Attachment 13-TO Specific Price Proposal.xlsx

XLSX spreadsheet 87 KB Posted

Attached to
Schriever Space Force Base Single Award Task Order IDIQ Contract
Solicitation number
FA255021R0019
Issued by

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Bid Format

Individual Task Order Bid Template

Prepriced Line Items
DivisionMaterial CostEquipment CostLabor-HoursPrevailing WageLabor CostTotal Cost= Contractor Input
01 - General Requirements00
02 - Existing Conditions00
03 - Concrete00
04 - Masonry00
05 - Metals00
06 - Wood, Plastics, and Composites00
07 - Thermal and Moisture Protection00
08 - Openings00
09 - Finishes00
10 - Specialties00
11 - Equipment00
12 - Furnishings00
13 - Special Construction00
14 - Conveying Equipment00
21 - Fire Suppression00
22 - Plumbing00
23 - HVAC00
25 - Integrated Automation00
26 - Electrical00
27 - Communications00
28 - Electronic Safety and Security00
31 - Earthwork00
32 - Exterior Improvements00
33 - Utilities00
34 - Transportation00
35 - Waterway and Marine Transportation00
40 - Process Interconnections00
41 - Material Processing and Handling Equipment00
42 - Process Heating, Cooling, and Drying Equipment00
43 - Process Gas and Liquid Handling, Purification and Storage Equipment00
44 - Pollution Control Equipment00
45 - Industry Specific Manufacturing Equipment00
46 - Water and Wastewater Equipment00
48 - Electric Power Generation00
Sub-Total #10
City Cost Index (CCI)0
Total #10
Non-prepriced Line Items
DivisionMaterial CostEquipment CostLabor-HoursPrevailing WageLabor CostTotal Cost01 - General Requirements
0002 - Existing Conditions
0003 - Concrete
0004 - Masonry
0005 - Metals
0006 - Wood, Plastics, and Composites
0007 - Thermal and Moisture Protection
0008 - Openings
0009 - Finishes
0010 - Specialties
0011 - Equipment
0012 - Furnishings
13 - Special Construction
Total #2014 - Conveying Equipment
21 - Fire Suppression
Cost Summary - Construction22 - Plumbing
Total (Prepriced and Non-prepriced)01023 - HVAC
RA Coefficient if applicable1.0251125 - Integrated Automation
Non-RA Coefficient if applicable2226 - Electrical
Total Construction Cost03327 - Communications
4428 - Electronic Safety and Security
Cost Summary - Design Fees531 - Earthwork
632 - Exterior Improvements
Level of Effort (%)Insert "Yes" or "No" from dropdownTotal Design Fee %Total Design CostYes733 - Utilities
35% Level of EffortYes00No834 - Transportation
935 - Waterway and Marine Transportation
65% Level of EffortNo1040 - Process Interconnections
<$250kYes001141 - Material Processing and Handling Equipment
$250k - $1MNo001242 - Process Heating, Cooling, and Drying Equipment
>$1MNo001343 - Process Gas and Liquid Handling, Purification and Storage Equipment
1444 - Pollution Control Equipment
Cost Summary - Grand Total1545 - Industry Specific Manufacturing Equipment
Total Construction Cost01646 - Water and Wastewater Equipment
Total Design Cost01748 - Electric Power Generation
Grand Total018
19
20

image1.png

File details come from the government source that posted it. Updated .