Addendum 2 - Final.pdf
PDF 318 KB Posted
- Attached to
- AUDIO / VISUAL - GOVERNOR'S CONFERENCE 2026
- Solicitation number
- ARFQ 0304 TOR2700000002 3
- Issued by
- West Virginia
About this file
This is Addendum No. 2 to a solicitation issued by the West Virginia Department of Tourism for audio/visual services to support the Governor's Conference 2026, identified as ARFQ TOR2700000002. The addendum modifies the scope of work by providing detailed technical specifications for a complete live-sound reinforcement system. The vendor must supply and operate 13 vocal/instrument microphones, 3 clip-on instrument microphones, 4 direct boxes, 6 headphone amplifiers, 7 monitor mixes (wedges or in-ear monitors), microphone stands, staging and riser equipment including one 12-inch acoustic riser and one 12-inch drum riser, and all associated cabling and accessories. The vendor is responsible for all setup, installation, configuration, operation, technical support, teardown, and removal services. The original bid deadline was deferred to September 3, 2026, with vendor questions due by August 28, 2026, at 12 p.m. ET, answers provided by September 1, 2026, at 4 p.m. ET, and final bid submissions due September 4, 2026, at 12 p.m. ET via WVOASIS.
Vendor pricing must be all-inclusive with no additional charges permitted, covering equipment, labor, materials, transportation, delivery, setup, installation, operation, technical support, teardown, removal, travel, supervision, overhead, and profit. Vendors must provide unit pricing and extended pricing across five categories: audio input equipment, output/monitor equipment, staging/riser equipment, technical services/labor, and additional required services. The vendor shall identify the make and model of proposed equipment and certify that the total bid price includes all costs necessary for complete service delivery in accordance with the solicitation and addendum. No pricing information regarding funding source, set-asides, or award amounts is specified in this addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
MODIFICATION TO SCOPE OF WORK
WEST VIRGINIA DEPARTMENT OF TOURISM
AUDIO / VISUAL – GOVERNOR’S CONFERENCE 2026
ARFQ TOR2700000002
Date Issued: August 24, 2026
The West Virginia Department of Tourism hereby issues Addendum No. 2 to ARFQ TOR2700000002, Audio / Visual – Governor’s Conference 2026.
This Addendum incorporates additional and detailed technical specifications for the audiovisual services required under the Solicitation.
The information contained in this Addendum is hereby made a part of the Solicitation. Vendors shall review and consider all requirements contained herein when preparing and submitting their quotations.
Except as expressly modified or supplemented by this Addendum, all other terms, conditions, specifications, requirements, and provisions of ARFQ TOR2700000002 remain unchanged and in full force and effect.
The bid closing deadline has been deferred to September 3, 2026.
1. AUDIO-VISUAL TECHNICAL SPECIFICATION
1.1 Scope of Work
The awarded Audio-Visual Vendor shall provide, install, configure, and operate a complete live-sound reinforcement system supporting all input channels, output/monitor mixes, and stage equipment described in this Addendum.
The Vendor’s proposed system must meet or exceed the channel counts, device types, and equipment quantities identified herein.
The attached stage plot referenced in the original technical specification shall be used as the reference for physical placement of inputs and equipment on stage.
2. AUDIO INPUT LIST
The following input channels must be supported by the Vendor’s console/system, with the corresponding microphone or DI type and stand/mounting hardware provided by the Vendor unless otherwise noted.
Ch. # Source / Label Type Stand / Mount Stage Location
2 Kick Out Mic Short stand/boom Drum riser
3 Snare Mic Clip mount Drum riser
4 Hat Mic Clip mount Drum riser
9/10 Overhead (pair) Mic x2 Tall boom Drum riser
13 Mtn Stage Bass DI — Stage
14 Guest Bass DI — Stage
15/16 DPA (pair) Mic x2 (clip-on)
Piano-mount clip Piano
49 Band Aco 2 DI — Stage Left
50 Harp Mic Short stand Stage Left
51 Guest Voc Mic Tall stand Stage Right
52 Host Mic Tall stand Stage Right
53 Egit 2 Band Mic Short stand Stage
54 Aco 1 Band DI — Stage Left
55 Egit 1 Band Mic Tall stand Stage Right (angled riser)
56 98 Pno Mic (clip-on) Piano-mount clip Piano
57/58 Audience (pair) Mic x2 Tall stand House
59/60 Km184 (pair) Mic x2 Short stand Stage
62 Announcer Mic Tall stand House/Booth
3. OUTPUT / MONITOR LIST
Out # Label Notes
1 Mix 1 Monitor mix (wedge/IEM – TBD)
2 Mix 2 Monitor mix (wedge/IEM – TBD)
3 Mix 3 Monitor mix (wedge/IEM – TBD)
4 Mix 4 Monitor mix (wedge/IEM – TBD)
5 Mix 5 Monitor mix (wedge/IEM – TBD)
6 Mix 6 Monitor mix (wedge/IEM – TBD)
7 Mix 7 Monitor mix (wedge/IEM – TBD)
8 Drm (Drum HP Amp) Headphone amp feed
17 Aco 1 Band (HP Amp) Headphone amp feed
18 Piano (HP Amp) Headphone amp feed
19 Egit Band (HP Amp) Headphone amp feed
The output channels, including monitor mixes and headphone amplifier feeds, must be supported and delivered to the labeled stage positions.
4. MINIMUM EQUIPMENT REQUIREMENTS
The quantities below represent the minimum equipment the Vendor must supply. Vendor may substitute equivalent-or-better models; any substitutions must be identified in the Vendor’s proposal.
Item Quantity Notes
Vocal/Instrument Microphones
13 Includes drum mics (Kick, Snare, Hat, OH pair), Harp, Guest Voc, Host, Egit 1 & 2, Km184 pair, Audience pair, Announcer
Clip-on Instrument Mics (Piano)
3 DPA pair (15/16) + 98 Pno clip (56)
Direct Boxes (DI) 4 Channels 13, 14, 49, 54
Headphone Amplifiers
6 Channels 8, 17, 18, 19, 20, 21; confirm channel count per unit needed on-site
Monitor Mixes (wedges or IEM packs)
7 Mix 1–7; Vendor to confirm wedge vs. IEM per position
20 Egit 2 Band (HP Amp) Headphone amp feed
21 Bass (HP Amp) Headphone amp feed
Tall Boom/Straight Mic Stands
5 Overhead pair, Guest Voc, Host, Egit 1, Audience pair, Announcer
Short Mic Stands 5 Kick, Harp, Egit 2, Km184 pair
Acoustic Riser (12”)
1 Per stage plot legend, “Other Items”
Drum Riser (12”) 1 Per stage plot legend, “Other Items”
Staging / Riser Items
— 12” riser sections; 4–6” tall riser sections; acoustic riser, 12”;
drum riser, 12”
Additional Staging / Riser Requirements
The Vendor shall provide the following staging/riser sections and equipment as required:
● 12” riser sections;
● Four (4) to six (6) inch tall riser sections;
● One (1) acoustic riser, 12”;
● One (1) drum riser, 12”.
5. STAGE PLOT REFERENCE
The Vendor shall lay out all microphones, DI boxes, headphone amplifiers, and risers in accordance with the official MTN Stage Input/Output 2026 stage plot diagram provided separately by the event producer.
The stage plot diagram governs physical placement.
This Addendum governs channel counts and equipment types.
6. INCORPORATION INTO ARFQ TOR2700000002
The requirements contained in Sections 1 through 6 of this Addendum are hereby incorporated into ARFQ TOR2700000002 and shall be considered part of the Solicitation.
The Vendor’s quote shall include all costs necessary to provide the equipment, labor, setup, operation, supervision, installation, teardown, removal, and other services necessary to meet these requirements.
7. NO OTHER CHANGES
Except as specifically modified or supplemented by this Addendum No. 2, all other terms, conditions, specifications, requirements, dates, and provisions of ARFQ TOR2700000002 remain unchanged and in full force and effect.
8. MISCELLANEOUS:
1.1. Questions: Any questions submitted concerning the Addendum 2 must be received no later than August 28th at 12 pm ET. Questions must be submitted via WVOASIS.
1.2. Answers will be provided via the website (https://wvtourism.com/purchasing/) and
WVOASIS to all vendors no later than September 1st at 4 pm ET.
1.3. Bid Submissions: Bids must be submitted by September 4, 2026, at 12:00 PM ET via
WVOASIS.
https://wvtourism.com/purchasing/
REVISED EXHIBIT A – PRICING PAGE
AUDIO / VISUAL SERVICES
WEST VIRGINIA DEPARTMENT OF TOURISM
GOVERNOR’S CONFERENCE 2026
ARFQ TOR2700000002
ADDENDUM NO. 2
VENDOR PRICING INSTRUCTIONS
Vendor shall provide all-inclusive pricing for the equipment, labor, materials, transportation, delivery, setup, installation, operation, technical support, teardown, removal, travel, supervision, overhead, profit, and all other costs necessary to fully perform the requirements of the Solicitation and Addendum No. 2.
No additional charges, fees, surcharges, or expenses will be accepted.
Vendor shall provide the requested unit pricing and extended pricing below. The Total Bid Price shall include all items and services necessary to meet the specifications.
A. AUDIO INPUT EQUIPMENT
Item Description Qty. Unit Price Extended Price
A-1 Vocal/Instrument Microphones 13 $_______ $________
A-2 Clip-on Instrument/Piano Microphones 3 $_______ $________
A-3 Direct Boxes (DI) 4 $_______ $________
A-4 Microphone Stands – Tall Boom/Straight TBD $_______ $________
A-5 Microphone Stands – Short TBD $_______ $________
A-6 Microphone Clip/Mounting Hardware LS $_______ $________
Subtotal – Audio Input Equipment
B. OUTPUT / MONITOR EQUIPMENT
B-1 Monitor Mixes – Wedges and/or IEMs 7 $________ $________
B-2 Headphone Amplifiers 6 $________ $________
B-3 Headphone Amplifier Cabling/Accessories LS $________ $________
B-4 Monitor Cabling and Accessories LS $________ $________
Subtotal – Output/Monitor Equipment
C. STAGING / RISER EQUIPMENT
C-1 12” Riser Sections ______ $________ $________
C-2 4–6” Tall Riser Sections ______ $________ $________
C-3 Acoustic Riser – 12” 1 $________ $________
C-4 Drum Riser – 12” 1 $________ $________
C-5 Staging/Riser Accessories LS $________ $________
Subtotal – Staging/Riser
Equipment
D. TECHNICAL SERVICES / LABOR
D-1 Setup and Installation Labor LS $________ $________
D-2 On-Site Audio Technician __ $________ $________
D-3 Show Operation / Technical Support LS $________ $________
D-4 Teardown and Removal Labor LS $________ $________
Subtotal – Technical Services/Labor
E. ADDITIONAL REQUIRED SERVICES
Item Description Qty. Unit Price Extended Price
E-1 Transportation / Delivery LS $______ $________
E-2 Equipment Loading / Unloading LS $______ $________
E-3 Travel / Travel Time LS $_______ $________
E-4 Supervision / Project Management LS $_______ $________
E-5 Other Required Costs Necessary to Complete the Work
LS $_______ $________
Subtotal – Additional Required Services
F. TOTAL BID PRICE
Pricing Category Total
A. Audio Input Equipment $________________
B. Output / Monitor Equipment $________________
C. Staging / Riser Equipment $________________
D. Technical Services / Labor $________________
E. Additional Required Services $________________
TOTAL BID PRICE – ALL INCLUSIVE $________________
VENDOR EQUIPMENT INFORMATION
Vendor shall identify the make and model of the proposed equipment where required by the specifications.
Equipment Category Manufacturer Model
Vocal/Instrument Microphones __________________ __________________
Clip-on/Piano Microphones __________________ __________________
Direct Boxes __________________ __________________
Headphone Amplifiers __________________ __________________
Monitor/Wedge System __________________ __________________
IEM System, if applicable __________________ __________________
Other Major Equipment __________________ __________________
PRICING CERTIFICATION
By signing below, Vendor certifies that the Total Bid Price includes all labor, equipment, materials, transportation, travel, delivery, installation, setup, operation, technical support, teardown, removal, supervision, insurance, taxes, overhead, profit, and all other costs necessary to provide complete services in accordance with ARFQ TOR2700000002 and Addendum No. 2.
Vendor further certifies that no additional charges will be billed to the West Virginia Department of
Tourism for services or equipment required by the Solicitation or Addendum.
Vendor Name: _______________________________________________
Authorized Representative (Print): ______________________________
Signature: __________________________________________________
Title: ______________________________________________________
Phone: _____________________________________________________
Email: ______________________________________________________
Date: ______________________________________________________
ADDENDUM TWO
WEST VIRGINIA DEPARTMENT OF TOURISM
GOVERNOR’S CONFERENCE AUDIO VISUAL
ARFQ TOR2700000002
The purpose of this addendum is to modify the solicitation identified as ARFQ TOR2700000002 (“Solicitation”) to reflect the change(s) identified and described below.
MODIFICATION TO SCOPE OF WORK
This Addendum is issued to answer Vendor Questions. All prospective bidders must acknowledge receipt of this Addendum, as failure to do so may result in disqualification of the bid.
All other terms, conditions, and requirements of the Solicitation remain unchanged.
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form.
Failure to acknowledge addenda may result in bid disqualification.
Addendum 2 -Modification to Scope of Work
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgment should be submitted with the bid to expedite document processing
File details come from the government source that posted it. Updated .