This structural observation report documents site conditions at the Audie L. Murphy VA Hospital in San Antonio, Texas. The report describes heavy efflorescence, delamination, and signs of corrosion in the masonry walls surrounding the hospital's water softener room. Specific issues noted include salt deposits along joint lines, separation of walls, cracking around the perimeter, and a heavily cracked and warped brine tank lid. The related federal contract opportunity is solicitation number 36C25722B0024 from the Department of Veterans Affairs for project 671-18-106 to replace the hospital's water softeners in San Antonio.

View the file

Other files

File Type Posted
Amendment 36C25722B0024 0004.docx DOCX document
Answers for 671-18-106 Replace Water Softeners with VA and A.E Responses.pdf PDF
Panel Board PIC IMG_0325.pdf PDF
Panel Board PIC IMG_0320.pdf PDF
Panel Board PIC IMG_0318.pdf PDF
Panel Board PIC IMG_0317.pdf PDF
Panel Board PIC IMG_0319.pdf PDF
Amendment 36C25722B0024 0003.docx DOCX document
Panel Board PIC IMG_0322.pdf PDF
CBB PANEL CIRCUIT.pdf PDF
CBA PANEL CIRCUIT.pdf PDF
COA PANEL CIRCUIT.pdf PDF
Panel Board PIC IMG_0323.pdf PDF
Panel Board PIC IMG_0321.pdf PDF
Panel Board PIC IMG_0324.pdf PDF
Amendment 36C25722B0024 0002.docx DOCX document
All 671-18-106 Water Softener Sign-In Walkthrough sheet.pdf PDF
Appendix D - Brine Tank Assessment Report_Redacted.pdf PDF
As Built 1-W2 Main.PDF PDF
As Built Fuel Tank File 2 of 3.pdf PDF
As Built 12-725 Hazardous Storage Pad Sht C01.PDF PDF
Amendment 36C25722B0024 0001.pdf PDF
As Built I-S127.pdf PDF
As Built Fuel Tank File 1 of 3.pdf PDF
671-18-106 Design Analysis Report FINAL_Redacted.pdf PDF
As Built 1-W Warehouse.PDF PDF
Appendix G - GPR Scan Report and Findings_Redacted.pdf PDF
As Built 1-W3 Main.PDF PDF
As Built I-P70.pdf PDF
As Built Fuel Tank File 3 of 3.pdf PDF
As Built I-W12.pdf PDF
As Built 1-W1 Main.PDF PDF
Attachment 671-18-106 Construction Specifications.pdf PDF
OSHA - EMR requirement.pdf PDF
Attachment 671-18-106 Construction Drawings.pdf PDF
Attachment Replace Water Softeners - Requested Structural Drawings.pdf PDF
Addendum to SOW.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING REQUIREMENT.pdf PDF
SELF-PERFORMED CALCULATIONS.pdf PDF
GA Drawing S5103-202P-(M-GA01)-V112030276-01_4.pdf PDF
Solicitation 36C25722B0024_1.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX E – STRUCTURAL

OBSERVATION REPORT

U.S. DEPARTMENT OF VETERANS AFFAIRS

AUDIE L. MURPHY MEMORIAL VA HOSPITAL

SAN ANTONIO, TEXAS

FIELD OBSERVATION REPORT

To:

For

From: .

For

Report Date: 10-09-19 Field Date: 10-08-19

Site: Audie L Murphy VA Hospital – San Antonio, TX

RE: Structural Site Visit – Water Softener Room and Brine Tank Report No.: PE-01577 – FR001

Person(s) Contacted:

Engineering), This report summarizes general conditions at the jobsite at the time of the actual field observation only. Conditions before or after the date(s) and time(s) indicated are not addressed in this report.

Weather Conditions: Time of Visit: 11 a.m.

Cool, Dry

Items Observed:

Water Softener Room, Brine Tank Location (Exterior Only)

Pierce Engineering 2

PE-01577-FR001

Additional Comments:

Water Softener Room

1. Heavy efflorescence, delamination, and signs of corrosion were observed in the masonry walls surrounding the room. The most extensive damage was observed near the bases of the walls. Damage was observed on both sides of the walls all around the room. The heaviest deposits of salts are found along the joint lines. Refer to Figure 1 and 2.

Figure 1. Salt Deposits.

Figure 2. Delamination of CMU Face Shell.

Pierce Engineering 3

2. The tops of the southern, eastern, and western walls surrounding the room were observed from an opening in the ceiling. The walls do not extend to the floor framing above and do not appear to be load-bearing. The northern wall appears to bypass a concrete beam, but how or if there is a connection could not be verified.

3. The eastern wall has separated from the northern wall or the joint filler has deteriorated.

4. Miscellaneous cracking of the walls was observed around the perimeter of the room. Refer to Figure 3.

Figure 3. Random Cracking.

5. The metal door frames are heavily corroded near the bottoms.

6. The upper surface of the floor slab has delaminated throughout the water softener room.

Pierce Engineering 4

Brine Tank

1. The surface of the brine tank was observed. The tank top is heavily cracked and warped. Refer to Figure 4.

Figure 4. Brine Tank Lid.