Y1DA--Project 671-18-106, Replace Water Softeners - San Antonio
Solicitation number
36C25722B0024
Issued by

About this file

This amendment modifies a solicitation for project 671-18-106 to replace water softeners at a Department of Veterans Affairs facility in San Antonio, Texas. The amendment extends the bid due date to November 10, 2022 at 1:00 PM CST. It also changes the pre-bid site visit date and time to October 25, 2022 at 10:00 AM CST and extends the cutoff for questions to November 1, 2022 at 2:00 PM CST. Additionally, it provides supplemental drawings for assets related to the project, including water softeners, fuel tanks, and hazardous storage areas.

View the file

Other files

File Type Posted
Amendment 36C25722B0024 0004.docx DOCX document
Answers for 671-18-106 Replace Water Softeners with VA and A.E Responses.pdf PDF
Panel Board PIC IMG_0325.pdf PDF
Panel Board PIC IMG_0320.pdf PDF
Panel Board PIC IMG_0318.pdf PDF
Panel Board PIC IMG_0317.pdf PDF
Panel Board PIC IMG_0319.pdf PDF
Amendment 36C25722B0024 0003.docx DOCX document
Panel Board PIC IMG_0322.pdf PDF
CBB PANEL CIRCUIT.pdf PDF
CBA PANEL CIRCUIT.pdf PDF
COA PANEL CIRCUIT.pdf PDF
Panel Board PIC IMG_0323.pdf PDF
Panel Board PIC IMG_0321.pdf PDF
Panel Board PIC IMG_0324.pdf PDF
Amendment 36C25722B0024 0002.docx DOCX document
All 671-18-106 Water Softener Sign-In Walkthrough sheet.pdf PDF
Appendix D - Brine Tank Assessment Report_Redacted.pdf PDF
As Built 1-W2 Main.PDF PDF
Appendix E - Structural Observation Report_Redacted.pdf PDF
As Built Fuel Tank File 2 of 3.pdf PDF
As Built 12-725 Hazardous Storage Pad Sht C01.PDF PDF
As Built I-S127.pdf PDF
As Built Fuel Tank File 1 of 3.pdf PDF
671-18-106 Design Analysis Report FINAL_Redacted.pdf PDF
As Built 1-W Warehouse.PDF PDF
Appendix G - GPR Scan Report and Findings_Redacted.pdf PDF
As Built 1-W3 Main.PDF PDF
As Built I-P70.pdf PDF
As Built Fuel Tank File 3 of 3.pdf PDF
As Built I-W12.pdf PDF
As Built 1-W1 Main.PDF PDF
Attachment 671-18-106 Construction Specifications.pdf PDF
OSHA - EMR requirement.pdf PDF
Attachment 671-18-106 Construction Drawings.pdf PDF
Attachment Replace Water Softeners - Requested Structural Drawings.pdf PDF
Addendum to SOW.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf PDF
SELF-PERFORMED CALCULATIONS.pdf PDF
GA Drawing S5103-202P-(M-GA01)-V112030276-01_4.pdf PDF
Solicitation 36C25722B0024_1.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

671-18-106

Department of Veterans Affairs Temple CTX Contracting (90C) 1901 Veterans Memorial Dr. Bldg. 171 Temple TX 76504

Department of Veterans Affairs Temple CTX Contracting (90C) 1901 Veterans Memorial Dr. Bldg. 171 Temple TX 76504

To all Offerors/Bidders

36C25722B0024

10-11-2022

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: November 10, 2022 by 1:00 PM CST

X 1

The purpose of Amendment A0001 is to:

A. Extend the Bid due date to November 10, 2022 by 1:00 PM CST.

B. Change the Pre-Bid Site Visit date and time to 10/25/2022 @ 10:00 AM CST and to extend the cut off for submission of RFI(s)/QUESTIONS to November 1, 2022 at 2:00 PM. C.S.T.

C. Provide Additional Drawings. See Attachments.

All other terms and conditions remain unchanged.

Project 671-18-106 Replace Water Softeners

See attached document: As Built 1-W1 Main.

See attached document: As Built 1-W2 Main.

See attached document: As Built 1-W3 Main.

See attached document: As Built I-W12.

See attached document: As Built 1-W Warehouse.

See attached document: As Built I-S127.

See attached document: As Built I-P70.

See attached document: As Built Fuel Tank File 1 of 3.

See attached document: As Built Fuel Tank File 2 of 3.

See attached document: As Built Fuel Tank File 3 of 3.

See attached document: As Built 12-725 Hazardous Storage Pad Sht C01.

See attached document: 671-18-106 Design Analysis Report FINAL_Redacted.

See attached document: Appendix D - Brine Tank Assessment Report_Redacted.

See attached document: Appendix E - Structural Observation Report_Redacted.

See attached document: Appendix G - GPR Scan Report and Findings_Redacted.