Attachment #9 Build America Buy America Information.pdf
PDF 323 KB Posted
- Attached to
- Boardwalk construction
- Solicitation number
- IFB-114989
- Issued by
- Covington City, Virginia
About this file
Summary
This is a Build America, Buy America (BABA) compliance document issued by the Commonwealth of Virginia for a state and local construction contract. The document establishes special conditions and requirements applicable to the Hopewell Riverwalk construction project, which involves the construction of a boardwalk to connect the existing phase II terminus to the Hopewell City Marina. The BABA requirements mandate that all contractors and subcontractors comply with domestic content provisions established under the Infrastructure Investment and Jobs Act (Public Law 117-58) and implementing regulations at 2 C.F.R. Part 184.
The document specifies that all iron, steel, manufactured products, and construction materials permanently incorporated into the project must be produced in the United States, with iron and steel products requiring 100 percent domestic production from initial melting through final coating, manufactured products requiring at least 55 percent U.S.-produced components by cost, and construction materials requiring domestic manufacturing. Project funding is provided through the U.S. Department of Housing and Urban Development (HUD) via the Community Development Block Grant (CDBG) Program, making BABA compliance mandatory unless a general applicability waiver or project-specific waiver has been issued or approved by HUD. Contractors must submit a completed BABA Compliance Affidavit prior to award, maintain documentation demonstrating compliance, include BABA requirements in all subcontracts and purchase orders, and understand that non-compliance constitutes material breach and may result in rejection of materials, payment withholding, cost disallowance, termination for default, or other remedies under Virginia law and federal regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL CONDITIONS
BUILD AMERICA, BUY AMERICA (BABA) REQUIREMENTS
(Infrastructure Investment and Jobs Act)
1. Federal Funding and Applicability
This project is funded in whole or in part with federal financial assistance provided by the U.S.
Department of Housing and Urban Development (HUD) through the Community Development
Block Grant (CDBG) Program. Accordingly, this procurement and any resulting contract are subject to the Build America, Buy America (BABA) provisions of the Infrastructure
Investment and Jobs Act (Public Law 117-58) and implementing regulations at 2 C.F.R. Part
184.
These requirements apply to all contracts, subcontracts, purchase orders, and lower-tier agreements for the construction, alteration, maintenance, or repair of infrastructure.
2. Domestic Content Requirement
Unless a waiver has been issued or approved by HUD, the Contractor shall ensure that all iron, steel, manufactured products, and construction materials permanently incorporated into the project are produced in the United States, as defined below:
a. Iron and Steel Products
All manufacturing processes, from the initial melting stage through the application of coatings, must occur in the United States.
b. Manufactured Products
Manufactured products must be manufactured in the United States, and the cost of components produced in the United States must exceed fifty-five percent (55%) of the total cost of all components.
c. Construction Materials
Construction materials, including but not limited to non-ferrous metals, plastic and polymer-based products, glass, fiber optic cable, lumber, drywall, and engineered wood products, must be manufactured in the United States.
3. Bidder Certification and Responsiveness
By submission of a bid, the bidder certifies that it has reviewed and understands the BABA requirements and agrees to comply fully with all applicable domestic content provisions.
Failure to acknowledge or comply with these requirements may render the bid non-responsive in accordance with the Virginia Public Procurement Act and the terms of this Invitation to Bid.
4. Documentation and Verification
The successful bidder shall be required to submit, upon request and prior to payment, certifications, affidavits, or other documentation sufficient to demonstrate compliance with
BABA requirements for all covered materials used in the project.
The Owner reserves the right to:
• Review material certifications,
• Conduct site inspections,
• Require corrective action, or
• Withhold payment for non-compliant materials.
5. Waivers
The use of foreign-produced iron, steel, manufactured products, or construction materials is prohibited unless:
• A general applicability waiver has been issued by HUD, or
• A project-specific waiver has been approved by HUD based on public interest, non-availability, or unreasonable cost.
The Contractor shall not substitute or install non-compliant materials without prior written approval from the Owner and HUD, where applicable. The Contractor bears all risk associated with unapproved substitutions.
6. Flow-Down Requirement
The Contractor shall include the substance of this provision in all subcontracts and purchase orders, regardless of tier, and shall be responsible for ensuring compliance by subcontractors and suppliers.
7. Remedies for Non-Compliance
Non-compliance with BABA requirements shall constitute a material breach of contract and may result in one or more of the following remedies, consistent with Virginia law and federal regulations:
• Rejection of materials,
• Withholding of progress payments,
• Disallowance of costs,
• Termination for default, or
• Any other remedy available under the contract or applicable law.
BUILD AMERICA, BUY AMERICA (BABA) COMPLIANCE AFFIDAVIT
Project Name: ___________________________________________
Project Number (if applicable): __________________________
Owner / Locality: _______________________________________
Funding Source: HUD Community Development Block Grant (CDBG)
AFFIDAVIT
I, the undersigned, being duly sworn, depose and say as follows:
1. Authority
I am an authorized officer or agent of the bidder/contractor listed below and am duly authorized to execute this affidavit on behalf of the firm.
2. Acknowledgment of Federal Requirements
I acknowledge that the above-referenced project is funded in whole or in part with federal financial assistance provided by the U.S. Department of Housing and Urban
Development (HUD) and is subject to the Build America, Buy America (BABA) provisions of the Infrastructure Investment and Jobs Act (Public Law 117-58) and implementing regulations at 2 C.F.R. Part 184.
3. Certification of Compliance
I hereby certify that all iron, steel, manufactured products, and construction materials that will be permanently incorporated into the project shall be produced in the
United States, unless a waiver has been issued or approved by HUD.
4. Material Standards
Specifically, I certify that:
o All iron and steel products will be 100 percent produced in the United States, including all manufacturing processes from initial melting through final coating.
o All manufactured products will be manufactured in the United States, and the cost of U.S.-produced components will exceed 55 percent of the total cost of all components.
o All construction materials, as defined by federal regulation, will be manufactured in the United States.
5. Waivers
I understand that foreign-produced materials may only be used if:
o A general applicability waiver has been issued by HUD; or o A project-specific waiver has been approved by HUD in writing.
I further acknowledge that no non-compliant materials may be installed without prior written approval from the Owner and HUD, where required.
6. Documentation and Recordkeeping
I agree to maintain and provide, upon request, all documentation necessary to verify compliance with BABA requirements, including manufacturer certifications, supplier affidavits, and cost documentation.
7. Flow-Down Requirement
I certify that all subcontractors, suppliers, and vendors will be required to comply with
BABA requirements and that such requirements will be included in all subcontracts and purchase orders.
8. Acknowledgment of Remedies
I understand that failure to comply with BABA requirements may result in rejection of materials, withholding of payment, disallowance of costs, termination for default, or other remedies available under federal law, the contract, and the Virginia Public
Procurement Act.
CONTRACTOR INFORMATION
Legal Name of Firm: _____________________________________
Address: ______________________________________________
City, State, ZIP: ______________________________________
Telephone: ____________________________________________
Email: ________________________________________________
SIGNATURE
I declare under penalty of perjury that the foregoing is true and correct.
Signature: _____________________________________________
Printed Name: _________________________________________
Title: ________________________________________________
Date: _________________________________________________
COMMONWEALTH OF VIRGINIA
CITY / COUNTY OF _______________________
Subscribed and sworn before me this _____ day of __________, 20.
Notary Public: _________________________________________
My Commission Expires: _________________________________
Notary Registration No.: _______________________________