Attachment 671-18-106 Construction Drawings.pdf
PDF 27 MB Posted
- Solicitation number
- 36C25722B0024
About this file
This document outlines a federal contract opportunity for replacing water softeners at a Veterans Affairs medical facility in San Antonio, Texas. The solicitation number is 36C25722B0024 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 for Project 671-18-106. The project involves replacing the existing water softeners to maintain water quality at the medical center. Responses are due by the date listed on the Federal Business Opportunities website. The award is expected to be a firm-fixed-price contract for purchase and installation of the new water softening equipment.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHED
P
I P
E
F
N
C
E
P
I P
N
C
E
36"
18" X 30"
36"
36"
.0
P
IP
E
F E
N C
E
36"
23"
23"
38"
BLDG.
CP-3
SET
NAIL
CP-4
SET
NAIL
SS MH
RIM ELEV = 953.66'
CONC.
CONC.
CONC.
SS MH
RIM ELEV = 955.16'
SS MH
RIM ELEV = 952.76'
TOP = 954.12'
CONC.
CONC.
P
I P
E
F
E
N
C
E
CONC.
BM-1
FOUND
SQUARE CUT
TOP OF CURB
TOP=956.18'
IRRIGATION
CONTROL
CONC.
CONC.
SHED
ST
ST
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
C
O
N
C
SP
SP
SS
SS
CO
CO
SS
W
W
W
W
W
W
W
W
W
CP-5
FOUND
SPINDLE
BRINE TANK TO BE
ABANDONED IN PLACE
(REFER TO STRUCTURAL
DEMO SHEET SB100)
RETAINING WALL
DITCH
EX 8" WL
EX FH
APPROX. 40' OF EX HARD WATER LINE TO OLD SALT
STORAGE (2" COPPER ENCASED) TO BE ABANDONED.
VA LINES ARE OWNED BY THE STATION AND SHOULD
BE COORDINATED WITH THE VA PRIOR TO
REMOVAL/REPLACEMENT.
EXISTING HARD WATER LINE TO SALT
STORAGE (2" COPPER ENCASED)
EXISTING SLAB TO BE
DEMOLISHED AS SHOWN
(REFER TO STRUCTURAL
DEMO SHEET SB100)
PIPE FENCE TO
BE REMOVED
LOCATION OF HARD WATER
LINE BASED ON AS-BUILT
DRAWINGS. CONTRACTOR
TO FIELD LOCATE.
SP
SS
CO
W
W
W
BENCHMARK
CONTROL POINT
LIGHT POLE
STAND PIPE
MANHOLE - SEWER
SEWER CLEANOUT
SPOT SHOT
MANHOLE - WATER
WATER VALVE
WATER METER
DITCH
RETAINING WALL
PIPE FENCE
BUILDING OVERHANG
ST
STORM SEWER MANHOLE
BRINE LINE TO MEASURING TANK
(2" PVC). LOCATION BASED ON
AS-BUILT DRAWINGS. PROTECT
LINE AND RECONNECT TO NEW
BRINE PUMPS
NOTES:
1. VA LINES ARE OWNED BY THE STATION AND
SHOULD BE COORDINATED WITH THE VA PRIOR TO
REMOVAL/REPLACEMENT.
C-100
EXISTING CONDITIONS
LPCB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
AUDIE L. MURPHY HOSPITAL
WATER SOFTENER
REPLACEMENT
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Brian Contreras, COR Audie L, Murphy Memorial VA Medical Center San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
CONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
10.23.2020
Feet
0 5 10
CO
SHED
BLDG.
CP-4
SET
NAIL
SS MH
RIM ELEV = 952.54'
SS MH
RIM ELEV = 951.90'
SS MH
RIM ELEV = 953.52'
SS MH
RIM ELEV = 953.66'
SS MH
RIM ELEV = 955.16'
SS MH
RIM ELEV = 952.76'
TOP = 952.00'
TOP = 951.98'
TOP = 954.48'
TOP = 954.12'
CONC.
BM-1
FOUND
SQUARE CUT
TOP OF CURB
TOP=956.18'
SHED
ST
ST
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S T
S
T
S
T
S
T
S
T
S T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
C
O
N
C
SP
SP
SS
SS
CO
CO
CO
CO
SS
SS
SS
SS
W
W
CP-5
FOUND
SPINDLE
SP
SS
CO
W
W
W
BENCHMARK
CONTROL POINT
LIGHT POLE
STAND PIPE
MANHOLE - SEWER
SEWER CLEANOUT
SPOT SHOT
MANHOLE - WATER
WATER VALVE
WATER METER
DITCH
RETAINING WALL
PIPE FENCE
BUILDING OVERHANG
CO
SHED
BLDG.
CP-4
SET
NAIL
SS MH
RIM ELEV = 952.54'
SS MH
RIM ELEV = 951.90'
SS MH
RIM ELEV = 953.52'
SS MH
RIM ELEV = 953.66'
SS MH
RIM ELEV = 955.16'
SS MH
RIM ELEV = 952.76'
TOP = 952.00'
TOP = 951.98'
TOP = 954.48'
TOP = 954.12'
CONC.
BM-1
FOUND
SQUARE CUT
TOP OF CURB
TOP=956.18'
SHED
ST
ST
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S T
S
T
S
T
S
T
S
T
S T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
C
O
N
C
SP
SP
SS
SS
CO
CO
CO
CO
SS
SS
SS
SS
W
W
CP-5
FOUND
SPINDLE
C-500
18" DRILLED PEIR (SEE STRUCTURAL)
14'
EX 8" WL
EX FH
EXISTING HARD WATER LINE TO SALT
STORAGE (2" COPPER ENCASED)
CONNECT TO EXISTING 2" COPPER LINE AND
EXTEND APPROX. 55' TO NEW CONNECTION ON
BRINE TANK. INCLUDE 2" SHUT OFF VALVE AT BRINE
TANK. ENCASE COPPER LINE (W/ 6" MIN. COVER OF
CLEAN SILICA SAND BEDDING) TO MATCH EXISTING.
WATER LINE LOCATION BASED ON AS-BUILT
DRAWINGS. CONTRACTOR TO FIELD LOCATE.
(SEE DETAIL 1 THIS SHEET)
BRINE LINE TO MEASURING TANK (2" PVC).
LOCATION BASED ON AS-BUILT DRAWINGS.
PROTECT LINE AND RECONNECT TO NEW
BRINE PUMPS
INSTALL 6"
BOLLARD
INSTALL 6"
BOLLARD
INSTALL 6"
BOLLARD
INSTALL 6"
BOLLARD
INSTALL 6"
BOLLARD
REPLACE TRENCH CUT WITH 6" SLAB, 4000
PSI CONCRETE, #4 @ 16" OCEW. DOWEL
INTO EXISTING CONCRETE WITH #4 @ 16"
OC (PER SLAB CONNECTION DETAIL 3 ON
STRUCTURAL SHEET SB502). MATCH
ADJACENT EXISTING PAVEMENT ELEVATION.
DEMO CONC FOR
NEW 2" WATER LINE
TRENCH (3' WIDE)
PROPOSED BRINE TANK
EXISTING BRINE TANK TO BE
ABANDONED IN PLACE AND
FILLED WITH FLOWABLE FILL
(REFER TO STRUCTURAL
SHEETS SB100 & SB501)
INSTALL 6"
BOLLARD
PROPOSED FOUNDATION (SEE STRUCTURAL)
APPROX. 40' OF EX HARD WATER
LINE TO OLD SALT STORAGE (2"
COPPER ENCASED) TO BE ABANDONED
SEE DETAIL 2 THIS
SHEET FOR WATER
LINE CONNECTION
DETAIL AT TANK
ST
STORM SEWER MANHOLE
EXISTING 2" COPPER LINE
SPLINE W/ COUPLING
R M
I
N
NEW 2" COPPER LINE
COPPER LINE CONNECTION DETAIL NOT TO SCALE
COPPER DETAIL NOTES:
1. BRASS FITTING SHALL CONFORM TO
ANSI/AWWA SPECIFICATIONS C-800
2. COPPER TUBING SHALL BE TYPE "K"
SOFT AND CONFORM WITH INSF
STANDARD 61, ASTM SPECIFICATIONS
B-88
BRINE TANK
1-1/2" BRINE TANK FLANGE
GASKET (NEOPRENE BRAND OR EQUIVALENT)
1-1/2" COPPER FLANGE (NIBCO OR EQUIVALENT)
COPPER COUPLING
90 DEG COPPER ELBOW
COPPER COUPLING
COPPER ADAPTOR/REDUCER (1-1/2" TO 2")
2" COPPER WATER SUPPLY LINE
CONCRETE PAD
NOT TO SCALE
COPPER PIPE CONNECTION DETAIL TO BRINE TANK FLANGE
INSTALL 6"
BOLLARD
C-100
C-100
VA LINES ARE OWNED BY THE STATION AND
SHOULD BE COORDINATED WITH THE VA
PRIOR TO REMOVAL/REPLACEMENT
NOTES:
1. VA LINES ARE OWNED BY THE
STATION AND SHOULD BE
COORDINATED WITH THE VA PRIOR TO
REMOVAL/REPLACEMENT.
2. CONTRACTOR TO FIELD LOCATE A
3/4-INCH WATER FAUCET
CONNECTION. COORDINATE LOCATION
WIT THE VA.
C-101
PROPOSED CONDITIONS
LPCB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
AUDIE L. MURPHY HOSPITAL
WATER SOFTENER
REPLACEMENT
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Brian Contreras, COR Audie L, Murphy Memorial VA Medical Center San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
CONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
10.23.2020
Feet
0 5 10
DATE
FRAC.
DRN.
APP'D.
DEC.
DRAWING NO.
SCALE
FILE ID.
SHEET
REV.
OF
50 TON BRINEMAKER TANK
GENERAL ARRANGEMENT
REVISIONS
NO. BY REMARKS
INCORPORATED
DATE
COMPLETE WATER SOLUTIONS
SILVER LAKE, WI EP18-261A-03-01
21MARK
10/4/2018
48"
24" MANWAY
WITH WEIGHTED
COVER
24"
MANWAY
WITH
BLIND
FLANGE
4" CONICAL
FLANGE
SALT INLET
57"
12"
172"
8" U-TYPE VENT
WITH
FLEX BOOT/PVC
DOWNPIPE/
POLYESTER DUST
BAG/CLAMPS
AND FRP BRACKETS
DUST BAG
FRP
MOUNTING
BRACKET
HEAVY DUTY
HOLD DOWN LUG
(4 PLACES)
ALL MATERIALS ARE TO BE
ISOPHTHALIC POLYESTER
Ø144"
TANK I.D.
80"
INSULATION
Ø150 1/2"
Ø144" I.D.
2"
INSULATION
HEAVY
DUTY
LIFT LUG
(4 PLACES)
115 VAC
HEAT PANEL
CONTROL
BOX
2500 WATT
CONSTRUCTION NOTES
1. 14,000 GAL CAPACITY, FLAT BOTTOM, DOME TOP, CONSTRUCTED OF FRP.
WITH DOUBLE WALL.
2. CHEMICAL ENVIRONMENT: WATER
SPECIFIC GRAVITY/MAX TEMP: 1.0/160°F
PRESSURE/VACUUM LIMITS: ATMOSPHERIC
CORROSION BARRIER: ISOPHTHALIC POLYESTER
TANK IS DESIGNED FOR 105 MPH WIND LOADS WITH IBC 2015
TANK IS DESIGNED FOR SEISMIC LOADS
DESIGN/SPECIFICATION: FABRICATED TO MEET SECTIONS OF ASTM D-3299
3. NON-PIGMENTED EXTERIOR WITH 2" THICK POLYURETHANE INSULATION AND WHITE
POLYURETHANE OVERCOAT.
4. HEATING SYSTEM WILL MAINTAIN 40°F WATER TEMP IN A -10°F ENVIRONMENT.
5. 304 STAINLESS STEEL HOLD DOWN LUGS HAVE 7/8" HOLE AND ARE NON SEISMIC
RATED/2000# EACH.
6. FLANGE CONNECTIONS ARE FULL FACE CONICAL GUSSET TYPE.
7. ESTIMATED SHIPPING WEIGHT 3,400 LBS.
8. ESTIMATED OPERATING WEIGHT 91,000 LBS.
9. TOP MANWAY IS 24” CIRCULAR WITH HINGED COVER.
10. SIDESHELL MANWAY IS 24" WITH BLIND FLANGE.
11. INSTALLATION OF BRINE MAKER INTERNAL DISTRIBUTION
BY OTHERS.
4" 304 SS PNUEMATIC
FILL LINE W/3/4" WATER
INJECTION PORT/ALUMINUM
CAM LOCK ADAPTER
266"
VAC
SMART
BOB
SENSOR
216"
36"
52 7/8"
75°
202°
240°
280°
40°
225°
270°
292°
0°
250°
180°
160°
135°
112°
90°
22°
261°
2" CONICAL
FLANGE
BRINE OUTLET
TO WATER
SOFTENER
2" CONICAL FLANGE
WATER INLET
3" FULL COUPLING
SALT LEVEL MOUNT
18"
1-1/4" HALF
COUPLING
LEVEL
TRANSMITTER
E
FRP LADDER
(WITH CAGE)
G
JJ
G
X
19A
18A
K 24A
A
C
B1
B2
Z
L
R
A
EEFF
34A
39A
Q
28A
29A
GG
38A
A
34A
19A
GG
30A 31A
Z
Q
24A
14A
C
QUARTZ FILTER BED REQUIRED FOR GRANULATED SALT
OR A FINE GRADE OF SOLOR SALT ONLY. QUARTZ FILTER
BED TO COVER ENTIRE BOTTOM OF TANK. IF ROCK SALT IS
USED DO NOT USE QUARTZ ROCK FILTER BED.
1-1/4" ASCO
FRESH WATER
MAKE-UP
SOLENOID
VALVE
115 VAC
115 VAC
66 CU.FT. OF
1/4" x 1/2"
GRAVEL
48 CU.FT.
1/8" x 1/4" GRAVEL
GALVANIZED IN GROUND
PIPE SUPPORT
C-500
CIVIL DETAILS
LPCB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
AUDIE L. MURPHY HOSPITAL
WATER SOFTENER
REPLACEMENT
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Brian Contreras, COR Audie L, Murphy Memorial VA Medical Center San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
CONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
10.23.2020
C-500
DATE
FRAC.
DRN.
APP'D.
DEC.
DRAWING NO.
SCALE
FILE ID.
SHEET
REV.
OF
50 TON BRINEMAKER TANK
GENERAL ARRANGEMENT
REVISIONS
NO. BY REMARKS
INCORPORATED
DATE
COMPLETE WATER SOLUTIONS
SILVER LAKE, WI
EP18-261A-03-01
22MARK
10/4/2018
LIQUID LEVEL
CONTROLLER
SMART BOB
CONTROLLER
SOLENOID CONTROL
VALVE
WATER INLET
BRINE OUTLET
GG
30A
LEVEL
TRANSMITTER
FLOW REGULATOR
WATER INJECTION
PNEUMATIC SALT DELIVERY
APPROX. PRESSURE- 15 PSI
14A
24A
E
29A
21A
L
R
EXTERIOR PIPING CONNECTION AND
LEVEL CONTROL BLOCK DIAGRAM
CONNECTION TABLE
SERVICE ITEM DESCRIPTION
QTY
TANK TIE DOWN A 304 STAINLESS STEEL TIE DOWN LUG 4
TANK LIFTING B1 304 STAINLESS STEEL LIFTING CHANNEL STANDARD 3
TANK LIFTING B2 304 STAINLESS STEEL LIFTING CHANNEL STANDARD 1
TANK ACCESS C 24" DIA. FRP SIDE FLANGED MANWAY WITH .75" THICK FLANGE & COVER 1
SALT INLET E 4" DIA. CONNICALLY GUSSETED FLANGED NOZZLE - TYPE 1 1
VENT G 8" DIA. FRP 90 DEGREE ELBOW 1
SALT PIPE SUPPORT K FRP SUPPORT MOUNT FOR SALT PIPE 3
WATER INLET L 2" DIA. CONICALLY GUSSETED FLANGED NOZZLE TYPE 2 1
TANK ACCESS/PRESSURE RELIEF
Q
24" DIA. FRP TOP FLANGED MANWAY W/.50" THK. FLANGE & COVER
BRINE OUTLET R 2" DIA. EXT. CONICALLY GUSSETED 1-PLATE INT. GUSSETED DOUBLE FLANGED NOZZLE 1
VENT PIPE SUPPORT X FRP VENT CLIPS WITH HOLES FOR INSERTION OF S.S. PIPE CLAMPS 2
TANK ID Z FRP ENCAPSULATED NAMEPLATE 1
INSULATION AA FOAM INSULATION WITH FRP COVERING 1
HEAT BOX BB PLASTA-THERM HEATING SYSTEM CONTROL BOX 1
HEAT TAPE CC PLASTA-THERM HEAT TAPE 120V OR 240V
LADDER CLIP EE FRP LADDER CLIP 2
LADDER CLIP FF FRP LADDER CLIP 4
LEVEL TRANSMITTER GG
1-1/4" F-NPT FRP HALF COUPLING
SALT LEVEL MOUNT JJ 3" F-NPT FRP HALF COUPLING 1
Table
FOR ITEMS ITEM
PARTS/ACCESSORIES
QTY
1A
QUARTZ ROCK FILTER BED
24A 14A
4" DIA. ALUMINUM KAMLOCK COUPLING WITH CAP (OPW)
G 18A 8" DIA. NEOPRENE CONNECTION BOOT 1
25A 19A DUST BAG 1
21A
NORMALLY CLOSED SOLENOID VALVE (2 WAY)
K 22A PIPE HANGER 3
E 24A 4" DIA. 304 STAINLESS STEEL FILL PIPE SCH.40 WITH FLANGE 1
L,Y
26A WATER INLET RING 1
Q
28A S.S. COMPRESSION SPRING 4
29A DIGITAL LEVEL CONTROLLER 1
GG 30A
PRESSURE TRANSMITTER W/.50" MNPT
GG 31A PRESSURE TRANSMITTER MOUNT SUB ASSEMBLY 1
A 32A 304 STAINLESS STEEL HOLD DOWN ANGLE 4
EE,FF
34A
FRP LADDER (WITH CAGE)
JJ 38A SALT LEVEL REMOTE UNIT 1
JJ,38A
39A CONTROL CONSOLE FOR SALT LEVEL UNIT 1
38A
VAC
C-501
CIVIL DETAILS
LPCB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
AUDIE L. MURPHY HOSPITAL
WATER SOFTENER
REPLACEMENT
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Brian Contreras, COR Audie L, Murphy Memorial VA Medical Center San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
CONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
10.23.2020
C-501
C-501
L
1 DRILLED PIER DETAIL
SB001 3/4"=1'-0"
M
IN
P E
N E
T R
A T
IO
N
CLR
3"
#3 AT 12" OC, MAX
STD ACI 90° HOOKS
BEAM AND TERMINATE IN
EXTEND 1'-9" INTO GRADE
TOP OF DENSE MARL
GENERAL CONCRETE EARTHWORK AND FOUNDATIONS
PENETRATION INTO DENSE MARL.
AS REQUIRED TO MEET MINIMUM
* PIER LENGTH SHALL BE INCREASED
M
IN
BRINE TANK FOUNDATION NOTES
SB001
SPACE.
MAY BE REQUIRED TO PREVENT FLOWABLE FILL AND/OR SOIL FROM INTRUDING INTO VOID
BE SPECIFICALLY MANUFACTURED FOR THIS PURPOSE. SOIL RETAINERS OR OTHER MEANS
11. GRADE BEAMS SHALL BE PLACED ON VOID FORMS TO CREATE A VOID OF 8”. VOID FORMS SHALL
10.“MUSHROOMING”AT THE TOP OF THE PIERS IS PROHIBITED.
PIERESEARCH OR APPROVED EQUAL.
9. PROVIDE PIER BOLSTERS AND CENTERING DEVICES FOR PIER REINFORCEMENT BY
PENETRATION.
- THE COMPETENCE OF THE DENSE MARL FOR THE FULL SECTION OF THE DESIGN
- THAT GROUNDWATER SEEPAGE IS CORRECTLY HANDLED;
- THE REMOVAL OF ALL SMEAR ZONES AND CUTTINGS;
- THE MINIMUM PENETRATION;
- THE BEARING STRATUM;
ASSUMPTIONS AND TO VERIFY:
GEOTECHNICAL ENGINEER PRIOR TO CONCRETING TO ASSURE COMPLIANCE WITH DESIGN
COMMENCEMENT OF DRILLING. EACH PIER EXCAVATION SHALL BE INSPECTED BY THE
8. THE CONTRACTOR SHALL NOTIFY THE GEOTECHNICAL ENGINEER 24 HOURS PRIOR TO
DURING EXTRACTION.
THAT A SUFFICIENT HEAD OF PLASTIC CONCRETE IS MAINTAINED WITHIN THE CASING
REMOVED PRIOR TO BEGINNING THE DESIGN PENETRATION. CARE MUST THEN BE TAKEN
SEATED IN THE TOP OF THE BEARING STRATUM WITH ALL WATER AND LOOSE MATERIAL
CASING WILL BE ENCOUNTERED DURING EXCAVATION OF THE SHAFT. THE CASING SHALL BE
WATER. IT SHOULD BE ANTICIPATED THAT SEEPAGE REQUIRING THE USE OF TEMPORARY
7. EXCAVATIONS FOR THE SHAFTS SHALL CONTAIN NO MORE THAN 2 INCHES OF STANDING
FOR MORE THAN EIGHT HOURS.
AND TO REDUCE THE POSSIBILITY OF SEEPAGE PROBLEMS. NO SHAFT SHALL BE LEFT OPEN
THE DRILLING AND INSPECTION IN ORDER TO PREVENT DETERIORATION OF BEARING SURFACES
OPERATION AND CONCRETE PLACED AS SOON AS PRACTICAL AFTER COMPLETION OF
6. THE DESIGN PENETRATION OF INDIVIDUAL SHAFTS SHALL BE EXCAVATED IN A CONTINUOUS
TO SHAFTS PENETRATING A MINIMUM OF 1.5 FEET INTO THE DENSE MARL.
PSF AND A SKIN FRICTION VALUE OF 1,500 PSF PER FOOT. THESE VALUES ARE APPLICABLE
5. DRILLED PIERS ARE DESIGNED FOR AN ALLOWABLE END BEARING PRESSURE OF 25,000
- CONCRETE CUT-OFF ELEVATION: PLUS 1" TO MINUS 2"
- SHAFTS OUT OF PLUMB: NOT MORE THAN 1”FOR EVERY 10 FEET.
- MAXIMUM PERMISSIBLE VARIATION OF LOCATION: NOT MORE THAN 1".
CENTERLINE TOLERANCES:
PIER'S ACTUAL FINAL LOCATION. PIERS SHALL BE CONSTRUCTED WITHIN THE FOLLOWING
PIER TO LINES AND LEVELS REQUIRED BEFORE EXCAVATION, AND MEASUREMENTS OF EACH
LAYOUTS, AND MEASUREMENTS FOR PIER WORK. THIS INCLUDES LAYOUT WORK FOR EACH
4. THE CONTRACTOR SHALL ENGAGE A REGISTERED SURVEYOR TO PERFORM SURVEYS,
EXCAVATION OF ANY KIND.
3. LOCATE ALL UTILITIES AND UNDERGROUND SERVICES PRIOR TO PERFORMING
-CONSULTATION AS REQUIRED DURING CONSTRUCTION
-OBSERVATION AND TESTING DURING PIER DRILLING OPERATIONS
TO, THE FOLLOWING:
REPORT. THESE TESTS AND OBSERVATIONS SHALL INCLUDE, BUT NOT BE LIMITED
IMPLEMENTING THE RECOMMENDATIONS OF THE AFOREMENTIONED GEOTECHNICAL
OBSERVE ALL EARTHWORKING OPERATIONS AND THE REQUIRED TESTING FOR
2. A QUALIFIED GEOTECHNICAL ENGINEER SHALL BE RETAINED BY THE OWNER TO
GEOTECHNICAL REPORT.
INFORMATION ONLY. ALL EARTHWORK SHALL BE IN ACCORDANCE WITH THE
EXCERPTS FROM THE AFOREMENTIONED REPORT ARE PROVIDED BELOW FOR
BRAUN INTERTEC CORPORATION (PROJECT NO.F-12228)DATED NOVEMBER 13, 2019.
1. FOUNDATION DESIGN IS IN ACCORDANCE WITH A GEOTECHNICAL REPORT BY
INCREASE TO THE CONTRACT SUM OR CONTRACT TIME.
THE MORE STRINGENT OR HIGHER QUALITY REQUIREMENT WITHOUT ANY
SHALL BE DEEMED THAT THE CONTRACTOR BID AND INTENDS TO EXECUTE
SHALL BE PROVIDED, UNLESS INSTRUCTED OTHERWISE BY THE ENGINEER. IT
SHOWN AND / OR THE HIGHEST QUALITY PRODUCT OR INSTALLATION METHOD
THE DRAWINGS AND SPECIFICATIONS, THE GREATER QUANTITY OF ITEMS
12. IF ANY INCONSISTENCIES OR DISCREPANCIES OCCUR WITHIN OR BETWEEN
RESPONSIBILITY TO ENFORCE THESE REQUIREMENTS.
PLACING MATERIALS ON FLOOR OR ROOF. IT IS THE CONTRACTOR'S
IN EXCESS OF THE DESIGN LIVE LOADS. IMPACT SHALL BE AVOIDED WHEN
11. CONSTRUCTION MATERIALS SHALL NOT BE STORED ON FLOOR OR ROOF
OR CAUSE DISTRESS IN THE STRUCTURES.
IN HIS OPINION, MIGHT ENDANGER THE STABILITY OF THE STRUCTURES
SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY CONDITION WHICH,
STRUCTURES DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR
SHORING OF ALL STRUCTURAL WORK AS REQUIRED FOR STABILITY OF THE
10. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACING AND
PERSONS DURING CONSTRUCTION.
PROVIDE ALL MEASURES NECESSARY TO PROTECT THE WORKERS AND OTHER
CONSTRUCTION UNLESS SO STATED OR NOTED. THE CONTRACTOR SHALL
FINISHED STRUCTURES. THEY DO NOT INDICATE THE METHODS OF
9. THE STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE
OF QUANTITIES, LENGTHS, OR FIT OF MATERIALS.
8. THE STRUCTURAL DRAWINGS ARE NOT TO BE SCALED FOR DETERMINATION
ATTENTION FOR APPROVAL PRIOR TO CONSTRUCTION.
ON THE STRUCTURAL DRAWINGS SHALL BE BROUGHT TO THE ENGINEER'S
VERIFIED BY THE CONTRACTOR. ANY DEVIATION FROM OPENINGS SHOWN
DETAILS NOT SHOWN. SIZE AND LOCATION OF ALL OPENINGS SHALL BE
AND PLUMBING DRAWINGS FOR SLEEVES, CURBS, INSERTS AND SIMILAR
7. THE CONTRACTOR SHALL REFER TO DESIGN, MECHANICAL, ELECTRICAL
THE WORK.
AND INFORMATION SHOWN ON THE DRAWINGS BEFORE PROCEEDING WITH
ENGINEER OF ANY DISCREPANCIES BETWEEN THE ACTUAL CONDITIONS
DIMENSIONS AND CONDITIONS AT THE SITE AND SHALL NOTIFY THE
6. THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL
COMPLETION OF THE SHOP DRAWINGS.
SECTIONS AND REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO
STRUCTURAL PLANS AND SECTIONS WITH THE MEP AND CIVIL PLANS AND
ALL CIVIL AND MEP DETAILS. THE CONTRACTOR SHALL COMPARE THE
ELEVATIONS NOT SHOWN AND FOR EXACT LOCATIONS AND DIMENSIONS OF
5. THE CONTRACTOR SHALL REFER TO THE CIVIL AND MEP DRAWINGS FOR
THAT SPECIFIC CHANGES ARE BEING SUGGESTED.
REVIEW DO NOT CONSTITUTE "IN-WRITING" UNLESS IT IS CLEARLY NOTED
ENGINEER FOR REVIEW. SHOP DRAWINGS THAT ARE SUBMITTED FOR
SHOWN ON THESE DRAWINGS SHALL BE SUBMITTED IN WRITING TO THE
MODIFICATION TO THE STRUCTURES OR ANY PART OF THE STRUCTURES
4. ANY DEVIATION FROM, ADDITION TO, SUBSTITUTION FOR, OR
REPRESENTATIVE.
UNTIL ALL SHOP DRAWINGS ARE APPROVED BY THE OWNER'S
AND CONSTRUCTION OF THE WORK. NO CONSTRUCTION IS PERMITTED
CONTRACTOR OF FULL RESPONSIBILITY FOR CORRECT FABRICATION
THIS REVIEW. REVIEW OF SHOP DRAWINGS DOES NOT RELIEVE THE
A PERIOD OF AT LEAST 10 WORKING DAYS SHALL BE PROVIDED FOR
SUBMITTED FOR REVIEW PRIOR TO COMMENCEMENT OF CONSTRUCTION.
3. COMPLETE SHOP DRAWINGS FOR THE STRUCTURAL WORK SHALL BE
7-10 "MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES."
0.18. WIND LOADS ARE CALCULATED IN ACCORDANCE WITH ASCE
115 MPH (EXPOSURE C) WITH AN INTERNAL PRESSURE COEFFICIENT OF
ACCORDANCE WITH CODE PROVISIONS FOR A BASIC WIND SPEED OF
WIND PRESSURES IN ALL DIRECTIONS HAVE BEEN CALCULATED IN
BUILDING WIND LOADS
ROOF. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 PSF
FLOOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100 PSF
BUILDING LIVE LOADS
PLUMBING, AND CIVIL DRAWINGS.
ALL WORK SHOWN ON THE STRUCTURAL, MECHANICAL, ELECTRICAL,
DEAD LOADS HAVE BEEN CALCULATED TO INCLUDE THE ACTUAL WEIGHT OF
DEAD LOADS
FOLLOWING:
2. LOADS THAT HAVE BEEN USED IN THE STRUCTURAL DESIGN INCLUDE THE
ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
THE 2018 INTERNATIONAL BUILDING CODE
AND THE FOLLOWING DESIGN CODES AND MATERIAL STANDARDS:
PROVISIONS OF THE UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
1. THE STRUCTURAL DESIGN IS IN ACCORDANCE WITH APPLICABLE
THAN ONCE PER 5000 SF OF WALL OR SLAB SURFACE PLACED.
TAKEN NOT LESS THAN ONCE PER DAY, NOR LESS THAN ONCE PER 100 YD3 PLACED, NOR LESS
20. SAMPLES FOR STRENGTH TESTS OF EACH CLASS OF CONCRETE PLACED EACH DAY SHALL BE
CONCRETE DIMENSIONS SHOWN AND TO MAINTAIN CONCRETE CLEAR COVER REQUIREMENTS.
19. BENT BARS SHALL BE SHOP FABRICATED, UNO. BARS SHALL BE FABRICATED TO FIT WITHIN THE
NOTED OTHERWISE.
18. ALL BAR DETAILS SHOWN ON THESE DRAWINGS ARE DIMENSIONED TO THE C OF BARS UNLESS
AND IN ACCORDANCE WITH THE DESIGN DRAWINGS.
ACI 308 AND THE SPECIFICATIONS. CHAMFERS (3/4" ) SHALL BE PROVIDED AT ALL EXPOSED EDGES
17. EACH AREA OF CONCRETE WORK SHALL BE FINISHED AND MOIST-CURED IN ACCORDANCE WITH
PLACED UNTIL THESE ITEMS ARE CHECKED AND APPROVED BY THE TESTING LABORATORY.
EMBEDS ARE POSITIONED PRIOR TO EACH CONCRETE PLACEMENT. NO CONCRETE SHALL BE
16. THE TESTING LABORATORY SHALL BE NOTIFIED AFTER THE MILD STEEL REINFORCEMENT AND
EARTH AND 1 1/2 " OTHERWISE (UNLESS NOTED OTHERWISE ON THE DRAWINGS).
15. CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE 3" FOR CONCRETE CAST AGAINST
"RECOMMENDED PRACTICE FOR PLACING REINFORCING BARS".
14. MILD STEEL REINFORCEMENT SHALL BE PLACED AND SECURED IN ACCORDANCE WITH CRSI
13. CONCRETE SLUMPS SHALL BE 4" (MAX) FOR STRUCTURAL CONCRETE.
12. THE MAXIMUM NOMINAL SIZE OF COARSE AGGREGATE SHALL BE 1" FOR STRUCTURAL CONCRETE.
4000 PSI.
11. MIXES SHALL BE DESIGNED TO PROVIDE CONCRETE WITH A 28-DAY COMPRESSIVE STRENGTH OF
CHLORIDE ION CONTENT SHALL BE LIMITED TO 0.10% BY WEIGHT OF CEMENT.
10. NONPOTABLE WATER SHALL NOT BE USED IN MIXING CONCRETE. MAXIMUM WATER-SOLUBLE
FURNACE SLAG SHALL CONFORM TO ASTM C989. SILICA FUME SHALL COMPLY WITH ASTM C1240.
9. FLY-ASH AND POZZOLANS SHALL COMPLY WITH ASTM C618. GROUND GRANULATED BLAST-
8. CONCRETE SHALL BE AIR-ENTRAINED TO 6% (+/- 1.5%) IN ACCORDANCE WITH ASTM C260.
CHLORIDE IS PROHIBITED.
ACCORDANCE WITH THE MANUFACTURER'S DIRECTIONS AND ASTM C494. THE USE OF CALCIUM
7. ALL ADDITIVES FOR AIR ENTRAINMENT, WATER REDUCTION, AND SET CONTROL SHALL BE USED IN
SHALL BE PROHIBITED.
NORMAL WEIGHT AGGREGATES, UNLESS NOTED OTHERWISE. ALKALI-REACTIVE AGGREGATES
6. NORMAL WEIGHT AGGREGATES SHALL CONFORM TO ASTM C 33. ALL CONCRETE SHALL USE
5. THE MAXIMUM WATER/CEMENT RATIO SHALL BE 0.5 FOR ALL CONCRETE.
4. PORTLAND CEMENT SHALL BE A SINGLE BRAND CONFORMING TO ASTM C 150, TYPE I OR II.
ACCORDANCE WITH ACI SP-66.
3. STEEL REINFORCEMENT AND ACCESSORIES SHALL BE DETAILED AND FABRICATED IN
2. MILD STEEL REINFORCING BARS SHALL CONFORM TO ASTM A 615, GRADE 60.
APPLY IN CASES OF CONFLICT.
AND SPECIFIC REFERENCED PORTIONS OF CODE. THE MOST RESTRICTIVE REQUIREMENT SHALL
SPECIFICATIONS FOR STRUCTURAL CONCRETE, THESE DRAWINGS, PROVIDED SPECIFICATIONS,
1. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF ACI 301, ABBREVIATIONS
L
CLR.........................................................................CLEAR
OC..................................................................ON CENTER
MIN......................................................................MINIMUM
ACI............................AMERICAN CONCRETE INSTITUTE
STD..................................................................STANDARD
UNO..................................UNLESS NOTED OTHERWISE
C...................................................................CENTERLINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management of Veterans Affairs U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACEMENT
WATER SOFTENER
AUDIE L. MURPHY HOSPITAL
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved:Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288 Mr. Brian Contreras, COR
Audie L, Murphy Memorial VA Medical Center
San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
DOCUMENTS
CONSTRUCTION
CONSULTANT
Revisions: Date:
10.23.2020 BMP
SCALE: AS SHOWN
BGP
PIERCE ENGINEERING
132 N MAIN ST.
CHILDRESS, TX 79201
940-937-8600
TX FIRM NO. F-9186
Structural
O'BrienEngineering, Inc.
10-23-2020
1 DEMOLITION PLAN
SB100 3/4"=1'-0"
SB100
DEMOLITION PLAN
BELOW
FACE OF TANK
SLAB
EXISTING TANK TOP
DEMO AND REMOVE
SB501
SB501
36'-0"
AS SHOWN
DEMOLISH SLAB
2'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACEMENT
WATER SOFTENER
AUDIE L. MURPHY HOSPITAL
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved:Project Director
2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288 Mr. Brian Contreras, COR
Audie L, Murphy Memorial VA Medical Center
San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
DOCUMENTS
CONSTRUCTION
CONSULTANT
Revisions: Date:
G-001
10.23.2020 BMP
SCALE: AS SHOWN
BGP
PIERCE ENGINEERING
132 N MAIN ST.
CHILDRESS, TX 79201
940-937-8600
TX FIRM NO. F-9186
Structural
O'BrienEngineering, Inc.
10-23-2020
CONC.
953.74'
.0 ' P
IP
E F
E N
C E
953.83'
4.0' PIPE FENCE
953.91'
SPINDLE
FOUND
CP-5
F E
N C
E
.0 ' P
IP
E
953.96'
W 23"
954.02'
4.0' PIPE FENCE
954.05'
954.06'
W
954.07'
23"
W 36"
954.07'
954.08'
W
36"
W 36"
W 38"
W
36"
TOP OF CURB
SQUARE CUT
FOUND
BM-1
SPSP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACEMENT
WATER SOFTENER
AUDIE L. MURPHY HOSPITAL
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved:Project Director
2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288 Mr. Brian Contreras, COR
Audie L, Murphy Memorial VA Medical Center
San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
DOCUMENTS
CONSTRUCTION
CONSULTANT
Revisions: Date:
10.23.2020 BMP
SCALE: AS SHOWN
BGP
PIERCE ENGINEERING
132 N MAIN ST.
CHILDRESS, TX 79201
940-937-8600
TX FIRM NO. F-9186
Structural
O'BrienEngineering, Inc.
10-23-2020
CONC.
953.74'
.0 ' P
IP
E F
E N
C E
953.83'
4.0' PIPE FENCE
953.91'
SPINDLE
FOUND
CP-5
F E
N C
E
.0 ' P
IP
E
953.96'
W 23"
954.02'
4.0' PIPE FENCE
954.05'
954.06'
W
954.07'
23"
W 36"
954.07'
954.08'
W
36"
W 36"
W 38"
W
36"
SPSP
AB
C
AB
1 FOUNDATION PLAN
9"
1/2"=1'-0"
14'-0"
BRINE TANK
PROPOSED
BELOW
EXISTING STRUCTURE
SB101
36'-0"
11'-0" 11'-0"
SB501
12'-6"9"
SB501
FACE OF EXISTING TANK
AND BOTTOM
#6 AT 12" OC, EW, TOP
REINFORCED WITH
10-INCH THICK SLAB
#4 AT 16" OC, EW
REINFORCED WITH
6-INCH THICK SLAB
SB101
BRINE TANK FOUNDATION PLAN
SB502
DETAIL, TYP
RE-ENTRANT CORNER
REFER 1/SB502 FOR
PIER BELOW, TYP
18" DIA DRILLED
DETAILS
GRADE BEAM CORNER
REFER 2/SB502 FOR
ANCHORAGE REQUIREMENTS.
3. REFER TANK FABRICATOR'S DRAWINGS FOR
2. REFER MEP DRAWINGS FOR UTILITY COORDINATION.
ADDITIONAL INFORMATION AND REQUIREMENTS.
1. REFER BRINE TANK FOUNDATION NOTES FOR
NOTES:
14'-0"8'-0"14'-0"
THICKENED SLAB
BRINE TRANSFER PUMPS
SB502
2'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACEMENT
WATER SOFTENER
AUDIE L. MURPHY HOSPITAL
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved:Project Director
2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288 Mr. Brian Contreras, COR
Audie L, Murphy Memorial VA Medical Center
San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
DOCUMENTS
CONSTRUCTION
CONSULTANT
Revisions: Date:
10.23.2020 BMP
SCALE: AS SHOWN
BGP
PIERCE ENGINEERING
132 N MAIN ST.
CHILDRESS, TX 79201
940-937-8600
TX FIRM NO. F-9186
Structural
O'BrienEngineering, Inc.
10-23-2020
1 TRANSVERSE SECTION
SB501 3/4"=1'-0"
2 LONGITUDINAL SECTION
SB501 3/4"=1'-0"
TYP
1'-0"
TYP
1'-0"
TOP AND BOTTOM
#6 AT 10" OC, EW,
TANK WALL
EXISTING BRINE
#4 AT 16" OC, TYP
BOTTOM, TYP
3-#8, TOP AND
TYP
8-INCH VOID FORM,
FLOWABLE FILL
HOOK, TYP
STD ACI 90˚
#4 AT 10" OC, TYP
TANK WALL
EXISTING BRINE
TANK WALL BEYOND
EXISTING BRINE
HOOK, TYP
STD ACI 90˚
#4 AT 10" OC, TYP
FLOWABLE FILL
TYP
8-INCH VOID FORM,
TOP AND BOTTOM
#6 AT 10" OC, EW,
BOTTOM, TYP
3-#8, TOP AND
3 DEMOLITION SECTION
SB501 3/4"=1'-0"
DEMOLISH TOP SLAB
WALL TO REMAIN, TYP
4 DEMOLITION SECTION
SB501 3/4"=1'-0"
DEMOLISH SLAB
WALL TO REMAIN,TYP
SB501
1'-6" 1'-6" 1'-6" 1'-6"
TYP
1'-0"
TYP
1'-0"
1/SB101, TYP
NEW SLAB, REFER
1/SB101, TYP
NEW SLAB, REFER
#4 AT 16" OC, TYP
BRINE TANK FOUNDATION DETAILS
C L
R
U N
O
/2
CLR
3"
CLR
3"
C L
R
U N
O
/2
CLR
3"
CLR
3"
SB502
BRINE TANK FOUNDATION DETAILS
3 SLAB CONNECTION
SB502 3/4"=1'-0"
2 GRADE BEAM CORNER
SB502 3/4"=1'-0"
1 RE-ENTRANT CORNER
SB502 3/4"=1'-0"
3"
3"
1'-0"6"
1/SB101
NEW SLAB, REFER
PIER BELOW
18" DIA DRILLED
2-#4 x 4'-0"
FACE OF GRADE BEAM
BOTTOM
#6 TOP AND
3'-2"
STD ACI 90° HOOK
REFER 1/SB501
REINFORCING,
GRADE BEAM
1/SB101
NEW SLAB, REFER
EXISTING SLAB
NATIVE SOIL
EQUAL
HY200 OR APPROVED
EPOXY WITH HILTI HIT
#4 AT 16" OC, DRILL AND
SB502 3/4"=1'-0"
THICKENED SLAB
8'-0"
C L
R
/2
C L
R
FOR TOP SLAB REINFORCING
REFER 11/SB101
NATIVE SOIL
EXISTING BRINE TANK WALL
FLOWABLE FILL
#4 AT 12" OC, EW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
REPLACEMENT
WATER SOFTENER
AUDIE L. MURPHY HOSPITAL
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved:Project Director
2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288 Mr. Brian Contreras, COR
Audie L, Murphy Memorial VA Medical Center
San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
DOCUMENTS
CONSTRUCTION
CONSULTANT
Revisions: Date:
10.23.2020 BMP
SCALE: AS SHOWN
BGP
PIERCE ENGINEERING
132 N MAIN ST.
CHILDRESS, TX 79201
940-937-8600
TX FIRM NO. F-9186
Structural
O'BrienEngineering, Inc.
10-23-2020
13'6" HIGH
CEILING
A
B
EXIST. 8" CMU WALL
TO BE DEMOLISHED
EXIST. CMU
WALL TO
REMAIN
EXIST. 8" CMU WALL
TO BE DEMOLISHED
EXIST. 4" BLOCK & BRICK
WALL TO BE DEMOLISHED
EXTENTS OF EXIST. 6"
SLAB. TO BE REMOVED
SHOWN SHADED
10'-0 1/2" 25'-8 5/8" 7'-3 7/8"
EXIST. CMU WALL TO REMAIN
EXIST. GRADE BEAM TO REMAIN
UNDER BASE BID AND TO BE
DEMOLISHED AND REPLACED UNDER
ADD ALT. #3, REF. 1/S501 FOR BEAM
SIZE & REINF.
EXIST. GRADE BEAM TO REMAIN IN
BASE BID AND TO BE DEMOLISHED AND
REPLACED UNDER ADD ALT. #4, REF.
2/S501 FOR BEAM SIZE & REINF.
NOTE:
AFTER DEMOLITION OF SLAB AND
WALL, ARRANGE FOR STRUCTURAL
EOR TO VIEW EXIST. GRADE BEAMS
PRIOR TO PLACEMENT OF NEW
WALLS AND SLAB.
REMOVE & REPLACE
THIS PORTION OF SLAB
AND HOUSEKEEPING
PAD FOR ADD ALT. #2
A
B
EXIST. CONCRETE WALL
NEW 6" SLAB
SHOWN SHADED;
REINF. w/ #3 @ 10"
O.C.B.W.
10'-0 1/2"
EXIST. 12"x24" CONC.
GRADE BEAM TO
REMAIN
E
X
I
S
T
P
I
E
R
E
X
I
S
T
P
I
E
R
EXIST. 12"x18" CONC. GRADE
BEAM BELOW TO REMAIN
E
X
I
S
T
P
I
E
R
L-3 L-1
1'-2"
P H
O T
O
PHOTO #3
PHOTO #4
PHOTO #5
PHOTO #6
4/S101
M C
J
M C
J
MCJ
MCJ
L-4
L-2
L-1 LINTEL
OVER GRILL
ABOVE
S
DRAIN PIT
REINF. CELL, TYP.
WHERE SHOWN; REF.
1/S501 FOR ADDITIONAL
INFO.
3/S501
S
REPAIRS TO RETAINING
WALL ARE ADD ALT. #1
L-1
PHOTO #2
1 DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
STRUCTURAL PLANS -
SOFTENER ROOM AB20a
S-100
2 FOUNDATION PLAN
SCALE: 1/4" = 1'-0"
PLAN NOTES:
1. REF. GENERAL NOTES THIS SHEET.
2. NEW FLOOR SLAB SHALL MATCH PROFILE OF EXIST.
SLAB AND SLOPE TO DRAIN PIT.
3. L- INDICATES LINTEL. REF. SCHEDULE ON SHT. S501
4. MCJ INDICATES MASONRY CONTROL JOINT. REF.
DETAIL 5/S501
5. REF. ARCH'L FOR FINISHES ON NEW & REPAIRED
WALLS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
AUDIE L. MURPHY HOSPITAL
WATER SOFTENER
REPLACEMENT
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Brian Contreras, COR Audie L, Murphy Memorial VA Medical Center San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
CONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
10.23.2020
10.23.20 RLW JAG
Structural & Forensic Engineering R. L. Woods & Associates, LLC
1151 W. PIONEER PKWY.
ARLINGTON, TX 76013
(817) 277-6686
C 2020 Copyright R. L. Woods & Associates, LLC Texas Registered Engineering Firm F-8284
WWW.RLWAENGINEERS.COM
1 DETAIL
1'-0"
EXIST. SLAB TO REMAIN
S L O
P E
NEW 6" SLAB ON
VAPOR BARRIER
2"
2 3/8"
7 5/8"
EXIST. #3 DOWELS @ 30"
O.C., LEAVE INTACT
I E
D
V
R
I F
Y
8" CMU BOND BEAM;
REINF. w/ (2) #4 CONT.
NEW 8" CMU WALL, REINF. w/ VERT.
#5 @ 48" O.C., HORIZ. LADDER TIES
@ 16" O.C. GROUT REINF. CELLS
ONLY (SLOT CMU AS REQ'D FOR
INSTALLATION OF REINF. & GROUT)
L7x4x3/8 CONT. w/ 5/8"Ø EXP. BOLTS @ 48" O.C.
THRU 1 1/2" VERT. SLOTTED HOLES @ CMU (4"
EMBED) AND 5/8"Ø EXP. BOLT @ 48" O.C. INTO BOT.
OF SLAB (3 1/2" EMBED.)
CONCRETE SLAB
2 DETAIL
1'-0"
#3x1'-6" DWL. @ 24" O.C.
DRILL 6" INTO EXIST. &
SET w/ ADHESIVE
F
I E
R
I F
Y
NEW 6" SLAB ON
VAPOR BARRIER
NEW 8" CMU PARTITION WALL, REINF.
HORIZ. LADDER TIES @ 16" O.C
M I N
EXIST. CEILING, REMOVE
& REPLACE AS REQ'D
FOR WALL INSTALLATION
3 DETAIL
#3x1'-6" DWL. @ 24" O.C.
DRILL 6" INTO EXIST. &
SET w/ ADHESIVE
BRACE PARTITION WALL TO
STRUCTURE @ 8'-0" O.C. MAX.
F
I E
R
I F
Y
NEW 6" SLAB ON
VAPOR BARRIER
NEW 8" CMU PARTIION WALL,
UNGROUTED. HORIZ. LADDER TIES
@ 16" O.C.
M I N
EXIST. CEILING, REMOVE
& REPLACE AS REQ'D FOR
WALL INSTALLATION
4 DETAIL - ADD ALTERNATE #1
SCALE: 3/4" = 1'-0"
PILASTER
BEYOND @
COLUMN
EXIST. SPALL AREAS
TO BE REPAIRED
SHOWN SHADED;
REF. PHOTOS THIS
SHT. FOR
CLARIFICATION
EXIST. #5 @ 12" O.C.
EXIST. SLAB
EXIST. #4 @ 12" O.C.
1'-2"
NEW FLOOR SLAB
ON VAPOR BARRIER
EXIST. #3 DOWELS
@ 24" O.C., LEAVE
INTACT
EXIST. #3 @ 12" O.C.
CMU LINTEL SCHEDULE
REINF.- REF. TO
GROUT FILL
LINTEL ELEVATION
MARK
LINTEL
THICKNESS
CMU WALL
8" MIN.
BRG.
CLEAR OPENING SIZE
SCHEDULE
REINF.- REF. TO
DEPTH
LINTEL
SCHEDULE
6" MIN.
R E
F
S C
H E
D
C L
R
REINF.
LINTEL
LINTEL SECTION 'A'
STD. HOOK
VERT. JAMB REINF.
1/2"
PRE-FORMED NEOPRENE
GASKET FULL HEIGHT OF
WALL
NOTE:
HORIZ. JOINT REINFORCEMENT
DISCONTINUOUS THRU JOINT
#5 FILL CELLS WITH
GROUT @ REINF.
WALLS ONLY.
REF. PLAN FOR LOCATION OF
CONTROL JOINTS.
5 TYPICAL DETAIL
MASONRY CONTROL JOINT (MCJ)
#5 x 1'-6" DWL. @ 48" O.C.
DRILL 6" INTO EXIST. GR.
BM. & SET w/ ADHESIVE
5"
BRACE PARTITION WALL TO
STRUCTURE @ 8'-0" O.C.
MAX.
WALL @ SIM. COND.
L-1 8" 10'-0"
SECTION
LINTEL
A 16" (2) #5 BOT.
L-2 8" 6'-4" A 8" (2) #5 BOT.
L-3 8" 3'-4" OR LESS A 8" (2) #5 BOT.
L-4 10" 4'-0" B - 4x4x1/4
LINTEL SECTION 'B'
ANGLE: REF.
SCHEDULE BEAR
ANGLES 8" EA. END.
BRICKCMU
EXIST. GR. BM. REINFORCED w/
(3) #8 TOP
(2) #8 BOT.
#3 @ 24" O.C.
EXIST. GR. BM. REINFORCED w/
(2) #9 TOP & BOT #3 @ 24" O.C.
SCALE: 3/4" = 1'-0"SCALE: 3/4" = 1'-0"
SCALE: 3/4" = 1'-0"
EXIST. FLOOR SLAB
1/2" Ø COUPLER
HILTI HIT-HY 200 + HAS
1/2" Ø (2 3/4" EMBED.)
1/2" Ø ROD w/
THREADED ENDS
CEILING
TRAPEZE HANGER -
REF. PLUMBING
DRAWINGS
6 TYPICAL DETAIL
NOTE:
TEMPORARY PIPING
SUPPORTS TO BE LOCATED
AT 5'-6" O.C. AND LAID OUT TO
MISS BEAM LOCATIONS, DO
NOT MAKE ATTACHMENTS AT
BEAM LOCATIONS
PHOTO #1
STRUCTURAL DETAILS -
SOFTENER ROOM AB20a
PHOTO #2 PHOTO #3 PHOTO #4 PHOTO #5 PHOTO #6
S-501
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
AUDIE L. MURPHY HOSPITAL
WATER SOFTENER
REPLACEMENT
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Brian Contreras, COR Audie L, Murphy Memorial VA Medical Center San Antonio, TX 78229 www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
CONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
10.23.2020
10.23.20 RLW JAG
Structural & Forensic Engineering R. L. Woods & Associates, LLC
1151 W. PIONEER PKWY.
ARLINGTON, TX 76013
(817) 277-6686
C 2020 Copyright R. L. Woods & Associates, LLC Texas Registered Engineering Firm F-8284
WWW.RLWAENGINEERS.COM
GRAPHIC CONTROL
CENTER
AB 19
UP
DO
W
N
DO
W N
A
B
F.F. 100’ - 0”
METER ROOM
AB 20b
WATER SOFTENER ROOM
AB 20a
MECHANICAL EQUIPMENT
ROOM
AB 20
MAINT.
OFFICE
MAINT./LOADING
AREA
NOTE:
THIS AREA IS
OUTDOORS
F F
D E
C B A
F
A-001
LIFE SAFETY PLAN - WATER
SOFTENER ROOM AB20a
08/21/2020 LC LC
SCALE: 1/16"=1"- 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
AUDIE L. MURPHY HOSPITAL
WATER SOFTENER
REPLACEMENT
SAN ANTONIO, TEXAS
Project Director
Revisions:
671-18-106
Approved: Project Director2340 E. TRIN ITY MILLS, STE. 220
CARROLLTON, TX 75006
972-233-2288
O'Brien Engineering, Inc.
Mr. Brian Contreras, COR Audie L, Murphy Memorial VA Medical Center San Antonio, TX 78229
ARCHITECT
Caffey Architecture, Inc.
1116 Lamar Ave Paris, Texas 75460
(903) 706-5270 Caffey-Architecture.com www.obrieneng.com
TEXAS ENGINEERING FIRM F-3758
CONSULTANT
Revisions: Date:
CONSTRUCTION
DOCUMENTS
10.23.2020
LIFE SAFETY PLAN
SCALE:1/16"=1'-0"
Reconfigure and reconstruct existing equipment room to accommodate upgrading of water filtration tanks.
STATEMENT OF INTENT
BUILDING DATA
TEXAS BUILDING CODE
Current Occupancy Classification: I2 (Incidental)
1 Stories
Construction Type: 1A
CODES AND REGULATIONS
TEXAS UNIFORM BUILDING CODE AND ALL AMENDMENTS
TO THE FOLLOWING CODES:
THIS PROJECT IS TO BE CONSTRUCTED TO MEET OR EXCEED
2015 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL BUILDING CODE
Alteration Level 3
2015 INTERNATIONAL EXISTING BUILDING CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 INTERNATIONAL PLUMBING CODE
2015 INTERNATIONAL BUILDING CODE
2014 NFPA 70 NATIONAL ELECTRICAL CODE
Occupant Load
Water Softener Room: 474 SF / 300 SF gross = 2 occupants
Egress
Maximum Travel Distance 300' (sprinklered)
GENERAL SPECIFICATIONS
This building is fully fire sprinklered. No modifications to the existing sprinkler system for this scope of work.
Meter Room: 627 SF / 300 SF gross = 3 occupants
KEY PLAN
AutoCAD SHX Text 53'
AutoCAD SHX Text 14'
AutoCAD SHX Text 21'
AutoCAD SHX Text
EGRESS PATH TO PUBLIC WAY
AutoCAD SHX Text
EXISTING EXIT SIGN TO REMAIN
AutoCAD SHX Text
NEW EXIT SIGN TYPICAL UNLESS NOTED OTHERWISE
AutoCAD SHX Text
FIRE EXTINGUISHER 10LB UL RATING: 4A:80B:C
AutoCAD SHX Text
1.1. CONSTRUCTION DOCUMENTS ARE DEFINED AS DRAWINGS AND SPECIFICATIONS CONSTRUCTION DOCUMENTS ARE DEFINED AS DRAWINGS AND SPECIFICATIONS TOGETHER. ANY DISCREPANCY FOUND IN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND ENGINEER PRIOR TO PERFORMING ANY WORK INVOLVING THE CONFLICTING INFORMATION. 1.2. CONTRACTOR SHALL EXAMINE AND BECOME FAMILIAR WITH THE CONTRACTOR SHALL EXAMINE AND BECOME FAMILIAR WITH THE CONSTRUCTION DOCUMENTS (AS DEFINED ABOVE) IN THEIR ENTIRETY, SHALL SURVEY THE PROJECT, AND SHALL BECOME FAMILIAR WITH THE EXISTING CONDITIONS AND SCOPE OF WORK. ALL COSTS SUBMITTED SHALL BE BASED ON THOROUGH KNOWLEDGE OF ALL WORK AND MATERIALS REQUIRED. ANY ADDITIONAL COSTS DUE TO FAILURE TO COMPLY WITH THIS REQUIREMENT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 1.3. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE CURRENT INTERNATIONAL CODES, NFPA, NEC, AND ALL LOCAL AMENDMENTS. 1.4. ALL WORK SHALL BE PERFORMED BY QUALIFIED AND COMPETENT ALL WORK SHALL BE PERFORMED BY QUALIFIED AND COMPETENT TRADESMEN UNDER THE SUPERVISION OF A FOREMAN HAVING AT LEAST TWO YEARS OF EXPERIENCE INSTALLING EQUIPMENT AND SYSTEMS OF SIMILAR TYPE AND SCOPE TO THOSE INDICATED IN THE CONSTRUCTION DOCUMENTS. 1.5. PRODUCTS OF A SIMILAR TYPE SHALL ALL BE FROM THE SAME PRODUCTS OF A SIMILAR TYPE SHALL ALL BE FROM THE SAME MANUFACTURER. PROVIDE STANDARD PRODUCTS OF MANUFACTURERS REGULARLY ENGAGED IN THE PRODUCTION OF SPECIFIED PRODUCTS. ALL PRODUCTS SHALL BE UL-LISTED WHERE APPLICABLE. 1.6. PROVIDE SUBMITTALS AND/OR SHOP DRAWINGS FOR THE FOLLOWING PROVIDE SUBMITTALS AND/OR SHOP DRAWINGS FOR THE FOLLOWING EQUIPMENT AND SYSTEMS: DUCTWORK, PIPING, VALVES, AIR-MOVING EQUIPMENT, PUMPS, ETC. AS APPLICABLE TO THE PROJECT. SUBMITTALS SHALL CONTAIN MANUFACTURER'S DATA GIVING DIMENSIONS, MATERIALS, PERFORMANCE, AND OTHER INFORMATION AS NECESSARY TO DEMONSTRATE COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS. SUBMITTAL DATA SHALL CLEARLY INDICATE THE ITEM BEING SUBMITTED. UNMARKED CATALOG PAGES ARE NOT ACCEPTABLE. EQUIPMENT SUBMITTALS (OTHER THAN PACKAGED DX EQUIPMENT LESS THAN 6 TONS) SHALL INCLUDE COMPUTER-RUN SELECTIONS AT SCHEDULED DESIGN CONDITIONS. CATALOG DATA AT "STANDARD" CONDITIONS IS NOT ACCEPTABLE. 1.7. CONTRACTOR SHALL PROVIDE THE OWNER A COMPLETE SET OF "AS BUILT" CONTRACTOR SHALL PROVIDE THE OWNER A COMPLETE SET OF "AS BUILT" DRAWINGS INDICATING ALL WORK AS ACTUALLY INSTALLED. UNMODIFIED COPIES OF ORIGINAL DESIGN DRAWINGS WILL NOT BE ACCEPTED AS "AS BUILT" DRAWINGS. PROVIDE ONE FULL SIZE PRINTED COPY, AND ONE ELECTRONIC COPY (PDF FILES PLOTTED AT FULL SIZE ON DISC). PDF FILES SHALL BE NEATLY ORGANIZED AND DESCRIPTIVELY NAMED. 1.8. ALL EQUIPMENT SHALL BE CLEANED, REPAIRED, PAINT TOUCHED UP, ETC. ALL EQUIPMENT SHALL BE CLEANED, REPAIRED, PAINT TOUCHED UP, ETC. AS NECESSARY TO BE IN NEW CONDITION PRIOR TO FINAL ACCEPTANCE BY THE OWNER. 1.9. CONTRACTOR SHALL TAKE PROPER PRECAUTIONS TO PROTECT ALL EXISTING CONTRACTOR SHALL TAKE PROPER PRECAUTIONS TO PROTECT ALL EXISTING OPERATIONS AND PROPERTY ADJACENT TO ALL WORK PERFORMED UNDER THIS CONTRACT. THIS INCLUDES TRANSPORTING, HOISTING, OR MOVING MATERIALS, EQUIPMENT, DEBRIS, ETC. CONTRACTOR SHALL REPAIR ANY DAMAGE CAUSED TO EXISTING PROPERTY TO MATCH EXISTING AS IT WAS PRIOR TO DAMAGE AND TO THE OWNER'S SATISFACTION. 1.10. CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER'S CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER'S REPRESENTATIVE FOR APPROVAL AND SCHEDULING OF ALL BUILDING SYSTEMS OR OPERATIONS INTERRUPTIONS NECESSARY TO COMPLETE HIS WORK. 1.11. DRAWINGS ARE DIAGRAMMATIC AND ONLY INDICATE GENERAL ARRANGEMENT DRAWINGS ARE DIAGRAMMATIC AND ONLY INDICATE GENERAL ARRANGEMENT OF WORK. THEY DO NOT SHOW EVERY OFFSET, TRANSITION, OR DIMENSION NECESSARY TO FIT THE SYSTEMS AND EQUIPMENT INTO THE GIVEN SPACE. CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURE, STRUCTURE, AND WORK OF ALL OTHER TRADES AS REQUIRED TO COMPLETE THE WORK AS GENERALLY INDICATED ON THE DRAWINGS. 1.12. ALL WORK SHALL BE INSTALLED READILY ACCESSIBLE FOR OPERATION, MAINTENANCE, ALL WORK SHALL BE INSTALLED READILY ACCESSIBLE FOR OPERATION, MAINTENANCE, AND REPAIRS. PROVIDE ALL CLEARANCES AS REQUIRED BY CODE AND AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER FOR PROPER MAINTENANCE. 1.13. ALL WORK AND EQUIPMENT SHALL BE FULLY GUARANTEED FOR A PERIOD ALL WORK AND EQUIPMENT SHALL BE FULLY GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL PAYMENT AND ACCEPTANCE. WARRANTY SHALL INCLUDE ALL PARTS, LABOR, AND TRAVEL NECESSARY TO FACILITATE REPAIRS/REPLACEMENT OF NON-WORKING EQUIPMENT AND/OR SYSTEMS. 1.14. COORDINATE WITH GENERAL CONTRACTOR FOR ON-SITE STORAGE OF COORDINATE WITH GENERAL CONTRACTOR FOR ON-SITE STORAGE OF MATERIALS AND EQUIPMENT. ALL EQUIPMENT AND MATERIALS SHALL BE PROTECTED FROM DAMAGE. 1.15. EQUIPMENT INTENDED FOR PERMANENT INSTALLATION SHALL NOT BE USED EQUIPMENT INTENDED FOR PERMANENT INSTALLATION SHALL NOT BE USED FOR TEMPORARY PURPOSES WITHOUT WRITTEN PERMISSION FROM THE OWNER'S REPRESENTATIVE. 1.16. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR NOTIFYING AND MECHANICAL CONTRACTOR IS RESPONSIBLE FOR NOTIFYING AND COORDINATING WITH ALL OTHER TRADES AFFECTED BY EQUIPMENT SUBSTITUTIONS AND/OR MODIFICATIONS. 1.17. SEAL ALL PENETRATIONS AS APPROPRIATE FOR THE GIVEN ASSEMBLY SEAL ALL PENETRATIONS AS APPROPRIATE FOR THE GIVEN ASSEMBLY CONSTRUCTION AND FIRE RATING.
AutoCAD SHX Text
1.1. CONSTRUCTION DOCUMENTS ARE DEFINED AS DRAWINGS AND SPECIFICATIONS CONSTRUCTION DOCUMENTS ARE DEFINED AS DRAWINGS AND SPECIFICATIONS TOGETHER. ANY DISCREPANCY FOUND IN THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND ENGINEER PRIOR TO PERFORMING ANY WORK INVOLVING THE CONFLICTING INFORMATION. 1.2. CONTRACTOR SHALL EXAMINE AND BECOME FAMILIAR WITH THE CONTRACTOR SHALL EXAMINE AND BECOME FAMILIAR WITH THE CONSTRUCTION DOCUMENTS (AS DEFINED ABOVE) IN THEIR ENTIRETY, SHALL SURVEY THE PROJECT, AND SHALL BECOME FAMILIAR WITH THE EXISTING CONDITIONS AND SCOPE OF WORK. ALL COSTS SUBMITTED SHALL BE BASED ON THOROUGH KNOWLEDGE OF ALL WORK AND MATERIALS REQUIRED. ANY ADDITIONAL COSTS DUE TO FAILURE TO COMPLY WITH THIS REQUIREMENT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 1.3. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE CURRENT INTERNATIONAL CODES, NFPA, NEC, AND ALL LOCAL AMENDMENTS. 1.4. ALL WORK SHALL BE PERFORMED BY QUALIFIED AND COMPETENT ALL WORK SHALL BE PERFORMED BY QUALIFIED AND COMPETENT TRADESMEN UNDER THE SUPERVISION OF A FOREMAN HAVING AT LEAST TWO YEARS OF EXPERIENCE INSTALLING EQUIPMENT AND SYSTEMS OF SIMILAR TYPE AND SCOPE TO THOSE INDICATED IN THE CONSTRUCTION DOCUMENTS. 1.5. PRODUCTS OF A SIMILAR TYPE SHALL ALL BE FROM THE SAME PRODUCTS OF A SIMILAR TYPE SHALL ALL BE FROM THE SAME MANUFACTURER. PROVIDE STANDARD PRODUCTS OF MANUFACTURERS REGULARLY ENGAGED IN THE PRODUCTION OF SPECIFIED PRODUCTS. ALL PRODUCTS SHALL BE UL-LISTED WHERE APPLICABLE. 1.6. PROVIDE SUBMITTALS AND/OR SHOP DRAWINGS FOR THE FOLLOWING PROVIDE SUBMITTALS AND/OR SHOP DRAWINGS FOR THE FOLLOWING EQUIPMENT AND SYSTEMS: DUCTWORK, PIPING, VALVES, AIR-MOVING EQUIPMENT, PUMPS, ETC. AS APPLICABLE TO THE PROJECT. SUBMITTALS SHALL CONTAIN MANUFACTURER'S DATA GIVING DIMENSIONS, MATERIALS, PERFORMANCE, AND OTHER INFORMATION AS NECESSARY TO DEMONSTRATE COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS. SUBMITTAL DATA SHALL CLEARLY INDICATE THE ITEM BEING SUBMITTED. UNMARKED CATALOG PAGES ARE NOT ACCEPTABLE. EQUIPMENT SUBMITTALS (OTHER THAN PACKAGED DX EQUIPMENT LESS THAN 6 TONS) SHALL INCLUDE COMPUTER-RUN SELECTIONS AT SCHEDULED DESIGN CONDITIONS. CATALOG DATA AT "STANDARD" CONDITIONS IS NOT ACCEPTABLE. 1.7. CONTRACTOR SHALL PROVIDE THE OWNER A COMPLETE SET OF "AS BUILT" CONTRACTOR SHALL PROVIDE THE OWNER A COMPLETE SET OF "AS BUILT" DRAWINGS INDICATING ALL WORK AS ACTUALLY INSTALLED. UNMODIFIED COPIES OF ORIGINAL DESIGN DRAWINGS WILL NOT BE ACCEPTED AS "AS BUILT" DRAWINGS. PROVIDE ONE FULL SIZE PRINTED COPY, AND ONE ELECTRONIC COPY (PDF FILES PLOTTED AT FULL SIZE ON DISC). PDF FILES SHALL BE NEATLY ORGANIZED AND DESCRIPTIVELY NAMED. 1.8. ALL EQUIPMENT SHALL BE CLEANED, REPAIRED, PAINT TOUCHED UP, ETC. ALL EQUIPMENT SHALL BE CLEANED, REPAIRED, PAINT TOUCHED UP, ETC. AS NECESSARY TO BE IN NEW CONDITION PRIOR TO FINAL ACCEPTANCE BY THE OWNER. 1.9. CONTRACTOR SHALL TAKE PROPER PRECAUTIONS TO PROTECT ALL EXISTING CONTRACTOR SHALL TAKE PROPER PRECAUTIONS TO PROTECT ALL EXISTING OPERATIONS AND PROPERTY ADJACENT TO ALL WORK PERFORMED UNDER THIS CONTRACT. THIS INCLUDES TRANSPORTING, HOISTING, OR MOVING MATERIALS, EQUIPMENT, DEBRIS, ETC. CONTRACTOR SHALL REPAIR ANY DAMAGE CAUSED TO EXISTING PROPERTY TO MATCH EXISTING AS IT WAS PRIOR TO DAMAGE AND TO THE OWNER'S SATISFACTION. 1.10. CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER'S CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER'S REPRESENTATIVE FOR APPROVAL AND SCHEDULING OF ALL BUILDING SYSTEMS OR OPERATIONS INTERRUPTIONS NECESSARY TO COMPLETE HIS WORK. 1.11. DRAWINGS ARE DIAGRAMMATIC AND ONLY INDICATE GENERAL ARRANGEMENT DRAWINGS ARE DIAGRAMMATIC AND ONLY INDICATE GENERAL ARRANGEMENT OF WORK. THEY DO NOT SHOW EVERY OFFSET, TRANSITION, OR DIMENSION NECESSARY TO FIT THE SYSTEMS AND EQUIPMENT INTO THE GIVEN SPACE. CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURE, STRUCTURE, AND WORK OF ALL OTHER TRADES AS REQUIRED TO COMPLETE THE WORK AS GENERALLY INDICATED ON THE DRAWINGS. 1.12. ALL WORK SHALL BE INSTALLED READILY ACCESSIBLE FOR OPERATION, MAINTENANCE, ALL WORK SHALL BE INSTALLED READILY ACCESSIBLE FOR OPERATION, MAINTENANCE, AND REPAIRS. PROVIDE ALL CLEARANCES AS REQUIRED BY CODE AND AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER FOR PROPER MAINTENANCE. 1.13. ALL WORK AND EQUIPMENT SHALL BE FULLY GUARANTEED FOR A PERIOD ALL WORK AND EQUIPMENT SHALL BE FULLY GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL PAYMENT AND ACCEPTANCE. WARRANTY SHALL INCLUDE ALL PARTS, LABOR, AND TRAVEL NECESSARY TO FACILITATE REPAIRS/REPLACEMENT OF NON-WORKING EQUIPMENT AND/OR SYSTEMS. 1.14. COORDINATE WITH GENERAL CONTRACTOR FOR ON-SITE STORAGE OF COORDINATE WITH GENERAL CONTRACTOR FOR ON-SITE STORAGE OF MATERIALS AND EQUIPMENT. ALL EQUIPMENT AND MATERIALS SHALL BE PROTECTED FROM DAMAGE. 1.15. EQUIPMENT INTENDED FOR PERMANENT INSTALLATION SHALL NOT BE USED EQUIPMENT INTENDED FOR PERMANENT INSTALLATION SHALL NOT BE USED FOR TEMPORARY PURPOSES WITHOUT WRITTEN PERMISSION FROM THE OWNER'S REPRESENTATIVE. 1.16. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR NOTIFYING AND MECHANICAL CONTRACTOR IS RESPONSIBLE FOR NOTIFYING AND COORDINATING WITH ALL OTHER TRADES AFFECTED BY EQUIPMENT SUBSTITUTIONS AND/OR MODIFICATIONS. 1.17. SEAL ALL PENETRATIONS AS APPROPRIATE FOR THE GIVEN ASSEMBLY SEAL ALL PENETRATIONS AS APPROPRIATE FOR THE GIVEN ASSEMBLY CONSTRUCTION AND FIRE RATING.
AutoCAD SHX Text
PLAN NORTH
AutoCAD SHX Text
TRUE NORTH
#4
#3
#2
#1
1'
13'9" HIGH
CEILING
13'6" HIGH
CEILING
METER ROOM
AB 20b
WATER SOFTENER ROOM
AB 20a
MECHANICAL EQUIPMENT
ROOM
AB 20
A
B
A-102
F.F. 100’ - 0”
F.F. 100’ - 0”
F.F. 100’ - 0”
MAINTENANCE OFFICE
MAINTENANCE LOADING
AREA
13'9" HIGH
CEILING
D103
D102
D101
A
B
A-102
F.F. 100’ - 0”
F.F. 100’ - 0”
F.F. 100’ - 0”
METER ROOM
AB 20b
WATER SOFTENER ROOM
AB 20a
MECHANICAL EQUIPMENT
ROOM
AB 20
MAINTENANCE OFFICE
MAINTENANCE LOADING
AREA
A-102
A-102
D101
A-101
FLOOR PLAN - WATER
SOFTENER ROOM AB20a
08/21/2020 MHW JLM
SCALE: 1/4"=1"- 0"
PLAN LEGEND
DEMOLITION FLOOR PLAN
SCALE:1/4"=1'-0"
PROPOSED FLOOR PLAN - WATER SOFTENER ROOM
SCALE:1/4"=1'-0"
FLOOR PLAN NOTES
FINISHES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .