230553_Identification_For_HVAC_Piping Equipment.pdf

PDF 30 KB Posted

Attached to
RECOVERY - HVAC System for Camino Real Office Project
Solicitation number
AG-9702-S-10-0335
Issued by

About this file

specifications

View the file

Other files

File Type Posted
CONSTRUCTION_IFB.docx DOCX document
sf25a_e.pdf PDF
sf25.pdf PDF
233713_Diffusers Registers Grilles.pdf PDF
230513_Common_Motor_Requirements_For_HVAC_Equipment.pdf PDF
sf25b.pdf PDF
230529_Hangers Supports_For_HVAC_Piping Equipment.pdf PDF
M100 100 .pdf PDF
233300_Air_Duct_Accessories.pdf PDF
233113_Metal_Ducts.pdf PDF
230100 HVAC System.doc DOC document
230700_HVAC_Insulation.pdf PDF
CONSTRUCTION_IFB.docx DOCX document
231126_Facility_Liquefied-Petroleum_Gas_Piping.pdf PDF
sf24_e.pdf PDF
Titlesheet —
M201 100 .pdf PDF
232300_Refrigerant_Piping.pdf PDF
USFS CR MECH CUTSHEETS.PDF PDF
DB General Decision Number.docx DOCX document
M301 100 .pdf PDF
230548_Vibration Seismic_Controls_For_HVAC_Piping Equipment.pdf PDF
Camino_ Real_titlesheet Layout1 —
235400_Furnaces.pdf PDF
238126_Split-System_Air-Conditioners.pdf PDF
230593_Testing Adjusting Balancing_For_HVAC.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA Forest Service – Camino Real Office Building 230553 - 1

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION 230553

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

PART 1 – GENERAL

1.1 SUMMARY

A. Section Includes:

1. Equipment labels.

2. Pipe labels.

1.2 SUBMITTAL

A. Product Data: None

PART 2 – PRODUCTS

2.1 EQUIPMENT LABELS

A. Plastic Labels for Equipment:

1. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/16 inch (1.6 mm) thick, and having predrilled holes for attachment hardware.

2. Letter Color: White.

3. Background Color: Black.

4. Maximum Temperature: Able to withstand temperatures up to 160 deg F (71 deg C).

5. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch (64 by 19 mm).

6. Minimum Letter Size: 1/4 inch (6.4 mm) for name of units if viewing distance is less than 24 inches (600 mm), 1/2 inch (13 mm) for viewing distances up to

72 inches (1830 mm), and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

7. Fasteners: Stainless-steel rivets.

8. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

B. Label Content: Include equipment's Drawing designation or unique equipment num-ber, Drawing numbers where equipment is indicated (plans, details, and schedules), plus the Specification Section number and title where equipment is specified.

C. Equipment Label Schedule: For each item of equipment to be labeled, on 8-1/2-by-

11-inch (A4) bond paper. Tabulate equipment identification number and identify

USDA Forest Service – Camino Real Office Building 230553 - 2

Drawing numbers where equipment is indicated (plans, details, and schedules), plus the Specification Section number and title where equipment is specified. Equipment schedule shall be included in operation and maintenance data.

2.2 PIPE LABELS

A. General Requirements for Manufactured Pipe Labels: Preprinted, color-coded, with lettering indicating service, and showing flow direction.

B. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.

C. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings, pipe size, and an arrow indicating flow direc-tion.

1. Lettering Size: At least 1-1/2 inches (38 mm) high.

PART 3 – EXECUTION

3.1 PREPARATION

A. Clean piping and equipment surfaces of substances that could impair bond of identifi-cation devices, including dirt, oil, grease, release agents, and incompatible primers, paints, and encapsulants.

3.2 EQUIPMENT LABEL INSTALLATION

A. Install or permanently fasten labels on each major item of mechanical equipment.

B. Locate equipment labels where accessible and visible.

3.3 PIPE LABEL INSTALLATION

A. Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:

1. Near each valve and control device.

2. Near each branch connection, excluding short takeoffs for fixtures and terminal units. Where flow pattern is not obvious, mark each pipe at branch.

3. Near penetrations through walls, floors, ceilings, and inaccessible enclosures.

4. At access doors, manholes, and similar access points that permit view of con-cealed piping.

5. Near major equipment items and other points of origination and termination.

6. Spaced at maximum intervals of 50 feet (15 m) along each run. Reduce inter-vals to 25 feet (7.6 m) in areas of congested piping and equipment.

USDA Forest Service – Camino Real Office Building 230553 - 3

B. Pipe Label Color Schedule

1. Propane Piping:

a. Background Color: Black.

b. Letter Color: White.

END OF SECTION 230553

File details come from the government source that posted it. Updated .