Attachment 7-Submittal_Register_Template.xls
XLS spreadsheet 152 KB Posted
- Attached to
- Schriever Space Force Base Single Award Task Order IDIQ Contract Federal contract opportunity
- Solicitation number
- FA255021R0019
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal 1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT NAME | SOLICITATION /CONTRACT NUMBER | ||||||||||||||||
| GLEN XX-XXX | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||
| LINE NUMBER | SUBMITTAL NUMBER | PRE-DESIGN | CONCEPT DESIGN | PRE-CONSTRUCTION | CONSTRUCTION | PRE-FINAL | FINAL | CLOSE OUT | REQUIRED SUBMISSION DATE | DATE TO CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | APPROVED | DISAPPROVED | CONTRACTOR SUBMITTAL | FINAL APPROVAL | REMARKS | |
| 1 | SECTION 01 11 00 SUMMARY of WORK | ||||||||||||||||||
| 2 | 0001 | Utility Outage | X | 10 days prior to need | Para 1.7.1 | ||||||||||||||
| 3 | 0002 | Excavation Permit [Delete if not required] | X | 21 days prior to need | Para 1.7.2 | ||||||||||||||
| 4 | 0003 | Welding Permit [Delete if not required] | X | NTP + 10 days | Para 1.7.2 | ||||||||||||||
| 5 | 0004 | Utilities Marking [Delete if not required] | X | 2 business days prior to excavation | Para 1.8 | ||||||||||||||
| 6 | 0005 | Design Submittal | X | Based on approved design schedule | Para 3.1.1 | ||||||||||||||
| 7 | 0006 | Specifications | X | Para 3.1.2 | |||||||||||||||
| 8 | 0007 | Photometric Plan [Delete if not required] | X | Para 3.1.3 | |||||||||||||||
| 9 | 0008 | Fire Protection Engineer Qualifications [Delete if not required] | X | At NTP | Para 3.1.4 | ||||||||||||||
| 10 | 0009 | Design Schedule | X | NTP + 10 days | Para 3.2.1 | ||||||||||||||
| 11 | Design Kick off submittal [Use if there is a dsg component] | ||||||||||||||||||
| 12 | 35% Design Submittas [Use if there is a dsg component] | ||||||||||||||||||
| 13 | 65% Design Submittal [Use if there is a dsg component] | ||||||||||||||||||
| 14 | SECTION 01 14 00 WORK RESTRICTIONS | ||||||||||||||||||
| 15 | 0010 | Contractor and Subcontractor Personnel Information | X | During Concept Design Phase | Para 1.3.2.1 / 1.3.2.2 / 1.4 | ||||||||||||||
| 16 | SECTION 01 30 00 - Admininistrative Requirements | ||||||||||||||||||
| 17 | 0011 | Color Boards [Delete if not required] | X | 90 days after NTP | 0 | Para 1.3 | |||||||||||||
| 18 | 0012 | Progress and Completion Pictures | X | Monthly | Para 1.4 | ||||||||||||||
| 19 | 0013 | Key Personnel | X | During Concept Design Phase | Para 1.6 | ||||||||||||||
| 20 | 0014 | Management Plan | X | NTP + 10 days | Para 1.7 | ||||||||||||||
| 21 | 0015 | Electronic Mail Address | X | NTP + 10 days | Para 1.9 | ||||||||||||||
| 22 | SECTION 01 32 16.00 20 - Small Project Construction Progress Schedules | ||||||||||||||||||
| 23 | 0016 | Baseline Design Schedule | X | Prior to Start of Design | Para 1.2 | ||||||||||||||
| 24 | 0017 | Baseline Construction Scehdule | X | During Concept Design Phase | Para 1.2 | ||||||||||||||
| 25 | 0018 | 2-Week Look Ahead Schedule | X | As required | Para 1.5 | ||||||||||||||
| 26 | 0019 | Monthly Updates | X | Monthly | Para 1.4 | ||||||||||||||
| 27 | 0020 | Correspondence and Test Report | X | As required | Para 1.6 | ||||||||||||||
| 28 | SECTION 01 35 26 - Governmental Safety Requriements | ||||||||||||||||||
| 29 | 0021 | Personnel Qualifications | X | During Concept Design Phase | Para 1.5.1 | ||||||||||||||
| 30 | 0022 | Accident Prevention Plan | X | Para 1.6 | |||||||||||||||
| 31 | 0023 | Activity Hazard Analysis [Only applies to task orders of $2.5M or larger] | X | Para 1.7 | |||||||||||||||
| 32 | 0024 | Mishap Notification | X | When Mishap occurs | Para 1.11.1 | ||||||||||||||
| 33 | 0025 | Accident Report | X | Within 5 days of incident | Para 1.11.2 | ||||||||||||||
| 34 | 0026 | Certificate of Compliance and Pre-Lift Plan/Checklisht for LHE and Rigging [Crane operations or high lift above 10 feet -- delete if not needed | X | 10 days prior to need | Para 1.10.4 | ||||||||||||||
| 35 | 0027 | Load Handling Equipment (LHE) reports. [Applicable to large projects over $2.5M] | X | Part of Daily reports | Para 1.10.3 | ||||||||||||||
| 36 | 0028 | Hot Work Permit | X | During Concept Design Phase | Para 1.11 | ||||||||||||||
| 37 | 0029 | Confined Space Entry | X | 10 days prior to need | Para 1.12 | ||||||||||||||
| 38 | 0030 | Lockout / Tagout | X | 10 days after NTP | Para 1.13 | ||||||||||||||
| 39 | 0031 | Fall Protection Program [Delete if not required] | X | 10 days after NTP | Para 3.3 | ||||||||||||||
| 40 | SECTION 01 45 00.10 QUALTIY CONTROL | ||||||||||||||||||
| 41 | 0032 | QC Plan | X | During Concept Desing Phase and 15 days prior to coordination meeting | Para 3.2 | ||||||||||||||
| 42 | 0033 | Documentation | x | Minimum Monthly | Para 3.8 | ||||||||||||||
| 43 | SECTION 01 45 35 - Special Inspections [This only applies if there is structural work. Delete if not required] | ||||||||||||||||||
| 44 | 0034 | Structural Engineer | X | During design | Part 1 | ||||||||||||||
| 45 | 0035 | Structural Observations | X | During Structural work | Part 1 | ||||||||||||||
| 46 | SECTION 01 50 00 - Temporary Construction Facilities and Controls | ||||||||||||||||||
| 47 | 0036 | Construciton Site Plan [Primarily for outdoor construciton. Delete if not required] | X | During Concept Design Phase | Para 1.3 | ||||||||||||||
| 48 | 0037 | Traffic Control Plan [Primarily for outdoor construciton. Delete if not required] | X | Para 2.2 | |||||||||||||||
| 49 | 0038 | Backflow Preventers [May not be required if we are not providing access to potable water.] | X | Para 2.5 | |||||||||||||||
| 50 | 0039 | Project Identification Sign [for outdoor projects only] | X | 15 days after NTP | Para 2.1.2 | ||||||||||||||
| 51 | SECTION 01 55 04 - Security Requirements for Schriever AFB | ||||||||||||||||||
| 52 | '0040 | Personnel Access List | X | During Concept Design Phase | Para 1.3.1 | ||||||||||||||
| 53 | SECTION 01 57 20.00 10 - Environmental Protection | ||||||||||||||||||
| 54 | 0041 | Environmental Protection Plan | X | X | As part of design submittal or if no design 10 days after NTP | Para 1.7 | |||||||||||||
| 55 | 0042 | Opacity Determination [Delete if not applicable] | X | X | Para 2.2.2 | ||||||||||||||
| 56 | 0043 | ODS Statement | X | X | Para 2.2.4.1 | ||||||||||||||
| 57 | 0044 | Storm Water Pollution Prevention Plan [only required for outdoor construction] | X | X | Para 2.3 | ||||||||||||||
| 58 | 0045 | Wastewater Management [only use if discharge to sanitary sewer is required] | X | X | Para 2.4 | ||||||||||||||
| 59 | 0046 | Refrigerant Equipment Requirement [Delete if not applicable] | X | X | Para 2.2.4 .2 | ||||||||||||||
| 60 | 0047 | Generator Permits [Delete if not applicable] | X | X | Para 2.2.5 | ||||||||||||||
| 61 | 0048 | Air Emissions Report | X | Monthly | Para 2.2.6 | ||||||||||||||
| 62 | 0049 | Hazardous Materials/Waste Discharge | X | Upon immediate dischard | Para 2.4.1 | ||||||||||||||
| 63 | 0050 | Septic System Permit [Delete if not applicable] | X | Prior to need | Para 2.4.3 | ||||||||||||||
| 64 | 0051 | Estimate of recylce / resue of construction debris/products | X | X | If design then as part of design submittal. Otherwise within 10 days of NTP | Para 2.6.2 | |||||||||||||
| 65 | 0052 | Recycling Reports | X | Quarterly | Para 2.6.2 | ||||||||||||||
| 66 | 0053 | HAZAMT PLAN | X | 10 days of NTP | Para 2.7 | ||||||||||||||
| 67 | 0054 | Hazardouse Materials Usage Report [Chose this if POP is < 90 days] | X | At end of construction | Para 2.7.4 | ||||||||||||||
| 68 | 0055 | Hazardouse Materials Usage Report [Chose this if POP is > 90 days] | X | Quarterly | Para 2.7.4 | ||||||||||||||
| 69 | 0056 | Hazardous Waste Identification | X | Prior to start of Construction | Para 2.8.1 | ||||||||||||||
| 70 | 0057 | Asbestos abatement plan [Delete if not applicable] | X | X | Part of Environmental Protection Plan submittal | Para 2.11 | |||||||||||||
| 71 | 0058 | Lead Base Paint abatement [Delete if not applicable] | X | X | Para 2.12 | ||||||||||||||
| 72 | 0059 | PCB certification [Delete if not applicable] | X | within 10 days of NTP | Para 2.10 | ||||||||||||||
| 73 | 0060 | Integrated Pest Management Plan [Delete if not applicable] | X | Part of Environmental Protection Plan submittal | 2.13 | ||||||||||||||
| 74 | 0061 | Reporting Pesticide Use [Delete if not applicable] | X | At final inspection | Para 2.13.7 | ||||||||||||||
| 75 | 0062 | Tank regulation and permits [Delete if not applicable] | X | X | within 10 days of NTP | Para 2.14.2 | |||||||||||||
| 76 | 0063 | Spills Reporting and response | X | Immediately | Para 2.14.3 / 2.15 | ||||||||||||||
| 77 | 0064 | Green Procurement Determination Form | X | X | At start of construction and througout the POP | Para 2.17.2 | |||||||||||||
| 78 | 0065 | Recoverd Material Estimate and Certification Form | X | 10 days after BOD | Para 2.17.3 | ||||||||||||||
| 79 | 0066 | Nuclear Soil Testing [Delete if not required] | X | within 10 days of NTP | Para 2.22.1 | ||||||||||||||
| 80 | 0067 | Noise | X | Para 2.22.2 | |||||||||||||||
| 81 | SECTION 01 78 00 - Closeout Submittals | ||||||||||||||||||
| 82 | 0068 | Spare Parts Data | X | X | 30 days prior to pre-warranty conference | Para 1.4 | |||||||||||||
| 83 | 0069 | Warranty Management Plan | X | 30 days prior to pre-warranty conference | Para 1.5.1 | ||||||||||||||
| 84 | 0070 | Pre-Warranty Conference | X | Prior to BOD | Para 1.5.3 | ||||||||||||||
| 85 | 0071 | Warranty Tags | X | X | X | At time of installation | Para 1.5.4 | ||||||||||||
| 86 | 0072 | Record Dwg and As-Built Drawings | X | NLT 30 days after BOD | Para 2.2 | ||||||||||||||
| 87 | 0073 | Interim DD Form 1354 | X | At pre-final | Para 3.3.1 | ||||||||||||||
| 88 | 0074 | Completed DD Form 1354 | X | At BOD | Para 3.3.2 | ||||||||||||||
| 89 | 0075 | O&M Manuals | X | 30 days prior to BOD | Para 3.4 | ||||||||||||||
| 90 | 0076 | Certification of EPA Designated Items | X | NLT 30 days after BOD | Para 2.3 | ||||||||||||||
| 91 | 0077 | Manufacturers Instruction | X | 30 days prior to BOD | Para 3.5 | ||||||||||||||
| 92 | 0078 | Final Approved Shop Drawings | X | NLT 30 days after BOD | Para 3.2 | ||||||||||||||
| 93 | SATOC DESING SPECS | ||||||||||||||||||
| 94 | 0079 | Add additional submittals based on applicable UFGS sections | |||||||||||||||||