Attachment 7 - Plans Sheets for Seed Project.pdf
PDF 44 MB Posted
- Solicitation number
- 693C73-26-R-000047
About this file
This is a set of design plans and specifications for the seed project referenced in the MATOC solicitation. The plans detail the rehabilitation of Trolley Bed Road (Route 404), a 0.37-mile segment, and Haul Road (Route 405), a 0.01-mile segment, both located within John Heinz National Wildlife Refuge at Tinicum in Philadelphia County, Pennsylvania. The project involves embankment construction, removal and installation of pipe culverts and stone masonry headwalls, placement of riprap, asphalt concrete pavement work on the Haul Road, and aggregate surface course on the Trolley Bed Road. The total disturbed area is approximately 0.52 acres, with minimal wetland impacts (0.011 acres permanent for Route 404 and 0.02 acres for Route 405). Design speeds are 15 mph for Trolley Bed Road and 15 mph for Haul Road, with 15-foot travel lanes specified for both routes.
The plans include typical sections showing pavement and base course specifications, drainage profiles for two culvert replacements, alignment data with curve specifications, and comprehensive erosion and sediment control measures. Key construction activities include stabilization of slopes at 1V:1.5H or steeper using rolled erosion control products and riprap, tree removal as indicated on the demolition plans, silt fence installation along project limits, and permanent turf establishment on disturbed areas. The project manager is Sheila Foronda, lead designer is Jeff Johnson, and highway design manager is Brenda Duong. The plans are dated April 2026 and prepared by the Federal Highway Administration's Eastern Federal Lands Highway Division. Contractors must comply with Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), Philadelphia Water District requirements, and Pennsylvania Department of Environmental Protection regulations throughout all construction phases.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S C
H U
Y
R
IV
ER
D
ELAW
ARE
RI
VERAIRPORT
INTERNATIONAL
PHILADELPHIA
DARBY CR
EEK
NEW JERSEY
HOOK
ROAD
I S
L A
N D A
V E
M A
C D
A D E
K I L L
B L V
D
B A
R T
R A
M A
V E
PEN
R
O
SE
AVE
D E L A
W A
R E E
X P
Y
PLANS FOR PROPOSED PROJECT
PA ERFO FW TCM 2020-1(1)
PHILADELPHIA COUNTY, PA
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
APRIL 2026
ASHBURN, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
INDEX TO SHEETS
LANE MILES:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
BRIDGE:
ROAD: WIDTH
15'
SURFACE BASE SUBGRADE
6" ASC N/A N/A
N/A
Haul Road (Route 405)
Trolley Bed Road (Route 404) placed riprap, and other miscellaneous work.
remove and install stone masonry headwalls, pavement, remove and install pipe culverts, aggregate surface course, asphalt concrete
Embankment construction, aggregate base, e(max)
C/A
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 0.38 Miles
ADT (2023)
ADT (2033)
DHV
%Truck
D
V (MPH)
SPECIFICATIONS:
DESIGN DESIGNATION:
Know what'sbelow.
before you dig.Call
R
15' 4.5" ACP 6" AB N/A
FW TCM 2020-1(1)
PROJECT PA ERFO
N
76 Philadelphia
Harrisburg
Scranton
Pittsburgh
0 50 100
SCALE IN MILES
STATE OF PENNSYLVANIA
KEY MAP
PROJECT PA ERFO FW TCM 2020-1(1)
N
SCALE IN MILES
0 0.5 1
Symbols And Abbreviations
Location Map
Typical Sections
Tabulation of Quantities
Plans And Profiles
Erosion And Sediment Control Narrative
Standards And Details
Cross Sections
DESCRIPTION
SHEET
NO
A01
A02-A03
A04
B01-B02
D01-D08
M01-M03
S01-S18
T01-T39
Title Sheet
M04-M11 Erosion And Sediment Control Plan
A05-A06 Survey Information
N01 Temporary Traffic Control Narrative
Temporary Traffic Control PlanN02-N03
K01-K02 Drainage Profiles
A07 Alignment Data
0.38 Miles
Disaster No. PA2020-1-FWS
TROLLEY BED ROAD
Less than 50
Less than 50
None
None
N/A
N/A
N/A
Cycle #(miles)
Schedule Description Station to Station Length RIP Milepost/
A
B
Trolley Bed Road
Haul Road
101+00 to 120+50
200+14 to 200+82
0.37
0.01
0.00-0.79 / Cycle 5
0.00-0.80 / Cycle 5
Project Manager
Sheila Foronda
Lead Designer
Jeff Johnson
Highway Design Manager
Brenda Duong
C02-C06 Summaries and Schedules
C01
Statutes, which include signing and sealing the documents.
the license requirements of Title 63, Chapter 5, Pennsylvania
An engineer employed by the United States is exempt from the Pennsylvania Department of Environmental Protection.
conformance with Chapter 105 of the rules and regulations of accepted engineering practice, is true and correct, and is in employees of the United States and is in accordance with
These design plans and specifications were performed by
Administration Federal Highway
U.S. Department of Transportation
FEMA Floodplain AreaM12-M13
F01-F08 Existing Conditions And Demolition Plans
M14 Darby Creek Watershed
INTERSTATE
INTERSTATE
JOHN HEINZ NATIONAL WILDLIFE REFUGE AT TINICUM
U.S. FISH AND WILDLIFE SERVICE
U.S. DEPARTMENT OF THE INTERIOR
TROLLEY BED ROAD AND HAUL ROAD
REHABILITATION OF
:3
M p r il
T it le
S h e e t
F W
S fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\A
P A
E R
F O
F W
T C
M
-1
(1
T it le .d g n
PROJECT
NUMBER
SHEET
A01PA ERFO FW TCM 2020-1(1)
PWD TRACKING NUMBER: FY26-PAER-8386-01
0.00EL.
BH TP
sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft spa.
shldr.
sec.
SC
SADT
S typ.
Ts
TS
traf.
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral traffic thread temporary bench mark township tangent distance
VPI
vph var.
V vertical point of intersection vehicles per hour varies design speed
W west mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line
No.
NMSA
NC
N number nominal maximum size aggregate normal crown north
OG
OD
o. to o.
ohwm
o. c.
original ground outside diameter out to out ordinary high water mark on center pvmt.
PT
PST
PSC
PS
prop.
POT
POS
POE
POC
POB
pl.
PI
PGL
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral proposed point on tangent point on spiral point of ending point on curve point of beginning plate point of intersection profile grade line point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft spa.
shldr.
sec.
SC
SADT
S
1 6
1 6
SEC.
SEC.
E
N 0
00000
JH
RBAR
PWD REVISION 1
NO. DATE BY REVISIONS
3/26/26
BD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION JOHN HEINZ WILDLIFE REFUGE AT TINICUM
HW
hex.
hdwl.
inv.
ID
jt.
high water hexagon headwall invert inside diameter joint ftg.
flg.
fin.
footing flange finish θs Ø ∆c
DY or DTY DW or DTW
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
CL
cc or c. to c.
BW
brg.
br.
BP
BM
bldg.
BL
BK
Asph
ASC
appr.
AMD
AH
Agg
ADT
ACP
abut.
spiral central angle diameter curve central angle total central angle dotted yellow dotted white double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column corrugated metal pipe centerline center to center broken white bearing bridge balance point bench mark building baseline back asphalt aggregate surface course approach amendment ahead aggregate average daily traffic asphalt concrete pavement abutment expansion joint excavation existing edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation electric superelevation rate east exp. jt.
exc.
ex. or exist.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elec.
e E
LW
lt. or LT Ls
LPSM
long.
LOD
lat.
lam.
L low water left length of spiral lump sum longitudinal Limits of Disturbance latitude lamination length of curve gnd or grnd galv.
GAB
ga.
HW
hex.
hdwl.
ground galvanized graded aggregate base gage (gauge) high water hexagon headwall
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir
Spring or Seep
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:2
P
M a rc h
S
H E
E T fh fl fi le s e rv e
.f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\A
-A
P
A E
R F
O F
W T
C M
-1 (1 s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A02PA ERFO FW TCM 2020-1(1)
AREA PATTERN
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION JOHN HEINZ WILDLIFE REFUGE AT TINICUM
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Reinforced concrete pipe
Not applicable
Erosion and sediment
Edge of gravel
Ductile iron pipe
Aggregate surface course
Aggregate base
RCP
N/A
E&S
EOG
DIP
ASC
AB
Aggregate surface course
Sheet 2 of 2
:2
M a r c h
S
H E
E fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\A
-A
P
A E
R F
O F
W T
C M
-1 (1 s y m .d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A03PA ERFO FW TCM 2020-1(1)
SCALE 1"=200'
0 100 200
SCALE 1"=2000'
0 1000 2000
N
N
R te
R te . 4
R te . 4
101+00 to 120+50
SCHEDULE A, Trolley Bed Road (Route 404)
PROJECT PA ERFO FW TCM 2020-1(1),
Garage A
Darby Creek
Hay Island
Smith Island
R te
R te . 4
Rte.
AZ
Tinicum
Wildlife Refuge at
John Heinz National
V is it o r
A c c e s s
R oa d
200+14 to 200+82
SCHEDULE B, Haul Road (Route 405)
PROJECT PA ERFO FW TCM 2020-1(1),
Impoundment Trail
L in d b e r g h B lv d
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
HAUL ROAD (ROUTE 405)
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
Approx: 39°52'32"N 75°16'03"W
Project Access Point
Approx: 39°52'32"N 75°16'03"W
Project Access Point
See Section 202
Roadside cleanup
Approx: 39°52'34"N 75°15'55"W
Project Stockpiling and Staging Area Under I-95 Bridges
INTERSTATE
325'
ENLARGED VIEW
See Enlarged View
50'
:0 p r il
A
L o c a ti o n
M a p fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\A
P A
E R
F O
F W
T C
M
-1
(1
L o c .d g n
LOCATION MAP
PROJECT
A04PA ERFO FW TCM 2020-1(1)
RBAR
RBAR
RBAR
RBAR
RBAR
RBAR
RBAR
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=140'
0 70 140
N
RBAR
A z
.3 to R
B A
R
2R
B A
R
A z
.3 to R
B A
R
A z . 1
.8
A
z. 308°
11.69'
Az . 2
°36
.62
R B
A R
Az. 119°
11.51'
A z
.7
A z.
.7
R B
A R
A z . 3
.5
Az. 270°
25.79'
A z
.9
R B A R A z
.4
Az. 105°
22.32'
A
z. 1
.9
R B
A R
A z
.7
Az. 122°
20.20'
A z
.0
RBAR
RBAR
RBAR
RBAR
RBAR
RBAR
RBAR
Long. -75.252881 Lat. 39.884368
R B
A R
A z . 3
.3
A z
.0
Az. 117°
25.43'
Units : US Survey Foot
Geoid Model : GEIOD18 (Conus)
Vert. Datum : NAVD 1988 (Conus)
Hor. Datum : NAD 1988 (Conus)
Zone : Pennsylvania S 3702
Coordinate System : US State Plane 1983
PROJECT COORDINATE SYSTEM
RBAR W/CAP0.9522667783.426208748.0691106
RBAR W/CAP1.3532668023.988208972.2721105
RBAR W/CAP0.7102668402.794209397.1601104
RBAR W/CAP0.3682668685.950209848.3361103
RBAR W/CAP0.7122668983.738210274.1491102
RBAR W/CAP1.6352669191.141210642.0691101
RBAR #IPF1.3032668855.480210112.751100
TYPEELEV.EASTINGNORTHINGNAME
PROJECT CONTROL POINTS
:1
M a r c h
A fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\A
-A
P
A E
R F
O F
W T
C M
-1 (1
S u rv e y
C o n tr o l.
d g n
SURVEY INFORMATION
PROJECT
A05PA ERFO FW TCM 2020-1(1)
H a ll R o a d G ra v e l
H a ll R o a d A s p h a lt
Boa t Ra mp Ac cess
Roa d - A spha lt
GPS
RBAR
RBAR
Boa t Ra mp A cce ss R oad
- A sph alt
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
HAUL ROAD (ROUTE 405)
SCHEDULE B
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=50'
0 25 50
N
GPS
C e n te r
I n fo r m a tio n
A z
.1 to R
B A
R
Az. 26 2°
60.7'
A z.
.3
RBAR
A z
.1 to G
P S R
B A
R
RBAR
A z.
.8
A z .3
.8
'Az.303°
6.54'
RBAR/GPS
RBAR
RBAR
N N N
Long. -75.257755 Lat. 39.892589
Units : US Survey Foot
Geoid Model : GEIOD18 (Conus)
Vert. Datum : NAVD 1988 (Conus)
Hor. Datum : NAD 1988 (Conus)
Zone : Pennsylvania S 3702
Coordinate System : US State Plane 1983
PROJECT COORDINATE SYSTEM
RBAR W/CAP11.1392667545.011213475.0881002
RBAR W/CAP11.4692667739.405213596.7841001
RBAR W/CAP (GPS)10.2372667696.781213489.8331000
TYPEELEV.EASTINGNORTHINGNAME
PROJECT CONTROL POINTS
:1
M a r c h
A fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\A
-A
P
A E
R F
O F
W T
C M
-1 (1
S u rv e y
C o n tr o l.
d g n
SURVEY INFORMATION
PROJECT
A06PA ERFO FW TCM 2020-1(1)
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404) AND HAUL ROAD (ROUTE 405)
SCHEDULE A AND B
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
:2
M a r c h
S
H E
E fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\A
P A
E R
F O
F W
T C
M
-1
(1
A li g n
D a ta
.d g n
ALIGNMENT DATA
PROJECT
A07PA ERFO FW TCM 2020-1(1)
C
(Route 404)
Trolley Bed Road
Existing ground
(unknown depth)
Existing aggregate
L
7.5'
Aggregate Surface Course
102+00 to 119+50 or flatter
1V:1.5H
6-inch Aggregate surface course
4% 4%
7.5' placing topsoil, 4-inch depth (typ.)
Turf establishment and furnishing and
C
(Route 404)
Trolley Bed Road
Existing ground depth varies (0 to 12")
Embankment construction, (unknown depth)
Existing aggregate
L
Lateral limit of disturbance match existing
Varies 7.5' to
Aggregate Surface Course (Transition Sections)
19+50 to 120+501
101+00 to 102+00 or flatter
1V:1.5H
6-inch Aggregate surface course or fl at te r
1V:
2H
4% 4% placing topsoil, 4-inch depth (typ.)
Turf establishment and furnishing and
Profile grade
Profile grade varies (see cross sections)
Embankment construction, depth
Varies 15' to match existing
Travel Lane
Lateral limit of disturbance
15'
Travel Lane disturbed areas, excluding rock and paved areas.
2. Place rolled erosion product Type 3.B on all with riprap according to Detail E251-A.
1. Stabilize slopes at the areas shown in the plans match existing
Varies 7.5' to or fl at te r
1V:
2H
NO SCALE
3/26/26 BD
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
OHWM~ -2' OHWM~ -2'
OHWM~ -2'
OHWM~ -2'
NOTES:
:2
M a r c h
T
Y P
E R
-1 fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\B
-B
P A
E R
F O
F W
T C
M
-1
(1 ty p
.d g n
TYPICAL SECTIONS
PROJECT
B01PA ERFO FW TCM 2020-1(1)
8.5'
Asphalt Concrete Pavement
Existing ground or flatter
1V:2H
9-inch Roadway excavation
6-inch Aggregate base, grading C or D
(unknown depth)
Existing aggregate
1.5-inch Asphalt concrete pavement, type 1 (3/8-inch NMSA)
(typ.)placing topsoil, 4-inch depth
Turf establishment and furnishing and shldr.
1' shldr.
1'
Separation-stabilization geotextile, class 2, type B or flat ter1V:2
H
Asphalt tack coat
3-inch Asphalt concrete pavement, type 1 (3/4-inch NMSA)
6.5' existing
Match existing
Match
15'
Travel Lane
Lateral limit of disturbance
C
(Route 405)
Haul Road
L disturbed areas, excluding rock and paved areas.
Place rolled erosion product Type 3.B on all
NO SCALE
3/26/26 BD
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
HAUL ROAD (ROUTE 405)
SCHEDULE B
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
NOTE:
:2
M a r c h
T
Y P
E
-2 fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\B
-B
P A
E R
F O
F W
T C
M
-1
(1 ty p
.d g n
TYPICAL SECTIONS
PWD TRACKING NUMBER: FY26-PAER-8386-01
PROJECT
B02PA ERFO FW TCM 2020-1(1)
SCHEDULE A SCHEDULE B
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404) AND HAUL ROAD (ROUTE 405)
SCHEDULES A AND B
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
:3 p r il
T a b u la ti o n o f Q u a n ti ti e s
P R
O J E
C T
S
F W
S \T
C M
\2 -1
(1
H W
Y D
E S
\C A
D D
\C P
A E
R F
O F
W T
C M
-1
(1 p ln q ta b .d g n
TABULATION OF QUANTITIES
PROJECT
C01PA ERFO FW TCM 2020-1(1)
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
:3 p r il
S c h e d u le
P R
O J E
C T
S
F W
S \T
C M
\2 -1
(1
H W
Y D
E S
\C A
D D
\C P
A E
R F
O F
W T
C M
-1
(1 p ln q ta b .d g n
SUMMARIES AND SCHEDULES
PROJECT
C02PA ERFO FW TCM 2020-1(1)
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
:3 p r il
S c h e d u le
A
R e m o v l
P R
O J E
C T
S
F W
S \T
C M
\2 -1
(1
H W
Y D
E S
\C A
D D
\C P
A E
R F
O F
W T
C M
-1
(1 p ln q ta b .d g n
SUMMARIES AND SCHEDULES
PROJECT
C03PA ERFO FW TCM 2020-1(1)
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
HAUL ROAD (ROUTE 405)
SCHEDULE B
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
:3 p r il
S c h e d u le
B
P R
O J E
C T
S
F W
S \T
C M
\2 -1
(1
H W
Y D
E S
\C A
D D
\C P
A E
R F
O F
W T
C M
-1
(1 p ln q ta b .d g n
SUMMARIES AND SCHEDULES
PROJECT
C04PA ERFO FW TCM 2020-1(1)
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
HAUL ROAD (ROUTE 405)
SCHEDULE B
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
:3 p r il
S c h e d u le
B
R e m o v l
P R
O J E
C T
S
F W
S \T
C M
\2 -1
(1
H W
Y D
E S
\C A
D D
\C P
A E
R F
O F
W T
C M
-1
(1 p ln q ta b .d g n
SUMMARIES AND SCHEDULES
PROJECT
C05PA ERFO FW TCM 2020-1(1)
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404) AND HAUL ROAD (ROUTE 405)
SCHEDULES A AND B
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCHEDULE A
SCHEDULE B
:3 p r il
S c h e d u le
A a n
P R
O J E
C T
S
F W
S \T
C M
\2 -1
(1
H W
Y D
E S
\C A
D D
\C P
A E
R F
O F
W T
C M
-1
(1 p ln q ta b .d g n
SUMMARIES AND SCHEDULES
PROJECT
C06PA ERFO FW TCM 2020-1(1)
BEGIN PROJECT
101+00
N 208,534.878
E 2,667,648.465 See Detail E251-A method A, class 3
50'x3' Placed riprap, Toe of fill (typ.)
Construction centerline
Proposed EOG
Existing EOG
Trolley Bed Ro ad
.5
.5
N
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION JOHN HEINZ WILDLIFE REFUGE AT TINICUM
PLAN AND PROFILE
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
SCALE 1"=20'
0 10 20
PI 102+40.45
Δ = 08°25'25" (RT)
R = 200.00' T = 14.73' L = 29.40' e = ___
PI 101+21.51
Δ = 03°46'30" (LT)
R = 200.00' T = 6.59' L = 13.18' e = ___
P C
.7
P T
.1
N33°53'36"E N30°07'05"E
P C
.9
P T
.1
P O
B
.0
2 1
M A T
C H L
IN
E
.0
100+50 101+00 101+50 102+00 102+50 103+00
-2 -2
0 0
2 2
4 4
+1.50%
+0.01%
.0
.2
SSD = 738'
K = 17
25' VC
.7
Existing ground
BEGIN PROJECT
101+00.00
Profile grade
:3 p ri l
T ro ll e y B e d
R o a d
B L
P la n
S h e t] fh fl fi le s e rv e
.f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\D
-D
P
A E
R F
O F
W T
C M
-1 (1 p ln p p
.d g n
PROJECT
D01PA ERFO FW TCM 2020-1(1)
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
Trolley B ed Road
- Grave l
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" A
S H
" H
A W
T H
O R N E
RBAR
" T
W
IN
LO
C U S T
" H
A W
T H
O R N E
" LO
C U S T
Trolley Bed Road - Gravel
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A C K B E R R Y
" H
A W
T H
O R N E
" T
W
IN
LO
C U S T
" H
A W
T H
O R N E
" T
W
IN
LO
C U S T
" H
A W
T H
O R N E
" H
A W
T H
O R N E
Toe of fill (typ.)
Construction centerline
Proposed EOG
Existing EOG
Trolley Bed Road
.5
.5
N
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION JOHN HEINZ WILDLIFE REFUGE AT TINICUM
PLAN AND PROFILE
0 10 20
PI 104+18.68
Δ = 10°17'53" (RT)
R = 200.00' T = 18.02' L = 35.95' e = ___
N38°32'30 "E N48°50'23"E
P C
.6
P T
.6
4 1
M A T
C H L
IN
E
.0
M A T
C H L
IN
E
.0
103+50 104+00 104+50 105+00 105+50 106+00
-2 -2
0 0
2 2
4 4
+0.01%
Existing ground
Profile grade
:3 p ri l
T ro ll e y B e d
R o a d
B L
P la n
S h e fh fl fi le s e rv e
.f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\D
-D
P
A E
R F
O F
W T
C M
-1 (1 p ln p p
.d g n
PROJECT
D02PA ERFO FW TCM 2020-1(1)
" O
A K
" H
A C
K B E R R Y
" O
A K
" O
A K
" O
A K
" A
S H
" O
A K
" H
A W
T H
O R
N E
Trolley Bed Road - Gravel
" C
H E R R Y
" O
A K
" M
A P L E
Trolley Bed R oad - G ravel
" O
A K
RBAR
" O
A K
" O
A K
" O
A K
" O
A K
" O
A K
" H
A W
T H
O R
N E
" H
A W
T H
O R
N E
" O
A K
" H
A W
T H
O R
N E
" C
H E R R Y
" O
A K
" M
A P L E
" C
H E R R Y
Toe of fill (typ.)
Construction centerline
Existing EOG
Trolley Bed R oad
Proposed EOG
See Detail E251-A method A, class 3
40'x3' Placed riprap, removed by others
Existing sign to be
.5
.5
N
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION JOHN HEINZ WILDLIFE REFUGE AT TINICUM
PLAN AND PROFILE
0 10 20
PI 107+76.62
Δ = 09°19'09" (RT)
R = 500.00' T = 40.75' L = 81.33' e = ___
PI 106+86.55
Δ = 13°51'36" (LT)
R = 200.00' T = 24.31' L = 48.38' e = ___
N34°58'4 7"E
N44°17'57"E
P C
.2
P T
.6
P C
.8
P T
.1
M A T
C H L
IN
E
.0
M A T
C H L
IN
E
.0
106+50 107+00 107+50 108+00 108+50 109+00
-2 -2
0 0
2 2
4 4
+0.01%
Existing ground
Profile grade
:3 p ri l
T ro ll e y B e d
R o a d
B L
P la n
S h e fh fl fi le s e rv e
.f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\D
-D
P
A E
R F
O F
W T
C M
-1 (1 p ln p p
.d g n
PROJECT
D03PA ERFO FW TCM 2020-1(1)
10" MAPLE
" B
IR
C
H
6" MAPLE
10" SWEET GUM
Trolley Bed Road - Gravel
9" SWEET
GUM
" T
IN
IR
C H
12" PENTA
BIRCH
8" MAPLE
6" HACKBERRY
8" SWEET
GUM
" A
S H
Trolley Bed Road - Gravel
12" SWEET GUM
18" SWEET GUM
20" HAWTHORNE
Toe of fill (typ.)
Construction centerline
See Detail E251-A method A, class 3
10'x3' Placed riprap, Proposed EOG Existing EOG
.5
Trolley Bed Road7 .5
N
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION JOHN HEINZ WILDLIFE REFUGE AT TINICUM
PLAN AND PROFILE
0 10 20
PI 109+91.46
Δ = 04°37'16" (LT)
R = 1,500.00' T = 60.52' L = 120.98' e = ___
N39°40'41"E
P C
.9
P T
.9
P C
.1
9 1
M A T
C H L
IN
E
.0
M A T
C H L
IN
E
.0
109+50 110+00 110+50 111+00 111+50 112+00
-2 -2
0 0
2 2
4 4
+0.01%
Profile grade
Existing ground
:3 p ri l
T ro ll e y B e d
R o a d
B L
P la n
S h e fh fl fi le s e rv e
.f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\D
-D
P
A E
R F
O F
W T
C M
-1 (1 p ln p p
.d g n
PROJECT
D04PA ERFO FW TCM 2020-1(1)
" T
W
IN
A S
H
" A
S H
" M
A P L E
" A
S H
" T
W
IN
" T
W
IN1
Trolley Bed Road - Gravel
" A
S H
" A
S H
" T
W
IN
A S
H
RBAR
" A
S H
15" SWEET GUM
" A
S H
13" SWEET GUM
" M
A P L E
" O
A K
" T
R
IP
L E
" A
S H
Toe of fill (typ.)
Construction centerline
Proposed EOG Existing EOG
Trolley Bed Road
See Detail E251-A method A, class 3
10'x3' Placed riprap, .5
.5
N
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION JOHN HEINZ WILDLIFE REFUGE AT TINICUM
PLAN AND PROFILE
0 10 20
PI 113+96.96
Δ = 01°29'32" (LT)
R = 1,500.00' T = 19.53' L = 39.06' e = ___
N34°09'19"E
PI 112+24.44
Δ = 05°31'22" (LT)
R = 1,500.00' T = 72.35' L = 144.58' e = ___
P T
.6
P C
.4
P T
.4
M A T
C H L
IN
E
.0
M A T
C H L
IN
E
.0
112+50 113+00 113+50 114+00 114+50 115+00
-2 -2
0 0
2 2
4 4
6 6
+0.01%
Existing ground
Profile grade
:3 p ri l
T ro ll e y B e d
R o a d
B L
P la n
S h e fh fl fi le s e rv e
.f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\D
-D
P
A E
R F
O F
W T
C M
-1 (1 p ln p p
.d g n
PROJECT
D05PA ERFO FW TCM 2020-1(1)
" A
S H
" A
S H
" T
R
IP
L E
" A
S H
" M
A P L E
" T
W
IN
M A P L E
9" SIDEWAYS
" A
S H
" A
S H
" A
S H
" T
W
IN
" A
S H
RBAR10" HAWTHORNE
TRIPLE
Trolley Bed Road - Gravel
Trolley Bed Road - Gravel
" A
S H
" O
A K
" O
A K
" A
S H
16" HAWTHORNE
13" SIDEWAYS
See Detail E251-A method A, class 3
33'x3' Placed riprap, Toe of fill (typ.)
Construction centerline
Proposed EOG
Existing EOG
Trolley Bed Road
See Detail E251-A method A, class 3
17'x3' Placed riprap, removed by others
Existing bench to be
See Detail E251-A method A, class 3
29'x3' Placed riprap, See Detail E251-A method A, class 3
62'x3' Placed riprap, .5
.5
N
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION JOHN HEINZ WILDLIFE REFUGE AT TINICUM
PLAN AND PROFILE
0 10 20
PI 116+44.42
Δ = 01°56'45" (RT)
R = 1,000.00' T = 16.98' L = 33.96' e = ___
PI 117+10.72
Δ = 01°17'43" (LT)
R = 1,000.00' T = 11.30' L = 22.61' e = ___
N32°39'47"E N34°36'32"E
P C
.4
P T
.0
P C
.4
P T
.4
M A T
C H L
IN
E
.0
M A
T C
H L
IN
E
.0
115+50 116+00 116+50 117+00 117+50 118+00
-2 -2
0 0
2 2
4 4
6 6
+0.01%
Profile grade
Existing ground
:3 p ri l
T ro ll e y B e d
R o a d
B L
P la n
S h e fh fl fi le s e rv e
.f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\D
-D
P
A E
R F
O F
W T
C M
-1 (1 p ln p p
.d g n
PROJECT
D06PA ERFO FW TCM 2020-1(1)
" 6
" 1
" T
W
IN
" T
R
IP
L E
" D
O U
B L E
Trolley Bed Road - Gravel
RBAR
END PROJECT
120+50
N 210,067.961
E 2,668,838.188
See Detail E251-A method A, class 3
62'x3' Placed riprap, Toe of fill (typ.)
Construction centerline
Proposed EOG
Existing EOG
Trolley Bed Road
See Detail E251-A method A, class 3
29'x3' Placed riprap, N
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION JOHN HEINZ WILDLIFE REFUGE AT TINICUM
PLAN AND PROFILE
0 10 20
N33°18'49"E
M
A T
C H
L
IN
E
.0
118+50 119+00 119+50 120+00 120+50 121+00
-2 -2
0 0
2 2
4 4
.3
+0.01%
-1.13%
.0
.5
H P
.7
SSD = 587'
K = 13
15' VC
Existing ground
Profile grade
END PROJECT
120+50.00
:3 p r il
T r o ll e y B e d R o a d B
L
P la n
S h e fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\D
-D
P
A E
R F
O F
W T
C M
-1 (1 p ln p p
.d g n
PROJECT
D07PA ERFO FW TCM 2020-1(1)
E le v . 4 .0
" D
IP
x .0
I N
F O
T
W I N
E le v . 5 .2
M E
T A
L G
A T
E
T h is P o in t
N o F is h in g B e y o n d
N o V e h ic le s
M
A P
L E
Hall Ro ad - Asp halt
M
A P
L E
M
A P
L E
S T
O N
E H
E A
D W
A L L
S T
O N
E H
E A
D W
A L L
E le v . 7 .5
P V
C x .2
E le v . 7 .5
W o o d H a n d r a il
M
A P
L E
A s p h a lt
C o n cre te +
M
A P
L E
B o a t R a m p A c c e s s R o a d A s p h a lt
M
A P
L E
P A
R K I
N F
O
W e tla n d L o o p
B ig B o a r d w a lk L o o p
R B
A R
BOULDERS
R e s tro o m s
M
A P
L E
N
See Detail E620-01 masonry headwalls
Remove and install stone and Detail E602-01 culvert (CMP). See Drainage Profile
Remove 12" and install 24" pipe
Cut/fill transition (typ.)
Top of cut (typ.)
Im poundm ent
Loop Trail
See Detail E251-01 class 2 (8 tons)
Placed riprap, method A, removed by others
Existing gate to be
Toe of fill (typ.)
Haul Road
B o a t R a m p A c c e s s R o to remain
Existing boulders centerline
Construction with Subsection 619.03(d).
install fence (wood) in accordance
Remove existing fence (wood) and
Offset 8.5' lt.
200+53.78 trail elevation
Match existing
Offset 8.5' lt.
200+02.03 trail elevation
Match existing
Offset 6.5' rt.
200+21.87
Offset 6.5' rt.
200+53.78 asphalt elevation.
Match existing
Offset 8.0' lt.
200+83.24 asphalt elevation
Match existing
Offset 7.35 rt.
200+81.76
Offset 7.70' rt.
200+77.68
See Detail E620-01 masonry headwalls
Remove and install stone
Offset 7.10' rt.
200+64.57
Offset 7.41' lt.
200+71.35
Offset 6.85' lt.
200+59.80
BEGIN PROJECT
200+14
N 213,380.594
E 2,667,581.590
200+82
N 213,448.557
E 2,667,571.458
END PROJECT8
.5
.5 and Detail E602-08 pipe culvert (RCP). See Drainage Profile
Remove 8" PVC and install 18" elliptical asphalt elevation
Match existing
Offset 9.6' lt.
201+00.00 asphalt elevation
Match existing
Offset 15.4 rt.
200+99.21 asphalt elevation
Match existing
Offset 11.8' lt.
201+07.90 asphalt elevation
Match existing
Offset 16.3 rt.
201+06.71
16 lnft
Ditch excavation, 20 lnft
Ditch excavation, FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
HAUL ROAD (ROUTE 405)
SCHEDULE B
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=10'
0 5 10 parallel to Boat Ramp Access Road.
Do not disturb existing underground power located
NOTE:
PI 200+99.54
Δ = 41°44'46" (RT)
R = 120.00' T = 45.76' L = 87.43' e = ___
N11°2 1'21
"W
P C
.7
8 P C
C
.2
P O
B
.0
P O
E
.2
:3 p ri l
H a u l R o a d B
L
P la n
S h e fh fl fi le s e rv e
.f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\D
P A
E R
F O
F W
T C
M
-1
(1 p ln p p .d g n
PLAN
PROJECT
D08PA ERFO FW TCM 2020-1(1)
Trolley Bed Road
Construction centerline
BEGIN PROJECT
101+00
N 208,534.878
E 2,667,648.465
Wetlands
Wetlands
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=20'
0 10 20
LEGEND:
Tree to be removed
M A
T C
H L I N
E
.0
John Heinz NWR Impoundment
John Heinz NWR Impoundment
:3 p r il
T r o ll e y B e d R o a d B
L
P la n
S h e
P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\F
-D
P
A E
R F
O F
W T
C M
-1 (1 d e m o .d g n
AND DEMOLITION PLAN
EXISTING CONDITIONS
PROJECT
F01PA ERFO FW TCM 2020-1(1)
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
Trolley B ed Road
- Grave l
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" A
S H
" H
A W
T H
O R N E
RBAR
" T
W
IN
LO
C U S T
" H
A W
T H
O R N E
" LO
C U S T
Trolley Bed Road - Gravel
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A W
T H
O R N E
" H
A C K B E R R Y
" H
A W
T H
O R N E
" T
W
IN
LO
C U S T
" H
A W
T H
O R N E
" T
W
IN
LO
C U S T
" H
A W
T H
O R N E
" H
A W
T H
O R N E
Trolley Bed Road
Construction centerline
Wetlands
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=20'
0 10 20
LEGEND:
Tree to be removed
4 1
M A
T C
H L I N
E
.0
M A
T C
H L I N
E
.0
John Heinz NWR Impoundment
John Heinz NWR Impoundment
:3 p r il
T r o ll e y B e d R o a d B
L
P la n
S h e
P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\F
-D
P
A E
R F
O F
W T
C M
-1 (1 d e m o .d g n
AND DEMOLITION PLAN
EXISTING CONDITIONS
PROJECT
F02PA ERFO FW TCM 2020-1(1)
" O
A K
" H
A C
K B E R R Y
" O
A K
" O
A K
" O
A K
" A
S H
" O
A K
" H
A W
T H
O R
N E
Trolley Bed Road - Gravel
" C
H E R R Y
" O
A K
" M
A P L E
Trolley Bed R oad - G ravel
" O
A K
RBAR
" O
A K
" O
A K
" O
A K
" O
A K
" O
A K
" H
A W
T H
O R
N E
" H
A W
T H
O R
N E
" O
A K
" H
A W
T H
O R
N E
" C
H E R R Y
" O
A K
" M
A P L E
" C
H E R R Y
Trolley Bed R oad
Construction centerline
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=20'
0 10 20
LEGEND:
Tree to be removed
M A
T C
H L I N
E
.0
M A
T C
H L I N
E
.0
John Heinz NWR Impoundment
John Heinz NWR Impoundment
:3 p r il
T r o ll e y B e d R o a d B
L
P la n
S h e
P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\F
-D
P
A E
R F
O F
W T
C M
-1 (1 d e m o .d g n
AND DEMOLITION PLAN
EXISTING CONDITIONS
PROJECT
F03PA ERFO FW TCM 2020-1(1)
" B
IR
C
H
6" MAPLE
10" SWEET GUM
Trolley Bed Road - Gravel
9" SWEET
GUM
" T
C H
12" PENTA
BIRCH
8" MAPLE
6" HACKBERRY
8" SWEET
GUM
" A
S H
Trolley Bed Road - Gravel
12" SWEET GUM
18" SWEET GUM
20" HAWTHORNE
Trolley Bed Road
Construction centerline
Wetlands
Wetlands
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=20'
0 10 20
LEGEND:
Tree to be removed
9 1
M A
T C
H L I N
E
.0
M A
T C
H L I N
E
.0
John Heinz NWR Impoundment
John Heinz NWR Impoundment
:3 p r il
T r o ll e y B e d R o a d B
L
P la n
S h e
P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\F
-D
P
A E
R F
O F
W T
C M
-1 (1 d e m o .d g n
AND DEMOLITION PLAN
EXISTING CONDITIONS
PROJECT
F04PA ERFO FW TCM 2020-1(1)
W
IN
A S
H
" A
S H
" M
A P L E
" A
S H
" T
W
IN
" T
W
IN1
Trolley Bed Road - Gravel
" A
S H
" A
S H
" T
W
IN
A S
H
RBAR
" A
S H
15" SWEET GUM
" A
S H
13" SWEET GUM
" M
A P L E
" O
A K
" T
R
IP
L E
" A
S H
Trolley Bed Road
Construction centerline
Wetlands
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=20'
0 10 20
Tree to be removed
LEGEND:
M A
T C
H L I N
E
.0
M A
T C
H L I N
E
.0
John Heinz NWR Impoundment
John Heinz NWR Impoundment
:3 p r il
T r o ll e y B e d R o a d B
L
P la n
S h e
P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\F
-D
P
A E
R F
O F
W T
C M
-1 (1 d e m o .d g n
AND DEMOLITION PLAN
EXISTING CONDITIONS
PROJECT
F05PA ERFO FW TCM 2020-1(1)
" A
S H
" A
S H
" T
R
IP
L E
" A
S H
" M
A P L E
" T
W
IN
M A P L E
9" SIDEWAYS
" A
S H
" A
S H
" A
S H
" T
W
IN
" A
S H
RBAR10" HAWTHORNE
TRIPLE
Trolley Bed Road - Gravel
Trolley Bed Road - Gravel
" A
S H
" O
A K
" O
A K
" A
S H
16" HAWTHORNE
13" SIDEWAYS
Trolley Bed Road
Construction centerline
Wetlands
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=20'
0 10 20
LEGEND:
Tree to be removed
M A
T C
H L I N
E
.0
M A
T C
H L
IN
E
.0
John Heinz NWR Impoundment
John Heinz NWR Impoundment
:3 p r il
T r o ll e y B e d R o a d B
L
P la n
S h e
P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\F
-D
P
A E
R F
O F
W T
C M
-1 (1 d e m o .d g n
AND DEMOLITION PLAN
EXISTING CONDITIONS
PROJECT
F06PA ERFO FW TCM 2020-1(1)
" 6
" 1
" T
W
IN
" T
R
IP
L E
" D
O U
B L E
Trolley Bed Road - Gravel
RBAR
Trolley Bed Road
Construction centerline
END PROJECT
120+50
N 210,067.961
E 2,668,838.188
Wetlands
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TROLLEY BED ROAD (ROUTE 404)
SCHEDULE A
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=20'
0 10 20
LEGEND:
Tree to be removed
M
A T
C H
L
IN
E
.0
John Heinz NWR Impoundment
John Heinz NWR Impoundment
:3 p r il
T r o ll e y B e d R o a d B
L
P la n
S h e
P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\F
-D
P
A E
R F
O F
W T
C M
-1 (1 d e m o .d g n
AND DEMOLITION PLAN
EXISTING CONDITIONS
PROJECT
F07PA ERFO FW TCM 2020-1(1)
E le v . 4 .0
D
IP
x .0
I N
F O
T
W I N
E le v . 5 .2
M E
T A
L G
A T
E
T h is P o in t
N o F is h in g B e y o n d
N o V e h ic le s
M
A P
L E
Hall Roa d - A spha lt
M
A P
L E
M
A P
L E
S T
O N
E H
E A
D W
A L L
S T
O N
E H
E A
D W
A L L
E le v . 7 .5
P V
C x .2
E le v . 7 .5
W o o d H a n d r a il
M
A P
L E
A s p h a lt
C o n cre te +
M
A P
L E
B o a t R a m p A c c e s s R o a d A s p h a lt
M
A P
L E
P A
R K I
N F
O
W e tla n d L o o p
B ig B o a r d w a lk L o o p
R B
A R
BOULDERS
R e s tro o m s
M
A P
L E
N
Im poundm ent
Loop Trail
Haul Road
B o a t R a m p A c c e s s R o a d centerline
Construction
BEGIN PROJECT
200+14
N 213,380.594
E 2,667,581.590
END PROJECT
200+82
N 213,448.557
E 2,667,571.458 asphalt pavement
Remove existing headwall and pipe culvert
Remove existing stone stone headwall
Remove existing asphalt pavement
Remove existing pipe culvert
Remove existing
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
HAUL ROAD (ROUTE 405)
SCHEDULE B
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=10'
0 5 10
LEGEND:
Tree to be removed
:3 p r il
H a u l R o a d
B L
P la n
S h e
P R
O J E
C T
S
F W
S \T
C M
\2 -1
(1
H W
Y D
E S
\C A
D D
\F P
A E
R F
O F
W T
C M
-1
(1 d e m o .d g n
AND DEMOLITION PLAN
EXISTING CONDITIONS
PROJECT
F08PA ERFO FW TCM 2020-1(1)
CL
Remove existing 12" DIP culvert.
Install 24" corrugated metal pipe culvert.
Length = 20'
Skew = 18° Rt. ahead
Geotextile, Class 1, Type C
(see Detail E251-01)
Placed riprap, method A, class 2 offset: 10.54' elev. 3.99'
Invert outlet
(see Detail E620-01)
Remove and install stone masonry headwall
Existing ground
(see Detail E620-01)
Remove and install stone masonry headwall offset: 8.95' elev. 4.24'
Invert outlet
1.25% Slope
+4.8% -3.0%
1V:3 H
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION JOHN HEINZ WILDLIFE REFUGE AT TINICUM
SCALE 1"=5'
0 2.5 5
200+68.36
-30 -20 -10 0 10 20 30
0 0
10 10
7.28 Des Grade =
6.65 Subgrade =
7.28 Original Grnd =
HAUL ROAD (ROUTE 405)
SCHEDULE B
NOTE:
Maintain minimum 1-foot pipe cover during construction to prevent damage to pipe from equipment.
:3 p r il
C u lv e r t
.3
S h e fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\K
P A
E R
F O
F W
T C
M
-1
(1 p ln p p .d g n
DRAINAGE PROFILE
PROJECT
K01PA ERFO FW TCM 2020-1(1)
offset: 4.13' elev. 6.36'
Invert outlet
Remove existing 8" PVC culvert.
Install 18" equivalent ellipitical RCP culvert.
Length = 8'
No Skew offset: 4.13' elev. 6.40'
Invert outlet
1V:3 H
Existing ground
1.7% Slope 0.50% Slope
CL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DRAINAGE PROFILE
SCHEDULE B
JOHN HEINZ WILDLIFE REFUGE AT TINICUM
HAUL ROAD (ROUTE 405)
/26/263
SCALE 1"=5'
0 2.5 5
-0+20-0+20 -0+10 0+00 0+10 0+20
5 5
10 10
201+03.48
8.69Original Grnd =
NOTE:
Maintain minimum 1-foot pipe cover during construction to prevent damage to pipe from equipment.
:3 p r il c u lv e r t-
P r o f il e
S h e
P R
O J E
C T
S
F W
S \T
C M
\2 -1
(1
H W
Y D
E S
\C A
D D
\K P
A E
R F
O F
W T
C M
-1
(1 p ln p p .d g n
PROJECT
K02PA ERFO FW TCM 2020-1(1)
TROLLEY BED ROAD (ROUTE 404) AND HAUL ROAD (ROUTE 405)
SCHEDULES A AND B
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:3
M a r c h
U
S
S u r_ ft
D
P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\M
-P
A E
R F
O F
W T
C M
-1 (1
E
S C
N a rr a ti v e .d g n
CONTROL NARRATIVE
EROSION AND SEDIMENT
water fishes.
Schedule B = 0.02 acres). The receiving water is Darby Creek that is a Chapter 93 designated stream for warm
The total disturbed area for the project is approximately 0.52 acres (Schedule A = 0.50 acres and masonry headwalls.
Soil disturbing activities include embankment construction, placing riprap, and installing pipe culverts and stone place riprap, and other miscellaneous work.
course, asphalt concrete pavement, remove and install pipe culverts, remove and install stone masonry headwalls, segment of Mainline Haul Road. This work includes embankment construction, aggregate base, aggregate surface
This project consists of the reconstruction of a 0.37-mile segment of Mainline Trolley Bed Road and a 0.01-mile
Project Description
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the waste materials into the on-site dumpsters. Dispose of material according to Federal, State, and local regulations.
appropriate and clearly marked containers away from other non-waste materials. Do not dispose of hazardous conduct these activities in a covered area to avoid contact with storm water. Store all hazardous waste materials in could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty containers. Collect contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to prevent
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges and are functioning as described in the Erosion and Sediment Control Plan.
the erosion and sediment control best management practices specified for that stage or phase have been installed
General site clearing, grubbing, and topsoil removal may not commence in any stage or phase of the project until
Limit clearing, grubbing, and topsoil removal to those areas described in each stage of the construction sequence.
review and approval.
erosion and sediment control plan to PWD and Pennsylvania Department of Environmental Protection (PA DEP) for
Notify PWD of any changes to the approved plan prior to implementation of those changes. Submit a revised with the sequence of construction.
Coordinator of the PWD can be reached at 215-685-6387. All earth disturbance activities will proceed in accordance
Control Plan Preparer, and the Inspections Coordinator of the Philadelphia Water District (PWD). The Inspections hold an on-site reconstruction meeting and invite the Refuge Manager, Contractor, the Erosion and Sediment
At least 7 days prior to starting any earth disturbance activities, including clearing and grubbing, notify the CO to for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion and Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
PROJECT
M01PA ERFO FW TCM 2020-1(1)
be required.
the E&S BMPs fail to perform as expected, replacement BMPs, or modifications of those installed, will replacement, regrading, reseeding, remulching, and renetting, must be performed immediately. If weekly basis. All preventative and remedial maintenance work, including clean out, repair, inspections of all E&S BMPs prior to any anticipated storm event, after each runoff event and on a Until the site is stabilized, all E&S BMPs shall be maintained properly. Maintenance shall include minimize the potential for erosion and sediment pollution and notify PWD and PA DEP.
and/or sediment pollution, the operator shall implement appropriate best management practices to Immediately upon discovering unforeseen circumstances posing the potential for accelerated erosion water and on all other disturbed areas specified on the plan maps and/or detail sheets.
Erosion control blanketing shall be installed on all slopes 3H:1V or steeper within 50 feet of a surface filter outlet. Sediment must be removed when accumulations reach 1/3 the height of the outlet.
Any fence section which has been undermined or topped must be immediately replaced with a rock ground height of the filter fence.
spaced at a maximum of 8 feet. Sediment must be removed when accumulations reach ½ the above extended at least 8 feet upslope at 45 degrees to the main barrier alignment. Support stakes shall be Filter fabric fence should be installed at level grade. Both ends of each fence section should be sediment be washed, shoveled, or swept into any roadside ditch, storm sewer, or surface water.
paved roadways shall be removed and returned to the construction site. In no case shall the maintained on-site for this purpose. At the end of each construction day, all sediment deposited on The rock construction entrance thickness shall be constantly maintained on-site. A stockpile shall be areas shall not exceed 1V:2H.
The maximum height for stockpiles areas shall be 20 feet. The maximum side slope for stockpile events.
occur on a weekly basis, before any anticipated precipitation events, and after all precipitation Inspection and maintenance of all erosion and sediment control best management practices shall of any erosion and sediment control practices.
PWD is not responsible for any cleaning or repairs needed on City-owned infrastructure due to failure the project site.
Inlet protection should be provided for all inlets owned by PWD that are located within one block of the procedure described in this plan, over undisturbed vegetated areas.
necessary during construction. All pumping of water from any work area shall be done according to An Industrial Waste Permit will be required should pumping to City-owned infrastructure become
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
perimeter control measures.
Do not allow any construction equipment to operate on or access the down-slope side of the
A copy of the approved drawings must be available at the project site at all times.
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
General Guidelines Continued PWD TRACKING NUMBER: FY26-PAER-8386-01
TROLLEY BED ROAD(ROUTE 404) AND HAUL ROAD (ROUTE 405)
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:3
M a r c h
U
S
S u r_ ft
P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\M
-P
A E
R F
O F
W T
C M
-1 (1
E
S C
N a rr a ti v e .d g n
CONTROL NARRATIVE
EROSION AND SEDIMENT
PROJECT
M02PA ERFO FW TCM 2020-1(1)
land in excess of 5,000 square feet.”
implosion; or engaging in earthworks, defined as “clearing, grubbing, or earth disturbance of any thousand (10,000) square feet; completely or partially demolishing any building or structure by is more than three (3) stories, greater than forty (40) feet tall, or encompasses more than ten A Dust Control Permit will be required when completely demolishing a building or structure that burned, buried, dumped, or discharged at the site.
271.1, and 287.1 et seq. No building materials or wastes or unused building materials shall be accordance with the PA DEP’s Solid Waste Management Regulations at 25 PA Code 260.1 et seq., All building materials and wastes shall be removed from the site and recycled or disposed of in the existing and/or proposed PWD facilities.
for additional approvals and permits required for all water services, meters, and connections to Contact PWD Water Transport Records (1101 Market Street, 2nd Floor, Phone: 215-685-6271)
Specifications For Sewers”, 2019 edition.
Corrosion Control Specifications”, 1985 edition, and “Standard Details and Standard accordance with the City of Philadelphia Water Department “Water Main Standard Details and All work associated with PWD water conveyance and sewer infrastructure shall be done in
Approved PCSMP is permitted without prior approval from PWD.
stormwater management plan (PCSMP) approved by PWD. No change or deviation from the During construction, the selected contractor is expected to follow the post-construction
(when applicable).
debris having potential to clog the basin/trap outlet structures and/or pollute the surface waters.
Sediment basins and/or traps shall be kept free of all construction waste, wash water, and other during the germinating season.
ensure rapid revegetation of disturbed areas, such removal/conversions are to be done only during removal or conversion of the E&S BMPs shall be stabilized immediately. In order to converted to permanent post-construction stormwater management practices. Areas disturbed After final site stabilization has been achieved, temporary E&S BMPs must be removed or stabilized or until they are replaced by another BMP approved by PWD and PA DEP.
E&S BMPs shall remain functional as such until all areas tributary to them are permanently and fill slopes shall be capable of resisting failure due to slumping, sliding, or other movements.
other permanent non-vegetative cover with a density sufficient to resist accelerated erosion. Cut Permanent stabilization is defined as a minimum uniform, perennial 70% vegetative cover or accordance with the permanent stabilization specifications.
specifications. Those areas which will not be reactivated within one year shall be stabilized in reactivated within one year, may be stabilized in accordance with the temporary stabilization blanketing shall be applied as described in the plan. Areas not at finished grade, which will be operator shall stabilize all disturbed areas. During non-germinating months, mulch or protective Immediately after earth disturbance activities cease in any area or subarea of the project, the
General Guidelines Continued the standards of this plan.
of a surface water, or as otherwise shown on the plan drawings, shall be blanketed according to slopes in competent bedrock and rock fills need not be vegetated. Seeded areas within 50 feet All graded areas shall be permanently stabilized immediately upon reaching finished grade. Cut standard and specification for subsurface drain or other approved method.
Seeps or springs encountered during construction shall be handled in accordance with the
Fill shall not be placed on saturated or frozen surfaces.
fills.
Frozen materials or soft, mucky, or highly compressible materials shall not be incorporated into objectionable materials that would interfere with or prevent construction of satisfactory fills.
Fill materials shall be free of frozen particles, brush, roots, sod, or other foreign or All earthen fills shall be placed in compacted layers not to exceed nine inches in thickness.
compacted in accordance with local requirements or codes.
other related problems. Fill intended to support buildings, structures, and conduits, etc. shall be All fills shall be compacted as required to reduce erosion, slippage, settlement, subsidence, or outslopes shall have a minimum of two inches of topsoil.
shall have a minimum four inches of topsoil in place prior to seeding and mulching. Fill six to 12 inches on compacted soils — prior to placement of topsoil. Areas to be vegetated Areas which are to be topsoiled shall be scarified to a minimum depth of three to five inches —
All sediment removed from BMPs shall be disposed of according to Subsection 203.05.
time of inspection.
date they were corrected shall be maintained on the site and be made available to PWD at the A log showing dates that E&S BMPs were inspected as well as any deficiencies found and the before clearing and grubbing operations begin.
boundaries shown on the plan maps. These areas must be clearly marked and fenced off At no time shall construction vehicles be allowed to enter areas outside the limit of disturbance that stage have been installed and are functioning as described in this E&S Plan.
commence in any stage of the project until the E&S BMPs specified by the BMP sequence for of the construction sequence. General site clearing, grubbing, and topsoil stripping may not Clearing, grubbing, and topsoil stripping shall be limited to those areas described in each stage vegetation, roots, and other objectionable material.
Areas to be filled are to be cleared, grubbed, and stripped of topsoil to remove trees, DEP prior to implementation.
plan drawings. Deviation from that sequence must be approved in writing by PWD and the PA All earth disturbance activities shall proceed in accordance with the sequence provided on the
242-1776 for the location of existing underground utilities.
area previously unmarked, the Pennsylvania One Call System Inc. shall be notified at 1-800- At least three (3) days prior to starting any earth disturbance activities, or expanding into an review and approval at its discretion.
implementation of those changes. PWD may require a written submittal of those changes for the project site at all times. PWD shall be notified of any changes to the approved plan prior to accordance with the approved E&S Plan. A copy of the approved drawings must be available at All earth disturbances, including clearing and grubbing, as well as cuts and fills, shall be done in
General Guidelines Continued PWD TRACKING NUMBER: FY26-PAER-8386-01
TROLLEY BED ROAD(ROUTE 404) AND HAUL ROAD (ROUTE 405)
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:3
M a r c h
U
S
S u r_ ft
P R
O J E
C T
S
F W
S \T
C M
\2
-1 (1
H
W Y
D
E S
\C A
D D
\M
-P
A E
R F
O F
W T
C M
-1 (1
E
S C
N a rr a ti v e .d g n
CONTROL NARRATIVE
EROSION AND SEDIMENT
for erosion and sediment pollution, and notify PWD and PA DEP.
and/or sediment pollution, implement appropriate best management practices to minimize the potential
Immediately upon discovering unforeseen…