Appendix D 2A Cooling System Plans.pdf

PDF 13 MB Posted

Attached to
Fish Barrier Controls Replacement, Romeoville, IL (USACE-CHICAGO DISTRICT)
Solicitation number
W912P6-20-R-0009
Issued by

About this file

This solicitation notice is for a federal contract opportunity issued by the U.S. Army Corps of Engineers Chicago District. The project involves replacing the pulse-generating control system for the Chicago Sanitary and Ship Canal Barrier IIA aquatic nuisance species dispersal barrier facility in Romeoville, Illinois. The contractor will be required to furnish and install a new control system for Barrier IIA by April 1, 2021, with an optional additional control system for Barrier IIB to be installed by November 1, 2021 if awarded. The installations must be completed within 120 calendar days and testing within 30 days. The control systems must integrate with existing backup generator controls and be fully functional for efficient and effective pulse generation. The North American Industry Classification code is 334513 and competition is unrestricted with a 10% price evaluation preference for HUBZone small businesses. Proposals are due by the date specified in the solicitation document. The point of contact is listed for any questions.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_G-001.dgn

3/4/2020 1:07:37 PM

F

IL

E N

A M

E

-6

L

D

G -0

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

IC

T

REVISED

F

IL

E N

A M

E

G-001

SHEET INDEX

J O

H N G

R O

B O

S K I, P .E

F A

Y E L

E F F

L E

R P .E

L

A N

D S

H E

E T I

N D

E X

L O

C A

L

IT

Y A

N D V

IC

IN

IT

Y M

A P

S

®of Engineers

US Army Corps

ALL DRAWINGS IN THIS SET.

INDICATE OFFICIAL RECOMMENDATION OF

REQUIRED BY ER 1110-1-8152. SIGNATURES

THE SCOPE OF THEIR EMPLOYMENT AS

ON THESE PROJECT DOCUMENTS WITHIN

TION DESIGNATIONS OF INDIVIDUALS APPEAR

INITIALS OR SIGNATURES AND REGISTRA-

CHICAGO DISTRICT CORPS OF ENGINEERS. THE

THIS PROJECT WAS DESIGNED BY THE

DRAWINGS CONTAINED IN THE SHEET INDEX.

RECOMMENDATION AND APPROVAL FOR ALL

SIGNATURE AFFIXED BELOW INDICATE OFFICAL

APPROVED BY:

APPROVAL RECOMMENDED BY:

PROJECT MANAGER

REVIEWED BY:

ATR TEAM LEADER DATE CHIEF, DESIGN BRANCH DATE

DATE

LOCATION MAP VICINITY MAP

(N.T.S) (N.T.S)

PROJECT LOCATION

SHEET SHEET TITLE

NUMBER REFERENCE

1. G-001

2. G-002

3.

4. V-001 SURVEY CONTROL AND BENCHMARKS

5.

6.

7. S-101

8.

M-101 PLAN VIEW

9.

M-301

10.

M-302

11.

M-303

12.

M-304

13.

M-305

14.

M-306

15.

M-307

16.

M-601 ONE LINE DIAGRAM

17.

ELECTRICAL DEMOLITION PLAN

18.

E-101 ELECTRICAL POWER PLAN

19.

E-601 ONE LINE DIAGRAM

M-001 GENERAL NOTES

MD-101

MD-102

20.

21.

22.

LOCATION AND VICINITY MAP AND SHEET INDEX

GENERAL NOTES AND STANDARD ABBREVIATIONS

WORK LIMITS

DEMOLITION PLAN

SITE PLAN

COOLING EQUIPMENT CONCRETE PAD TYPICAL SECTION

M-602

M-603

M-604

23.

24.

25.

26.

27.

28.

MD-501

29.

M-308

ED-101

MD-502

M-501 DETAILS

GC-001

CD-101

CS-101

MECHANICAL SCHEDULES

MECHANICAL SCHEDULES

CHILLER UNIT

COOLING TANK DEMOLITION

COOLING SYSTEM PIPING PLAN DEMOLITION

THERMOSTAT AND PULL STATION RELOCATION

ELECTRIC CONDUITS RELOCATION

JEFFREY DUPONT, P.E.

MIKE NGUYEN, P.E. 08 AUGUST 18

JOSEPH SCHMIDT, P.E. 08 AUGUST 1808 AUGUST 18

30. R-001 COOLING TANK, PLAN, SECTIONS, AND EQUIPMENT PAD DETAIL

J G

CHICAGO SANITARY SHIP CANAL

BARRIER - 2A

COOLING SYSTEM REPLACEMENT

LOCKPORT, ILLINOIS

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

CHICAGO DISTRICT

W912P6-18-C-0018

W912P6-18-B-0012

RECORD DRAWINGS / AS-BUILT CONDITIONS - ASI/HILL - W912P6-18-C-0023

/0

/2

A S -B

U

IL

T C

O N

D

IT

IO

N S

3PUMP ASSEMBLY DETAILS - REVERSED

PUMP ASSEMBLY DETAILS

HEAT EXCHANGER ASSEMBLY DETAILS

HEAT EXCHANGER ASSEMBLIES

/2

/2

C

S S

C B

A R

E V

IS

IO

N S

SEP 20, 2019

PULSER CABINET PIPING

CHILLER & HEAT EXCHANGER ELEVATION

INFORMATION COMBINED ON DRAWING M-302

INFORMATION COMBINED ON DRAWING M-302

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_G-002.dgn

9/19/2019 8:19:11 AM

F

IL

E N

A M

E

-6

L

D

G -0

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

G-002G-002

GENERAL NOTES

STANDARD ABBREEVIATIONS

PAVEMENTP

TOP OF CURBTC

GRADE AT FORNDATIONGF

FINISH FLOORFF

CENTERLINECL

FIRE HYDRANTFH

NORTH AMERICAN VERTICAL DATUMNAVD

OCEAN SURVEYS, INC.OSI

CORPS OF ENGINEERSCOE

ARMY CORPS OF ENGINEERSACOE

DIGITAL TERRAIN MODELDTM

CORRUGATED METAL PIPECMP

REINFORCED CONCRETE PIPERCP

STEEL SHEET PILESSP

CONTRACTING OFFICER'S REPRESENTATIVECOR

MANHOLEMH

VERIFY IN FIELDVIF

ILLINOIS DEPARTMENT OF TRANSPORTATIONIDOT

PIPE SLOPES

HORIZONTALH

VERTICALV

MINIMUMMIN

NOT TO SCALENTS

EXPANSION JOINTEJ

CONSTRUCTION JOINTCJ

S T

A N

D A

R D A

B B

R E

V

IA

T

IO

N S

G E

N E

R A

L N

O T

E S A

N D

F L

F A

Y E L

E F F

L E

R P .E

S T

A N

D A

R D A

B B

R E

V

IA

T

IO

N S

G E

N E

R A

L N

O T

E S A

N D

F L

F A

Y E L

E F F

L E

R P .E

J O

H N G

R O

B O

S K I, P .E

J O

H N G

R O

B O

S K I, P .E

VFD

20AT

100AF

PB

M

SAFETY DISCONNECT SWITCH, 3P IN NEMA 3R/4X INDOOR/OUTDOOR

FUSED DISCONNECT SWITCH, 3P IN NEMA 3R/4X INDOOR/OUTDOOR

COMBINATION MOTOR STARTER, NEMA SIZE X UNO

VARIABLE FREQUENCY DRIVE

MOTOR

MOLDED CASE CIRCUIT BREAKER (MCCB) WITH LSI FUNCTIONS FRAME SIZE AND TRIP RATING 3-POLE

PULL BOX, SIZED PER NEC UNO

ABOVE GROUND CONDUIT (HIDDEN FROM VIEW IN ARCHITECTUALLY FINISHED SPACES)

BELOW GROUND/GRADE CONDUIT (ROUTED IN OR BELOW CONCRETE/SLAB)

ELECTRICAL SYMBOL LEGEND

F L

F L

ALL ON-SITE CONSTRUCTION ACTIVITIES SHALL BE COMPLETED WITHIN THAT TIME FRAME.

13. THE BARRIER CAN ONLY BE SHUT DOWN FROM DECEMBER 15, 2018 UNTIL MARCH 31, 2019.

PRE-CONSTRUCTION CONDITION OR AS SPECIFIED IN THE PLANS AND SPECIFICATION.

12. ALL AREAS AND FACILITIES DISTURBED DUE TO CONSTRUCTION MUST BE RESTORED TO

REPLACED AT NO ADDITIONAL COST TO THE GOVERNMENT.

WITHIN THE WORK AREA. DAMAGES TO EXISTING FEATURES MUST BE REPAIRED OR

UTILITIES, EQUIPMENT, AND FEATURES THAT ARE NOT DESIGNATED TO BE REMOVED

11. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING

STRAY CURRENT.

CONTRACTORS MUST TAKE PRECAUTIONS TO PROTECT EMPLOYEES FROM

OF THE STRAY CURRENT HAS BEEN AS HIGH AS 346 VOLTS DIRECT CURRENT (VDC).

CONDUCTIVE MATERIALS WITHIN AND ADJACENT TO THE WORK LIMITS. MEASUREMENT

CONDUCTIVE MATERIALS CONTACTING THE GROUND, STRUCTURES, OR OTHER

CAUSED ELECTRIFICATION AND POTENTIAL SHOCK HAZARD WITH REGARD TO

10. AS A CONSEQUENCE OF OPERATIONS AT THE FISH BARRIER, STRAY CURRENT HAS

WILL BE UTILIZED BY OTHERS DURING PROJECT DURATION.

TRAFFIC DURING THE CONSTRUCTION DURATION OF THE PROJECT. ROADWAY

9. CONTRACTOR SHALL PROVIDE AT LEAST ONE OPEN LANE FOR TWO WAY TRUCK

ALLOWED TO BE SHUT DOWN DURING CONSTRUCTION.

8. CONTRACTOR SHALL NOTE THAT THE ROAD ADJACENT TO THE BARRIERS IS NOT

NOT FROM CANAL, VIA BARGE OR BOAT.

7. CONTRACTOR SHALL NOTE THAT ALL WORK WILL BE PERFORMED ON LAND AND

15 DECEMBER 2018 TO 1 APRIL 2019.

WORKING IN AND AROUND THE CANAL. SHUTDOWN OF THE BARRIER MAY OCCUR FROM

WILL BE ACTIVE DURING CONSTRUCTION AND SHOULD PROCEED WITH CAUTION WHILE

6. CONTRACTOR SHALL BE AWARE THAT OTHER ELECTRIC BARRIERS ON THE SITE

MANUFACTURERS RECOMMENDATIONS AND AS APPROVED BY THE GOVERNMENT.

5. ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH

THE SPECIFIED WORK LIMITS.

4. THE CONTRACTOR SHALL PERFORM ALL WORK WITHIN

BECOME APPARENT, THE COR MUST BE NOTIFIED PRIOR TO START OF WORK.

AND GRADES PRIOR TO COMMENCEMENT OF CONSTRUCTION, IF DISCREPANCIES

3. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL SITE CONDITIONS

VERTICAL DATUM (NAVD) OF 1988.

2. THE VERTICAL DATUM IS BASED ON NORTH AMERICAN

STATE PLANE COORDINATE SYSTEM, EAST ZONE, NAD 1983.

1. THE HORIZONTAL DATUM IS BASED ON THE ILLINOIS

H

H

H

H

H

H

S

H

H

E E

H

H

H

H

H

M W

H

H

E E

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_GC001.dgn

9/20/2019 9:57:30 AM

F

IL

E N

A M

E

-6

L

D

G C

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

GC001GC001

B1

WORK LIMITS PLAN

SCALE: 1" = 40'

NORTH

PLAN

TRUE N

50' 100'0

J O

H N G

R O

B O

S K I, P .E

W O

R K L

IM

IT

S

F L

F A

Y E L

E F F

L E

R P .E

J O

H N G

R O

B O

S K I, P .E

W O

R K L

IM

IT

S

F L

F A

Y E L

E F F

L E

R P .E

SIGN

(UNPAVED)

OLD ROMEOVILLE RD(UNPAVED)

OLD ROMEOVILLE RD

(UNPAVED)

OLD ROMEOVILLE RD

STAGING AREA

EXISTING COMED SUB STATION

EXISTING COMED IIB TRANSFORMER

EXISTING BARRIER 2A GENERATOR

EXISTING WALKWAY

EXISTING TRANSFORMER

COOLING TANK

EXISTING BARRIER 2A

EXISTING PULSE GENERATING BUILDING

EXISTING RECTIFIERS

TRANSFORMER

EXISTING

IIB BUILDING

EXISTING BARRIER

IIA BUILDING

EXISTING BARRIER

AND WORK LIMITS

EXISTING FENCE

WORK LIMITS

EDGE OF ROAD

CHICAGO SANITARY AND SHIP CANAL (CSSC)

E

R O

M E

O R

D

WL1

WL2

WL3

WL4

QUALITY BUILDING

EXISTING POWER

SA1

SA2

SA3

SA5

SA4

STAGING AREA COORDINATE POINTS

NORTHERN EASTERNPOINT

WORK LIIMITS COORDINATE POINTS

RAILROADRAILROAD

1059005.81811251.28SA5

1059006.561811334.56SA4

1059014.471811390.49 SA3

1058973.211811394.81 SA2

1058961.061811252.52 SA1

1059043.2 1811979.73 WL4

1059046.8 1812090.64WL3

1059008.191812092.46 WL2

1058999.651811981.63 WL1

EASTERNNORTHERN POINT

WORK LIMITS

FENCING MUST BE DEPLOYED TO ENSURE SITE SECURITY EACH DAY.

JERSEY BARRIERS AS NEEDED FOR CONSTRUCTION ACCESS. TEMPORARY

REMOVE, STORE, AND REPLACE (AFTER COMPLETION OF WORK) FENCE AND 2.

REMOVED BY OTHERS.

CONSTRUCTION TRAILER SHOWN ON AERIAL MAP AT STAGING AREA WAS 1.

GENERAL NOTES

LEGEND:

WORK LIMITS

EXISTING FENCE

F L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_V-001.dgn

9/19/2019 8:24:42 AM

F

IL

E N

A M

E

-6

L

D

V -0

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y

E L

E F F

L E

R P

E

S U

R V

E Y C

O N

T R

O L A

N D B

E N

C H

M A

R K

V-001

F L

F A

Y E L

E F F

L E

R

F L

F A

Y E L

E F F

L E

R P

E

S U

R V

E Y C

O N

T R

O L A

N D B

E N

C H

M A

R K

V-001

F L

F L

F A

Y E L

E F F

L E

R

NAVD88

IL EAST NAD83 STATEPLANE COORDINATES

HORIZONTAL & VERTICAL CONTROL POINTS

POINT

EASTING (X)

DESCRIPTION

ELEV.

NORTHING (Y)

GENERAL NOTES

N

100 0 100 200

SCALE IN FEET

PT NO. 15 1,059,164.98 582.84 BRASS USACE DISK

OF CONCRETE PAD

DISK SET ON NW CORNER

OF CONCRETE PAD

DISK SET ON SW CORNER

586.08

585.80

1,058,840.11

1,058,811.60

12-235-1

USACE 1

12-235-2

USACE 2

NAVD88

ELEV.

ME2887.

REFERENCED TO NGS MONUMENTS ME1966, AE9231, ME3356, AND

4. ALL HORIZONTAL AND VERTICAL CONTROL POINTS ARE

AMERICAN VERTICAL DATUM OF 1988 (NAVD88) U.S. FEET.

3. ALL ELEVATIONS SHOWN ARE REFERENCED TO THE NORTH

AMERICAN DATUM OF 1983 (NAD83) U.S. FEET.

STATE PLANE COORDINATE SYSTEM, EAST ZONE, NORTH

2. ALL COORDINATES SHOWN ARE REFERENCED TO THE ILLINOIS

BID.

THE TIME OF BIDDING, AND INCLUDE COST ACCORDINGLY IN THE

NECESSARY ACTIONS TO ASSESS THE EXISTING CONDITIONS AT

DIFFER FROM THOSE SHOWN. THE CONTRACTOR SHALL TAKE ALL

EXISTING CONDITIONS DURING CONSTRUCTION MAY VARY AND

AND REPRESENTS CONDITIONS EXISTING AT THAT TIME.

FROM A 2013 SURVEY COMPLETED BY THE CHICAGO DISTRICT

1. THE SURVEY CONDITIONS SHOWN ON THESE DRAWINGS ARE

1,813,786.14

1,812,462.75

1,812,138.26

PT NO. 15

COE 12-235-2

USACE 2

COE 12-235-1

USACE 1

9 59

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_CD101.dgn

3/2/2020 10:58:52 AM

F

IL

E N

A M

E

-6

L

D

C D

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

D

M O

L

IT

IO

N P

L A

N

CD101

F L

F A

Y E L

E F F

L E

R P .E

D E

M O

L

IT

IO

N P

L A

N

CD101

F L

F A

Y E L

E F F

L E

R P .E

A1

DEMOLITION PLAN

SCALE: 1" = 5' 0 5' 10'

NORTH

PLAN

TRUE N

EXISTING BARRIER IIA BUILDING

TO BE REMOVED

EXISTING COOLING TANK CONCRETE PAD

WORK LIMITS AND EXISTING FENCE

WORK LIMITS

BUILDING

EXISTING POWER QUALITY

EXISTING WALKWAY

GENERATING EQUIPMENT

EXISTING PULSE

CHICAGO SANITARY AND SHIP CANAL

(UNPAVED)

OLD ROMEOVILLE RD

REPLACE AFTER EACH WORK DAY

FOR CONSTRUCTION ACCESS AND

REMOVE FENCE AS NECESSARY

FENCING MUST BE DEPLOYED TO ENSURE SITE SECURITY EACH DAY.

JERSEY BARRIERS AS NEEDED FOR CONSTRUCTION ACCESS. TEMPORARY

REMOVE, STORE, AND REPLACE (AFTER COMPLETION OF WORK) FENCE AND 3.

OF CONCRETE DEBRIS OFFSITE.

REMOVE EXISTING CONCRETE SLAB UNTO TO GRAVEL SUB-BASE. DISPOSE 2.

SITE.

REMOVE EXISTING COOLING TANK AND APPURTANANCES AND DISPOSE OFF 1.

GENERAL NOTES

LEGEND:

DEMOLITION

F L

F L

J O

H N G

R O

B O

S K I, P .E

TO BE REMOVED

EXISTING BARRIER IIA COOLING TANK

9 59

H

H

PUMP MODULE 3

TANK MODULE 3

Y =1811989.0356

X =1059029.6942

Y =1812010.0100

X =1059030.7305

Y =1812010.3061

X =1059024.7378

Y =1811989.3316

X =1059023.7015

Y =1811988.6480

X =1059032.3277

Y =1811988.8802

X =1059026.3322

Y =1812009.8645

X =1059027.1451

Y =1812009.6322

X =1059033.1406

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_CS101.dgn

9/20/2019 9:41:27 AM

F

IL

E N

A M

E

-6

L

D

C S .d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

J

H N G

R O

B O

S K I, P .E

S

IT

E P

L A

N

CS101

F L

F A

Y E L

E F F

L E

R P .E

J O

H N G

R O

B O

S K I, P .E

S

IT

E P

L A

N

CS101

F L

F A

Y E L

E F F

L E

R P .E

A1

SITE PLAN

SCALE: 1" = 5'

NORTH

PLAN

TRUE N

0 5' 10'

BUILDING

EXISTING POWER QUALITY

EXISTING BARRIER IIA BUILDING

(UNPAVED)

OLD ROMEOVILLE RD

EXISTING WALKWAY

CHICAGO SANITARY AND SHIP CANAL

GENERATING EQUIPMENT

EXISTING PULSE

WORK LIMITS

EXISTING FENCE

WORK LIMITS AND

CLEARANCE

SERVICE

MIN. 3.5'

SYSTEM

COOLING

PROPOSED

9'X22'

12" CONCRETE PAD

REFER TO SHEETS MECHANICAL SHEETS FOR EQUIPMENT DETAILS.

PLACE COOLING SYSTEM EQUIPMENT OVER PROPOSED CONCRETE SLAB. 3.

SHOWN FROM THE COOLING EQUIPMENT TO ADJACENT STRUCTURES.

SHEET (S-101) FOR DETAILS. MAINTAIN MINIMUM CLEARANCE DISTANCE AS

PLACE 12" CONCRETE PAD AT LOCATION SHOWN. REFER TO STRUCTURAL 2.

BEDROCK TO BASE OF CONCRETE PAD.

SUBBASE. IF DEPTH FROM BEDROCK IS LESS THAN 8", PLACE GRAVEL FROM

MOVE AND COMPACT GRAVEL SUBBASE TO ATTAIN 8" DEPTH OF GRAVEL 1.

GENERAL NOTES

.3

E D

G E

B U

IL

D

IN

G

R

M

N 1812009.63

E 1059033.14

N 1812009.87

E 1059027.15

N 1811988.88

E 1059026.33

3.63'

(3' MIN. SERVICE CLEARANCE)

3.67'

N 1811988.65

E 1059032.33

B O

T H S

ID

6" BOTH SIDE

S -B

U

IL

T C

O N

D

IT

IO

N S

/0

/2

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_S-101.dgn

9/19/2019 8:24:24 AM

F

IL

E N

A M

E

-6

L

D S -1

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y E L

E F F

L E

R P .E

T Y

P

IC

A L S

E C

T

IO

N

C O

O L

IN

G E

Q U

IP

M E

N T C

O N

C R

E T

E P

A D

S-101

F L

E R

IC

S

A M

P S

O N

F A

Y E L

E F F

L E

R P .E

T Y

P

IC

A L S

E C

T

IO

N

C O

O L

IN

G E

Q U

IP

M E

N T C

O N

C R

E T

E P

A D

S-101

F L

E R

IC

S

A M

P S

O N

3/4" CHAMFER TYP.

2" CLEAR COVER TYP.

#4 @ 6" TYP.

#4 @ 6" TYP.

2" CLEAR COVER TYP.

-0

E1

TYPICAL CONCRETE EQUIPMENT PAD SECTION

SCALE: 1" = 1'

6"EQUIPMENT DIMENSION6"

M

IN

A B

O V

E G

R O

U N

D

8".

PLACE GRAVEL FILL TO BEDROCK, IF BEDROCK IS LESS THAN 4.

SWING ARC OF DOORS.

INSTALL EDGE OF CONCRETE A MINIMUM OF 6" AWAY FROM 3.

CONCRETE PAD REINFORCING MUST BE EPOXY COATED, TYP. 2.

AS A FOUNDATION FOR THE CONCRETE PAD.

AN 8" WELL-COMPACTED GRAVEL BASE MUST BE PROVIDED 1.

NOTE:

S E

E N

O T

E

F L

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-001.dgn

9/19/2019 8:21:20 AM

F

IL

E N

A M

E

-6

L

D

M -0

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y E L

E F F

L E

R P

E

G E

N E

R A

L N

O T

E S

M-001

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

G E

N E

R A

L N

O T

E S

M-001

K P

C

F L

K

IR

IL

Z

U M

B U

L E

V

GENERAL NOTES GENERAL MECHANICAL NOTES

AT HIS OWN EXPENSE.

CONTRACTOR SHALL REASSEMBLE EQUIPMENT AFTER IT IS IN THE SPACE

HOUSING FOR ENTRANCE INTO THE EXISTING SPACE OR BUILDING.

ELECT TO ORDER THE EQUIPMENT DISASSEMBLED AND/OR WITH SPLIT

RESTORE SAME TO ORIGINAL SIZE AND CONDITION. CONTRACTOR MAY

SHALL, AT HIS OWN EXPENSE, PROVIDE NEW OR ENLARGED OPENINGS AND

BUILDING. IF OPENINGS ARE TOO SMALL FOR ACCESS THEN CONTRACTOR

EQUIPMENT INTO OR REMOVAL OF EXISTING EQUIPMENT FROM THE

WINDOWS, DOORS, CORRIDORS, ROOMS, ETC. FOR ACCESS OF THE NEW

CONTRACTOR SHALL FIELD COORDINATE THE SIZE OF EXISTING OPENINGS, 14.

FIT IN THE SPACE AND FUNCTION AS INTENDED.

ENGINEER TO MAKE CHANGES WHICH WOULD ALLOW THE EQUIPMENT TO

WORK REQUIRED BY OTHER CONTRACTORS, GOVERNMENT, ARCHITECT OR

GOVERNMENT. CONTRACTOR WILL ALSO PAY ALL COSTS FOR ADDITIONAL

ACCOMMODATE SUCH EQUIPMENT AT NO ADDITIONAL COST TO

CONTRACTOR SHALL PAY FOR ALL ALTERATIONS REQUIRED TO

PHYSICAL SIZE OR ARRANGEMENT OF THAT SCHEDULED AND SPECIFIED,

WHEN EQUIPMENT IS SUBMITTED FOR REVIEW AND DOES NOT MEET THE 13.

CAPACITY AND DUTY SPECIFIED.

CHARACTERISTICS OF THE EQUIPMENT SUBMITTED FOR REVIEW MEETS THE

CONTRACTOR AND/OR MANUFACTURER SHALL DOCUMENT HOW THE 12.

AND MAINTENANCE ON THE EQUIPMENT.

ALLOCATED WITH SUITABLE ACCESS AROUND EQUIPMENT FOR OPERATION

DRAWINGS AND EQUIPMENT WILL PHYSICALLY FIT INTO THE SPACE

PERMITTED, PROVIDED THE RATINGS MEET THOSE SHOWN ON THE

SHOWN ON THE DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE

DIMENSIONS OF THE EQUIPMENT TO VERIFY THAT IT WILL FIT IN THE SPACE

THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL THE 11.

SHALL BE SUPPORTED FROM BUILDING STRUCTURAL MEMBERS ONLY.

TANKS, EQUIPMENT, ETC. ALL OVERHEAD SUPPORTED FROM THE CEILING

REQUIRED FOR THE SUPPORTING OF THEIR PIPING, DUCTWORK, CONDUIT,

CONTRACTOR SHALL PROVIDE ALL AUXILIARY SUPPORTING STEEL AS 10.

BACK-CHARGES AS DEEMED APPROPRIATE BY THE G0VERNMENT.

CLEAN-UP AND THE NEGLIGENT CONTRACTOR SHALL PAY THE ASSOCIATED

GOVERNMENT WILL DIRECT ANOTHER CONTRACTOR TO PERFORM THE

CONSTRUCTION. IF CONTRACTOR FAILS TO PROVIDE SUCH CLEAN-UP, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN CLEAN-UP DURING 9.

REMOVED FROM THE SITE.

REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND

CAREFULLY SO AS NOT TO DAMAGE THEM. ALL OTHER ITEMS TO BE

ANY ITEMS THAT THE GOVERNMENT WANTS TO RETAIN SHALL BE REMOVED 8.

THE SATISFACTION OF THE GOVERNMENT.

REPAIRED, REPLACED AND PAID FOR BY THE INSTALLING CONTRACTOR, TO

INSTALLATION OF NEW WORK OR REMOVAL OF EXISTING WORK SHALL BE

ARE TO REMAIN. ANY EXISTING FINISHES THAT ARE DAMAGED DURING THE

NOT TO DAMAGE ANY EXISTING BUILDING CONSTRUCTION OR ITEMS THAT

CONSTRUCTION AS CLOSELY AS POSSIBLE. CARE SHALL BE TAKEN SO AS

INVOLVED IN THAT TRADE AND SHALL MATCH THE ADJACENT

AND REFINISHING WORK SHALL BE PERFORMED BY THOSE REGULARLY

INSTALLATION OR REMOVAL OF THEIR WORK. ALL PATCHING, REPAIRING

OR EXISTING BUILDING CONSTRUCTION REQUIRED TO ACCOMMODATE THE

PATCHING, REPAIRING, REFINISHING AND REMOVAL/REPLACEMENT OF NEW

CONTRACTOR SHALL BE RESPONSIBLE AND PAY FOR ALL CORING, CUTTING, 7.

COORDINATED BETWEEN ALL CONTRACTORS ON THE PROJECT.

THE SEQUENCE FOR THE INSTALLATION OF ALL WORK SHALL BE 6.

TRADES BEFORE INSTALLING THEIR WORK.

WORK IF SAME WAS INSTALLED WITHOUT CONSULTING WITH OTHER

EXPENSE, FOR THE REMOVAL AND REINSTALLATION OF ANY PART OF THEIR

ROUGH-IN. EACH CONTRACTOR SHALL BE RESPONSIBLE, AT THEIR OWN

CONDITIONS, SHOP DRAWINGS, AND WORK OF OTHER TRADES PRIOR TO

EXACT LOCATIONS OF ALL DEVICES AND EQUIPMENT WITH FIELD

INSTALLATION OF THE NEW WORK. CONTRACTORS SHALL COORDINATE

WORK OUT SPACE CONDITIONS AND MAKE SATISFACTORY ADJUSTMENTS TO

WITH WORK OF OTHER TRADES, ALL TRADES SHALL MEET ON JOB SITE TO

WHERE THERE IS EVIDENCE THAT WORK OF ONE TRADE WILL INTERFERE 5.

AFFECTED TO INSTALL THEIR WORK PROPERLY AND WITHOUT DELAY.

OPENINGS, ETC. NEEDED FOR THEIR WORK TO PERMIT OTHER TRADES

CONDUIT, RACEWAYS, EQUIPMENT, FRAMES, BOXES, SLEEVES AND

AND/OR SHOP DRAWINGS ON LOCATIONS AND SIZES OF PIPING, DUCTWORK,

CONTRACTOR SHALL FURNISH OTHER TRADES ADVANCE INFORMATION 4.

ENSURE ADEQUATE CLEARANCE FOR THE NEW EQUIPMENT.

THE CONTRACTOR SHALL REROUTE EXISTING CONDUITS OR PIPE LINES TO 3.

CLEAR OF OBSTRUCTIONS.

COORDINATE THAT SPACES IN WHICH THEIR WORK WILL BE INSTALLED ARE

CONTRACTOR SHALL REFER TO DRAWINGS OF OTHER TRADES TO 2.

COMPLETION DATE OF THE PROJECT.

MADE WITHOUT ADDITIONAL COST TO THE GOVERNMENT OR DELAY IN

OF OTHER TRADES AND BUILDING CONSTRUCTION. ALL CHANGES SHALL BE

BENDS OR CHANGES IN ELEVATION DUE TO COORDINATION WITH THE WORK

GENERAL ROUTING SHOWN ON THESE DRAWINGS, SUCH AS OFFSETS,

THE CONTRACTOR SHALL MAKE ANY REQUIRED CHANGES FROM THE

THAT MAY BE ENCOUNTERED DURING THE INSTALLATION OF THIS WORK.

EVERY RISE, DROP,OFFSET, FITTING NOR EVERY STRUCTURAL ELEMENT

RACEWAYS, ETC,AS SHOWN ON DRAWINGS, DOES NOT INTEND TO TO SHOW

DRAWINGS ARE GENERALLY DIAGRAMMATIC ROUTING OF PIPING, CONDUITS, 1.

SPECIFICATIONS.

ACCOMMODATE ALL PIPING, SUPPORTS, SLEEVES, ETC. AS REQUIRED BY

CONTRACTOR SHALL VERIFY ALL PENETRATION DIMENSIONS TO 15.

MANUFACTURERS RECOMMENDATIONS.

ALL COOLING SYSTEM COMPONENTS SHALL BE INSTALLED AS PER 14.

PIECE OF EQUIPMENT BEFORE FABRICATION AND INSTALLATION.

AND DETERMINE EXACT ROUTE AND LOCATION OF EACH ELEMENT AND

AND SHALL THOROUGHLY COORDINATE WORK WITH ALL OTHER TRADES

INSTALLATION TO ASSURE PROPER FIT AND AVOIDANCE OF OBSTRUCTIONS,

CONTRACTOR SHALL LAYOUT ALL EQUIPMENT PRIOR TO FABRICATION OR 13.

BEFORE START OF WORK.

OBSTACLES OR INTERFERENCE'S. ALL DIMENSIONS ARE TO BE VERIFIED

CHANGES IN ELEVATION, FITTINGS, OR OFFSETS TO ACCOMMODATE

VERIFY EXACT LOCATION AND ELEVATIONS AT THE SITE. MAKE NECESSARY 12.

AND THE RECTIFIER UNIT.

CONNECTING TO THE PLATE AND FRAME HEAT EXCHANGER, PULSER UNIT,

THE CONTRACTOR SHALL FLUSH THE COOLING SYSTEM PRIOR TO 11.

SYSTEM.

SHALL DEMONSTRATE REMOVAL OF THE ASSEMBLIES FROM THE COOLING

ASSEMBLIES INSTALLATION AND PRIOR TO TESTING, THE CONTRACTOR

ENGINEER LICENSED IN THE STATE OF ILLINOIS. AFTER HEAT EXCHANGER

SUPPORTS AND ALL DETAILS SEALED AND SIGNED BY STRUCTURAL

AND FABRICATION SHOP DRAWINGS SHOWING LAYOUT OF THE PIPE, PIPE

EXTENT OF PIPING AND ELEVATIONS. SUBMIT CALCULATIONS, DRAWINGS

REQUIREMENTS IN THE SPECIFICATIONS. SEE MECHANICAL DRAWINGS FOR

COMPLY WITH THE GOVERNING BUILDING CODE AND THE MINIMUM

EXPANSION AND CONTRACTION OF THE PIPING SYSTEM. DESIGN SHALL

ENGINEER FOR ALL VERTICAL LOADS, THRUST FORCES, AND LOADS FROM

DESIGNED BY THE CONTRACTOR'S ILLINOIS LICENSED STRUCTURAL

OR SAG OVER TIME. THE MODULAR SUPPORT FRAME SYSTEM SHALL BE

SHALL INSURE THE ASSEMBLY SUPPORT FRAME SYSTEM WILL NOT SETTLE

MOVEMENT OCCURS WHEN THE SYSTEM IS OPERATING. THE CONTRACTOR

SUPPORT FRAME/MOVABLE BASE SHALL BE ANCHORED SUCH THAT NO

CONNECTED TO THE COOLING SYSTEM CLOSED LOOPS, THE MODULAR

THE MODULAR SUPPORT FRAME SYSTEM. WHEN THE ASSEMBLIES ARE

INSTRUMENTATION AND COMPONENTS SHALL BE SUPPORTED AS A PART OF

BE LIFTED BY A FORKLIFT. ALL PIPING, HEAT EXCHANGERS,

PEOPLE. IN ADDITION, THE MOVABLE BASE SHALL HAVE THE CAPABILITY TO

MOVABLE BASE SHALL BE DESIGNED TO BE EASILY MANEUVERED BY TWO

MODULAR SUPPORT FRAME SHALL HAVE A MOVABLE BASE ON WHEELS. THE

BUILDING DURING MAINTENANCE SHUTDOWNS (SEE SHEET M-302). THE

CAN QUICKLY MOVE THE ENTIRE HEAT EXCHANGER ASSEMBLY OUT OF THE

SUPPORT STRUCTURE SHALL BE DESIGNED SO THAT THE OPERATIONS TEAM

STRUCTURE FOR THE HEAT EXCHANGER ASSEMBLIES. THE MODULAR

THE CONTRACTOR SHALL DESIGN AND PROVIDE A MODULAR SUPPORT 10.

ENGINEER LICENSED IN THE STATE OF ILLINOIS.

SUPPORTS AND ALL DETAILS SEALED AND SIGNED BY STRUCTURAL

AND FABRICATION SHOP DRAWINGS SHOWING LAYOUT OF THE PIPE, PIPE

EXTENT OF PIPING AND ELEVATIONS. SUBMIT CALCULATIONS, DRAWINGS

REQUIREMENTS IN THE SPECIFICATIONS. SEE MECHANICAL DRAWINGS FOR

COMPLY WITH THE GOVERNING BUILDING CODE AND THE MINIMUM

EXPANSION AND CONTRACTION OF THE PIPING SYSTEM. DESIGN SHALL

ENGINEER FOR ALL VERTICAL LOADS, THRUST FORCES, AND LOADS FROM

DESIGNED BY THE CONTRACTOR'S ILLINOIS LICENSED STRUCTURAL

COOLING SYSTEM PIPING. ALL PIPE SUPPORTS AND CONNECTIONS SHALL BE

SPECIFICATIONS. THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING ALL

INSTALLED IN CONFORMANCE WITH THE REQUIREMENTS SET FORTH IN THE

HANGERS AND SUPPORTS AND DUCT HANGERS AND SUPPORTS SHALL BE

INTENDED TO INDICATE THE GENERAL ARRANGEMENT OF THE PIPING. PIPE

PIPING SUPPORTS AND LOCATIONS SHOWN IN THE PLANS ARE ONLY 9.

COMPLETE AND FULLY OPERATIONAL .

MAKE ALL MECHANICAL EQUIPMENT INSTALLED UNDER THIS PROJECT

INTERLOCKS, ELECTRICAL POWER AND ALL OTHER DEVICES REQUIRED TO

THE CONTRACTOR SHALL PROVIDE ALL CONTROL COMPONENTS, WIRING, 8.

ELECTRICAL CODE AND APPLICABLE STATE AND LOCAL AMENDMENTS.

ELECTRICAL WORK SHALL BE IN CONFORMANCE WITH THE NATIONAL 7.

THE CAPACITY AND DUTY SPECIFIED.

CHARACTERISTICS OF THE EQUIPMENT HE SUBMITS FOR REVIEW MEETS

CONTRACTOR AND/OR MANUFACTURER SHALL VERIFY THAT THE 6.

FOR CLEARANCES, CHASES, RECESSES AND OPENINGS REQUIRED.

CONFER WITH THE OTHER TRADES IN THE COORDINATION OF THIS WORK 5.

EQUIPMENT DRAWINGS ONLY.

FINAL CONNECTION SHALL BE MADE FROM SUBMITTED AND APPROVED

THESE DRAWINGS ARE TO BE USED FOR BIDDING ONLY. ROUGH-IN AND 4.

IMPROPER SUBMITTAL PROCEDURES.

REQUIRED RESULTING FROM THE IMPROPER COORDINATION AND/OR

RESPONSIBLE FOR ALL CHANGES, MODIFICATIONS AND/OR EXTRA SERVICES

THE CONTRACTOR'S RISK. THE CONTRACTOR SHALL BE ENTIRELY

PURCHASED PRIOR TO THE REVIEW OF SUBMITTED DRAWINGS IS DONE AT

INSTALLATION OF ANY EQUIPMENT. ANY WORK STARTED OR EQUIPMENT

SUBMIT COORDINATION DRAWINGS PRIOR TO PURCHASE, FABRICATION, OR 3.

AUTHORITIES HAVING JURISDICTION.

WORK SHALL BE PERFORMED IN ACCORDANCE WITH CODES AND 2.

SAFETY.

STRINGENT REQUIREMENT SHALL APPLY, PROVIDING THE GREATEST

SPECIFICATIONS OR NOTES CONFLICT WITH ANY OTHER: THE MOST

IN THE EVENT THAT ANY PART OF THE MECHANICAL DRAWINGS, 1.

t e r m in a l in p u t t e r m in a l in p u t

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_MD101.dgn

9/19/2019 8:23:00 AM

F

IL

E N

A M

E

-6

L

D

M D

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

MD101MD101

P

IP

IN

G P

L A

N D

E M

O L

IT

IO

N P

IP

IN

G P

L A

N D

E M

O L

IT

IO

N

C O

O L

IN

G S

Y S

T E

M C

O O

L

IN

G S

Y S

T E

M

TANKS DURING DEMOLITION WORK IN THE PUMP ROOM.

CONTRACTOR SHALL ENSURE NOT TO DAMAGE THE EXPANSION

EXPANSION TANKS AS REQUIRED PER CONTRACT DRAWINGS. THE

NEW COOLING SYSTEM. THE CONTRACTOR SHALL RELOCATE THE

THE FOUR EXPANSION TANKS SHALL BE REUSED AS PART OF THE 10.

OR PLUGGED.

ALL REMAINING UNUSED UNDERGROUND PIPING SHALL BE CAPPED 9.

CONFLICTING OPTIONS.

GREATEST SAFETY AND/OR AT THE HIGHEST COST OF THE

STRINGENT REQUIREMENT SHALL APPLY, PROVIDING THE

SPECIFICATIONS OR NOTES CONFLICT WITH ANY OTHER: THE MOST

IN THE EVENT THAT ANY PART OF THE MECHANICAL DRAWINGS, 8.

PIPES ARE NOT SHOWN IN THIS DRAWING.

ALL BRAIDED STEEL FLEXIBLE PIPES TO BE REMOVED. THE BRAIDED STEEL 7.

DEMOLISHED MATERIAL SHALL NOT BE REUSED.

ALL DEMOLISHED MATERIAL SHALL BE DISPOSED OF OFF SITE. 6.

SMOKE RATED ASSEMBLIES.

MATCH EXISTING. PROVIDE FIRE STOPPING AT ALL FIRE RATED AND

CLOSE ALL UNUSED PIPE OPENINGS IN WALLS AND FLOORS TO 5.

NEW CONSTRUCTION.

AREA. ADJACENT FINISHES TO REMAIN SHALL BE PREPARED FOR

PIPE, CONDUIT, WIRING, DUCTS, ETC. AND BE REMOVED FROM THE

CONSTRUCTION INCLUDING ALL HANGERS, ANCHORS, FASTENERS,

REMOVED, IT SHALL BE COMPLETE FOR THAT ITEM OF

WHERE ITEMS OF CONSTRUCTION ARE SHOWN OR NOTED TO BE 4.

DEMOLITION AND NEW CONSTRUCTION.

SHORING, BRACING AND SCAFFOLDING REQUIRED FOR BOTH

CONTRACTOR SHALL DESIGN AND PROVIDE ALL NECESSARY 3.

CONSTRUCTION WORK SHOWN ON THE DRAWINGS FOR ALL TRADES.

THE CONTRACTOR SHALL COORDINATE DEMOLITION AND NEW 2.

MECHANICAL CONTRACTORS WORK.

THE MECHANICAL DEMOLITION DRAWINGS SHALL BE UNDER THE

ALL DEMOLITION OF THE MECHANICAL SYSTEMS AS CALLED FOR ON 1.

F A

Y E L

E F F

L E

R P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

K P

C

F L

K

IR

IL

Z

U M

B U

L E

V

C1

SCALE: 1/4" = 1' 0 4' 8'2'

NORTH

PLAN

TRUE N

COOLING SYSTEM PIPING PLAN DEMOLITION

STEEL BRAIDED HOSES NOT SHOWN ON THE DRAWING

LOOPS. ALL STEEL BRAIDED HOSES SHALL BE REMOVED.

STEEL BRAIDED HOSES ARE UTILIZED FOR THE PULSER

AND NEW PIPES

PROPERCONNECTION BETWEEN OLD

IN ORDER TO ALLOW FOR

MINIMUM OF 12" ABOVE FLOOR LEVEL

EXISTING PIPE SHALL BE LEFT AT A

AFTER BEING SHORTENED, THE

PULSER 1

PULSER 2

PULSER 3

BURIED PIPING SHALL REMAIN IN PLACE

PLACE OR RELOCATED AS REQUIRED. (SEE MD-501 AND MD-502)

ELECTRICAL AND FIRE PROTECTION EQUIPMENT SHALL REMAIN IN

BE REUSED AS PART OF THE NEW COOLING SYSTEM. ALL

DURING DEMOLITION WORK. THE FOUR EXPANSION TANKS SHALL

COMPONENTS SO AS NOT TO DAMAGE THE EXPANSION TANKS

CONTRACTOR SHALL CAREFULLY REMOVE THE COOLING SYSTEM

LIMITED TO: PIPING, VALVES, GAUGES, AND PUMPS. THE

REMOVE ALL COOLING SYSTEM EQUIPMENT SUCH AS, BUT NOT

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_MD102.dgn

3/2/2020 1:50:26 PM

F

IL

E N

A M

E

-6

L

D

M D

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

MD102MD102

F A

Y E L

E F F

E L

R ,P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

E L

R ,P

E

K P

C

F L

K

IR

IL

Z

U M

B U

L E

V

C O

O L

IN

G T

A N

K C

O O

L

IN

G T

A N

K

OR PLUGGED.

ALL REMAINING UNUSED UNDERGROUND PIPING SHALL BE CAPPED 9.

SHALL BE DEMOLISHED AND BACK FILLED.

THE UNDERGROUND PIPING ON THE EAST SIDE OF THE WATER TANK 8.

CONFLICTING OPTIONS.

GREATEST SAFETY AND/OR AT THE HIGHEST COST OF THE

STRINGENT REQUIREMENT SHALL APPLY, PROVIDING THE

SPECIFICATIONS OR NOTES CONFLICT WITH ANY OTHER: THE MOST

IN THE EVENT THAT ANY PART OF THE MECHANICAL DRAWINGS, 7.

STEEL PIPES ARE NOT SHOWN IN THIS DRAWING.

ALL BRAIDED STEEL FLEXIBLE PIPES TO BE REMOVED. THE BRAIDED 6.

WORK CONTRACT.

THE DEMOLITION CONTRACT, MAY BE REUSED UNDER THE NEW

THE BUILDING SITE. NO ITEM, WHICH IS BEING REMOVED UNDER

MECHANICAL CONTRACTOR WILL REMOVE ALL SUCH ITEMS FROM

SITE. DEMOLISHED MATERIAL SHALL NOT BE REUSED. THE

NOTED. ALL DEMOLISHED MATERIAL SHALL BE DISPOSED OF OFF

BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE

ALL EQUIPMENT, MATERIAL, ETC. THAT IS BEING DEMOLISHED WILL 5.

SMOKE RATED ASSEMBLIES.

MATCH EXISTING. PROVIDE FIRESTOPPING AT ALL FIRE RATED AND

CLOSE ALL UNUSED PIPE OPENINGS IN WALLS AND FLOORS TO 4.

NEW CONSTRUCTION.

AREA. ADJACENT FINISHES TO REMAIN SHALL BE PREPARED FOR

PIPE, CONDUIT, WIRING, DUCTS, ETC. AND BE REMOVED FROM THE

CONSTRUCTION INCLUDING ALL HANGERS, ANCHORS, FASTENERS,

REMOVED, IT SHALL BE COMPLETE FOR THAT ITEM OF

WHERE ITEMS OF CONSTRUCTION ARE SHOWN OR NOTED TO BE 3.

DEMOLITION AND NEW CONSTRUCTION.

SHORING, BRACING AND SCAFFOLDING REQUIRED FOR BOTH

CONTRACTOR SHALL DESIGN AND PROVIDE ALL NECESSARY 2.

CONSTRUCTION WORK SHOWN ON THE DRAWINGS FOR ALL TRADES.

THE CONTRACTOR SHALL COORDINATE DEMOLITION AND NEW 1.

D E

M O

L

IT

IO

N D

E M

O L

IT

IO

N

A2

SCALE: 1/2" = 1' 0 2' 4'1'

NORTH

PLAN

TRUE N

DEMOLITION PLAN

LEGEND

DEMOLISH WATER TANK PIPING TO VALVE AND CONVERT TO AREA DRAINS

DEMOLISH WATER TANK PIPING TO VALVE AND CONVERT TO AREA DRAINS

DEMOLISH WATER TANK PIPE TO VALVE AND CAP PIPE AT VALVE

BUILDING SLAB

UNUSED UNDERGROUND PIPING AT

CAP OR PLUG ALL REMAINING

13 3" PVC PIPE

25 6"X2" PVC REDUCER

25A 6"X3" PVC REDUCER

25A

EXISTING WATER TANK

PROPER CONNECTION.

ARE LONG ENOUGH TO MAKE A

SPANG) COOLING LOOP PIPES

FROM SLAB. ENSURE RECTIFIER (

BE DEMOLISHED TO 1' AWAY

ALL UNDERGROUND PIPING SHALL

INSTRUMENTS ABOVE GROUND.

WITH ALL PIPING, VALVES AND

REMOVE EXISTING WATER TANK

OF THE BUILDING. SEE SHEET MD-502.

RELOCATED TO THE SOUTH EAST CORNER

WALL. THE TWO PULL STATIONS SHALL BE

THERMOSTAT ON THE BUILDING'S EAST

THE CONTRACTOR SHALL RELOCATE THE

THE COOLING SKID

RAISED UP AS TO NOT INTERFERE WITH

ABOVE ARE TO BE REROUTED OR

ALL CONDUIT, PIPING AND SUPPORTS

STATIONS ON THE "I BEAM" NEXT TO THE OVERHEAD DOOR.

THE CONTRACTOR SHALL INSTALL THE THERMOSTAT AND THE TWO PULL 1.

WITH IT.

WIRING ASSOCIATED

ALL CONDUIT AND

THE NORTH WALL AND

CONTROLLER FROM

TEMPERATURE

COOLING TANK

SHALL REMOVE THE

THE CONTRACTOR

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_MD501.dgn

3/2/2020 1:53:55 PM

F

IL

E N

A M

E

-6

L

D

M D

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y

E K

E F F

L E

R P

E

MD501

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E K

E F F

L E

R P

E

MD501

K P

C

F L

K

IR

IL

Z

U M

B U

L E

V

B1

SCALE: NTS

E L E

C T

R

IC

C

O N

D U

IT

S R

E L

O C

A T

IO

N E

L E

C T

R

IC

C

O N

D U

IT

S R

E L

O C

A T

IO

N

B5

SCALE: NTS

SPACE BETWEEN PULSER 1 AND BUILDING SOUTH WALL BUILDING SOUTH WALL

FROM SOUTH WALL

BUILDING THERMOSTAT

NEW LOCATION OF THE

DEMOLITION WORK

PRIOR TO CONTRACTOR'S

UNITS WILL BE REMOVED

STATIONS (SEE SHEET MD-501)

FIRE PROTECTION PULL

LOCATION OF THE RELOCATED

GENERAL NOTES

STATIONS ON THE "I BEAM" NEXT TO THE OVERHEAD DOOR.

THE CONTRACTOR SHALL INSTALL THE THERMOSTAT AND THE TWO PULL 1.

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_MD502.dgn

3/2/2020 1:57:12 PM

F

IL

E N

A M

E

-6

L

D

M D

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y

E L

E F F

L E

R P

E

MD502

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

MD502

K P

C

F L

K

IR

IL

Z

U M

B U

L E

V

B2

SCALE: NTS

T H

E R

M O

S T

A T A

N D P

U L L S

T A

T

IO

N R

E L

O C

A T

IO

N T

H E

R M

O S

T A

T A

N D P

U L L S

T A

T

IO

N R

E L

O C

A T

IO

N

EAST BUILDING WALL, NORTH OF OVERHEAD DOOR

B7

BUILDING SOUTH-EAST CORNER

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-101.dgn

3/4/2020 12:29:25 PM

F

IL

E N

A M

E

-6

L

D

M -1

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

1/4" = 1'-0"

(FOR 30' RUN)

L/4

PULSER 2

PULSER 1

PUMP 1

PUMP 2

CHILLER

HX-1 (BOTTOM)

HX-2 (TOP)

HX-3 (BOTTOM)

HX-4 (TOP)

2" CHW TO HX-2 B/9'-11"

2" CHW TO HX-1 B/ 9'-11"

2" CHW TO PULSER 2&3 B/ 9'-4 3/4"

2" TO PULSER 1&3 B/ 9'-4 3/4"

LEAVING HX-3

HX-3 & HX-4 DN TO EXISTING

UNDERGROUND

<6"CHW

DN TO EXISTING

UNDERGROUND

GUIDE TYP.

(SEE DETAIL)

ANCHOR TYP.

(SEE DETAIL)

< 2" CHW TO HX 3

2" CHW TO PUMP 1 >

2" CHW TO PULSER 1&3 >

2" CHW TO PULSER 2&3 >

< 2" CHW TO HX 1

< 2" CHW TO HX 2

< 4"CHW

4"CHW >

<2'-6 3/4"

ABOVE GROUND

PIPING HEAT TREATED

6'-2"

22'-2 5/8"

.6

5'-3 1/4"

FIT-3

(30 GPM)

PIPING WILL BE TRAPEZED

UNDER DOOR RAILS

FIT-7

(30 GPM)

PULSER 3

C

H W F

R O

M H

X

C

H W T

O P

U M

P

C

H W T

O P

U M

P

C

H W T

O P

U M

P

C

H W F

R O

M H

X

C

H W T

O P

U M

P

C

H W F

R O

M H

X

C

H W F

R O

M H

X

B/9'-7 1/2"

B/8'-8"

< 2" CHW TO HX 4

2" CHW TO PUMP 2 >

PUMP 3

PUMP 4

"1

FP TANK-1

FP TANK-2

PIPING BETWEEN CHILLER

AND HEAT EXCHANGER TO

BE INSULATED

BUSBAR

1'-0"

FIELD COORDINATE

INSTSALLATION OF GUIDE

AT THIS LOCATION

LEAVING HX-4

5'-5 3/8"

2'-1 1/8"

PULSER 1 TO HX FRAME

FIT-6

PETES PLUG

PETES PLUG

3'-7 3/4"

4'-2 1/4"

4'-11 1/2"

5'-8 3/8"

5'-8 3/8"

6'-1"

3'-7 3/4"

4'-4 1/4"

11'-2 3/4" 0'-7 3/8"

1'-10 1/2"

3'-7 1/4"

2'-10 5/8"

0'-10 1/2"

2'-10 3/8"

B/9'-5"

B/9'-10"

B/5'-3 1/8"

6" CHW SUPPLY

B/6'-3 1/2"

6" CHW RETURN

B/9'-11"

B/9'-8 7/8"

B/1'-5 3/8"

B/10'-3" B/10'-2"

CONNECTION DETAILS

FOR FINAL PULSER

SEE SHEET M-301

PUMP 2

PUMP 1

PUMP 4

PUMP 3

PULSER 1

PUMP-1

HX-1

PULSER 2

PUMP-2

HX-2> >

PULSER 3

PUMP-3

HX-3

PUMP-4

HX-4> >

UNDERGROUND

Y E L

E F F

L E

R P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

M-101

K P

C

F L

K

IR

IL

Z

U M

B U

L E

V

P L

A N V

IE

W

SEE PLANS FOR THIS

MINIMUM DIMENSION

4"

OFFSET

6"

6"

6"

6"

6"

6"

8"

7' 11 5/8"

BOTTOM OF L-ANGLE

FINISHED FLOOR

30°

4" C-CHANNEL

2 x 2 x 1/8 L-ANGLE

NOTE: JOINTS TO BE FILLET WELDS

SEE PLANS FOR LOCATION OF GUIDES

SCALE: 1/4" = 1'

E1

PLAN VIEW

4'0 2' 8'

B2

COMPLETE SYSTEM ISOMETRIC

SCALE: 3/16" = 1'

EXPANSION GUIDE DETAIL

NTS

EXPANSION ANCHOR DETAIL

NTS

S -B

U

IL

T C

O N

D

IT

IO

N S

/0

/2

/2

/2

C

S S

C B

A R

E V

IS

IO

N S

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-301.dgn

3/4/2020 8:26:25 AM

F

IL

E N

A M

E

-6

L

D

M -3

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y E L

E F F

L E

R P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

M-301

K P

C

F L

K

IR

IL

Z

U M

B U

L E

V

NTS

NTS

NTS

NTS

S -B

U

IL

T C

O N

D

IT

IO

N S

/0

/2

/2

/2

C

S S

C B

A R

E V

IS

IO

N S

3 4

NTS

NTS

PULSER 1 - VIEW 1

PULSER 1 - VIEW 2

PULSER 2 - VIEW 1

PULSER 2 - VIEW 2

PULSER 3 - VIEW 1

PULSER 3 - VIEW 2

P U

L S

E R C

A B

IN

E T P

IP

IN

G

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-302.dgn

3/10/2020 12:18:52 PM

F

IL

E N

A M

E

-6

L

D

M -3

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y E L

E F F

L E

R P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

M-302

K P

C

F L

K

IR

IL

Z

U M

B U

L

V

S -B

U

IL

T C

O N

D

IT

IO

N S

/0

/2

3/4" = 1' - 0"

1" = 1' - 0"

NTS

NTS

HEAT EXCHANGER ASSEMBLIES

HEAT EXCHANGER FRAMES

HEAT EXCHANGER PUMP SIDE - ISO

HEAT EXCHANGER CHILLER SIDE - ISO

3 4

/2

/2

C

S S

C B

A R

E V

IS

IO

N S

DISCONNECTION POINTS

SPACERS SHOWN ON CONTRACT DRAWINGS WERE REMOVED.

NOTE:

* 3" AND SMALLER PIPE -1" THICK FLEXIBLE ELASTOMETRIC

* 4-6" DIA. PIPE -1.5" THICK CELLULAR GLASS

INDOOR CHW:

* 3" THICK CELLULAR GLASS INSULATION WITH ALUMINUM JACKETING.

OUTDOOR CHW:

CHILLER SIDE PIPING ARE INSULATED.

NOTE:

A T E

X C

H A

N G

E R A

S S

E M

B L

IE

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-303.dgn

3/4/2020 12:41:46 PM

F

IL

E N

A M

E

-6

L

D

M -3

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y E L

E F F

L E

R P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

M-303

K P

C

F L

K

IR

IL

Z

U M

B U

L

/2

/2

C

S S

C B

A R

E V

IS

IO

N S

1/2" = 1'

"16 55'-4"8

522'-2

"16 115'-1

"4 34'-6

"2 14'-4

"16 13'-10

"16 153'-

"16 31'-7

"16

"16

1"

"16

"16

"16 111'-

"16 151'-6

"16 132'-

"16 34'-7

CHILLER

4"CHW>

<4"CHW

<6"CHW

PETES PLUG

PETES PLUG

CHILLER & HEAT EXCHANGER ELEVATION

C H

IL

L E

R H

E A

T E

X C

H A

N G

E R E

L E

V A

T

IO

N

3 4

SLAB

TOP OF

EQUIPMENT

TOP OF

DOOR RAILS

TRAPEZED UNDER

PIPING WILL BE

FRAME

HEAT EXCHANGER

EXISTING UNDERGROUND

HX-3 & HX-4 DN TO

PIPING HEAT TREATED

ABOVE GROUND

BE INSULATED

AND HEAT EXCHANGER TO

PIPING BETWEEN CHILLER

RETURN

6" CHW

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-304.dgn

3/11/2020 7:16:38 AM

F

IL

E N

A M

E

-6

L

D

M -3

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y E L

E F F

L E

R P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

M-304

K P

C

F L

K

IR

IL

Z

U M

B U

L

S -B

U

IL

T C

O N

D

IT

IO

N S

/0

/2

3 4

/2

/2

C

S S

C B

A R

E V

IS

IO

N S

ON M-302

INFORMATION COMBINED

IN

F

O R

M A

T

IO

N C

O M

B

IN

E D O

N D

R A

W

IN

G M

-3

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-305.dgn

3/11/2020 7:17:15 AM

F

IL

E N

A M

E

-6

L

D

M -3

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y E L

E F F

L E

R P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

M-305

K P

C

F L

K

IR

IL

Z

U M

B U

L E

3 4

S -B

U

IL

T C

O N

D

IT

IO

N S

/0

/2

/2

/2

C

S S

C B

A R

E V

IS

IO

N S

ON M-302

INFORMATION COMBINED

IN

F

O R

M A

T

IO

N C

O M

B

IN

E D O

N D

R A

W

IN

G M

-3

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-306.dgn

3/4/2020 8:39:42 AM

F

IL

E N

A M

E

-6

L

D

M -3

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

HX-2

HX-1

B

(B Y

P A

S S

TEMP.

SENSOR

FIT-2

TEMP.

SENSOR

2" BV

(BYPASS)

2" BV

2" PCV

2" BV

2" PCV

2" NPT TYP. X4

/2

V E

N T

3/4"

DRAIN

3/4" DRAIN

/2

V E

B V

PETES

PLUG

PETES

PLUG

PETES

PLUG

B V

B V

B V

/2

V E

N T

3" BV

PETES

PLUG

3" BV

(BYPASS)

PETES

PLUG

FI-15

3/4"

DRAIN

3" PCV

FI-16

/2

V E

N T

3/4"

DRAIN

3" C

HW

3"CHW

3"CHW

"C

H W

4" C

HW

4" C

HW

2" NPT TYP. X4

HX-1

HX-2

PETES

PLUG

3" PCV

3" BV

3" BV

3" BV

4" CHW RETURN TO CHILLER

4" CHW FROM

CHILLER TO HEAT

EXCHANGERS

D

IS

C O

N N

E C

T

IO

IN

T S

D

IS

C O

N N

E C

T

IO

IN

T S

2" BV DISCONNECTION POINTS

C H

W R

E T

U R

N T

O E

X

IS

T

U N

D E

R G

R O

U N

D

C H

W F

R O

M P

U M

P

C H

W F

R O

M P

U M

P

2" CHW RETURN TO

EXIST. UNDERGROUND

/2

V E

N T

3" BV

3" PCV

3" PCV

B V

B

(B Y

P A

S S

3" BV

(BYPASS)

FI-14

FI-13

3/4" DRAIN

3/4" DRAIN

/2

V E

N T

PETES

PLUG

PETES

PLUG

HX-3

HX-4

2" NPT TYP.X4

4" CHW

4" CHW

3" CHW

3" CHW

3" C

H W

3" BV

PETES

PLUG

/2

V E

N T

/2

V E

N T

3/4" DRAIN

2" BV

(BYPASS)

2" PCV

2" PCV

2" BV

TEMP

GAUGE

FI-10

FI-12

TEMP

GAUGE

PETES

PLUG

2" BV

2" BV

(BYPASS)

3/4" DRAIN

2" NPT

TYP. X4

HX-3

HX-4

PETES

PLUG

PETES

PLUG

2" BV

2" BV

2" BV

2" BV

Y E L

E F F

L E

R P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

M-306

K P

C

F L

K

IR

IL

Z

U M

B U

L E

V

H E

A T E

X C

H A

N G

E R

A S

S E

M B

L Y D

E T

A

IL

S

NTS

NTS

HEAT EXCHANGER 1 & 2 PUMP SIDE HEAT EXCHANGER 1 & 2 CHILLER SIDE

NTS

NTS

HEAT EXCHANGER 3 & 4 PUMP SIDE HEAT EXCHANGER 3 & 4 CHILLER SIDE

S -B

U

IL

T C

O N

D

IT

IO

N S

/0

/2

/2

/2

C

S S

C B

A R

E V

IS

IO

N

3 4

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-307.dgn

3/4/2020 9:21:31 AM

F

IL

E N

A M

E

-6

L

D

M -3

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

PUMPS 1 THROUGH 4 - LOOKING WEST

P1

P2

FP TANK 2

FP TANK 1

PUMPS 1 THROUGH 4 - LOOKING SOUTH

5' 5-3/8"

FROM WALL TO CHW DROP

(TYPICAL X4)

NOTE: DIMESNIONS FOR PUMP 1 & PUMP 2 ARE TYPICAL NOTE: DIMESNIONS FOR PUMP 3 & PUMP 4 ARE TYPICAL

10' 11"

CENTER OF PUMPS TO WALL

(TYPICAL X4)

Y STRAINER

CHECK

VALVE

PI-11

GATE

VALVE

PUM

P 3

PRESSURE

RELIEF

VALVE

2" PCV

1' W

FIT-9

PI-10

2" BALL

VALVE

6' 3" L

ACCESS

ZONE

6' H

ACCESS

ZONE

GATE VALVE

2" PCV

6' H

3/4"

DRAIN

1" BALL

VALVE

PI-9

3/4" BALL

VALVE

6' 3" L

PRESSURE

RELIEF VALVE

FLEX HOSE TO

STORAGE TANK

3/4" PCV

2" C

HW

F

ROM

P

UM

P

TO

HEAT

EXCHANGER

2" C

HW

ROM

UNDERGROUND

1' W

AIR

SEPPERATOR

STORAGE

TANK

Y STRAINER

CHECK

VALVE

PI-15

GATE

VALVE

PUM

P 4

PRESSURE

RELIEF

VALVE

2" PCV

FIT-11

PI-14

2" BALL

VALVE

6' 3" L

6' H

ACCESS

ZONE

GATE VALVE

2" PCV

3/4"

DRAIN

1" BALL

VALVE

PI-13

3/4" BALL

VALVE

PRESSURE

RELIEF VALVE

FLEX HOSE TO

STORAGE TANK

3/4" PCV

2" C

HW

F

ROM

P

UM

P 4T

O

HEAT

EXCHANGER

2" CHW

FROM

UNDERGROUND

1' W

EXPANSION

TANK

AIR

SEPERATOR

STORAGE

TANK

-7 /8

-1 /2

" 5 -3 /4

-1 /4

-1 /8

-7 /8

6' 4"

4' 2-3/8"

3' 3-7/8"

2' 3-/4"

-1 /8

5-1/8"

'4 -1 /4

WALL

2" C

H W F

R O

M P

U M

TO

EAT

EXC

H

AN

G

ER

Y STRAINER

2" P

CV

PRESSURE

RELIEF VALVE

EXPANSION

TANK

CHECK VALVE

PI-4

AIR

SEPERATOR

PCV

PUM

P

PRESSURE

RELIEF VALVE

PCV

FLEX HOSE TO

STORAGE TANK

1' W

FIT-4

(3GPM)

3/4"PCV

PI-1

3/4"

BALL

VALVE

FIT-1

PI-2

B Y

P A

S S F

E E

D E

R

STORAGE

TANK

3/4"

PCV

6' 3" L

6' H

ACCES

S

ZO

NE

GATE VALVE

GATE VALVE

-1 /8

-1 /4

-1 /8

-3 /4

5-1/8"

-3 /4

-1 /8

-1 /2

FI

NI

SHED

FL

O O

R

2' 2- 3/4

3' 4"

4' 2- 3/8

6' 4"

7' 8- 1/4

" 2" C

H W F

R

PU

LS

ER

&3

-1 /4

3/4" BALL

VALVE

WALL

WALL

P1

P2 P3

P4

FP T

ANK 2

FP T

ANK 1

1' 2-1 /4"

3' 8-1 /4"

6' 2-3 /8"

8' 8-1 /8"

2" C

H W F

R O

M P

U M P

TO

EAT

EXC

H

AN

G

Y STRAINER

2" P

CV

PRESSURE

RELIEF VALVE

EXPANSION

TANK

CHECK

VALVE

PI-8

>2" C

HW

F

RO

PULS

GATE VALVE

AIR

SEPERATOR

PCV

PUM

P

PRESSURE

RELIEF

VALVE

2" PCV

FLEX HOSE TO

STORAGE TANK

1' W

FIT-8

(3GPM)

3/4"PCV

PI-5

3/4" BALL

VALVE

FIT-1

PI-6

B Y

P A

S S F

E E

D E

R

3/4"

PCV

6' 3" L

6' H

ACCES

S

ZO

NE

1' W 6' 3" L

6' H

ACCES

S

ZO

NE

3/4"BALL

VALVE

GATE VALVE

2" PCV

Y E L

E F F

L E

R P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

M-307

K P

C

F L

K

IR

IL

Z

U M

B U

L

S -B

U

IL

T C

O N

D

IT

IO

N S

/0

/2

NTS

PUMP 1 - ISO VIEW PUMP 2 - ISO VIEW

NTS

PUMP 3 - ISO VIEW

NTS

PUMP 4 - ISO VIEW

NTS

NTS

PUMPS 1 THROUGH 4 + LOOKING SOUTH

NTS

PUMPS 1 THROUGH 4 + LOOKING WEST

P U

M P A

S S

E M

B L

Y D

E T

A

IL

/2

/2

3 4

P4 P3

P2 P1

C

S S

C B

A R

E V

IS

IO

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-308.dgn

3/4/2020 2:28:26 PM

F

IL

E N

A M

E

-6

L

D

M -3

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y E L

E F F

L E

R P

E

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

M-308

K P

C

F L

K

IR

IL

Z

U M

B U

L

/2

/2

NTS

NTS

NTS

NTS

PUMP 1 - REVERSE ISO PUMP 2 - REVERSE ISO PUMP 3 - REVERSE ISO PUMP 4 - REVERSE ISO

BALL VALVE

FILL FUNNEL

AIR RELEASE VALVE

DRAIN VALVE WITH HOSE ADAPTER

FLOOR STAND

FEEDER

BYPASS

FI

A R

V

NTS

HIGH PRESSURE BYPASS FEEDER

C

S S

C B

A R

E V

IS

IO

N S

P U

M P A

S S

E M

B L

Y D

E T

A

IL

S R

E V

E R

S

D

NOT TO SCALE

FIRE RATED SEALANT

ONE-HOUR

FIRE-STOPPING MATERIAL

WHERE REQUIRED

PIPE INSULATION

PIPE

WHEN PIPING IS VISIBLE

ESCUTCHEON PLATE

INSTALL CHROME

CUT HOLE FOR PIPE

CONCRETE OR CMU,

BACKING MATERIAL

MINERAL WOOL

PIPE SLEEVE

PENETRATIONS.

STOPPING AND PIPE

DETAILS ABOUT FIRE

SEE SPECIFICATION FOR

NOTE:

2" PIPE AND GREATER (COLD)

2" PIPE AND GREATER (HOT)

INSULATION JACKET (TYPICAL)

PIPE INSULATION (TYPICAL)

PROTECTION SADDLE TYPE-39

MSS-SP-69

TYPE-40

PROTECTION SHIELD

MSS-SP-69

TYPE-40

PROTECTION SHIELD

MSS-SP-69

(HOT OR COLD)

1½" PIPE AND SMALLER

WHERE EXPANSION IS PRESENT:

PIPE INSULATION AT HANGERS

WHERE EXPANSION IS NOT PRESENT:

PIPE INSULATION AT HANGERS

B2

PIPE INSULATION AT HANGERS AND SCHEDULE

NOT TO SCALE

E2

PIPE PENETRATION DETAIL

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

RECORD DRAWING

...\DGN\114466-6L84D0_M-501.dgn

9/19/2019 8:21:57 AM

F

IL

E N

A M

E

-6

L

D

M -5

.d g n

A N

S I

D

W P -1

-B -0

W P -1

-C -0

P R

O J E

C T I

D

S E

P

L O

C K

P O

R T

IL

L

IN

O

IS

C O

O L

IN

G S

Y S

T E

M R

E P

L A

C E

M E

N T

B A

R R

IE

R

A

C H

IC

A G

O S

A N

IT

A R

Y S

H

IP

C

A N

A L

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C H

IC

A G

O

IL

L

IN

O

IS

S L

A S

A L L E S

T S

U

IT

E

C H

IC

A G

O D

IS

T R

Y

E L

E F F

L E

R P

E

D E

T A

IL

S

M-501

K P

C

K

IR

IL

Z

U M

B U

L E

V

F L

F A

Y E L

E F F

L E

R P

E

D E

T A

IL

S

M-501

K P

C

F L

K

IR

IL

Z

U M

B U

L

6"PIPE

6"PIPE

4" PIPE

4" PIPE

4" PIPE

3" PIPE

ET

UNION

EXPANSION TANK

BALL VALVE

CHECK VALVE

PUMP

TEE

ELBOW

DRAIN VALVE

FLEXIBLE COUPLING

HOSE BIB AND DRAIN

Y STRAINER

BASKET STRAINER

PRESSURE RELIEF VALVE

DGV

ARV

DEGASSING VALVE

AIR RELEASE VALVE

PETE'S PLUGPP

45° TAKEOFF

T

NOTES:

LEGEND

N.O.

N.C.

PPPP

(2

P

PI-3

P1

START UP

INITIAL

DURING

BY-PASS

FULL FLOW

PP

T

(2

P

PPF

I-

110 PSI

SET POINT

PRESSURE

START UP

INITIAL

DURING

BY-PASS

FULL FLOW

NORMALLY OPENED

NORMALLY CLOSED

DURING INITIAL START UP

FULL FLOW BY-PASS

PP PP

PP

T

CHILLER UNIT

PULSER 1 PULSER 2 PULSER 3 SPANG 1 SPANG 2 SPANG 3

TS

PPPP

START UP

INITIAL

DURING

BY-PASS

FULL FLOW

TS

DURING INITIAL START UP

FULL FLOW BY-PASS

DURING INITIAL START UP

FULL FLOW BY-PASS

PP

PP

PP

F I-

PP

HEAT EXCHANGER 4

PLATE/FRAME

HEAT EXCHANGER 3

PLATE/FRAME

HEAT EXCHANGER 2

PLATE/FRAME

HEAT EXCHANGER 1

PLATE/FRAME

F I-

PP

PCV PCV

PCV

PCV

DURING TAB)

INITIAL SETTINGS

N.O. (ADJUSTABLE,

(3

P

DURING TAB)

INITIAL SETTINGS

N.O. (ADJUSTABLE,

(3

P

(3

P

N.O. (ADJUSTABLE,

(3

P

N.O. (ADJUSTABLE,

PIPING REDUCER

PCV

TEMPERATURE GAUGE

CONTROL BALL VALVE

PROPORTIONAL

FM FLOW METER

(2

P

ET

PI-4

AS

ET

PCV

P C

V

V F

D

130 PSI

SET POINT

PRESSURE

PCV

PCV

PI-2

PI-1

BF P2

PI-8

ET

PCV

P C

V

V F

D

130 PSI

SET POINT

PRESSURE

PI-5

3/4" NPT FILL POINT

15PSI

PRESSURE

TANK AIR

EXPANSION

INITIAL

V F

D

PI-11

PI-10

PI-9

DURING TAB)

INITIAL SETTINGS

N.O. (ADJUSTABLE,

PP

T

(2

P

PPF

I-

2" PIPE

START UP

INITIAL

DURING

BY-PASS

FULL FLOW

ET

15PSI

PRESSURE

TANK AIR

EXPANSION

INITIAL

V F

D

PI-14

110 PSI

SET POINT

PRESSURE

DURING TAB)

INITIAL SETTINGS

N.O. (ADJUSTABLE,

PI-13

P

P

PI-12 PI-16

PI-15

FLOW INDICATOR

BYPASS FEEDER

FI

AS AIR SEPERATOR

BF

PI-7

PI-6

135 PSI

STORAGE CONTAINER

135 PSI

F I-

F I-

15PSI

PRESSURE

TANK

EXPANSION

INITIAL

TANK

STORAGE

15PSI

PRESSURE

TANK

EXPANSION

INITIAL

PCV

AS

PCV

AS

GATE VALVE

PCV

AS

F I-

BF

PCV

PCV PCV

F I-

BF

PCV

PCVPCV

DURING INITIAL START UP

FULL FLOW BY-PASS

PRESSURE INDICATOR

VFD VARIABLE FREQUENCY DRIVE

PCV 4"

POINTS

DISCONNECTION

HX ASSEMBLY

POINTS

DISCONNECTION

HX ASSEMBLY

POINTS

DISCONNECTION

HX ASSEMBLY

POINTS

DISCONNECTION

HX ASSEMBLY

POINTS

DISCONNECTION

HX ASSEMBLY

2" CPVC, 30 GPM, NOMINAL FLOW 2" CPVC, 30 GPM, NOMINAL FLOW

2" CPVC, 10 GPM, NOMINAL FLOW

PP

PP

F

IT

-3

F

IT

-7

FIT-4

F

IT

-1

F

IT

-2

F

IT

-6

F

IT

-1

BF

PCV

FIT-8

PI-

FIT FLOW TRANSDUCER

HX ASSEMBLY DISCONNECTING POINT

4" PIPE 145 GPM NOMINAL FLOW RATE

INSTALLATION.

INSIDE THE PULSER CABINETS PRIOR TO NEW PIPE LINES

THE CONTRACTOR SHALL VERIFY THE CONNECTION POINTS 8.

MANUFACTURERS RECOMMENDATIONS.

CONTRACTOR SHALL PROVIDE PUMP SUPPORTS PER 7.

BE COMPATIBLE WITH DEIONIZED WATER APPLICATION.

ALL DI WATER LOOP COOLING SYSTEM COMPONENTS SHALL 6.

THERMOWELLS SHALL BE INSTALLED BY THE CONTRACTOR.5.

REQUIRED PER SPEC. SECTION 23 64 26.

CONTRACTOR SHALL INSTALL EXPANSION JOINTS AS 4.

FOR VALVES AND PIPE FITTINGS.

CONTRACTOR SHALL INSURE CLEARANCE BETWEEN PIPES 3.

POINTS AND DRAINS AT ALL LOW POINTS OF THE PIPING.

CONTRACTOR SHALL INSTALL AIR VENTS AT ALL HIGH 2.

CPVC SCHEDULE 80 (SEE SPECIFICATIONS.

ALL COOLING PIPES AND ASSOCIATED FITTINGS SHALL BE 1.

RATE

FLOW

NOMINAL

40 GPM

PIPE

SCH 80

2" CPVC

80 PIPE

2" CPVC SCH

RATE AT 69° F

NOMINAL FLOW

PIPE, 40 GPM

2" CPVC SCH 80

PIPE

SCH 80

2" CPVC

FLOW RATE

3 GPM NOMINAL

3/4" CPVC SCH 80 PIPE

FLOW BYPASS

PIPE FULL

2" CPVC SCH 80

FLOW RATE

3 GPM NOMINAL

3/4" CPVC SCH 80 PIPE

PIPE

SCH 80

2" CPVC

FLOW RATE

40 GPM NOMINAL

2" CPVC SCH 80 PIPE

FLOW RATE AT 69° F

40 GPM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .