AHEC-27705-B 7th Street Garage Addendum 1 QA.pdf
PDF 3 MB Posted
- Solicitation number
- IFB1 GMAA 2027000031 2
- Issued by
- Denver County, Denver City, Colorado
About this file
Summary of AHEC-27705-B 7th Street Garage Addendum 1
This is Addendum 1 to an Invitation for Bid (IFB) issued by the Auraria Higher Education Center (AHEC) for high-priority structural repairs and waterproofing at the 7th Street Parking Garage located at 799 Lawrence Way, Denver, Colorado. The project encompasses 28 work items addressing concrete repair, reinforcing steel restoration, joint sealant replacement, traffic coating application, and silane sealer installation across four levels of the parking structure. Estimated quantities include 18 expansion joints, 125 locations of perimeter repairs, 1,200 square feet of overhead/vertical surface repairs, 19,300 square feet of horizontal surface repairs, 25,100 square feet of traffic coating, and 131,000 square feet of restriping. The addendum clarifies discrepancies between drawings and work lists, provides answers to 33 bidder questions, and includes updated drawing sheets and a mandatory Unit Pricing Form for handling quantity variances. The Notice to Proceed is projected for November 2, 2026, with a completion deadline of May 14, 2027. Work hours are restricted to 7:00 a.m. to 6:00 p.m., with phasing requirements limiting work to one-half floor at a time to maintain parking garage functionality.
Bidders must use the quantities listed on Sheet S0.4 for pricing purposes, with a Unit Pricing Form required at bid closing to address differences between bid quantities and field-verified quantities, which will be handled as change orders. Buy Clean Colorado requirements apply only to metal and rebar materials. AHEC will provide parking passes for two-thirds of project vehicles; other parking requires daily payment. Testing and special inspections will be managed through a third-party inspection agency contracted separately with AHEC, with the contractor responsible for general testing costs. The contractor must retain and pay a Colorado-licensed specialty engineer for temporary shoring and bracing design, including sealed calculations and certifications. Top-to-bottom phasing is preferred, and detailed construction schedules must be submitted within three business days of Notice to Proceed. Apprenticeship Utilization Certification is required after award, with trades not included in the contractor's scope marked as "N/A."
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AHEC-27705-B 7th Street Garage High-Priority Structural Repairs Addendum 1 Includes:
All questions received and the corresponding answers Updated drawing sheets Unit Pricing Form Mandatory pre-bid sign-in sheet
1. Q: There are 15 joints listed in the specifications but 18 joints are shown on the drawings. Which one is correct?
A: Work item 14 should be 18 joints. Sheet S0.4 has been updated and is included in this Addendum.
2. Q: Is there a cost for parking on campus?
A: Yes, everyone parking on campus must pay the daily rate (as of 9/25/26 rates are as follows: Bronze Lots - $5.50, Silver Lots - $7.00, Gold Lots - $8.50).
Additional information is available at the Parking and Transportation - Auraria Campus website: aurariacampus.edu/services-departments/parking/ or by phone at 303-556-2003. Bidders may find parking passes to be more cost effective.
3. Q: Are entire floors, or multiple floors, available to be worked on at a time?
A: Only ½ of a floor at a time may be worked on as the parking garage has to maintain close to full functionality.
4. Q: Is traffic control required?
A: Work areas must be clearly marked with signage and barriers.
5. Q: For phasing purposes, should work be done top to bottom or bottom to top?
A: Up to the contractor, but top to bottom is preferred.
6. Q: Does Buy Clean Colorado apply for the project?
A: Only the metal and rebar on the job will need to comply with Buy Clean Colorado.
7. Q: What are the available working hours?
A: Work hours are 7:00am to 6:00pm.
8. Q: To what extent do utilities need to be re-routed? What procedure should be followed where this occurs?
A: We do not expect that the project will require utilities to be rerouted. If utilities are in the way of construction, contractor shall notify the Auraria Higher Education Center (AHEC) Project Manager (PM) immediately.
http://www.aurariacampus.edu/services-departments/parking/
9. Q: To what items and scopes does wet curing concrete (7H on S0.2) apply?
A: Wet curing concrete applies to all repair mortars unless the manufacturer provides an alternative curing procedure.
10. Q: Is it acceptable to splice stirrups at stem enlargement? Condition shown will be difficult to impossible without damaging reinforcing steel. (Item 7 19-S3.0) A: #3s can be field bent to achieve installation as shown. Alternatively, it is acceptable to install two (2) C-bars, lap top and bottom 9” minimum.
11. Q: Alternate work item #28 says to re-stripe areas to receive traffic coatings.
The estimated area of traffic coating is listed as 25,100sf and restriping as 150,900sf for restriping on the work list. Please clarify to what extent the re-striping intent is. (Only at traffic coating vs. entire floor vs. entire garage).
Please also provide a spec for the striping material.
A: Re-stripe areas to receive traffic coating. The estimated area of traffic coating is estimated to be 25,100sf. Work Item 28 has been revised. Oil-based traffic paint is preferred; contractor shall confirm compatibility with the polyurethane traffic coating.
12. Q: Please provide locations for work item 13, and which condition shown on 6- S3.1 will occur at each.
A: Work Item 13 (Detail 6/S3.1) is listed as a typical plan work item around the perimeter on sheets S1.6 and S1.7. Contractor shall include this repair at 125 locations per Work List on sheet S0.4.
13. Q: Work item 15 is shown in both plan views and RCPs, and in some cases in the same location (on top and bottom of deck/tee). Please confirm that this work item is meant to appear in plan views and what overhead/vertical surfaces it is referring to at these locations (example GL7/8-J on S1.2).
A: Work Item 15 applies to vertical and overhead surfaces of double-tees, beams, columns, and walls. Where work is called out on plan it typically occurs at wall and column faces which extend up from the level below.
14. Q: For bidding purposes, it is difficult to determine where case 2 on 20-S3.0 occurs, and to what extent it does. Where work items 15 & 17 occur at the same location on RCP/Plan, is it acceptable to assume that all of these locations (in immediate vicinity) are to be full depth repairs, and become work item 18?
A: Contractor shall include this repair for 150sf per Work List on sheet S0.4.
Differences between bid quantities and field verified quantities will be reviewed in detail by the contractor and AHEC PM. Lower or higher quantities of field verified repairs will be handled as a change order. A Unit Pricing Form is being added to the IFB via this addendum. It is a separate attachment and must be submitted with the bid documents at bid closing. This form will be used to calculate any variance in quantities.
15. Q: Is there any concern with supporting the topping slab after removal of the damaged DT section per 19-S3.1?
A: Similar to Note 1 detail 18/S3.1 and Note 2 detail 20/S3.1, if the work extends beyond adjacent tee stems or if areas are larger than 10 SF work must be staged or temporary shoring must be installed.
16. Q: The repair quantities and limits shown in the Contract Documents appear to be based on existing observations. If demolition, sounding, or other field investigation exposes deterioration extending beyond the indicated repair limits, how will additional concrete removal, reinforcing repair/replacement, patching, and associated work be measured and compensated? Should bidders provide or carry any unit pricing for additional quantities?
A: Bid shall include quantities shown in the drawings, work list, and details.
Differences between bid quantities and field verified quantities will be reviewed in detail by the contractor and AHEC PM. Lower or higher quantities of field verified repairs will be handled as a change order. A Unit Pricing Form is being added to the IFB via this addendum. It is a separate attachment and must be submitted with the bid documents at bid closing. This form will be used to calculate any variance in quantities.
17. Q: The Contract Documents require repairs within each half-floor work zone to be completed and inspected prior to reopening that area and proceeding to the next zone. Please identify who will perform the required inspection and the anticipated inspection/approval turnaround bidders should assume for scheduling and pricing purposes.
A: Martin/Martin will perform progress site visits and observation. Inspections will be completed by AEC-West (3rd Party contracted with Auraria).
18. Q: Please confirm whether all Add Alternate No. 1 Level 4 work must be performed entirely within the specified Level 4 closure windows of December 11, 2026–January 3, 2027 and March 12–28, 2027, or whether portions of this work may be performed outside those windows while maintaining the required partial garage operations.
A: Add Alternate No. 1 work may be completed at any time during the construction timeline (provided that contractor maintains only closure of ½ floor at a time, and complying with any temperature/moisture recommendations for the traffic coating).
19. Q: Given the anticipated winter construction period, please clarify whether AHEC has any project-specific requirements for temporary enclosures, heating, minimum ambient/substrate temperatures, or cold-weather protection beyond the applicable manufacturer requirements and Contract Documents. Should bidders assume all temporary heating, enclosure, and weather protection necessary to maintain required curing and application temperatures is Contractor-provided?
A: Temporary heating, enclosures, cold-weather protection are not defined in this contract. Contractor is responsible for meeting the required curing and applications temperatures recommended by the manufacturers.
20. Q: Please confirm that the Contractor is responsible for retaining and paying the Colorado-licensed specialty engineer required to design the temporary shoring/bracing systems, including sealed calculations, shop drawings, required inspections, and certification of the installed shoring.
A: Contractor is responsible for retaining and paying the Colorado-licensed specialty engineer required to design the temporary shoring/bracing systems, including sealed calculations, shop drawings, required inspections, and certification of the installed shoring.
21. Q: The drawings indicate that electrical conduit and other utilities may conflict with structural repairs and require temporary or permanent relocation. Are bidders expected to include the cost of anticipated relocations in the Base Bid?
Additionally, how should unforeseen utility relocations resulting from concealed conditions, including utilities encountered within concrete scheduled for removal, be addressed after award?
A: AHEC does not expect that the project will require utilities to be rerouted.
If utilities are in the way of construction, contractor shall notify the AHEC PM immediately.
22. Q: Please confirm that the work-item quantities identified on Sheet S0.4 are the quantities bidders are to use as the basis of bid and clarify how differences between those quantities and actual field-verified quantities will be addressed after award.
A: Differences between bid quantities and field verified quantities will be reviewed in detail by the contractor and AHEC PM. Lower or higher quantities of field verified repairs will be handled as a change order. A Unit Pricing Form is being added to the IFB via this addendum. It is a separate attachment and must be submitted with the bid documents at bid closing. This form will be used to calculate any variance in quantities.
23. Q: Please identify which testing, special inspection, adhesion testing, concrete testing, welding inspection, and other QA/QC services are Owner-provided versus Contractor-provided, and identify any associated testing or inspection costs bidders are expected to include in the Base Bid.
A: Testing will be the responsibility of the contractor. Special inspections, adhesion testing, concrete testing, and welding inspections will be handled through a 3rd party inspection agency through a separate AHEC contract.
24. Q: Please confirm the staging area available to the Contractor and identify any parking, staging, access, or space-use fees that bidders should include in their bids.
A: Staging and access will be reviewed with AHEC PM at the pre-construction kick-off meeting. No fees will be associated with these items. Parking fees will be required (AHEC will work with parking team to provide parking passes for 2/3 vehicles associated with the project. Other vehicles parking on campus must pay the daily rate (as of 9/25/26 rates are as follows: Bronze Lots - $5.50, Silver Lots - $7.00, Gold Lots - $8.50). Additional information is available at the Parking and Transportation - Auraria Campus website:
aurariacampus.edu/services-departments/parking/ or by phone at 303-556- 2003. Bidders may find parking passes to be more cost effective.
25. Q: Does AHEC have an anticipated Notice to Proceed date or required overall completion date that bidders should use in establishing the Time of Completion durations?
A: Notice to Proceed is projected as November 2, 2026. Completion date is May 14, 2027.
26. Q: Please confirm that bidders are not required to submit a detailed construction schedule or phasing plan with the bid, and that the bid-stage schedule requirement is limited to the calendar-day durations requested on the Bid Form, with the detailed construction schedule and phasing plan to be provided by the successful Contractor after award.
A: Confirmed, bidders are not required to submit a construction schedule.
Within three (3) business days of Notice to Proceed, contractor shall provide detailed construction schedule and phasing plan for AHEC and Engineer review.
27. Q: Please confirm whether SBP-2.1 Apprenticeship Utilization Certification is required with the bid or after award, and whether trades listed on SBP-2.1 that are not included in the Contractor's scope may be identified as “N/A.”
A: Apprenticeship Utilization certificate is required after award. Trades not included in the contractor’s scope can be identified as N/A.
28. Q: For restriping areas receiving traffic coating (work item 28). Can you explain how the quantity of 150.900 square feet was calculated when the area identified to receive traffic coating is only 25,100 square feet?
http://www.aurariacampus.edu/services-departments/parking/
A: Re-stripe areas to receive traffic coating. The estimated area of traffic coating is estimated to be 25,100sf. Work Item 28 has been revised. Oil-based traffic paint is preferred; contractor shall confirm compatibility with the polyurethane traffic coating.
29. Work item 14: there is a discrepancy between the drawings and the work list.
The drawings indicate 18 joints, whereas the work list includes only 15 joints.
A: Work item 14 should be 18 joints. Sheet S0.4 has been updated and included in this Addendum.
30. Work item 15: Is there an estimated square footage for repair associated with detail 19/S3.1(2T flange)? This detail requires rebar dowels and screw anchors (including anodes at lev 1 RCP and lev 2 RCP), which di�er from the requirements for the other overhead repairs. If a quantity for 2T flange repair is not available, please advise whether a percentage of the 1,200 square feet in the work list may be used for estimating purposes.
A: Work Item 15 generally occurs at double-tees on the RCPs. Work Item 15 shown on plans occur at other concrete elements. For costs, assume 95% of the work occurs at double-tees.
31. Is a cementitious product acceptable for the crickets and joint shoulder shown in details 4, 5, and 12 on sheet S3.2 in lieu of epoxy?
A: Yes, in accordance with Work Item 17, minimum 1-1/2” thickness unless the manufacturer’s minimum thickness limitations are more stringent.
32. Is it acceptable to use an allowance for temporary electrical relocation?
A: AHEC does not expect that the project will require utilities to be rerouted.
If utilities are in the way of construction, contractor shall notify the AHEC PM immediately.
33. Could you please update the Phasing Notes on sheet S0.1 of the bid set drawings.
A: Phasing Notes on Sheet S0.1 have been updated and included in this Addendum.
© MARTIN/MARTIN 2026
M a rt in
/M ar ti n
, I n c . c o n s id e rs t h at d es ig n d a ta is o n ly i n i ts f in a l f o rm o n p lo tt e d d ra w in g s w it h o ri g in a l s ig n a tu re s a n d p ro fe s s io n a l c er ti fi ca ti o n b ei n g v is ib ly p re s en t o n t h e d ra w in g s . D a ta s u p p lie d v ia c o m p u te r g en e ra te d f o rm a t d o es n o t c o n ta in t h is a p p ro v al o r ce rt if ic a ti o n
T h e r ec ei v er o f el e ct ro n ic a ll y tr a n s m it te d d ra w in g s is r e s p o n s ib le f o r v er if yi n g t h e in fo rm a ti o n c o n ta in e d w it h in t h e e le c tr o n ic d a ta a g a in s t th e r ec o rd e d o r ap p ro v ed d o cu m en ts
T h e u se o f el e ct ro n ic a lly t ra ns m itt e d d ra w in g s is c on si d e re d to b e a t yo u r o w n r is k.
M a rt in
/M a rt in
In c.
a ss u m e s n o re sp on si b ili ty f o r a ny c la im s o r da m a ge s re su lti ng f ro m y o u r us e o f t h is in fo rm a tio n.
E le ct ro ni c in fo rm a tio n is p ro vi d ed fo r th e co nv en ie nc e o f th e r e ci p ie nt o nl y.
T h e r ec ip ie n t of t hi s fil e a gr ee s th a t th e in fo rm a tio n m ay n ot b e tr a ns fe rr ed t o a ny o th e r p ar ty
AERIAL PHOTO
VICINITY MAP
CONSULTANT
OWNER'S REPRESENTATIVE
DRAWING INDEX
HIGH PRIORITY STRUCTURAL REPAIRS AND WATERPROOFING
AURARIA CAMPUS
7th STREET PARKING GARAGE
799 LAWRENCE WAY
DENVER, COLORADO 80204
MARTIN/MARTIN PROJECT NO. 24.0355.S.03
ADDENDUM #1: 09/30/2026
CONTACT: ARTURO GARCIA, PE
AURARIA HIGHER EDUCATION CENTER
1156 7th STREET, SUITE 103
DENVER, COLORADO 80204
CONTACT: LEAH BYERS
303.556.8056
303.431.6100
STRUCTURAL SHEET LIST
SHEET
NUMBER SHEET NAME
S0.1 GENERAL NOTES
S0.2 GENERAL NOTES
S0.3 QUALITY ASSURANCE
S0.4 WORK LIST
S1.0 LEVEL 1 PLAN - NORTH
S1.1 LEVEL 1 PLAN - SOUTH
S1.2 LEVEL 2 PLAN - NORTH
S1.3 LEVEL 2 PLAN - SOUTH
S1.4 LEVEL 3 PLAN - NORTH
S1.5 LEVEL 3 PLAN - SOUTH
S1.6 LEVEL 4 PLAN - NORTH
S1.7 LEVEL 4 PLAN - SOUTH
S2.0 LEVEL 1 RCP - NORTH
S2.1 LEVEL 1 RCP - SOUTH
S2.2 LEVEL 2 RCP - NORTH
S2.3 LEVEL 2 RCP - SOUTH
S2.4 LEVEL 3 RCP - NORTH
S2.5 LEVEL 3 RCP - SOUTH
S3.0 DETAILS
S3.1 DETAILS
S3.2 DETAILS
SP0.1 JOINT SEALANT SPECIFICATION
SP0.2 SILANE SEALER SPECIFICATION
SP0.3 TRAFFIC COATING SPECIFICATION
SP0.4 EPOXY OVERLAY SPECIFICATION
NORTH
NORTH
799 LAWRENCE WAY
7th STREET PARKING GARAGE a rt in
/M ar ti n
, I n c . c o n s id e rs t h at d es ig n d a ta is o n ly i n i ts f in a l f o rm o n p lo tt e d d ra w in g s w it h o ri g in a l s ig n a tu re s a n d p ro fe s s io n a l c er ti fi ca ti o n b ei n g v is ib ly p re s en t o n t h e d ra w in g s . D a ta s u p p lie d v ia c o m p u te r g en e ra te d f o rm a t d o es n o t c o n ta in t h is a p p ro v al o r ce rt if ic a ti o n
T h e r ec ei v er o f el e ct ro n ic a ll y tr a n s m it te d d ra w in g s is r e s p o n s ib le f o r v er if yi n g t h e in fo rm a ti o n c o n ta in e d w it h in t h e e le c tr o n ic d a ta a g a in s t th e r ec o rd e d o r ap p ro v ed d o cu m en ts
T h e u se o f el e ct ro n ic a lly t ra ns m itt e d d ra w in g s is c on si d e re d to b e a t yo u r o w n r is k.
M a rt in
/M a rt in
In c.
a ss u m e s n o re sp on si b ili ty f o r a ny c la im s o r da m a ge s re su lti ng f ro m y o u r us e o f t h is in fo rm a tio n.
E le ct ro ni c in fo rm a tio n is p ro vi d ed fo r th e co nv en ie nc e o f th e r e ci p ie nt o nl y.
T h e r ec ip ie n t of t hi s fil e a gr ee s th a t th e in fo rm a tio n m ay n ot b e tr a ns fe rr ed t o a ny o th e r p ar ty
PROJECT NO:
DATE:
REVISIONS
SHEET TITLE:
SHEET NUMBER:
M M
J O
B
P
R
IN
C
IP
A L:
E O
R
P R
O
JE
C T
M A
N A
G E
R
D E
S
IG
N E
R S
LE
A D
R E
V
IT
T E
C H
D
A T
E P
R
IN
T E
D
F
IL
E P
A T
H
9/
/2
7:
:0
A
M A ut od es k
D oc s:
//A
C C
-M M
S
/2 4.
.S .0
3-
La w re nc e
W ay
H ig h P rio rit y- S
.rv t
H
IG
H P
R
IO
R
IT
Y S
T R
U C
T U
R A
L R
E P
A
IR
S A
N D
W A
T E
R P
R O
O F
IN
G
A U
R A
R
IA
C A
M P
U S
7t h
S T
R E
E T
P A
R K
IN
G
G A
R A
G E
LA
W
R E
N C
E W
A Y
D E
N V
E R
, C O
LO
R
A D
O
04/21/2026
S0.1
GENERAL NOTES
© MARTIN/MARTIN 2026
A R
T G
A R
C
IA
B E
N E
S T
R
IC
H
T A
M I
W O
R K
E R
.0
5.
S .0
T A
M I
W O
R K
E R
J.
W
IL
LI
A M
S
24.0355.S.03
1) CONNECTIONS AND ASSEMBLIES:
1A) PROVIDE CONNECTIONS AND ASSEMBLIES AS SHOWN IN THE DETAILS HEREIN.
1B) FABRICATE AND ASSEMBLE IN SHOP TO GREATEST EXTENT POSSIBLE. FABRICATE ACCORDING TO AISC’S “CODE OF
STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES” AND AISC 360.
2) BOLTING REQUIREMENTS:
2A) BOLT HOLES: CUT, DRILL, MECHANICALLY THERMAL CUT, OR PUNCH STANDARD BOLT HOLES PERPENDICULAR TO METAL
SURFACES. DO NOT ENLARGE BOLTS BY BURNING.
- BOLT HOLE SIZES SHALL BE INSTALLED AS REQUIRED BY ANSI/AISC 360-16 TABLE J3.3 INCLUDING STANDARD, OVERSIZE, SHORT-SLOT, OR LONG-SLOT. HOLES ARE STANDARD SIZE UNLESS NOTED OTHERWISE.
2B) UNLESS INDICATED OTHERWISE, SNUG TIGHTEN ALL JOINTS AS DEFINED BY AISC.
3) WELDING REQUIREMENTS:
3A) HAVE IN POSSESSION CURRENT EVIDENCE OF PASSING THE APPROPRIATE AWS QUALIFICATION TESTS.
3B) MINIMUM WELDS: AISC SPECIFICATION, NOT LESS THAN 3/16” FILLET, CONTINUOUS UNLESS OTHERWISE NOTED.
3C)WELD SIZES AND LENGTHS CALLED FOR ON THE DRAWINGS ARE THE NET EFFECTIVE REQUIRED. INCREASE WELD SIZE IF
GAPS EXIST AT THE FAYING SURFACE.
3D)WELD SIZES SHALL BE AS SHOWN UNLESS A GREATER SIZE IS REQUIRED BY ANSI/AISC 360-16 TABLES J2.3 AND J2.4.
3E) ALL GROOVE WELDS SHALL BE COMPLETE PENETRATION UNLESS NOTED.
3F) FIELD WELDING SYMBOLS INDICATE SEQUENCE CONSIDERED DURING DESIGN.
4) STEEL FINISHES:
4A) UNLESS OTHERWISE NOTED, PRIME STEEL ASSEMBLIES WITH RUST-INHIBITING SHOP PRIMER, TOUCH UP PRIMER
DAMAGED DURING FIELD WELDING OPERATIONS.
STEEL NOTES
METAL DECKING A1008/A653 50 - -
WELDING ELECTRODES E70 - - PER AWS
RECT HSS A500 GR C 50 62 -
PLATES A36 36 58 -
OTHER SHAPES
A36 36 58 A572 WITH Fy=50 KSI AND Fu=65 KSI
ACCEPTABLE AT CONTRACTOR'S
OPTION
BOLTS F3125 - GRADE
A325
- 120 BOLTS ARE 3/4"Ø UNO
ANCHOR RODS
- - - SEE "POST-INSTALLED ANCHOR NOTES"
STEEL ELEMENT ASTM/TYPE Fy (KSI) Fu
(KSI)
COMMENTS
STEEL MATERIAL TABLE
1) GENERAL:
1A) ENGINEER: REFERENCES ON THE STRUCTURAL DRAWINGS TO ‘ENGINEER’ MEAN THE STRUCTURAL ENGINEER OF RECORD. OTHER ENTITIES ARE SPECIFICALLY NOTED AS “CONTRACTOR’S ENGINEER”, “MECHANICAL ENGINEER”, ETC.
1B) THESE NOTES SUPPLEMENT THE SPECIFICATIONS, WHICH SHALL BE REFERENCED FOR ADDITIONAL REQUIREMENTS.
1C)STRUCTURAL ELEMENTS ARE CENTERED ON GRID LINES AND GRID LINE INTERSECTIONS UNLESS DIMENSIONED
OTHERWISE.
2) USE OF DRAWINGS:
2A) DO NOT SCALE DRAWINGS.
2B) DETAILS ON DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.
2C)DETAILS NOTED TYPICAL APPLY TO ALL SIMILAR CONDITIONS. WHERE NO SPECIFIC DETAILS ARE SHOWN, CONSTRUCTION
SHALL CONFORM TO SIMILAR WORK ELSEWHERE ON THE PROJECT.
2D)WHERE DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, GENERAL NOTES AND SPECIFICATIONS:
- CONTACT THE ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION
- THE MORE STRINGENT REQUIREMENTS SHALL GOVERN FOR PRICING
3) EXISTING STRUCTURES:
3A) CONTRACT DOCUMENTS HAVE BEEN PREPARED USING AVAILABLE DRAWINGS AND SITE OBSERVATION AS PERMITTED BY
ACCESS RESTRICTIONS DURING DESIGN.
3B) DURING CONSTRUCTION, THE CONTRACTOR MAY ENCOUNTER EXISTING CONDITIONS WHICH ARE NOT KNOWN OR ARE AT VARIANCE WITH PROJECT DOCUMENTATION. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ALL CONDITIONS NOT PER THE
CONTRACT DOCUMENTS. EXAMPLES INCLUDE:
- SIZES OR DIMENSIONS OTHER THAN THOSE SHOWN
- DAMAGE OR DETERIORATION TO MATERIALS AND COMPONENTS
- CONDITIONS OF INSTABILITY OR LACK OF SUPPORT
- ITEMS NOTED AS EXISTING ON THE DRAWINGS BUT NOT FOUND IN THE FIELD
3C)CONTRACTOR SHALL FIELD VERIFY ALL EXISTING STRUCTURAL CONDITIONS PRIOR TO SUBMITTING SHOP DRAWINGS.
4) SUBMITTALS, SUBSTITUTIONS AND SITE VISITS:
4A) SUBMITTALS:
- REFER TO SPECIFICATIONS FOR DETAILED REQUIREMENTS. PROVIDE THE FOLLOWING SUBMITTALS:
---- ALL PRODUCT DATA AND MATERIALS INCLUDING BUT NOT LIMITED TO: CONCRETE REPAIR PRODUCTS, SLIDE BEARING
PRODUCTS, GALVANIC ANODE PRODUCTS, SEALANTS, TRAFFIC COATING, ETC.
-----PHASING PLAN
---- DEFERRED SHORING DESIGN SUBMITTAL
---- WELDER AWS CERTIFICATIONS
---- JOINT SEALANT ADHESION TEST RESULTS
---- TRAFFIC COATING MOCK-UP PLAN WITH ADHESION TESTING
---- MOCKUP FOR RAMP TRACTION FINISH TO MATCH ORIGINAL TEXTURED FINISH
---- CONVENTIONAL CONCRETE MIX DESIGN
---- STEEL MATERIAL MILL CERTIFICATIONS
---- PENETRATING SEALER MOCKUP TO DETERMINE APPLICATION RATE AND NUMBER OF COATS
---- STEEL SHOP DRAWINGS COORDINATED WITH EXISTING CONDITIONS
- IF THE CONTRACTOR REQUESTS A CHANGE FROM THE STRUCTURAL DRAWINGS, IT SHALL BE APPROVED BY THE ENGINEER AND DESIGNED BY MARTIN/MARTIN, INC. PRIOR TO SUBMITTING SHOP DRAWINGS. VARIATION SHALL BE INDICATED ON THE SHOP DRAWINGS. CONTRACTOR SHALL COMPENSATE MARTIN/MARTIN, INC. FOR MAKING THE CHANGE.
- CONSTRUCTION DOCUMENTS SHALL NOT BE REPRODUCED FOR USE IN SUBMITTALS
- ALL SHOP DRAWINGS SHALL REFERENCE THE STRUCTURAL DRAWING NUMBER AND DETAIL USED TO PREPARE THE
SUBMITTAL
4B) SUBSTITUTIONS: ENGINEER’S APPROVAL SHALL BE SECURED FOR ALL SUBSTITUTIONS
4C)NONCONFORMANCE: NOTIFY ENGINEER OF CONDITIONS NOT CONSTRUCTED PER THE CONTRACT DOCUMENTS PRIOR TO PROCEEDING WITH CORRECTIVE WORK. SUBMIT PROPOSED REPAIR TO THE ENGINEER FOR ACCEPTANCE. CONTRACTOR
SHALL COMPENSATE MARTIN/MARTIN, INC. FOR DESIGNING THE REPAIR.
4D)ALL SHOP DRAWINGS SHALL BE SUBMITTED IN ELECTRONIC FORMAT ONLY.
4E) SITE VISITS: PROVIDE THE ENGINEER WITH ADEQUATE NOTICE FOR SITE OBSERVATIONS.
5) TEMPORARY CONDITIONS AND CONSTRUCTION ENGINEERING
5A) THE STRUCTURE IS DESIGNED TO FUNCTION AS A UNIT UPON COMPLETION AND ONLY FOR LOADS ANTICIPATED DURING
THE STRUCTURE’S SERVICE LIFE.
5B) THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL TEMPORARY BRACING AND/OR SUPPORT THAT MAY BE REQUIRED AS THE RESULT OF THE CONTRACTOR’S CONSTRUCTION METHODS AND/OR SEQUENCES. CONTRACTOR SHALL PROVIDE ALL REQUIRED ENGINEERING AND OTHER MEASURES TO ACHIEVE THE MEANS, METHODS, AND SEQUENCES OF
WORK WHICH MAY INCLUDE, BUT IS NOT LIMITED TO:
- LAYOUT
- DESIGN FOR FORM WORK, SHORING, AND RESHORING
- WELD PROCEDURES
- SURVEYING TO VERIFY CONSTRUCTION TOLERANCES
- EVALUATION OF TEMPORARY CONSTRUCTION LOADS ON STRUCTURE DUE TO EQUIPMENT AND MATERIALS
- STRUCTURAL ENGINEERING TO RESIST ANY OTHER LOADS NOT IDENTIFIED ON DESIGN DRAWINGS
5C)CONTRACTOR’S CONSTRUCTION AND/OR ERECTION SEQUENCES SHALL RECOGNIZE AND CONSIDER THE EFFECTS OF
THERMAL MOVEMENTS OF STRUCTURAL ELEMENTS DURING THE CONSTRUCTION PERIOD.
6) OSHA STANDARDS:
6A) NOTHING SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE CONSTRUED AS ELIMINATING THE NEED FOR THE CONTRACTOR TO COMPLY WITH ALL OSHA REQUIREMENTS. WHERE THE STRUCTURAL DRAWINGS APPEAR TO CONFLICT WITH
OSHA REQUIREMENTS, THE STRUCTURAL DRAWINGS REPRESENT FINAL CONDITIONS ONLY.
GENERAL NOTES
1) CODES AND STANDARDS:
1A) GENERAL DESIGN
- INTERNATIONAL EXISTING BUILDING CODE 2024 WITH CITY AND COUNTY OF DENVER 2025 AMENDMENTS.
2) LATERAL LOAD RESISTING SYSTEM DESCRIPTION:
- THE WORK SHOWN ON THESE DRAWINGS DOES NOT INCREASE THE EXISTING LATERAL LOADS ACTING ON THE STRUCTURE
OR ALTER THE EXISTING LATERAL SYSTEM.
3) GRAVITY LOADS
- DEAD LOADS = CONCRETE SELF-WEIGHT
- GARAGE LIVE LOAD = 40 PSF
- GARAGE COMBINED ROOF SNOW AND LIVE LOAD = 90 PSF
DESIGN CRITERIA
1) GENERAL:
1A) EMPLOY A SPECIALTY ENGINEER TO DESIGN ALL SHORING AND BRACING NECESSARY TO COMPLETE THE REPAIR WORK.
DESIGN LOADS SHALL BE IN ACCORDANCE WITH THE DESIGN-BASIS CODE REQUIREMENTS, OR IF THE AREA IS BLOCKED
FROM PUBLIC ACCESS IT IS ACCEPTABLE TO USE ASCE 37-14 LOADS.
1B) PROVIDE BASE BEAMS, WOOD CRIBBING, OR BOTH AT LOWEST LEVEL AS NECESSARY TO LIMIT SERVICE LEVEL REACTION
TO 1500 PSF.
1C)LOCATE ALL EXISTING BURIED UTILITIES/DRAIN PIPING AND NOTIFY SPECIALTY ENGINEER IF LOCATIONS CONFLICT WITH
PROPOSED SHORING.
2) PRODUCTS:
2A) USE COMMERCIALLY MANUFACTURED AND PRE-ENGINEERED SHORING AND BRACING SYSTEMS AND COMPONENTS
WHENEVER POSSIBLE.
- COMMERCIALLY AVAILABLE REUSABLE SHORING EQUIPMENT SHALL INCLUDE A MINIMUM SAFETY FACTOR OF 2.5:1.
- DO NOT INSTALL STEEL SHORING PRODUCTS WITH EXCESSIVE CORROSION, BENT OR BROKEN FLANGES OR WEBS, DENTED TUBE WALLS, OR OTHER DETERIORATION WHICH MAY AFFECT MEMBER CAPACITY.
2B) DESIGN MEMBERS OF SHORING SYSTEMS THAT ARE NOT PRE-ENGINEERED IN ACCORDANCE WITH THE DESIGN-BASIS
CODE.
3) SUBMITTALS:
3A) SUBMIT SHORING LAYOUT SHOP DRAWINGS DEPICTING THE ARRANGEMENT OF EQUIPMENT FOR SHORING, INCLUSIVE OF INSTALLATION DETAILS, TIGHTENING PROCEDURE, AND MAINTENANCE REQUIREMENTS SEALED BY THE SPECIALTY
DESIGNER.
3B) SUBMIT DEFERRED SUBMITTAL STRUCTURAL CALCULATIONS SEALED BY THE SPECIALTY DESIGNER.
4) INSTALLATION REQUIREMENTS:
4A) THE TRIBUTARY AREA OF EACH SHORED STRUCTURAL MEMBER SHALL BE BLOCKED OFF AND CLEAR OF ALL VEHICLES
AND PUBLIC OR EMPLOYEE ACCESS.
4B) INSTALL SHORING AND BRACING IN ACCORDANCE WITH SEQUENCING DOCUMENTATION.
4C)SHORING SHALL EXTEND DOWN ALL LEVELS TO GRADE AT THE LOWEST LEVEL AND BE ALIGNED VERTICALLY BETWEEN
LEVELS.
4D)THE SPECIALTY ENGINEER WHO DESIGNED THE SHORING SHALL INSPECT THE INSTALLATION AND CERTIFY THAT THE
SHORING AND BRACING, AS INSTALLED, MEETS THE INTENT OF THEIR DESIGN.
5) SHORING REMOVAL:
5A) UNLESS OTHERWISE SPECIFIED, REMOVE SHORING AND BRACING ONLY AFTER ALL CONCRETE REPAIRS ACHIEVE SPECIFIED STRENGTH (5,000PSI MINIMUM), ENGINEER REVIEWS AND ACCEPTS TEST RESULTS.
SHORING NOTES
1) GENERAL:
1A) THE FOLLOWING PORTIONS OF THE STRUCTURAL DESIGN WILL NOT BE SUBMITTED AT THE TIME OF PERMIT APPLICATION.
WHEN RECEIVED AND REVIEWED, THESE DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE BUILDING OFFICIAL BY
THE CONTRACTOR:
- SHORING DESIGN AND DETAILS FOR DOUBLE-TEES, BEAMS, SPANDREL, AND RAIL SUPPORT POSTS
1B) SUBMIT STAMPED STRUCTURAL CALCULATIONS BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO FOR ALL DEFERRED SUBMITTAL ITEMS PRIOR TO OR CONCURRENTLY WITH DRAWINGS OR PRODUCT DATA. INCLUDE ANALYSIS OF ATTACHMENT TO PRIMARY STRUCTURE. INCLUDE CURRENT ICC REPORT WITH ALL PROPRIETARY STRUCTURAL
ELEMENTS AND ANCHORS/FASTENERS.
DEFERRED SUBMITTALS
1) PERSONNEL REQUIREMENTS:
1A) THE CONTRACTOR SHALL ARRANGE AN ANCHOR MANUFACTURER’S REPRESENTATIVE TO PROVIDE ONSITE INSTALLATION TRAINING FOR ALL OF THEIR ANCHORING PRODUCTS SPECIFIED. SUBMIT DOCUMENTED CONFIRMATION THAT ALL OF THE CONTRACTOR’S PERSONNEL WHO INSTALL ANCHORS HAVE PASSED THE TRAINING COURSE PRIOR TO THE COMMENCEMENT
OF INSTALLING ANCHORS.
2) INSTALLATION REQUIREMENTS:
2A) ALL POST-INSTALLED ANCHORS SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S PRINTED INSTALLATION
INSTRUCTIONS AND PER MANUFACTURER'S ON-SITE TRAINING.
2B) ALL ADHESIVE ANCHORS AND ADHESIVE ANCHORED REINFORCEMENT DESIGNS ARE FOR INSTALLATION IN THE FOLLOWING CONDITIONS, UNLESS NOTED OTHERWISE. WRITTEN APPROVAL MUST BE RECEIVED FROM ENGINEER PRIOR TO
INSTALLATION IN ALTERNATE CONDITIONS.
- DRY CONCRETE, UNLESS NOTED OTHERWISE.
- CONCRETE TEMPERATURE AT TIME OF INSTALLATION THROUGH CURE TIME MUST BE WITHIN THE TEMPERATURE RANGE SPECIFIED IN MANUFACTURER'S PRINTED INSTALLATION INSTRUCTION FOR ADHESIVE GEL AND CURE TIMES.
- ANCHOR HOLES TO BE HAMMER DRILLED AND CLEANED.
- CONCRETE MUST BE AT LEAST 21 DAYS OLD BEFORE INSTALLATION OF ANCHORS.
- HOLES TO BE CLEANED AND PREPARED IN STRICT ACCORDANCE WITH MANUFACTURER'S PRINTED INSTALLATION
INSTRUCTIONS AND EVALUATION REPORT PRIOR TO ADHESIVE INJECTION.
2C)THE POSITION OF EXISTING REINFORCING BARS IN THE CONCRETE STRUCTURE SHALL BE LOCATED PRIOR TO INSTALLING POST INSTALLED ANCHORS OR REINFORCEMENT. EXISTING REINFORCEMENT SHALL BE LOCATED USING A SCANNER, GPR, X-
RAY, CHIPPING OR OTHER MEANS.
3) ADHESIVE ANCHORS:
3A) ADHESIVE
- ADHESIVE (IN CONCRETE) #5 OR SMALLER: HILTI HIT-HY 200A (THREADED ROD) 200R V3 (REBAR)
- ADHESIVE (IN CONCRETE) #6 OR LARGER: HILTI HIT-RE 500 V3
3B) ANCHORS
- THREADED RODS: ASTM F1554 GR. 55 KSI
-----TIGHTEN NUT TO TORQUE SPECIFIED BY ADHESIVE MANUFACTURER
-----DAMAGE ANCHOR THREADS OR TACK WELD NUT TO ROD FOLLOWING NUT INSTALLATION
-----CUT ROD EXTENSION 1/2" FROM BOLT FACE FOR FINAL CONDITION, UNLESS NOTED OTHERWISE
- REBAR: ASTM A615, ASTM A706 (FIELD WELDED)
4) MECHANICAL ANCHORS:
4A) SCREW ANCHORS (IN CONCRETE)
- HILTI KWIK HUS-EZ
4B) GALVANIZED SCREW ANCHORS
- SIMPSON TITEN HD
- HILTI KH-EZ CRC
4C)EXPANSION ANCHORS (IN CONCRETE)
- HILTI KWIK BOLT TZ2
- SIMPSON STRONG BOLT
POST-INSTALLED ANCHOR NOTES
1) GENERAL:
1A) THE FOLLOWING PHASING NOTES ARE FOR PRICING AND A RESULT OF A VIRTUAL MEETING WITH AHEC ON JANUARY 22, 2026. ADDITIONAL COORDINATION WITH AHEC AND PARKING SERVICES WILL BE REQUIRED DURING CONSTRUCTION.
1B) THE UPPER LEVEL (LEVEL 4 AND RAMP FROM LEVEL 3 TO 4) CAN BE CLOSED ENTIRELY DURING CAMPUS BREAKS.
THANKSGIVING WEEK (NOVEMBER 20 TO 29), WINTER BREAK (DECEMBER 11, 2026 TO JANUARY 17, 2027, SPRING BREAK MARCH
19-MARCH 28, 2027).
1C) LEVELS 1 TO 3 CAN BE CLOSED 50% AT A TIME. NO MORE THAN TWO LEVELS CAN BE WORKED ON AT A TIME, WITH EXCEPTION OF RESHORING. CONTRACTOR TO PROVIDE SIGNAGE AND BARRIERS TO DIRECT TRAFFIC RE-ROUTES AND
TEMPORARY PARKING SPACE CLOSURES.
1D) WITHIN 3 BUSINESS DAYS OF NOTICE TO PROCEED, CONTRACTOR SHALL PROVIDE DETAILED CONSTRUCTION SCHEDULE
AND PHASING PLAN FOR AHEC AND ENGINEER REVIEW.
1E) CONSTRUCTION CANNOT EXTEND PAST MAY 14, 2027.
PHASING NOTES
NO. ISSUE DATE
1 ADDENDUM 1 09/30/2026
CONCRETE MIX TABLE ABBREVIATIONS:
- NWC = NORMAL WEIGHT CONCRETE
- SCM = SUPPLEMENTARY CEMENTITIOUS MATERIAL
- THK = 2 1/4" MINIMUM THICK PLACEMENT
CONCRETE MIX TABLE NOTES:
1) CONCRETE MIX DESIGNS ARE A PERFORMANCE SPECIFIED ITEM DESIGNED BY THE CONTRACTOR. THE CONTRACTOR SHALL PROVIDE A CONCRETE MIX MEETING THE PERFORMANCE REQUIREMENTS SPECIFIED IN THE "CONCRETE MIX TABLE" IN
ADDITION TO THE REQUIREMENTS BELOW
2) PROPORTIONS OF MATERIALS IN CONCRETE MIXES SHALL BE ESTABLISHED TO:
2A) PROVIDE THE MINIMUM COMPRESSIVE STRENGTH AS INDICATED IN THE MIX TABLE. DO NOT EXCEED THE MAXIMUM
WATER-CEMENT RATIO
2B) PROVIDE WORKABILITY AND CONSISTENCY FOR SLAB FINISHING AND TO PERMIT CONCRETE TO BE WORKED READILY INTO FORMS AND AROUND REINFORCEMENT UNDER CONDITIONS OF PLACEMENT TO BE EMPLOYED WITHOUT SEGREGATION OR EXCESSIVE BLEEDING. CONTRACTOR SHALL SELECT APPROPRIATE SLUMP. USE ADMIXTURES AS REQUIRED TO OBTAIN
DESIRED RESULTS
2C) FOR CONCRETE PLACED BY PUMPING, PROVIDE CONCRETE MIX FLOWABILITY TO FACILITATE PUMPING. ENTRAINED AIR
MAY BE USED TO FACILITATE PUMPING SUBJECT TO THE PROVISIONS OF NOTE 4 BELOW
3) FOR THE MAXIMUM COARSE AGGREGATE SIZE INDICATED, USE THE FOLLOWING AGGREGATE SIZE NUMBERS PER ASTM C33:
- 3/4": #67 AGGREGATE
4) WHERE AIR CONTENT IS INDICATED IN THE MIX TABLE, PROVIDE AIR ENTRAINING ADMIXTURE TO MEET THE SPECIFIED AIR PERCENTAGE. TOTAL AIR CONTENT LIMITS INCLUDE BOTH ENTRAINED AND ENTRAPPED AIR ±1 1/2%. AIR CONTENT NOTED IS
BASED ON 3/4" AGGREGATE.
5) THE MAXIMUM PERCENTAGE OF CEMENTITIOUS MATERIAL WHICH IS CLASSIFIED AS SCM (INCLUDING FLY ASH, NATURAL POZZOLANS, SILICA FUME, AND SLAG CEMENT) SHALL BE AS FOLLOWS. THE INDIVIDUAL LIMITS SHOWN BELOW SHALL APPLY
REGARDLESS OF THE NUMBER OF CEMENTITIOUS MATERIALS IN THE CONCRETE MIXTURE.
- FLY ASH OR NATURAL POZZOLANS CONFORMING TO ASTM C618 = 25%
- SLAG CEMENT CONFORMING TO ASTM C989 = 50%
- SILICA FUME CONFORMING TO ASTM C1240 = 10%
- TOTAL OF FLY ASH OR OTHER POZZOLANS AND SILICA FUME = 35%
- TOTAL OF FLY ASH OR OTHER POZZOLANS, SLAG CEMENT, AND SILICA FUME = 50%
6) EVIDENCE SHALL BE SUBMITTED THAT THE CONCRETE MIXTURE COMPLIES WITH THE FOLLOWING:
6A) AGGREGATES ARE NOT ALKALI-SILICA REACTIVE OR MEASURES TO MITIGATE ALKALI-SILICA REACTIVITY HAVE BEEN
ESTABLISHED
6B) AGGREGATES ARE NOT ALKALI-CARBONATE REACTIVE
7) MAXIMUM CHLORIDE ION LIMITS (PERCENTAGE BY MASS OF CEMENTITIOUS MATERIALS INCLUDING SCM) = 0.15
M a rt in
/M ar ti n
, I n c . c o n s id e rs t h at d es ig n d a ta is o n ly i n i ts f in a l f o rm o n p lo tt e d d ra w in g s w it h o ri g in a l s ig n a tu re s a n d p ro fe s s io n a l c er ti fi ca ti o n b ei n g v is ib ly p re s en t o n t h e d ra w in g s . D a ta s u p p lie d v ia c o m p u te r g en e ra te d f o rm a t d o es n o t c o n ta in t h is a p p ro v al o r ce rt if ic a ti o n
T h e r ec ei v er o f el e ct ro n ic a ll y tr a n s m it te d d ra w in g s is r e s p o n s ib le f o r v er if yi n g t h e in fo rm a ti o n c o n ta in e d w it h in t h e e le c tr o n ic d a ta a g a in s t th e r ec o rd e d o r ap p ro v ed d o cu m en ts
T h e u se o f el e ct ro n ic a lly t ra ns m itt e d d ra w in g s is c on si d e re d to b e a t yo u r o w n r is k.
M a rt in
/M a rt in
In c.
a ss u m e s n o re sp on si b ili ty f o r a ny c la im s o r da m a ge s re su lti ng f ro m y o u r us e o f t h is in fo rm a tio n.
E le ct ro ni c in fo rm a tio n is p ro vi d ed fo r th e co nv en ie nc e o f th e r e ci p ie nt o nl y.
T h e r ec ip ie n t of t hi s fil e a gr ee s th a t th e in fo rm a tio n m ay n ot b e tr a ns fe rr ed t o a ny o th e r p ar ty
PROJECT NO:
DATE:
REVISIONS
SHEET TITLE:
SHEET NUMBER:
M M
J O
B
P
R
IN
C
IP
A L:
E O
R
P R
O
JE
C T
M A
N A
G E
R
D E
S
IG
N E
R S
LE
A D
R E
V
IT
T E
C H
D
A T
E P
R
IN
T E
D
F
IL
E P
A T
H
9/
/2
7:
:0
A
M A ut od es k
D oc s:
//A
C C
-M M
S
/2 4.
.S .0
3-
La w re nc e
W ay
H ig h P rio rit y- S
.rv t
H
IG
H P
R
IO
R
IT
Y S
T R
U C
T U
R A
L R
E P
A
IR
S A
N D
W A
T E
R P
R O
O F
IN
G
A U
R A
R
IA
C A
M P
U S
7t h
S T
R E
E T
P A
R K
IN
G
G A
R A
G E
LA
W
R E
N C
E W
A Y
D E
N V
E R
, C O
LO
R
A D
O
04/21/2026
S0.2
GENERAL NOTES
© MARTIN/MARTIN 2026
A R
T G
A R
C
IA
B E
N E
S T
R
IC
H
T A
M I
W O
R K
E R
.0
5.
S .0
T A
M I
W O
R K
E R
J.
W
IL
LI
A M
S
24.0355.S.03
CONCRETE REPAIR NOTES
BAR LOCK COUPLER
TYPE 2/CLASS L
PER ACI 318
WELDED A706 60 80 1030 -
TYP REINFORCING A615 60 90 1030 -
REINF ELEMENT ASTM Fy (KSI) Fu (KSI) GWP LIMITS (kg CO2e / METRIC
TON) - NOTE 1
COMMENTS
REINFORCING MATERIAL TABLE
#11 25 39 26 43 75 58 47 97 75 61 126 97 80
#10 21 33 23 39 63 49 39 82 63 51 107 82 66
#9 18 28 21 34 52 40 32 68 52 42 88 67 54
#8 15 24 18 30 43 32 26 56 42 34 72 54 44
#7 12 19 16 27 34 26 23 45 33 29 58 43 38
#6 10 15 14 23 21 16 28 20 36 26
#5 8 12 12 19 16 13 20 17 26 22
#4 6 9 9 15 12 14 18
#3 6 6 8 12 12 12 13
BAR SIZE LDH
SPACING
s≥ 6db s< 6db LCE LCS LTE
LTE TOP
& LTS
LTS TOP
CLEAR COVER 1" 1.5" 2"+ 1" 1.5" 2"+ 1" 1.5" 2"+
LAP SPLICE & DEVELOPMENT LENGTHS (INCHES)
F'c=5,000 PSI, Fy=60,000 PSI
1) GENERAL:
1A) ALL WORK SHALL CONFORM WITH ACI 563-18 (SPECIFICATION FOR REPAIR OF CONCRETE IN BUILDINGS) REFERENCE THE
SPECIFICATION FOR DETAILED REQUIREMENTS.
1B) CONSTRUCTION TOLERANCES FOR REPAIR WORK SHALL CONFORM TO ACI 117.
1C)HOT AND COLD WEATHER CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF ACI 305R AND ACI 306R, RESPECTIVELY.
1D)PROTECT THE STRUCTURE AND ADJACENT CONSTRUCTION FROM RISKS ASSOCIATED WITH WORK, INCLUDING IMPACT, MARRING OF SURFACES, STAINING, AND OTHER TYPES OF DAMAGE.
1E) DURING CURING PERIOD, PROTECT REPAIR MATERIALS FROM DAMAGE BY MECHANICAL DISTURBANCES, INCLUDING LOAD- INDUCED STRESSES, SHOCK, VIBRATION, AND FROM TEMPERATURE, HUMIDITY, SUNLIGHT, WIND, PRECIPITATION, WATER, AND DELETERIOUS MATERIALS.
1F) PROVIDE TEMPORARY COVER OVER OPENINGS WHEN NOT IN USE.
2) SPALLED/DELAMINATED CONCRETE REMOVAL:
2A) WITHIN THE WORK AREA, PERFORM VISUAL INSPECTION AND HAMMER SOUNDING, CHAIN DRAG SOUNDING, OR OTHER METHODS ACCEPTABLE TO THE ENGINEER TO IDENTIFY CRACKED, DELAMINATED, SPALLED, DISINTEGRATED, AND
OTHERWISE UNSOUND CONCRETE FOR REMOVAL.
- CONFIGURE GEOMETRY OF REMOVAL AREA TO MAXIMIZE THE USE OF RIGHT-ANGLE GEOMETRY, AVOIDING REENTRANT
CORNERS, AND TO OBTAIN UNIFORMITY OF DEPTH.
- REMOVAL OF SOME SOUND CONCRETE MAY BE NECESSARY TO ACHIEVE THE REQUIRED REPAIR AREA GEOMETRY.
2B) LOCATE AND VERIFY DEPTH OF ALL EXISTING REINFORCING BARS, PRE-STRESSING TENDONS, CONDUIT, ETC. PRIOR TO CONCRETE REMOVAL IN AREA TO BE REPAIRED USING GROUND PENETRATING RADAR SCANNING, PACHOMETER, OR OTHER
NON-DESTRUCTIVE MEANS ACCEPTABLE TO ENGINEER.
2C)PERFORM CONCRETE REMOVAL WITH SMALL CONCRETE CHIPPING HAMMERS TO MINIMIZE DAMAGE TO CONCRETE SUBSTRATE, ADJOINING CONSTRUCTION, AND TO PREVENT BRUISING OF OTHERWISE SOUND CONCRETE SURFACES.
- CONCRETE CHIPPING HAMMERS SHALL BE LIMITED TO 15 POUND ELECTRIC STYLE HANDHELD HAMMERS. PROVIDE SHARP
TIPS ON EQUIPMENT TO MINIMIZE BRUISED SURFACES IN PARTIAL DEPTH REMOVAL.
- AVOID DIRECTLY STRIKING REINFORCEMENT AND OTHER EMBEDDED ITEMS WITH IMPACT TOOLS USED FOR CONCRETE
REMOVAL, CAREFULLY HAND CHIP AROUND SUCH ITEMS.
- DO NOT CUT OR DAMAGE EXISTING EMBEDDED REINFORCEMENT OR OTHER EMBEDDED ITEMS.
2D)EXTEND CONCRETE REMOVAL ALONG THE REINFORCEMENT TO WHERE THERE IS NO FURTHER CONCRETE DELAMINATION, CONCRETE CRACKING, OR BOND INHIBITING REINFORCEMENT CORROSION, AND WHERE THE
REINFORCEMENT IS BONDED TO THE SURROUNDING CONCRETE.
3) EXISTING CONCRETE SUBSTRATE PREPARATION:
3A) ALL REINFORCING BARS WHICH HAVE MORE THAN 1/2 OF THEIR DIAMETER EXPOSED OR WHICH ARE CORRODED SHALL BE
UNDERCUT BY 3/4 INCH MINIMUM.
- UNLESS NOTED OTHERWISE IN DETAILS DO NOT REMOVE CONCRETE BEHIND VERTICAL REINFORCING BARS IN COLUMNS, WALLS, OR OTHER VERTICAL LOAD BEARING MEMBERS
3B) CHIP OUT ENTIRE REPAIR AREA TO REMOVE ALL UNSOUND CONCRETE. REPAIR AREA SHALL NOT BE LESS THAN 1/2” IN
DEPTH.
3C)CONCRETE REPAIR AREAS SHOULD BE SQUARE OR RECTANGULAR IN SHAPE WITH A 1/2 INCH SAW CUT AT THE
PERIMETER. DO NOT CUT OR DAMAGE EMBEDDED REINFORCING OR OTHER EMBEDDED ITEMS.
3D)DO NOT TERMINATE CEMENTITIOUS REPAIR MORTAR AT A FEATHER EDGE. ADHERE TO REPAIR MORTAR PRODUCT
MANUFACTURER’S MINIMUM AND MAXIMUM MATERIAL THICKNESS REQUIREMENTS.
3E) PREPARE CONCRETE SURFACES TO RECEIVE REPAIR MORTAR WITH MECHANICAL MEANS TO OBTAIN AN EXPOSED AGGREGATE SURFACE WITH A MINIMUM SURFACE PROFILE OF ± 1/4 INCH (ICRI DEGREE OF ROUGHNESS = CSP-9 MINIMUM).
4) EXISTING STEEL REINFORCING PREPARATION:
4A) CLEAN ALL EXPOSED REINFORCING STEEL IN REPAIR AREA TO REMOVE ALL TRACES OF CORROSION BY MEDIA BLASTING OR OTHER APPROVED MEANS. IF MEDIA BLASTING IS USED, CLEAN SHOT MEDIA FROM REPAIR AREA. PREPARE EXISTING STEEL SURFACES TO MEET OR EXCEED THE REQUIREMENTS OF ICRI GUIDELINE 210.5R-23 LEVEL 2 CLEAN.
- THIS ALSO APPLIES TO STEEL PLATES, STEEL CONDUITS, OR ANY OTHER METAL ITEMS WHICH WILL BE ENCAPSULATED IN
THE REPAIR AREA.
4B) IF OVER 10% OF REINFORCING BAR CROSS-SECTIONAL AREA IS LOST DUE TO DAMAGE OR CORROSION AT ANY LOCATION, CONTACT ENGINEER FOR REVIEW AND SUPPLEMENTAL REINFORCING REQUIREMENTS.
4C)COAT ALL EXISTING EXPOSED REINFORCING STEEL WITH CORROSION RESISTANT STEEL PRIMER. FOLLOW PRIMER PRODUCT MANUFACTURER’S REQUIREMENTS FOR APPLICATION TIMING, APPLICATION RATE, AND RECOMMENDED NUMBER
OF COATS.
4D)WHERE EXISTING CONDITIONS DO NOT PERMIT COMPLIANCE WITH CONCRETE COVER LIMITS, NOTIFY ENGINEER FOR
SUPPLEMENTAL INSTRUCTIONS.
5) ACCEPTABLE REPAIR PRODUCTS:
5A) HORIZONTAL SURFACE PARTIAL DEPTH CONCRETE REPAIR MORTAR
- SIKAEMACO T 1060/1061 BY SIKA CORPORATION
- PLANITOP 18TG/18ES BY MAPEI CORPORATION
- VERSASPEED 100/LS100 BY EUCLID CHEMICAL COMPANY
- HP CONCRETE (EXTENDED) OR HP DOT MORTAR (NEAT) BY US CONCRETE PRODUCTS
5B) TROWEL APPLIED VERTICAL AND OVERHEAD PARTIAL DEPTH CONCRETE REPAIR MORTAR (2" MAX THICKNESS)
- SIKAEMACO N 425 CI BY SIKA CORPORATION
- PLANITOP X/XS BY MAPEI CORPORATION
- EUCOREPAIR V100 BY EUCLID CHEMICAL COMPANY
- US THIN PATCH V/O BY US CONCRETE PRODUCTS
5C)FORM AND POUR VERTICAL AND OVERHEAD PARTIAL DEPTH CONCRETE REPAIR MORTAR
- SIKAEMACO S 466 CI BY SIKA CORPORATION
- PLANITOP FD/15 BY MAPEI CORPORATION
- EUCOCRETE BY EUCLID CHEMICAL COMPANY
- DECK MIX FP BY US CONCRETE PRODUCTS
5D)FORM AND POUR FULL DEPTH CONCRETE REPAIR MORTAR
- SIKACRETE 211 SCC PLUS BY SIKA CORPORATION
- PLANITOP 11 SCC BY MAPEI CORPORATION
- EUCOREPAIR SCC BY EUCLID CHEMICAL COMPANY
- DECK MIX SCC OR AE BY US CONCRETE PRODUCTS
5E) FORM AND PUMP AT PRESSURE VERTICAL AND OVERHEAD CONCRETE REPAIR MORTAR
- SIKACRETE 211 SCC PLUS BY SIKA CORPORATION
- PLANITOP 11 SCC BY MAPEI CORPORATION
- EUCOREPAIR SCC BY EUCLID CHEMICAL COMPANY
5F) EMBEDDED REINFORCING STEEL PRIMER
- ARMATEC 110 EPOCEM BY SIKA CORPORATION
- PLANIBOND 3C BY MAPEI CORPORATION
- DURALPREP A.C. BY EUCLID CHEMICAL COMPANY
- HP BONDIT III BY US CONCRETE PRODUCTS
5G)SUBSTITUTIONS:
- ALL SUBSTITUTIONS MUST BE SUBMITTED AND APPROVED BY THE ENGINEER IN WRITING PRIOR TO USE. ALTERNATE PRODUCTS MUST HAVE SIMILAR PERFORMANCE CRITERIA TO THE BASIS OF DESIGN PRODUCTS LISTED.
5H)DELIVER PACKAGED MATERIALS CLEARLY MARKED WITH LEGIBLE AND INTACT LABELS WITH MANUFACTURER’S NAME, BRAND NAME, LOT NUMBER, AND IDENTIFYING CONTENTS OF CONTAINERS.
- THE REPAIR MORTAR SHALL BE SUPPLIED IN A FACTORY PROPORTIONED UNIT.
- IF EXTENSION OF THE MORTAR WITH ADDED AGGREGATE WILL BE USED, PROVIDE FACTORY PROPORTIONED UNITS BY THE SAME MANUFACTURER. UNLESS OTHERWISE REQUIRED BY THE MANUFACTURER, AGGREGATE SHOULD BE 3/8” CLEAN, WELL- GRADED, SATURATED SURFACE DRY MATERIAL, HAVING LOW ABSORPTION AND HIGH DENSITY. AGGREGATE SHALL CONFORM
TO ASTM C33.
5I) WEIGH CEMENTITIOUS PACKAGED REPAIR MATERIALS. THE CONTENTS OF ANY PACKAGED CONTAINER SHOULD NOT VARY BY MORE THAN 2% FROM THE WEIGHT STATED ON THE PACKAGE MARKINGS. IF THE WEIGHT IS OUTSIDE THE 2 PERCENT
TOLERANCE, CONTACT THE REPAIR MATERIAL MANUFACTURER FOR RECOMMENDATIONS.
5J) STORE MATERIALS IN AREAS WHERE CONDITIONS CONFORM WITH REPAIR MATERIAL MANUFACTURER’S RECOMMENDATIONS AND INSTRUCTIONS. MATERIALS SHALL BE SUPPLIED AND APPLIED WITHIN THEIR STATED SHELF LIFE OR BY THEIR EFFECTIVE “USE BY” DATE. PROTECT REPAIR MATERIAL COMPONENTS FROM FREEZING AND FROM TEMPERATURE
CHANGES THAT WOULD ADVERSELY AFFECT THEIR PERFORMANCE AND PROPERTIES.
5K) THE MATERIAL SHALL NOT CONTAIN ASBESTOS, NITRATES, ADDED GYPSUM, ADDED LIME, OR HIGH ALUMINUM CEMENT.
REPAIR MATERIAL SHALL NOT CONTAIN SOLUBLE CHLORIDES OR OTHER INGREDIENTS IN SUFFICIENT QUANTITY TO CAUSE
CORROSION OF EMBEDDED REINFORCING STEEL. MATERIALS SHALL BE NON-COMBUSTIBLE.
5L) COLOR TO BE PRODUCT STANDARD AND CLOSELY MATCH EXISTING CONCRETE SURFACE COLOR UNLESS DIRECTED
OTHERWISE BY ENGINEER.
6) FORMWORK:
6A) FORM-FACING MATERIAL IN CONTACT WITH REPAIR MATERIAL SHALL BE LUMBER, PLYWOOD, TEMPERED CONCRETE-FORM- GRADE HARDBOARD, METAL, PLASTIC, OR PAPER THAT MATCHES THE APPEARANCE AND TEXTURE OF ADJACENT EXISTING
SURFACES.
6B) ANCHOR BOLTS USED TO SECURE FORM WORK SHALL BE ABLE TO BE REMOVED WITHOUT SPALLING CONCRETE.
6C)DESIGN FORM WORK TO WITHSTAND REPAIR MATERIAL PRESSURES, AS WELL AS PRESSURE RESULTING FROM
PLACEMENT.
6D)PROVIDE FORM WORK SURFACES WHICH DO NOT BOND TO REPAIR MATERIAL. USE OF OSB FOR FORM FACING MATERIAL IS NOT ALLOWED. IF RELEASE AGENT IS USED, DO NOT ALLOW FORM WORK RELEASE AGENT TO PUDDLE IN FORMS, CONTACT REINFORCEMENT, OR CONTACT HARDENED CONCRETE. RELEASE AGENT SHALL BE NON-STAINING.
7) CONDITIONING, MIXING, AND PLACEMENT:
7A) ADHERE TO ALL LIMITATIONS AND CAUTIONS AND FOLLOW ALL RECOMMENDATIONS FOR “BEST PERFORMANCE” IN THE
MANUFACTURER’S PRINTED INSTALLATION INSTRUCTIONS.
7B) REMOVE ALL LAITANCE, DEBRIS, ABRASIVE BLAST MEDIA, AND BOND-INHIBITING MATERIALS FROM THE REPAIR AREA.
7C)MIXING AND PLACEMENT REQUIREMENTS ARE CONTINGENT ON PLACEMENT METHOD AND SELECTED REPAIR MORTAR PRODUCT. MIX AND PLACE MATERIALS IN STRICT ACCORDANCE WITH MANUFACTURER’S PRINTED INSTALLATION INSTRUCTIONS. IN THE ABSENCE OF PRINTED INSTALLATION INSTRUCTIONS, CONTACT THE ENGINEER FOR ADDITIONAL
DIRECTION PRIOR TO APPLICATION.
7D)ADHERE TO ALL MANUFACTURER TIME-FRAME/POT-LIFE REQUIREMENTS.
7E) CONDITION REPAIR AREA SUBSTRATE TO SATURATED SURFACE DRY (SSD) CONDITION.
7F) PLACE AND CONSOLIDATE MATERIAL WITH MEANS ACCEPTABLE TO THE MANUFACTURER TO PROVIDE A WELL-COMPACTED REPAIR, CONSOLIDATED AROUND REINFORCEMENT, AND WITHOUT SEGREGATION. DO NOT VIBRATE SELF-CONSOLIDATING
(SCC) REPAIR MORTAR.
7G)FINISHING:
- FLOAT THEN BROOM, SWIRL, OR TROWEL FINISH REPAIRS TO MATCH EXISTING SURROUNDING CONCRETE SURFACES.
- MAINTAIN ALL EXISTING JOINTS BY TOOLING OR FORMING JOINTS IN UNCURED REPAIR MATERIAL. SAW CUTTING JOINTS IN CURED REPAIR MATERIAL IS NOT AN ACCEPTABLE METHOD UNLESS PERFORMED WITH EARLY ENTRY SAW EQUIPMENT PRIOR
TO CONCRETE CURE.
- MAINTAIN ALL EXISTING CHAMFERED EDGES TO MATCH ADJACENT CONSTRUCTION.
7H)CURING:
- WET CURE CEMENTITIOUS REPAIR MATERIALS WITH ABSORBENT COVERING (BURLAP) AND WATER-RETENTION SHEETING.
TAPE SHEETING TOGETHER OR LAP SHEETS, REPAIR HOLES AND GAPS, AND KEEP SHEETS IN PLACE. CONTINUE CURING
MEASURES FOR AT LEAST 7 DAYS AFTER PLACEMENT.
8) FINAL CONDITIONS:
8A) REMOVE ALL FORM WORK AND ATTACHMENT HARDWARE FROM REPAIR AREA.
- REMOVE FORMWORK ONLY AFTER REPAIR MATERIAL CURE IS COMPLETE AND CONCRETE HAS REACHED A MINIMUM
STRENGTH OF 5,000 PSI
8B) REFER TO SHORING DESIGN FOR SHORING REMOVAL REQUIREMENTS AND LIMITATIONS.
8C)LEAVE FINISHED WORK AND WORK AREA IN A NEAT, CLEAN CONDITION WITHOUT EVIDENCE OF SPILLOVERS ONTO ADJACENT AREAS. SPILLOVERS SHOULD BE REMOVED BY GRINDING AND CHAMFERING AT EDGES OF REPAIR AND HOLES FROM
ATTACHMENT HARDWARE FILLED WITH AN APPROVED EPOXY OR CONCRETE REPAIR PRODUCT.
8D)PROVIDE RECORD SET COPY OF FINAL REPAIR AREAS WITH QUANTITIES TO ENGINEER.
9) QUALITY ASSURANCE QUALITY CONTROL:
9A) OBTAIN AND COORDINATE SERVICES OF A FIELD TECHNICIAN QUALIFIED BY THE MANUFACTURER AT THE PROJECT SITE BEFORE MIXING OR INSTALLING PROPRIETARY MATERIALS OR COMPONENTS TO TRAIN PERSONNEL IN PREPARATION, INSTALLATION, AND QUALITY CONTROL PROCEDURES.
9B) COMPLETED AND CURED CONCRETE REPAIR AREAS SHOULD BE HAMMER-SOUNDED. REPLACE DELAMINATED OR POORLY
CONSOLIDATED REPAIR AREAS IDENTIFIED DURING SOUNDING AT NO COST TO THE OWNER.
CONCRETE MIX TABLE
CONC
MIX
TYPE INTENDED USE
COMPRESSIVE
STRENGTH f'c
(KSI)
TEST AVG
(DAYS)
CONC
WEIGHT
MAX W/C
RATIO,
INCLUDING
SCM, NOTE 6
MAX
AGGREGATE
SIZE (IN),
NOTE 3
TOTAL AIR
CONTENT
(%), NOTE 4 OTHER REQTS
1 STAIR LANDING
INFILL AND
HORIZONTAL
REPAIRS
5 28 NWC 0.40 3/4 6 THK
NO. ISSUE DATE
JOISTS 1 1/2
COLUMNS, GIRDERS, AND BEAMS 1 1/2
TOP SURFACE OF SLABS EXPOSED TO WEATHER 2
CONCRETE PLACED IN FORMS, EXPOSED TO WEATHER OR EARTH 2
CASE COVER (IN)
REBAR COVER TABLE
NOTES:
1. GLOBAL WARMING POTENTIAL LIMITS ARE BASED ON THE FOLLOWING CRITERIA:
- VALUES HAVE BEEN SET BASED ON THE REQUIREMENTS OF BUY CLEAN COLORADO (C.R.S 24-92117)
- VALUES REPRESENT FABRICATED MATERIAL SCOPE, AS DEFINED BY BUY CLEAN COLORADO'S GLOBAL WARMING
POTENTIAL LIMITS GUIDANCE
a rt in
/M ar ti n
, I n c . c o n s id e rs t h at d es ig n d a ta is o n ly i n i ts f in a l f o rm o n p lo tt e d d ra w in g s w it h o ri g in a l s ig n a tu re s a n d p ro fe s s io n a l c er ti fi ca ti o n b ei n g v is ib ly p re s en t o n t h e d ra w in g s . D a ta s u p p lie d v ia c o m p u te r g en e ra te d f o rm a t d o es n o t c o n ta in t h is a p p ro v al o r ce rt if ic a ti o n
T h e r ec ei v er o f el e ct ro n ic a ll y tr a n s m it te d d ra w in g s is r e s p o n s ib le f o r v er if yi n g t h e in fo rm a ti o n c o n ta in e d w it h in t h e e le c tr o n ic d a ta a g a in s t th e r ec o rd e d o r ap p ro v ed d o cu m en ts
T h e u se o f el e ct ro n ic a lly t ra ns m itt e d d ra w in g s is c on si d e re d to b e a t yo u r o w n r is k.
M a rt in
/M a rt in
In c.
a ss u m e s n o re sp on si b ili ty f o r a ny c la im s o r da m a ge s re su lti ng f ro m y o u r us e o f t h is in fo rm a tio n.
E le ct ro ni c in fo rm a tio n is p ro vi d ed fo r th e co nv en ie nc e o f th e r e ci p ie nt o nl y.
T h e r ec ip ie n t of t hi s fil e a gr ee s th a t th e in fo rm a tio n m ay n ot b e tr a ns fe rr ed t o a ny o th e r p ar ty
PROJECT NO:
DATE:
REVISIONS
SHEET TITLE:
SHEET NUMBER:
M M
J O
B
P
R
IN
C
IP
A L:
E O
R
P R
O
JE
C T
M A
N A
G E
R
D E
S
IG
N E
R S
LE
A D
R E
V
IT
T E
C H
D
A T
E P
R
IN
T E
D
F
IL
E P
A T
H
9/
/2
7:
:0
A
M A ut od es k
D oc s:
//A
C C
-M M
S
/2 4.
.S .0
3-
La w re nc e
W ay
H ig h P rio rit y- S
.rv t
H
IG
H P
R
IO
R
IT
Y S
T R
U C
T U
R A
L R
E P
A
IR
S A
N D
W A
T E
R P
R O
O F
IN
G
A U
R A
R
IA
C A
M P
U S
7t h
S T
R E
E T
P A
R K
IN
G
G A
R A
G E
LA
W
R E
N C
E W
A Y
D E
N V
E R
, C O
LO
R
A D
O
04/21/2026
S0.3
QUALITY
ASSURANCE
© MARTIN/MARTIN 2026
A R
T G
A R
C
IA
B E
N E
S T
R
IC
H
T A
M I
W O
R K
E R
.0
5.
S .0
T A
M I
W O
R K
E R
J.
W
IL
LI
A M
S
24.0355.S.03
1. GENERAL:
A. SCOPE OF WORK
• THE OWNER WILL ENGAGE A QUALIFIED INSPECTION AND TESTING AGENCY(S) TO
PERFORM INSPECTIONS AND TESTING FOR ALL STRUCTURAL MEMBERS AND
ASSEMBLIES AS NOTED HEREIN.
B. INSPECTIONS AND TESTING ARE APPLICABLE TO ALL REVISIONS AND/OR FUTURE WORK
ADDED BY AMENDMENTS TO THESE DOCUMENTS.
C. DEFINITIONS
• INSPECTOR: THE AGENCY ENGAGED BY THE OWNER TO PERFORM INSPECTIONS.
• (P) PERIODIC INSPECTION: THE PART-TIME OR INTERMITTENT OBSERVATION BY THE
INSPECTOR OF WORK BEING PERFORMED. INSPECTOR SHALL BE PRESENT IN THE
AREA WHERE THE WORK IS BEING PERFORMED. OBSERVATION OF ALL WORK (100%
VISUAL) SHALL BE MADE AT THE…
This is the start of the file's text. The full file is on GovTribe.