230100 HVAC System.doc

DOC document 43 KB Posted

Attached to
RECOVERY - HVAC System for Camino Real Office Project
Solicitation number
AG-9702-S-10-0335
Issued by

About this file

specifications

View the file

Other files

File Type Posted
CONSTRUCTION_IFB.docx DOCX document
sf25a_e.pdf PDF
sf25.pdf PDF
233713_Diffusers Registers Grilles.pdf PDF
230553_Identification_For_HVAC_Piping Equipment.pdf PDF
230513_Common_Motor_Requirements_For_HVAC_Equipment.pdf PDF
sf25b.pdf PDF
230529_Hangers Supports_For_HVAC_Piping Equipment.pdf PDF
M100 100 .pdf PDF
233300_Air_Duct_Accessories.pdf PDF
233113_Metal_Ducts.pdf PDF
230700_HVAC_Insulation.pdf PDF
CONSTRUCTION_IFB.docx DOCX document
231126_Facility_Liquefied-Petroleum_Gas_Piping.pdf PDF
sf24_e.pdf PDF
Titlesheet —
M201 100 .pdf PDF
232300_Refrigerant_Piping.pdf PDF
USFS CR MECH CUTSHEETS.PDF PDF
DB General Decision Number.docx DOCX document
M301 100 .pdf PDF
230548_Vibration Seismic_Controls_For_HVAC_Piping Equipment.pdf PDF
Camino_ Real_titlesheet Layout1 —
235400_Furnaces.pdf PDF
238126_Split-System_Air-Conditioners.pdf PDF
230593_Testing Adjusting Balancing_For_HVAC.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 230100

HVAC System

PART 1 – GENERAL

1.1 SUMMARY

The work involves providing all equipment, labor, supplies, installation and delivery of an operational HVAC system according to the plans and specifications as provided.

1.2 COORDINATION

Contractor shall coordinate features of motors, installed units, and accessory devices to be compatible with the following:

The contractor shall work closely with the project COR to coordinate installation schedules for the various phases of installation of the HVAC system.
It is expected the contractor shall be responsive to meet the Forest Service needs within a 3 day notice.
The Contractor shall contact the Forest Service COR 5 days after award of contract to discuss installation schedules.

1.3 SUBMITTALS

The contractor shall provide submittals as required in the specifications and drawings.

1.4 Operational System

Contractor shall be responsible for installing all equipment, electrical work, ductwork, insulation, vents, grilles, etc. to provide for a complete operational system as required in the drawings and specifications. This will also include startup, testing and balancing of all the units to meet the intended design.

1.5 Documenation

Contractor shall be required to prepare a complete set of documents of the equipment installed and operational procedures. This documentation shall include manufacturer’s product information and cut sheets for all equipment and products used. A complete operational procedures handbook to for system operation and shutdown with maintenance schedules shall also be provided.

1.6 Payment

Payment shall be for a complete operational system with required documentation. Payment includes all costs for equipment, labor, installation, delivery, etc.

Pay Item Work Unit

230100 (1) HVAC System LS