Appendix F - Contractors DBB Agreement - 7th St Garage Repairs - SC6.21.pdf
PDF 407 KB Posted
- Solicitation number
- IFB1 GMAA 2027000031 2
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Contractor's Design/Bid/Build (D/B/B) Agreement executed by the State of Colorado, Office of the State Architect, State Buildings Program, in conjunction with the Auraria Higher Education Center (AHEC) for the 7th Street Garage High-Priority Structural Repairs project (Project Number P1004332). The agreement establishes the contractual framework between the state and the selected contractor responsible for performing all work required for the complete execution of the structural repair project. The contract documents incorporate the General Conditions of the Contractor's Design/Bid/Build Agreement (SC-6.23) by reference and establish that the contractor shall perform the work to the highest industry standards and in strict accordance with all contract documents. The contractor must achieve Substantial Completion within a specified number of calendar days from the Notice to Proceed, with an additional period for final completion from Substantial Completion to Final Acceptance. Timely completion is designated as an essential condition of the agreement, with potential liquidated damages assessed for failure to meet established timelines. The project manager for the state is Leah Byers of AHEC, and the principal point of contact is Holly Hall, Campus Architect.
The total project budget is Two Million Four Hundred Forty-Three Thousand One Hundred Sixty Dollars ($2,443,160.00), which encompasses professional services, construction improvements, project contingencies, furnishings, movable equipment, reimbursable expenses, and miscellaneous costs. The contract includes a condition precedent requiring that sufficient funding be appropriated and made available prior to the contractor's performance of remaining services. The agreement requires the contractor to provide a Performance Bond (Form SC-6.22) and Labor and Material Payment Bond (Form SC-6.221), along with evidence of workers' compensation certification. Optional provisions address apprenticeship utilization certifications for mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work; compliance with the Buy Clean Colorado Act regarding Environmental Product Declarations; and applicability of prevailing wage requirements under either the Federal Davis-Bacon Act or Colorado state prevailing wage statute. The contract is not effective until signed by the State Controller or Chief Financial Officer and is subject to Colorado Fiscal Rules and the Office of the State Architect's Building Code Compliance Policy.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SC-6.21
Rev. 07/2026
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S
DESIGN/BID/BUILD (D/B/B)
AGREEMENT
(STATE FORM SC-6.21)
State Agency Auraria Higher Education Center Department I.D.
GMA
Contract I.D. Number Insert CMS number or other contract number Project Number P1004332 Project Name 7th St. Garage High-Priority Structural Repairs Contractor Name Insert Contractor's full Legal Name including "Inc.", "LLC" etc.
Principal Representatives For the State:
Leah Byers, Project Manager Auraria Higher Education Center PO Box 173361, Campus Box D Denver, CO 80217-3361 leah.byers@ahec.edu
For Contractor:
Name Company Name Address Line 1 Address Line 2 City, State ZIP Email
ATTACHMENT 1: The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23) mailto:leah.byers@ahec.edu
Rev. 07/2026 TOC
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
TABLE OF CONTENTS… ...................................................................................................... Page Table of Contents for the entire Agreement is located in THE GENERAL CONDITIONS OF THE
CONTRACTOR’S DESIGN/BID/BUILD (D/B/B) AGREEMENT (SC-6.23)
SIGNATURE PAGE
RECITALS:
1 ARTICLE 1 PERFORMANCE OF THE WORK
2 ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS
3 ARTICLE 3 TIME OF COMPLETION
4 ARTICLE 4 ESSENTIAL CONDITION
5 ARTICLE 5 CONTRACT SUM
5.1 CONDITION PRECEDENT
6 ARTICLE 6 CONTRACT DOCUMENTS
6.1 CAPITALIZED TERMS
7 ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS
7.1 MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation
7.2 MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples
7.3 MODIFICATION 1 OF ARTICLE 27: Labor and Wages
7.4 MODIFICATION 2 OF ARTICLE 27: Labor and Wages
7.5 MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations
7.6 MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion
7.7 MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages
8 ARTICLE 8 NOTICE IDENTIFICATION
EXHIBIT A: CONTRACTOR’S BID ........................................................... A EXHIBIT B: PERFORMANCE BOND ......................................................... B
EXHIBIT C: LABOR AND MATERIAL PAYMENT BOND ................................... C
EXHIBIT D: INSURANCE CERTIFICATE(S) ................................................. D EXHIBIT E: BUILDING CODE COMPLIANCE POLICY ..................................... E EXHIBIT F: STATE SALES AND USE TAX FORM .......................................... F
EXHIBIT G: APPLICABLE PREVAILING WAGE DETERMINATIONS AND
APPRENTICESHIP CONTRIBUTION RATES ................................................. G
EXHIBIT H: APPRENTICESHIP UTILIZATION CERTIFICATIONS ........................ H
Rev. 07/2026 1
SIGNATURE PAGE
THE PARTIES HERETO HAVE EXECUTED THIS AGREEMENT
Each person signing this Agreement represents and warrants that the signer is duly authorized to execute this Agreement and to bind the Party authorizing such signature.
In accordance with §24-30-202, C.R.S., this Contract is not valid until signed by the State Controller (or an authorized delegate) or the Chief Financial Officer per the Fiscal Rules of the individual Institution of Higher Education
Project Number/Name: P1004332 / 7th St. Garage High-Priority Structural Repairs Contract ID No.: Insert CMS Number & 27-EN-1519
CONTRACTOR
INSERT: Legal Name of Contractor
By: Name & Title of Person Signing for Contractor
Date: __________________
STATE OF COLORADO
Acting by and through: The Board of
Directors of the Auraria Higher Education Center
By: Stacy L. Tino, Director of Procurement
Date: __________________
OFFICE OF THE STATE ARCHITECT
State Buildings Program
By: Holly Hall, Campus Architect
Date: __________________
AURARIA HIGHER EDUCATION CENTER
Zach Hermsen, Chief Financial Officer
By: Zach Hermsen, Chief Financial Officer Effective Date: __________________
Rev. 07/2026 2
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD (D/B/B) AGREEMENT
(STATE FORM SC-6.21)
Department ID: GMA Contract ID #: Insert Contract ID Project #: P1004332
1. PARTIES. THIS AGREEMENT is entered into by and between the STATE OF COLORADO, acting by and through the Board of Directors of the Auraria Higher Education Center, a body corporate and agency of the state of Colorado, 1201 5th Street, Suite 370, Denver, CO 80204 hereinafter referred to as the State or Principal Representative, and Insert Contractor's full Legal Name including "Inc.", "LLC" etc. having its offices at Street address, City, State and Zip Code hereinafter referred to as the Contractor.
2. EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Agreement shall not be effective or enforceable until it is approved and signed by the State’s Chief Financial Officer or its designee (hereinafter called the “Effective Date”), but shall be effective and enforceable thereafter in accordance with its provisions. The State shall not be bound by any provision of this Contract before the Effective Date, and shall have no obligation to pay Contractor for any Work performed or expense incurred before the Effective Date.
RECITALS:
WHEREAS, the Principal Representative intends to engage the services of a Contractor for the 7th St. Garage High-Priority Structural Repairs, hereinafter called the Project; and
WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated, and otherwise made available, and a sufficient unencumbered balance thereof remains available for payment in Fund Number 2000, Account Number 2000-2310-56300-P1004332; and
WHEREAS, the State has Appropriated and the Principal Representative has been authorized to expend the total sum of Two Million Four Hundred Forty-Three Thousand One Hundred Sixty Dollars ($2,443,160.00) for this project including all professional services, construction/improvements, project contingencies, furnishings, movable equipment, reimbursable expenses and miscellaneous expenses; and
(WHEREAS, funds are available for only a portion of the services defined herein, as more fully described in the funding Condition Precedent clause in Article 5.1; and)
WITNESSETH, that the State of Colorado and the Contractor agree as follows:
Rev. 07/2026 3
1 ARTICLE 1 PERFORMANCE OF THE WORK
The Contractor shall perform all of the Work required for the complete and prompt execution of everything described or shown in, or reasonably implied from the Contract Documents for the above referenced Project.
2 ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS
The Contractor agrees to perform the Work to the highest industry standards and to the satisfaction of the State of Colorado and its contractor in strict accordance with the provisions of the Contract Documents.
3 ARTICLE 3 TIME OF COMPLETION
The Contractor agrees to Substantially Complete the Project within calendar days from the date of the Notice to Proceed, in addition, the Contractor agrees to finally complete the Project from Substantial Completion to Final Acceptance within calendar days for a total time of completion of the entire Project of calendar days.
The Contractor shall perform the Work with due diligence to completion.
4 ARTICLE 4 ESSENTIAL CONDITION
Timely completion of the Project is an essential condition of this Agreement. The Contractor shall be subject to any liquidated damages described in Article 7.6 for failure to satisfactorily complete the Work within the time periods in Article 3 above.
5 ARTICLE 5 CONTRACT SUM
The Contractor shall be paid for the performance of this Agreement, subject to any additions and deductions as provided for in Articles 32, 34 and 35 of The General Conditions of the Construction Contract SC-6.23, the sum of INSERT DOLLAR VALUE IN
WORDS DOLLARS AND NO/100 ($ ).
Name of Document Short Description of Work/Date Dollar Amount Base Bid Amount Base Bid Alt. # Alt. #
Total Contract Sum -$
5.1 CONDITION PRECEDENT
(At the time of the execution of this Agreement, there are sufficient funds budgeted and appropriated to compensate the Contractor only for performance of the services through and including Insert the project phases that have been fully funded Therefore, it shall be a Condition Precedent to the Contractor’s performance of the remaining services and the
Rev. 07/2026 4
State's liability to pay for such performance, sufficient funding must be appropriated and made available to the Principal Representative for the Project prior to and, as a further Condition Precedent, a written Amendment is entered into in accordance with the State of Colorado Fiscal Rules, stating that additional funds are lawfully available for the project. If either Condition Precedent is not satisfied by , the Contractor’s obligation to perform services for Insert the scope pf work or phases that will be completed in the future and the State's obligation to pay for such service is discharged without liability to each other. If funding is eventually made available after , the Contractor has no right to perform services under of this Agreement and the state has no right to require the Architect/Engineer to perform the said services.)
6 ARTICLE 6 CONTRACT DOCUMENTS
The Contract Documents, as enumerated in Article 1.1 of The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23), (the “General Conditions”).
The Contract Documents, including the General Conditions, are all essential parts of this Agreement and are fully incorporated herein.
6.1 CAPITALIZED TERMS
Capitalized terms used herein and not defined shall have the meanings ascribed to them in The General Conditions of Design/Bid/Build (D/B/B) Agreement (SC-6.23)
7 ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS
The provisions of this Article 7 alter or enlarge upon the following Articles (the General Conditions of the Contractor’s Design/Bid/Build Agreement SC-6.23):
7.1 MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation.
If the box below is marked, certification of apprenticeship utilization is required for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical and plumbing work on the project.
☒ ______ Principal Representative initial
7.2 MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples
If the box below is marked, the Buy Clean Colorado Act, §24-92-117, C.R.S., shall be applicable to the Project. The Contractor is responsible for submitting Environmental Product Declaration (EPD) information for all eligible materials to be used on the project.
☒ ______ Principal Representative initial
7.3 MODIFICATION 1 OF ARTICLE 27: Labor and Wages
If the box below is marked, the Federal Davis-Bacon Act shall be applicable to the Project.
The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents.
☐ ______ Principal Representative initial
Rev. 07/2026 5
7.4 MODIFICATION 2 OF ARTICLE 27: Labor and Wages
If the box below is marked, the State prevailing wage statute shall be applicable to the Project. The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents.
☒ ______ Principal Representative initial
7.5 MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations
If the box below is marked, and initialed by the State as noted, the requirement to participate in facilitated negotiations shall be deleted from this Contract. Article 39, Non- Binding Dispute Resolution – Facilitated Negotiations, shall be deleted in its entirety and all references to the right to the same where ever they appear in the contract shall be similarly deleted.
The box may be marked only for projects with an estimated value of less than $500,000.
☐ ______ Principal Representative initial
7.6 MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion
If the box below is marked the six-month guarantee inspection is not required.
☐ ______ Principal Representative initial
7.7 MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages
If an amount is indicated immediately below, liquidated damages shall be applicable to this Project as, and to, the extent shown below. Where an amount is indicated below, liquidated damages shall be assessed in accordance with and pursuant to the terms of The General Conditions of the Design/Bid/Build Agreement Article 46, Time of Completion and Liquidated Damages, in the amounts and as here indicated. The election of liquidated damages shall limit and control the parties right to damages as the State’s sole and exclusive remedy for delay.
7.7.1 Inability To Use The Project
For the inability to use the Project, for each day after the number of calendar days specified in the Contractor’s bid for the Project and the Agreement for achievement of Substantial Completion, until the day that the Project has achieved Substantial Completion and the Notice of Substantial Completion is issued, the Contractor agrees that an amount equal N/A Dollars ($N/A) shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due, but amounts remaining are insufficient to cover the entire assessment.
7.7.2 Damages Related to Extended Closeout
For damages related to or arising from additional administrative, technical, supervisory and professional expenses related to and arising from the extended closeout period, for
Rev. 07/2026 6 each day in excess of the number of calendar days specified in the Contractor’s bid for the Project and the Agreement to finally complete the Project as defined by the issuance of the Notice of Final Acceptance (after the issuance of the final Notice of Substantial Completion), the Contractor agrees that an amount equal to N/A Dollars ($N/A) shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due but amounts remaining are insufficient to cover the entire assessment.
8 ARTICLE 8 NOTICE IDENTIFICATION
All Notices pertaining to this Agreement and the General Conditions (SC-5.23) or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing.
NOTICE TO PRINCIPAL REPRESENTATIVE:
Auraria Higher Education Center Attn: Leah Byers, Project Manager PO Box 173361, Campus Box D Denver, CO 80217-3361 leah.byers@ahec.edu
With copies to State Buildings Program (or Delegate) Auraria Higher Education Center Attn: Holly Hall, Campus Architect PO Box 173361, Campus Box D Denver, CO 80217-3361 holly.hall@ahec.edu
NOTICE TO CONTRACTOR:
Insert Name of Individual acting on the contractor behalf Insert Street Address City, State Zip Code Insert email address mailto:leah.byers@ahec.edu mailto:holly.hall@ahec.edu
Rev. 07/2026 Ex A
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT A: CONTRACTOR’S BID
CONTRACTOR’S BID (Form SBP-6.13) Workers’ Compensation Certification (SBP-4.1) Bid Alternates (Form SBP-6.131) Bid Bond (Form SBP-6.14) Labor Burden Calculation (Form SBP-6.18)
Rev. 07/2026 Ex B
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT B: PERFORMANCE BOND
PERFORMANCE BOND (Form SC-6.22)
Rev. 07/2026 Ex C
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT C: LABOR AND MATERIAL PAYMENT BOND
LABOR AND MATERIAL PAYMENT BOND (Form SC-6.221)
Rev. 07/2026 Ex D
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT D: INSURANCE CERTIFICATE(S)
INSURANCE CERTIFICATE(S) (Attached)
Rev. 07/2026 Ex E
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT E: BUILDING CODE COMPLIANCE POLICY
BUILDING CODE COMPLIANCE POLICY: COORDINATION OF APPROVED BUILDING CODES, PLAN
REVIEWS, BUILDING INSPECTIONS AND STATE DEVELOPMENT REQUIREMENTS
Refer to the Office of the State Architect’s Building Codes Webpage for the Building Code Compliance Policy (Rev. July 2025)
Exhibit A: Approved Building Codes of the Code Compliance Policy dated July 2026 including the Amendments to the International Building Code and Code Compliance Plan Review Procedures (Rev. July 2026);
Exhibit B: Plan Review Procedures of the Code Compliance Policy dated July 2026
Exhibit I: State Development Requirements of the Code Compliance Policy dated July 2026
The State Buildings Program Building Codes Webpage may be found at:
https://osa.colorado.gov/state-buildings/building-codes
Rev. 07/2026 Ex F
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
EXHIBIT F: STATE SALES AND USE TAX FORM
STATE SALES AND USE TAX FORM
Rev. 07/2026 Ex G
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
EXHIBIT G: APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP
CONTRIBUTION RATES
Applicable Prevailing Wage Determinations (Attached) Apprenticeship Contribution Rates (Attached)
Rev. 07/2026 Ex H
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
EXHIBIT H: APPRENTICESHIP UTILIZATION CERTIFICATIONS
APPRENTICESHIP UTILIZATION CERTIFICATIONS
| State Agency |
| Department I.D. |
| Contract I.D. Number |
| Project Number |
| Project Name |
| Contractor Name |
| Principal Representatives |
| CONTRACTOR |
| STATE OF COLORADO |
| OFFICE OF THE STATE ARCHITECT |
| AURARIA HIGHER EDUCATION CENTER |
| 1 ARTICLE 1 PERFORMANCE OF THE WORK |
| 2 ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS |
| 3 ARTICLE 3 TIME OF COMPLETION |
| 4 ARTICLE 4 ESSENTIAL CONDITION |
| 5 ARTICLE 5 CONTRACT SUM |
| 5.1 CONDITION PRECEDENT |
| 6 ARTICLE 6 CONTRACT DOCUMENTS |
| 6.1 CAPITALIZED TERMS |
| 7 ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS |
| 7.1 MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation. |
| 7.2 MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples |
| 7.3 MODIFICATION 1 OF ARTICLE 27: Labor and Wages |
| 7.4 MODIFICATION 2 OF ARTICLE 27: Labor and Wages |
| 7.5 MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations |
| 7.6 MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion |
| 7.7 MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages |
| 7.7.1 Inability To Use The Project |
| 7.7.2 Damages Related to Extended Closeout |
| 8 ARTICLE 8 NOTICE IDENTIFICATION |
| Refer to the Office of the State Architect’s Building Codes Webpage for the Building Code Compliance Policy (Rev. July 2025) |
| Exhibit A: Approved Building Codes of the Code Compliance Policy dated July 2026 including the Amendments to the International Building Code and Code Compliance Plan Review Procedures (Rev. July 2026); |
| Exhibit B: Plan Review Procedures of the Code Compliance Policy dated July 2026 |
| Exhibit I: State Development Requirements of the Code Compliance Policy dated July 2026 |
File details come from the government source that posted it. Updated .