Extraction & Remediation Technician - Manipulation charge - after business hours*$per SF / per hour (after hours)
Cove base molding - rubber or vinyl, 4" high$per LF
Dehumidifier - XLarge - No monitoring$per 24 hour period
Emergency service call - after business hours*$each (after hours)
Equip. setup, take down, & monitoring - after business hours*$each (after hours)
Equipment setup, take down, and monitoring$per hour
Final cleaning - construction – Commercial$per SF
Flood Cuts based on up to 24” height$per SF
General Demolition$per hour
Mask and prep for paint - plastic, paper, tape$per LF
Seal/prime then paint the walls twice (3 coats)$per SF
Scissor Lift$per 24 hour period
Suspended ceiling grid - 2' x 2'$per SF
Suspended ceiling tile - 2' x 2'$per SF
Water Extraction & Remediation Technician$per hour
Water extraction from hard surface floor - after business hours*$per SF / per hour (after hours)
Consulting/Project Manager/Labor CostRateUnit of Measure
Environmental Project Director$per hour
Environmental Project manager$per hour
Mold or Asbestos Supervisor$per hour
Mold or Asbestos Technician$per hour
Project Director$per hour
Project Manager$per hour
Project technician$per hour
Accounting Technician$per hour
* After business hours shall mean Saturday, Sunday, and/or non-regular business hours **
** Regular business hours shall mean Monday through Friday, 6:00AM to 6:00PM

NOTE: AHEC reserves the right to negotiate rates upon Contractor/Service Provider selection and at the time of renewal.

Campany Name Signature

THIS PAGE MUST BE COMPLETED, SIGNED, AND INCLUDED WITH RESPONSE UNDER TAB 4: PERSONNEL

File details come from the government source that posted it. Updated .