230553_Identification_For_HVAC_Piping Equipment.pdf
PDF 30 KB Posted
- Solicitation number
- AG-9702-S-10-0335
About this file
specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CONSTRUCTION_IFB.docx | DOCX document | |
| sf25a_e.pdf | ||
| sf25.pdf | ||
| 233713_Diffusers Registers Grilles.pdf | ||
| 230513_Common_Motor_Requirements_For_HVAC_Equipment.pdf | ||
| sf25b.pdf | ||
| 230529_Hangers Supports_For_HVAC_Piping Equipment.pdf | ||
| M100 100 .pdf | ||
| 233300_Air_Duct_Accessories.pdf | ||
| 233113_Metal_Ducts.pdf | ||
| 230100 HVAC System.doc | DOC document | |
| 230700_HVAC_Insulation.pdf | ||
| CONSTRUCTION_IFB.docx | DOCX document | |
| 231126_Facility_Liquefied-Petroleum_Gas_Piping.pdf | ||
| sf24_e.pdf | ||
| Titlesheet | — | |
| M201 100 .pdf | ||
| 232300_Refrigerant_Piping.pdf | ||
| USFS CR MECH CUTSHEETS.PDF | ||
| DB General Decision Number.docx | DOCX document | |
| M301 100 .pdf | ||
| 230548_Vibration Seismic_Controls_For_HVAC_Piping Equipment.pdf | ||
| Camino_ Real_titlesheet Layout1 | — | |
| 235400_Furnaces.pdf | ||
| 238126_Split-System_Air-Conditioners.pdf | ||
| 230593_Testing Adjusting Balancing_For_HVAC.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service – Camino Real Office Building 230553 - 1
IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 230553
IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
PART 1 – GENERAL
1.1 SUMMARY
A. Section Includes:
1. Equipment labels.
2. Pipe labels.
1.2 SUBMITTAL
A. Product Data: None
PART 2 – PRODUCTS
2.1 EQUIPMENT LABELS
A. Plastic Labels for Equipment:
1. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/16 inch (1.6 mm) thick, and having predrilled holes for attachment hardware.
2. Letter Color: White.
3. Background Color: Black.
4. Maximum Temperature: Able to withstand temperatures up to 160 deg F (71 deg C).
5. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch (64 by 19 mm).
6. Minimum Letter Size: 1/4 inch (6.4 mm) for name of units if viewing distance is less than 24 inches (600 mm), 1/2 inch (13 mm) for viewing distances up to
72 inches (1830 mm), and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.
7. Fasteners: Stainless-steel rivets.
8. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.
B. Label Content: Include equipment's Drawing designation or unique equipment num-ber, Drawing numbers where equipment is indicated (plans, details, and schedules), plus the Specification Section number and title where equipment is specified.
C. Equipment Label Schedule: For each item of equipment to be labeled, on 8-1/2-by-
11-inch (A4) bond paper. Tabulate equipment identification number and identify
USDA Forest Service – Camino Real Office Building 230553 - 2
Drawing numbers where equipment is indicated (plans, details, and schedules), plus the Specification Section number and title where equipment is specified. Equipment schedule shall be included in operation and maintenance data.
2.2 PIPE LABELS
A. General Requirements for Manufactured Pipe Labels: Preprinted, color-coded, with lettering indicating service, and showing flow direction.
B. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.
C. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings, pipe size, and an arrow indicating flow direc-tion.
1. Lettering Size: At least 1-1/2 inches (38 mm) high.
PART 3 – EXECUTION
3.1 PREPARATION
A. Clean piping and equipment surfaces of substances that could impair bond of identifi-cation devices, including dirt, oil, grease, release agents, and incompatible primers, paints, and encapsulants.
3.2 EQUIPMENT LABEL INSTALLATION
A. Install or permanently fasten labels on each major item of mechanical equipment.
B. Locate equipment labels where accessible and visible.
3.3 PIPE LABEL INSTALLATION
A. Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:
1. Near each valve and control device.
2. Near each branch connection, excluding short takeoffs for fixtures and terminal units. Where flow pattern is not obvious, mark each pipe at branch.
3. Near penetrations through walls, floors, ceilings, and inaccessible enclosures.
4. At access doors, manholes, and similar access points that permit view of con-cealed piping.
5. Near major equipment items and other points of origination and termination.
6. Spaced at maximum intervals of 50 feet (15 m) along each run. Reduce inter-vals to 25 feet (7.6 m) in areas of congested piping and equipment.
USDA Forest Service – Camino Real Office Building 230553 - 3
B. Pipe Label Color Schedule
1. Propane Piping:
a. Background Color: Black.
b. Letter Color: White.
END OF SECTION 230553
File details come from the government source that posted it. Updated .