This is an IT Requirements Workbook (Appendix H) supporting the Request for Proposals for External Quality Review Organization (EQRO) services issued by the New Hampshire Department of Health and Human Services, Division of Program Quality and Integrity. The workbook establishes comprehensive technical and security requirements that vendors must address in their proposals, including general application specifications, application security protocols, testing methodologies, hosting and cloud infrastructure standards, disaster recovery procedures, service level agreements, support and maintenance requirements, and project management obligations. Vendors are required to respond to mandatory (M), preferred (P), and optional (O) requirements by indicating whether their proposed solution can deliver each functionality as a standard feature, future release, custom modification, or not available offering. Responses must include detailed comments explaining how each requirement will be met, with custom modifications requiring estimated hours, billing rates, and total costs. The contract performance period runs from July 1, 2026, through June 30, 2029, with possible renewal extensions of up to four additional years, and proposals were due March 13, 2026, at 12:00 PM Eastern Time.

The workbook mandates that all proposed solutions utilize open standards (XML, HTML, SQL) and comply with W3C standards including HTML5, CSS 2.1, and XML 1.1 for web-based compatibility. Security requirements are extensive, encompassing user authentication, role-based access controls, complex password enforcement, encryption of data in transit and at rest using Advanced Encryption Standard (AES), session timeout capabilities, comprehensive audit logging with one-year retention (six years if protected health information is involved for HIPAA compliance), and change management documentation. Hosting infrastructure must meet ANSI/TIA-942 Tier 3 Data Center specifications with 99.982% availability, daily differential backups with weekly complete backups, off-site data storage, and server patch installation within sixty days of manufacturer release. Vendors must provide technical support available Monday through Friday, 8:30 AM to 5:00 PM EST, with response times tiered by deficiency classification (Class A deficiencies within two to four hours, Class B and C deficiencies within four hours). The workbook does not specify pricing information, set-asides, or incumbent vendor details, as this is a technical compliance document supporting the broader RFP evaluation process.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Vendor Instructions for Technical (TR) Requirements
Vendor Response Column: Place a “Yes” if the current release of the software can fully support ALL the functionality described in the row, without special customization. A “Yes” can only be used if the delivery method is Standard (see delivery method instructions below). Otherwise, enter an "No"; A "No" can only be used with delivery method Future, Custom, or Not Available/Not Proposing (see delivery method instructions below).

Criticality Column:

(M) Indicates a requirement that is "Mandatory". The State considers it to be of such great importance that it must be met in order for the proposal to be accepted. If the proposer believes that there is something about their proposal that either obviates the need for this requirement or makes it of less importance this must be explained within the comments. The State retains the right to accept a proposal if the need of the requirement is reduced or eliminated by another feature of the proposal.

(P) Indicates a requirement which is "Preferred". This requirement is considered by the State to be of great usefulness but the lack of this feature is not considered serious enough to disqualify the proposal.

(O) Indicates a requirement which is "Optional". This requirement is considered by the State to be one which useful or potentially useful but not a central feature of the Project.

Delivery Method Column:

Complete the delivery method using a Standard, Future, Custom, or Not Available/Not Proposing (as defined below) that indicates how the requirement will be delivered.

Standard - Feature/Function is included in the proposed system and available in the current software release.

Future - Feature/Function will be available in a future release. (Provide anticipated delivery date, version, and service release in the comment area.)

Custom - Feature/Function can be provided with custom modifications. (Respondent must provide estimated hours and average billing rate or flat cost for the software modification in the comment area. These cost estimates should add up to the total cost for software modifications found in the cost summary table in Section X of the RFP).

Not Available/Not Proposing - Feature/Function has not been proposed by the Vendor. (Provide brief description of why this functionality was not proposed.)

Comments Column:

For all Delivery Method responses vendors must provide a brief explanation of how the requirement will be met. Free form text can be entered into this column.

Vendor Instructions for Activity, Deliverable, and Milestone
Vendor shall complete the Activity Deliverable, and Milestone Table identifying estimated delivery date and price.

Technical Requirements

APPLICATION REQUIREMENTS
State Requirements
Req #Requirement DescriptionCriticalityResponseExample Response
GENERAL SPECIFICATIONS
A1.1Ability to access data using open standards access protocol.
MThe solution being proposed will use a commercial off the shelf (COTS) software that utilizes XML, HTML and SQL all of which leverage open standards to allow for interoperability and continued quality.
A1.2Data is available in commonly used format over which no entity has exclusive control, with the exception of National or International standards. Data is not subject to any copyright, patent, trademark or other trade secret regulation.MAs represented in A1.1 by utilizing open standards our solution is compliant with this requirement.
A1.3Web-based compatible and in conformance with the following W3C standards: HTML5, CSS 2.1, XML 1.1MThe web based component of this solution conforms to w3c standards in our case specifically leveraging HTML5, XML and SOAP
APPLICATION SECURITY
A2.1Verify the identity or authenticate all of the system client applications before allowing use of the system to prevent access to inappropriate or confidential data or services.
MUtilizing our COTS solution will require the user to validate their identify through a user name and password provided after information is obtained to create the users account.
A2.2Verify the identity and authenticate all of the system’s human users before allowing them to use its capabilities to prevent access to inappropriate or confidential data or services.MBased on the role based access controls within the COTS solution we will ensure the users have access only to the data that the State authorizes.
A2.3Enforce unique user names.MThe COTS solution combined with our logical access procedure to create user accounts ensures the unique user name.
A2.4Comply with the Department's Password Standard and DoIT’s statewide User Account and Password Policy when developing, establishing, and enforcing system Administrative (privileged) and End User (non-privileged) accounts. Should a requirement conflict reside between the two documents the more restrictive requirement must be followed.MThe COTS solution will comply with the requirements as listed in the Department's Password Standard and NH DoIT's Password Policy.
A2.5Enforce the use of complex passwords for general users using capital letters, numbers and special characters in accordance with NH DHHS Password Standard and DoIT’s statewide User Account and Password Policy.M
A2.6Encrypt passwords in transmission and at rest within the database.M
A2.7Establish ability to expire passwords after a definite period of time in accordance with NH DHHS Password Standard and DoIT’s statewide User Account and Password Policy.M
A2.8Provide the ability to limit the number of people that can grant or change authorizations.
MBased on State approval the system will allow for up to 3 administrators to support granting or changing permissions.
A2.9Establish ability to enforce session timeouts during periods of inactivity in accordance with NH DHHS Password Standard and DoIT’s statewide User Account and Password Policy.
M
A2.10The application shall not store authentication credentials or sensitive data in its code.MAll authentication credentials are encrypted utilizing the Advanced Encryption Standard (AES)
A2.11Log all attempted accesses that fail identification, authentication and authorization requirements.MThe system in compliance with failed attempt policy automatically logs all failed attempts to result in a lockout. See A2.4
A2.13All logs must be kept for one (1) year, unless protected health information is entered into/stored in the system or product, then all audit logs must be kept for six (6) years for HIPPA compliance.MThe COTS solution will maintain logs for 1 years
A2.14The application must allow a human user to explicitly terminate a session. No remnants of the prior session should then remain.MThe COTS solution allows for the termination of the user account which will result in the termination of access.
A2.15Do not use Software and System Services for anything other than they are designed for.
MThe solution will be implemented at the direction of the department to meet the requirements of the contract.
A2.16The application Data shall be protected from unauthorized use when at rest.
MThe COTS solution will encrypt data in transit and at rest coupled with role based access permissions the application data will be protected at rest
A2.17The application shall keep any sensitive Data or communications private from unauthorized individuals and programs.MSee A2.16
A2.18Subsequent application enhancements or upgrades shall not remove or degrade security requirements.
MThe COTS solution and subsequent upgrades will maintain or enhance security requirements in partnership and communication with the State.
A2.19Utilize change management documentation and procedures.
MThe COTS solution will follow industry best practices for change management and the configuration administrators will document all changes made to production after final user acceptance of the changes.
A2.20Web Services : The service provider shall use Web services exclusively to interface with the State’s data in near real time when possible.
MThe COTS solution will not utilize web services to interface with the State's data systems; however the solution will be able to export the information into CSV, Excel or similar functions and provide the information to the State for ingestion.
A2.21Logs must be configured using "fail-safe" configuration. Audit logs must contain the following minimum information:

1. User lDs (of all users who have access to the system)

2. Date and time stamps

3. Changes made to system configurations

4. Addition of new users

5. New users level of access

6. Files accessed (including users)

7. Access to systems, applications and data

8. Access trail to systems and applications (successful and unsuccessful attempts)

9. Security events M The COTS solution will be able to maintain the following information either in a log or separate documentation:

1. User lDs (of all users who have access to the system)

2. Date and time stamps

3. Changes made to system configurations

4. Addition of new users

5. New users level of access

6. Files accessed (including users)

7. Access to systems, applications and data

8. Access trail to systems and applications (successful and unsuccessful attempts)

9. Security events

TESTING REQUIREMENTS
State Requirements
Req #Requirement DescriptionCriticalityResponseExample Response
APPLICATION SECURITY TESTING
T1.1All components of the Software shall be reviewed and tested by the vendor to ensure they protect the Department and State’s Data assets.
MAs this is a COTS solution the components of the software that will be reviewed and tested will focus on the configuration of the system to meet the business and technical requirements of the solution.
T1.2The Vendor shall be responsible for providing documentation of security testing, as appropriate. Tests shall focus on the technical, administrative and physical security controls that have been designed into the System architecture in order to provide the necessary confidentiality, integrity and availability.
MThe COTS solution has published documentation to address the technical, administrative and physical security controls available upon request.
T1.3Provide evidence that supports the fact that Identification and Authentication testing has been recently accomplished; supports obtaining information about those parties attempting to log onto a system or application for security purposes and the validation of users.
MThis is addressed via logs associated with login attempts
T1.4Test for Access Control; supports the management of permissions for logging onto a computer or network.
MSee A2.4
T1.5Test for encryption; supports the encoding of data for security purposes, and for the ability to access the data in a decrypted format from required tools.
MSee A2.4 and A2.16
T1.6Test the Intrusion Detection; supports the detection of illegal entrance into a computer system.
MSee T1.2
T1.7Ensure verification features are enabled to support the confirmation of a users authority to enter a computer system, application or network.MFor example, Captcha
T1.8Test the User Management feature; supports the administration of computer, application and network accounts within an organization.
MSee A2.4, this process is tested each time an account is activated or de-activated
T1.9Test Role/Privilege Management; supports the granting of abilities to users or groups of users of a computer, application or network.
MThis will be accomplished after final configuration and account creation has been completed and validated by the department
T1.10Test Audit Trail Capture and Analysis; supports the identification and monitoring of activities within an application or system.
MThe COTS solution has an internal testing plan for ensuring the audit trail logs are in place.
T1.11Test Input Validation; ensures the application is protected from buffer overflow, cross-site scripting, SQL injection, and unauthorized access of files and/or directories on the server.
MThe COTS solution has an internal testing plan and is covered contractually to protect against the items listed
T.1.12For web applications, ensure the application has been tested and hardened to prevent critical application security flaws. ( At a minimum, the application shall be tested against all flaws outlined in the Open Web Application Security Project (OWASP) Top Ten (http://www.owasp.org/index.php/OWASP_Top_Ten_Project).
MThe COTS solution has an internal testing plan for ensuring the audit trail logs are in place.
T1.13Provide the State with validation of 3rd party security reviews performed on the application and system environment. The review may include a combination of vulnerability scanning, penetration testing, static analysis of the source code, and expert code review (please specify proposed methodology in the comments field).
MThe 3rd party scans can be provided upon request. These reports are a sub-contract component with the COTS solution being employed on this solution.
T1.14Prior to the System being moved into production, the Vendor shall provide results of all security testing to the Department of Information Technology for review and acceptance.
MAs the COTS solution maintains FedRamp Moderate certification all testing was completed in order to maintain compliance. It is anticipated that testing of the configuration will be accomplished prior to production use.
STANDARD TESTING
T2.1The Vendor must test the software and the system using an industry standard and State approved testing methodology.
MSee T1.14
T2.2The Vendor must perform application stress testing and tuning.
MSee T1.14
HOSTING-CLOUD REQUIREMENTS
State Requirements
Req #Requirement DescriptionCriticalityResponseExample Response
OPERATIONS
H1.1Vendor shall provide an ANSI/TIA-942 Tier 3 Data Center or equivalent. A tier 3 data center requires 1) Multiple independent distribution paths serving the IT equipment, 2) All IT equipment must be dual-powered and fully compatible with the topology of a site's architecture and 3)Concurrently maintainable site infrastructure with expected availability of 99.982%.
MSee T1.14
H1.2Vendor shall maintain a secure hosting environment providing all necessary hardware, software, and Internet bandwidth to manage the application and support users with permission based logins.MSee T1.14
H1.3The Data Center must be physically secured – restricted access to the site to personnel with controls such as biometric, badge, and others security solutions. Policies for granting access must be in place and followed. Access shall only be granted to those with a need to perform tasks in the Data Center.
MSee T1.14
H1.4Vendor shall install and update all server patches, updates, and other utilities within 60 days of release from the manufacturer.
MSee T1.14
H1.5Vendor shall monitor System, security, and application logs.
MSee T1.14
H1.6Vendor shall manage the sharing of data resources.
MSee T1.14
H1.7Vendor shall manage daily backups, off-site data storage, and restore operations.
MDaily backups will be performed nightly per sub-contract with COTS solution
DISASTER RECOVERY
H2.2The disaster recovery plan shall identify appropriate methods for procuring additional hardware in the event of a component failure. In most instances, systems shall offer a level of redundancy so the loss of a drive or power supply will not be sufficient to terminate services however, these failed components will have to be replaced.
MSee T1.14
H2.3Vendor shall adhere to a defined and documented back-up schedule and procedure.
MSee H1.7
H2.4Back-up copies of data are made for the purpose of facilitating a restore of the data in the event of data loss or System failure.
MSee H1.7
H2.5Scheduled backups of all servers must be completed regularly. The minimum acceptable frequency is differential backup daily, and complete backup weekly.
MSee H1.7
H2.6Tapes or other back-up media tapes must be securely transferred from the site to another secure location to avoid complete data loss with the loss of a facility.
MSee H1.7
H2.7Data recovery – In the event that recovery back to the last backup is not sufficient to recover State Data, the Vendor shall employ the use of database logs in addition to backup media in the restoration of the database(s) to afford a much closer to real-time recovery. To do this, logs must be moved off the volume containing the database with a frequency to match the business needs.MAll data recovery is managed via the backup and restore process
HOSTING SECURITY
H3.1If State data is hosted on multiple servers, data exchanges between and among servers must be encrypted.
MAll data is encrypted and at rest regardless of number of servers.
H3.3All servers and devices must have event logging enabled. Logs must be protected with access limited to only authorized administrators. Logs shall include System, Application, Web and Database logs.
MAll security controls are tested and addressed via the item T1.14
H3.4Operating Systems (OS) and Databases (DB) shall be built and hardened in accordance with guidelines set forth by CIS, NIST or NSA.
MAll security controls are tested and addressed via the item T1.14
SERVICE LEVEL AGREEMENT
H4.1The Vendor’s System support and maintenance shall commence upon the Effective Date and extend through the end of the Contract term, and any extensions thereof.
MThe COTS solution will be maintained, operated and supported per the contract terms.
H4.2The vendor shall maintain the hardware and Software in accordance with the specifications, terms, and requirements of the Contract, including providing, upgrades and fixes as required.MThe COTS configuration may be changed as needed to meet the State's requirements.
H4.3The vendor shall repair or replace the hardware or software, or any portion thereof, so that the System operates in accordance with the Specifications, terms, and requirements of the Contract.
MSince the solution is dependent upon the COTS solution proposed any replacement of the software would require a change order and amendment to the contract.
H4.4All hardware and software components of the Vendor hosting infrastructure shall be fully supported by their respective manufacturers at all times. All critical patches for operating systems, databases, web services, etc., shall be applied within sixty (60) days of release by their respective manufacturers.
MThis will follow the COTS solutions roadmaps for patches in alignment with item T1.14
H4.5The State shall have unlimited access, via phone or Email, to the Vendor technical support staff between the hours of 8:30am to 5:00pm- Monday through Friday EST.
MThe proposal will include technical support for the State between 8:30am and 5:00pm EST Monday through Friday.
H4.6The Vendor shall conform to the specific deficiency class as described: o Class A Deficiency - Software - Critical, does not allow System to operate, no work around, demands immediate action; Written Documentation - missing significant portions of information or unintelligible to State; Non Software - Services were inadequate and require re-performance of the Service.

o Class B Deficiency - Software - important, does not stop operation and/or there is a work around and user can perform tasks; Written Documentation - portions of information are missing but not enough to make the document unintelligible; Non Software - Services were deficient, require reworking, but do not require re-performance of the Service.

o Class C Deficiency - Software - minimal, cosmetic in nature, minimal effect on System, low priority and/or user can use System; Written Documentation - minimal changes required and of minor editing nature; Non Software - Services require only minor reworking and do not require re-performance of the Service.

M The proposed solution will be a COTS solution and thus the solution will be able to comply with the following:

Class A Deficiency - system is not available or is not performing the function agreed upon during production go live

Class B Deficiency - COTS configuration issue with a workaround not impacting system utilization, but requires attention to resolve manual workaround.

Class C Deficiency - COTS configuration that has minimum impact on the function. Would be de prioritized to complete remediation on Class B and Class A deficiencies.

H4.7 As part of the maintenance agreement, ongoing support issues shall be responded to according to the following:

a. Class A Deficiencies - The Vendor shall have available to the State on-call telephone assistance, with issue tracking available to the State, eight (8) hours per day and five (5) days a week with an email / telephone response within two (2) hours of request; or the Vendor shall provide support on-site or with remote diagnostic Services, within four (4) business hours of a request;

b. Class B & C Deficiencies –The State shall notify the Vendor of such Deficiencies during regular business hours and the Vendor shall respond back within four (4) hours of notification of planned corrective action; The Vendor shall repair or replace Software, and provide maintenance of the Software in accordance with the Specifications, Terms and Requirements of the Contract.

MThe proposed solution will be able to provide response times as described herein.
H4.8The hosting server for the State shall be available twenty-four (24) hours a day, 7 days a week except for during scheduled maintenance.
MThe COTS solution will be available 24 hours a day and 7 days a week; however support will be available as described in H4.5
H4.9A regularly scheduled maintenance window shall be identified (such as weekly, monthly, or quarterly) at which time all relevant server patches and application upgrades shall be applied.
MThe COTS solution has full failover functionality allowing for maintenance to occur without impact to the business functionality.
H4.10If The Vendor is unable to meet the uptime requirement, The Vendor shall credit State’s account in an amount based upon the following formula: (Total Contract Item Price/365) x Number of Days Contract Item Not Provided. The State must request this credit in writing.
MAgreed for any uptime requirement not met for the COTS solution included in the proposal.
H4.11The Vendor shall use a change management policy for notification and tracking of critical outages.M
H4.12A critical outage will be designated when a business function cannot be met by a nonperforming application and there is no work around to the problem.M
H4.14The Vendor will give two-business days prior notification to the State Project Manager of all changes/updates and provide the State with about information the upgrades and changes.
MFollowing the change management process see item A2.19 notification will be provided prior to implementation in production and training shall be performed either via in-person, video computer based training, and/or in documentation.
SUPPORT & MAINTENANCE REQUIREMENTS
State Requirements
Req #Requirement DescriptionCriticalityResponseExample Response
SUPPORT & MAINTENANCE REQUIREMENTS
S1.1The Vendor’s System support and maintenance shall commence upon the Effective Date and extend through the end of the Contract term, and any extensions thereof.
MAgreed
S1.3Repair Software, or any portion thereof, so that the System operates in accordance with the Specifications, terms, and requirements of the Contract.
MBased on assigned deficiencies the support team will resolve the issue and obtain acceptance following standard change management practices.
S1.4The State shall have unlimited access, via phone or Email, to the Vendor technical support staff between the hours of 8:30am to 5:00pm- Monday through Friday EST.M
S1.5The Vendor response time for support shall conform to the specific deficiency class as described below or as agreed to by the parties:

o Class A Deficiency - Software - Critical, does not allow System to operate, no work around, demands immediate action; Written Documentation - missing significant portions of information or unintelligible to State; Non Software - Services were inadequate and require re-performance of the Service.

o Class B Deficiency - Software - important, does not stop operation and/or there is a work around and user can perform tasks; Written Documentation - portions of information are missing but not enough to make the document unintelligible; Non Software - Services were deficient, require reworking, but do not require re-performance of the Service.

o Class C Deficiency - Software - minimal, cosmetic in nature, minimal effect on System, low priority and/or user can use System; Written Documentation - minimal changes required and of minor editing nature; Non Software - Services require only minor reworking and do not require re-performance of the Service.M
S1.6o Class A Deficiency - Software - Critical, does not allow System to operate, no work around, demands immediate action; Written Documentation - missing significant portions of information or unintelligible to State; Non Software - Services were inadequate and require re-performance of the Service.MThese documents will be provided based on their availability from the third-party COTS solution.
S1.7o Class B Deficiency - Software - important, does not stop operation and/or there is a work around and user can perform tasks; Written Documentation - portions of information are missing but not enough to make the document unintelligible; Non Software - Services were deficient, require reworking, but do not require re-performance of the Service.MAgreed
S1.8o Class C Deficiency - Software - minimal, cosmetic in nature, minimal effect on System, low priority and/or user can use System; Written Documentation - minimal changes required and of minor editing nature; Non Software - Services require only minor reworking and do not require re-performance of the Service.MThe proposed solution and support will be able to diagnose root cause as needed as well as problem management to address repeat calls or configuration issues.
S1.9As part of the Software maintenance agreement, ongoing software maintenance and support issues, shall be responded to according to the following or as agreed to by the parties:

a. Class A Deficiencies - The Vendor shall have available to the State on-call telephone assistance, with issue tracking available to the State, eight (8) hours per day and five (5) days a week with an email / telephone response within two (2) hours of request; or the Vendor shall provide support on-site or with remote diagnostic Services, within four (4) business hours of a request;

b. Class B & C Deficiencies –The State shall notify the Vendor of such Deficiencies during regular business hours and the Vendor shall respond back within four (4) hours of notification of planned corrective action; The Vendor shall repair or replace Software, and provide maintenance of the Software in accordance with the Specifications, Terms and Requirements of the Contract; or as agreed between the parties.M
S1.15The State shall provide the Vendor with a personal secure FTP site to be used by the State for uploading and downloading files if applicable.
Magreed
S1.16The State shall provide the Vendor with a personal secure FTP site to be used by the State for uploading and downloading files if applicable.M
S1.17The hosting server for the State shall be available twenty-four (24) hours a day, 7 days a week except for during scheduled maintenance.MSee H4.8
PROJECT MANAGEMENT
State Requirements
Req #Requirement DescriptionCriticalityResponseExample Response
PROJECT MANAGEMENT
P1.1Vendor shall participate in an initial kick-off meeting to initiate the Project.
MAgreed
P1.2Vendor shall provide Project Staff as specified in the RFP.
MAgreed
P1.3Vendor shall submit a finalized Work Plan within ten (10) days after Contract award and approval by Governor and Council. The Work Plan shall include, without limitation, a detailed description of the Schedule, tasks, Deliverables, milestones/critical events, task dependencies, vendors and state resources required and payment Schedule. The plan shall be updated no less than every two weeks.MAgreed
P1.4Vendor shall provide detailed bi-weekly status reports on the progress of the Project, which will include expenses incurred year to date.
MThis proposal includes a weekly update for status reports that will include risks, actions, decisions. A monthly financial expense report will be provided.
P1.5All user, technical, and System Documentation as well as Project Schedules, plans, status reports, and correspondence must be maintained as project documentation in digital format using Department standard tools.
MThis proposal includes standard project management principles and deliverables to include schedules, plans, reports, risks, actions, issues, decisions and financials and we can support utilizing the State project management solution or provide our own at the State's direction.
P1.6Vendor shall provide a full time Project Manager assigned to the project.MAgreed
P1.7The Vendor Project Manager, and relevant key staff, shall every three (3) months, beginning in the first month of the Contract, meet with project representatives from DHHS and/or DoIT virtually, or in-person to review past quarter performance and upcoming quarter Plan of Operations.MAll staff will be work remotely for the duration of this contract
P1.8The Vendor's project manager is also expected to host other important meetings, assign contractor staff to those meetings as appropriate and provide an agenda for each meeting.MAgreed
P1.9Meeting minutes will be documented and maintained electronically by the contractor and distributed within 24 hours after the meeting. Key decisions along with Closed, Active and Pending issues will be included in this document as well.MAgreed
WEBSITE AND SOCIAL MEDIA MANAGEMENT
State RequirementsVendor
Req #Requirement DescriptionCriticalityVendor ResponseComments
PROJECT MANAGEMENT
W1.1The Vendor shall work with the Department’s Communications Bureau to ensure that any social media or website designed, created, or managed on behalf of the Department meets all of the Department’s and NH Department of Information Technology’s website, social media, and privacy notice requirements/policies.M

Appendix H: IT Requirements Workbook

RFP-2027-DPQI-01-EQRO

RFP-2027-DPQI-01-EQRO Appendix H

File details come from the government source that posted it. Updated .