Attachment 2 SBP-6.13 Bid Form.pdf
PDF 192 KB Posted
- Attached to
- MT GOAT Site Construction Project
- Solicitation number
- IFB1 FAAA 2027000006 2
- Issued by
- Arapahoe County, Denver City, Colorado
About this file
This is a State Bid Form (SBP-6.13) issued by the Colorado Office of the State Architect State Buildings Program for the MT GOAT Site Construction Project under the Colorado Department of Public Health and Environment (Project No. 793 – ATOPs SB MT GOAT Site Construction). The form serves as the standardized bidding document through which contractors submit their proposals to furnish all labor, materials, and work required for complete project execution as described in the bidding documents, drawings, and specifications. Bidders must certify that they have examined all bidding documents and the project site to understand site conditions and work requirements. The form requires bidders to acknowledge receipt of any addenda, specify their anticipated time for completion from Notice to Proceed to Substantial Completion, identify the period from Substantial Completion to Final Acceptance, and provide a total project completion timeline. Bidders must execute the required Agreement, Performance Bond, Labor and Material Payment Bond, and Insurance Policy within ten days of the Notice of Award and begin performance within ten days of the Notice to Proceed.
The bid form requires submission of a base bid amount that includes all applicable taxes and establishes a bid guarantee requirement of not less than 5% of the total bid for construction values of $50,000 or greater. The form includes compliance declarations for services performed outside the United States or Colorado, the 80% Colorado Labor requirement for State Public Works projects exceeding $500,000, Service-Disabled Veteran Owned Small Business (SDVOSB) certification status, State Apprenticeship Utilization requirements for projects estimated at $1 million or more, and State Prevailing Wage requirements for projects estimated at $500,000 or more. All referenced requirements do not apply to projects receiving federal funds or to projects for Institutions of Higher Education that have opted out of the State Procurement Code. Bidders indicating non-compliance with the 80% Colorado Labor requirement must submit written justification with their bid submission. The contract is subject to liquidated damages provisions as specified in Article 7D of the Contractor's Agreement (SC-6.21), and all wage rates for prime contractors and subcontractors must be submitted as requested in the solicitation documents.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.13
Rev 7/2025
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID FORM
Institution or Agency:
Project No./Project Name:
Bidder Acknowledges Receipt of Addenda Numbers: _______________________________
(See 3a below for the next 3 items)
Bidder Anticipates Services outside the United States or Colorado:* No Yes
Bidder will comply with 80% Colorado Labor on project above $500,000 No Yes
Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes
Base Bid $________________________
Bidder’s Time of Completion
Time Period from Notice to Proceed to Substantial Completion: ____________________________
Time Period from Substantial Completion to Final Acceptance: ____________________________
Total Time of Completion of Entire Project (a + b): _________________________
1. BID: Pursuant to the advertisement by the State of Colorado dated ______________ the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.
2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done.
3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid.
a. If the bidder anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the bidder shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys) *
b. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be employed to perform at least 80% of the work. Colorado Labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
Bidders indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the bid submission. (Does not apply to any project that receives federal moneys) *
c. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs.
Attach proof of certification along with the bid submission. *
d. Projects estimated to be $1 million or more that do not receive federal funds are required to comply with the State Apprenticeship Utilization requirements C.R.S.
24-92-115
e. Projects estimated to be $500,000 or more that do not receive federal funds are required to comply with the State Prevailing Wage requirements C.R.S. 24-92-201 through 210.
4. BID GUARANTEE: This Bid is accompanied by the required Bid Guarantee. Per C.R.S. §24- 105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. You are authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Office of the State Architect, may retain said Bid Guarantee, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, and Insurance Policy.
5. TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the Project from the date of the Notice to Proceed within the number of calendar days entered above, and in addition, further agrees that the period between Substantial Completion and Final Acceptance of the Project will not exceed the number of calendar days noted above. If awarded the Work, the bidder agrees to begin performance within ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of Completion and Liquidated Damages of the General Conditions of the Contract, and agrees to prosecute the Work with due diligence to completion. The bidder represents that Article 7D of the Contractor’s Agreement (SC-6.21) has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract.
6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, bidder must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance within ten (10) days from the date of the Notice of Award, and that the bidder will be required to sign to acknowledge and accept the Contract Documents, including the Drawings and Specifications.
7. ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this bid form if alternates are requested by the institution/agency in the solicitation documents.
8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as requested by the institution/agency in the solicitation documents.
9. The right is reserved to waive informalities and to reject any and all Bids.
*Does not apply to projects for Institutions of Higher Education that have opted out of the State Procurement Code.
SIGNATURES: If the Bid is being submitted by a Corporation, the Bid shall be signed by an officer, i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Bid, the Bid shall so indicate and be properly signed.
Dated this ________ Day of _______________________ , 20______
THE BIDDER:
By ________________________________________ _________________________________________________ Company Name Address
Phone Number ______________________________ _________________________________________________ City, State Zip Code
By ________________________________________ _________________________________________________ Name (Print) and Title Signature
| BID FORM |
| Base Bid ________________________ |
| Total Time of Completion of Entire Project (a b): _________________________ |
| THE BIDDER: |
| TextInput.119: Colorado Department of Public Health and Environment |
| TextInput.165: 793 - ATOPs SB MT GOAT Site Construction project |
| Check Box1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box2: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text3: |
| Text4: |
| 0: |
| 2: |
| Text5: |
| Text6: |
| Text7: |
File details come from the government source that posted it. Updated .