About this file
Summary
This is a specifications document prepared by the State of Utah Division of Facilities Construction and Management (DFCM) for the design-build construction of a single-story residential structure at the Logan Fish Hatchery property. The document establishes detailed technical requirements across three primary areas: resilient vinyl plank flooring (Section 096519), sheet carpeting (Section 096816), and asphalt shingle roofing (Section 073113). For flooring, the specifications call for Class III resilient vinyl planks measuring 6 by 36 inches with 0.120-inch thickness, installed using heat-welded seamless methods on properly prepared substrates with moisture content not exceeding 3 pounds of water per 1,000 square feet in 24 hours. Carpet specifications require 100 percent nylon 6,6 tufted broadloom in cut-pile construction, 12-foot roll width, installed via direct-glue-down method with water-resistant adhesives on substrates meeting ASTM F1869 and F2170 moisture standards. Roofing specifications require laminated-strip, glass-fiber-reinforced asphalt shingles meeting ASTM D3462 standards and Class F wind resistance per ASTM D3161, with self-adhering polymer-modified bitumen underlayment and metal flashing components fabricated according to SMACNA standards. All installations require qualified installers certified or approved by manufacturers, with environmental conditions maintained at specific temperature and humidity ranges during and after installation.
The project budget is capped at $500,000.00 for the 2,000-square-foot rambler construction. Warranty provisions span multiple years: asphalt shingles carry a 30-year prorated materials warranty with a nonprorated first five years, a 5-year wind-speed warranty, and a 5-year installer warranty; carpet and carpet cushion each include 10-year warranties from the date of Substantial Completion; and resilient flooring maintenance materials must be furnished at a rate of one box per every 50 boxes installed. The specifications require submission of product data, samples, shop drawings, and maintenance documentation prior to construction, with installations proceeding only after substrate examination, moisture testing, alkalinity verification, and written approval. Field conditions mandate temperature maintenance between 70 and 95 degrees Fahrenheit during installation and 48 hours before and after, with spaces closed to traffic during these periods. The contractor must provide protection of installed materials throughout the construction period and complete final cleaning and vacuuming immediately after installation completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Flooring Specifications
Section 096519 – Resilient Tile/Plank Flooring
Section 096816 – Sheet Carpeting
RESILIENT TILE FLOORING 096519 - 1
SECTION 096519 - RESILIENT TILE/PLANK FLOORING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Resilient solid vinyl plank flooring.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples: Full-size units of each color, texture, and pattern of flooring required.
C. Samples for Initial Selection: For each type of floor plank indicated.
D. Welded-Seam Samples: For seamless-installation technique indicated and for each floor covering product, color, and pattern required; with seam running lengthwise and in center of
6-by-9-inch Sample applied to a rigid backing and prepared by Installer for this Project.
1.3 CLOSEOUT SUBMITTALS
A. Maintenance Data: For each type of floor plank to include in maintenance manuals.
1.4 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Floor Planks: Furnish one box for every 50 boxes or fraction thereof, of each type, color, and pattern of floor plank installed.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are competent in techniques required by manufacturer for floor plank installation and seaming method indicated.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Store floor planks and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than
50 degrees F or more than 90 degrees F. Store floor planks on flat surfaces.
DWR Logan Fish Hatchery Residence February 19, 2025 DFCM Project No. 24437520
RESILIENT TILE FLOORING 096519 - 2
1.7 FIELD CONDITIONS
A. Maintain ambient temperatures within range recommended by manufacturer, but not less than
70 degrees F or more than 95 degrees F, in spaces to receive floor planks during the following periods:
1. 48 hours before installation.
2. During installation.
3. 48 hours after installation.
B. After installation and until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer, but not less than 55 degrees F or more than 95 degrees F.
C. Close spaces to traffic during floor plank installation.
D. Close spaces to traffic for 48 hours after floor plank installation.
E. Install floor planks after other finishing operations, including painting, have been completed.
PART 2 - PRODUCTS
2.1 SOLID VINYL PLANK FLOORING LVP
A. Plank Standard: ASTM F1700.
1. Class: Class III, Printed Film Vinyl Tile.
2. Type: B, Embossed Surface.
B. Thickness: 0.120 inch.
C. Size: 6 by 36 inches.
D. Seamless-Installation Method: Heat welded.
E. Colors and Patterns: As selected by Architect from manufacturer’s full range..
2.2 INSTALLATION MATERIALS
A. Trowelable Leveling and Patching Compounds: Latex-modified, portland-cement-based or blended hydraulic-cement-based formulation provided or approved by floor plank manufacturer for applications indicated.
B. Adhesives: Water-resistant type recommended by floor plank and adhesive manufacturers to suit floor plank and substrate conditions indicated.
C. Seamless-Installation Accessories:
1. Heat-Welding Bead: Manufacturer's solid-strand product for heat welding seams.
a. Colors: As selected by Architect from manufacturer's full range to contrast with floor planks.
RESILIENT TILE FLOORING 096519 - 3
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
1. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of floor planks.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Prepare substrates according to floor planks manufacturer's written instructions to ensure adhesion of resilient products.
B. Concrete Substrates: Prepare according to ASTM F710.
1. Verify that substrates are dry and free of curing compounds, sealers, and hardeners.
2. Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by floor tile manufacturer. Do not use solvents.
3. Alkalinity and Adhesion Testing: Perform tests recommended by floor tile manufacturer.
Proceed with installation only after substrate alkalinity falls within range on pH scale recommended by manufacturer in writing, but not less than 5 or more than 9 pH.
4. Moisture Testing: Perform tests so that each test area does not exceed 200 square feet, and perform no fewer than three tests in each installation area and with test areas evenly spaced in installation areas.
a. Anhydrous Calcium Chloride Test: ASTM F1869. Proceed with installation only after substrates have maximum moisture-vapor-emission rate of 3 lb of water/1000
sq. ft. in 24 hours.
b. Relative Humidity Test: Using in-situ probes, ASTM F2170. Proceed with installation only after substrates have a maximum 75 percent relative humidity level measurement.
C. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound; remove bumps and ridges to produce a uniform and smooth substrate.
D. Do not install floor planks until materials are the same temperature as space where they are to be installed.
1. At least 48 hours in advance of installation, move resilient floor planks and installation materials into spaces where they will be installed.
E. Immediately before installation, sweep and vacuum clean substrates to be covered by resilient floor planks.
RESILIENT TILE FLOORING 096519 - 4
3.3 FLOOR PLANKS INSTALLATION
A. Comply with manufacturer's written instructions for installing floor planks.
B. Lay out floor planks from center marks established with principal walls, discounting minor offsets, so planks at opposite edges of room are of equal width. Adjust as necessary to avoid using cut widths that equal less than one-half plank at perimeter.
1. Lay planks square with room axis.
C. Match floor planks for color and pattern by selecting planks from cartons in the same sequence as manufactured and packaged, if so numbered. Discard broken, cracked, chipped, or deformed planks.
1. Lay planks with grain running in one direction.
D. Scribe, cut, and fit floor planks to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.
E. Extend floor planks into toe spaces, door reveals, closets, and similar openings. Extend floor planks to center of door openings.
F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on floor planks as marked on substrates. Use chalk or other nonpermanent marking device.
G. Adhere floor planks to substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.
H. Seamless Installation:
1. Heat-Welded Seams: Comply with ASTM F1516. Rout joints and heat weld with welding bead to fuse sections permanently into a seamless flooring installation. Prepare, weld, and finish seams to produce surfaces flush with adjoining flooring surfaces.
3.4 CLEANING AND PROTECTION
A. Comply with manufacturer's written instructions for cleaning and protecting floor planks.
B. Perform the following operations immediately after completing floor plank installation:
1. Remove adhesive and other blemishes from surfaces.
2. Sweep and vacuum surfaces thoroughly.
3. Damp-mop surfaces to remove marks and soil.
C. Protect floor planks from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period.
D. Cover floor planks until Substantial Completion.
END OF SECTION 096519
SHEET CARPETING 096816 - 1
SECTION 096816 - SHEET CARPETING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Tufted carpet.
2. Carpet cushion.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include manufacturer's written data on physical characteristics and durability.
2. Include manufacturer's written installation recommendations for each type of substrate.
B. Samples for Initial Selection: For each type of product.
1. Include Samples of exposed edge, transition, and other accessory stripping involving color or finish selection.
C. Samples for Verification: For each of the following products and for each color and texture required. Label each Sample with manufacturer's name, material description, color, pattern, and designation indicated on Drawings and in schedules.
1. Carpet: 12-inch-square Sample.
2. Exposed Edge, Transition, and Other Accessory Stripping: 12-inch-long Samples.
3. Carpet Cushion: 6-inch- square Sample.
4. Carpet Seam: 6-inch Sample.
1.3 INFORMATIONAL SUBMITTALS
A. Sample Warranties: For special warranties.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: For carpet to include in maintenance manuals. Include the following:
1. Methods for maintaining carpet, including cleaning and stain-removal products and procedures and manufacturer's recommended maintenance schedule.
2. Precautions for cleaning materials and methods that could be detrimental to carpet and carpet cushion.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: An experienced installer who is certified by the International Certified
Floorcovering Installers Association.
SHEET CARPETING 096816 - 2
1.6 DELIVERY, STORAGE, AND HANDLING
A. Comply with the Carpet and Rug Institute's CRI 104.
B. Deliver carpet in original mill protective covering with mill register numbers and tags attached.
1.7 FIELD CONDITIONS
A. Comply with the Carpet and Rug Institute's CRI 104 for temperature, humidity, and ventilation limitations.
B. Environmental Limitations: Do not deliver or install carpet and carpet cushion until spaces are enclosed and weathertight, wet-work in spaces is complete and dry, and ambient temperature and humidity conditions are maintained at levels planned for building occupants during the remainder of the construction period.
C. Do not install carpet and carpet cushion over concrete slabs until slabs have cured, are sufficiently dry to bond with adhesive, and have pH range recommended by carpet manufacturer.
D. Where demountable partitions or other items are indicated for installation on top of carpet, install carpet before installing these items.
1.8 WARRANTY
A. Special Warranty for Carpet: Manufacturer agrees to repair or replace components of carpet installation that fail in materials or workmanship within specified warranty period.
1. Warranty does not include deterioration or failure of carpet due to unusual traffic, failure of substrate, vandalism, or abuse.
2. Failures include, but are not limited to, the following:
a. More than 10 percent loss of face fiber, edge raveling, snags, and runs.
b. Loss of tuft bind strength.
c. Excess static discharge.
d. Delamination.
3. Warranty Period: 10 years from date of Substantial Completion.
B. Special Warranty for Carpet Cushion: Manufacturer agrees to repair or replace components of carpet cushion installation that fail in materials or workmanship within specified warranty period.
1. Warranty includes removal and replacement of carpet and accessories required by replacement of carpet cushion.
2. Warranty does not include deterioration or failure of carpet cushion due to unusual traffic, failure of substrate, vandalism, or abuse.
3. Failure includes, but is not limited to, permanent indentation or compression.
4. Warranty Period: 10 years from date of Substantial Completion.
SHEET CARPETING 096816 - 3
PART 2 - PRODUCTS
2.1 TUFTED CARPET
A. Residential grade broadloom carpet.
B. Color: As selected by Architect from manufacturer's full range.
C. Pattern: As selected by Architect from manufacturer's full range.
D. Fiber Content: 100 percent nylon 6, 6.
E. Pile Characteristic: Cut pile.
F. Primary Backing: Manufacturer's standard material.
G. Secondary Backing: Manufacturer's standard material.
H. Backcoating: Manufacturer's standard material.
I. Roll Width: 12 feet.
J. Applied Treatments:
1. Applied Soil-Resistance Treatment: Manufacturer's standard material.
2.2 INSTALLATION ACCESSORIES
A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet cushion manufacturer.
B. Adhesives: Water-resistant, mildew-resistant, nonstaining type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet and is recommended or provided by carpet and carpet cushion manufacturers.
C. Tackless Carpet Stripping: Water-resistant plywood, in strips as required to match cushion thickness and that comply with the Carpet and Rug Institute's CRI 104.
D. Seam Adhesive: Hot-melt adhesive tape or similar product recommended by carpet manufacturer for sealing and taping seams and butting cut edges at backing to form secure seams and to prevent pile loss at seams.
E. Metal Edge/Transition Strips: Extruded aluminum with [mill] <Insert finish> finish of profile and width shown, of height required to protect exposed edge of carpet, and of maximum lengths to minimize running joints.
Roofing Specifications
SHEET CARPETING 096816 - 4
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for maximum moisture content, alkalinity range, installation tolerances, and other conditions affecting carpet performance.
B. Examine carpet for type, color, pattern, and potential defects.
C. Concrete Slabs: Verify that finishes comply with requirements specified in Section 033000
"Cast-in-Place Concrete" and that surfaces are free of cracks, ridges, depressions, scale, and foreign deposits.
1. Moisture Testing: Perform tests so that each test area does not exceed 200 square feet, and perform no fewer than three tests in each installation area and with test areas evenly spaced in installation areas.
a. Anhydrous Calcium Chloride Test: ASTM F1869. Proceed with installation only after substrates have maximum moisture-vapor-emission rate of 3 pounds of water/1000 square feet in 24 hours.
b. Relative Humidity Test: Using in situ probes, ASTM F2170. Proceed with installation only after substrates have a maximum 75 percent relative humidity level measurement.
c. Perform additional moisture tests recommended in writing by adhesive, carpet cushion, and carpet manufacturers. Proceed with installation only after substrates pass testing.
D. Wood Subfloors: Verify the following:
1. Underlayment over subfloor complies with requirements specified in Section 061600
"Sheathing."
2. Underlayment surface is free of irregularities and substances that may interfere with adhesive bond or show through surface.
E. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. General: Comply with the Carpet and Rug Institute's CRI 104 and with carpet manufacturer's written installation instructions for preparing substrates.
B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch wide or wider, and protrusions more than 1/32 inch, unless more stringent requirements are required by manufacturer's written instructions.
C. Concrete Substrates: Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by adhesive, carpet, and carpet cushion manufacturers.
SHEET CARPETING 096816 - 5
D. Broom and vacuum clean substrates to be covered immediately before installing carpet.
3.3 INSTALLATION
A. Comply with the Carpet and Rug Institute's CRI 104 and carpet and carpet cushion manufacturers' written installation instructions for the following:
1. Direct-glue-down installation.
2. Stair installation.
B. Comply with carpet manufacturer's written instructions and Shop Drawings for seam locations and direction of carpet; maintain uniformity of carpet direction and lay of pile. At doorways, center seams under the door in closed position.
C. Cut and fit carpet to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet manufacturer.
D. Extend carpet into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.
E. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on carpet as marked on subfloor. Use nonpermanent, nonstaining marking device.
3.4 CLEANING AND PROTECTION
A. Perform the following operations immediately after installing carpet:
1. Remove excess adhesive, seam sealer, and other surface blemishes using cleaner recommended by carpet manufacturer.
2. Remove yarns that protrude from carpet surface.
3. Vacuum carpet using commercial machine with face-beater element.
B. Protect installed carpet to comply with the Carpet and Rug Institute's CRI 104.
C. Protect carpet against damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods recommended in writing by carpet manufacturer and carpet adhesive manufacturer.
END OF SECTION 096816
ASPHALT SHINGLES 073113 - 1
SECTION 073113 - ASPHALT SHINGLES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Glass-fiber-reinforced asphalt shingles.
2. Underlayment materials.
3. Metal flashing and trim.
B. Related Requirements:
1. Section 077200 "Roof Accessories" for roof ventilators.
1.2 DEFINITIONS
A. Roofing Terminology: See ASTM D1079 for definitions of terms related to roofing Work in this Section.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.4 ACTION SUBMITTALS
A. Product Data: For the following:
1. Asphalt shingles.
2. Underlayment materials.
3. Asphalt roofing cement.
4. Elastomeric flashing sealant.
B. Shop Drawings: For metal flashing and trim.
C. Samples: For each exposed product and for each color and blend specified, in sizes indicated.
1. Asphalt Shingles: Full size.
2. Ridge and Hip Cap Shingles: Full size.
3. Exposed Valley Lining: 12 inches square.
D. Final design of Warranty Sign, including all required verbiage.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
ASPHALT SHINGLES 073113 - 2
B. Product Test Reports: For each type of asphalt shingle and underlayment product indicated, for tests performed by manufacturer and witnessed by a qualified testing agency or a qualified testing agency.
C. Sample Warranty: For manufacturer's materials warranty.
1.6 CLOSEOUT SUBMITTALS
A. Maintenance Data: For asphalt shingles to include in maintenance manuals.
B. Materials warranties.
C. Roofing Installer's warranty.
1.7 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Asphalt Shingles: 100 square feet of each type and in each color and blend, in unbroken bundles.
1.8 QUALITY ASSURANCE
A. Installer Qualifications: An authorized installer who is trained and approved by manufacturer.
1.9 DELIVERY, STORAGE, AND HANDLING
A. Store roofing materials in a dry, well-ventilated location protected from weather, sunlight, and moisture in accordance with manufacturer's written instructions.
B. Store underlayment rolls on end, on pallets or other raised surfaces. Do not double-stack rolls.
C. Protect unused roofing materials from weather, sunlight, and moisture when left overnight or when roofing Work is not in progress.
D. Handle, store, and place roofing materials in a manner to prevent damage to roof deck or structural supporting members.
1.10 FIELD CONDITIONS
A. Environmental Limitations: Proceed with installation only when existing and forecasted weather conditions permit product installation and related Work to be performed in accordance with manufacturer's written instructions and warranty requirements.
1. Install self-adhering, polymer-modified bitumen sheet underlayment within the range of ambient and substrate temperatures recommended in writing by manufacturer.
ASPHALT SHINGLES 073113 - 3
1.11 WARRANTY
A. Materials Warranty: Manufacturer agrees to repair or replace asphalt shingles that fail within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Manufacturing defects.
2. Materials Warranty Period: 30 years from date of Substantial Completion, prorated, with first five years nonprorated.
3. Wind-Speed Warranty Period: Asphalt shingles will resist blow-off or damage caused by wind speeds of up to 110 mph for five years from date of Substantial Completion.
4. Algae-Resistance Warranty Period: Asphalt shingles will not discolor for fiveyears from date of Substantial Completion.
B. Roofing Installer's Warranty: On State of Utah Division of Facilities Construction and
Management (DFCM) warranty form at end of this Section, signed by Installer.
1. Warranty Period: Five years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 SOURCE LIMITATIONS
A. Obtain each type of product from single source from single manufacturer.
2.2 PERFORMANCE REQUIREMENTS
A. Exterior Fire-Test Exposure: Provide asphalt shingles and related roofing materials identical to those of assemblies tested for Class A fire resistance in accordance with ASTM E108 or UL 790 by Underwriters Laboratories or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing agency.
B. Wind Resistance: Provide asphalt shingles that comply with requirements of
ASTM D3161/D3161M, Class F, and with ASTM D7158/D7158M, Class H.
2.3 GLASS-FIBER-REINFORCED ASPHALT SHINGLES
A. Laminated-Strip Asphalt Shingles: ASTM D3462/D3462M, laminated, multi-ply overlay construction; glass-fiber reinforced, mineral-granule surfaced, and self-sealing.
1. Butt Edge: Straight cut.
2. Strip Size: Manufacturer's standard.
3. Algae Resistance: Granules resist algae discoloration.
4. Color and Blends: As selected by Architect from manufacturer's full range.
B. Hip and Ridge Shingles: Manufacturer's standard units to match asphalt shingles.
ASPHALT SHINGLES 073113 - 4
2.4 UNDERLAYMENT MATERIALS
A. Ptimary Underlayment: Self-adhering, polymer-modified bitumen sheet:
1. ASTM D1970/D1970M, minimum 55-mil-thick sheet; glass-fiber-mat-reinforced, polymer-modified asphalt; with slip-resistant top surface and release backing; cold applied.
2. Provide primer for adjoining metal surfaces to receive underlayment.
B. Slip Sheet: Organic Felt: Asphalt-saturated organic felts, nonperforated and complying with the following:
1. ASTM D226/D226M: Type II.
2.5 ACCESSORIES
A. Asphalt Roofing Cement: ASTM D4586/D4586M Type II, asbestos free.
B. Elastomeric Flashing Sealant: ASTM C920, Type S, Grade NS, one-part, non-sag, elastomeric polymer sealant; of class and use classifications required to seal joints and remain watertight;
recommended in writing by manufacturer for installation of flashing systems.
C. Roofing Nails: ASTM F1667, aluminum, stainless steel, copper, or hot-dip galvanized-steel wire shingle nails, minimum 0.120-inch-diameter, sharp-pointed, with a 3/8- to 7/16-inch-diameter flat head and of sufficient length to penetrate 3/4 inch into solid wood decking or extend at least 1/8 inch through sheathing less than 3/4 inch thick.
1. Where nails are in contact with metal flashing, use nails made from same metal as flashing.
D. Underlayment Nails: Aluminum, stainless steel, or hot-dip galvanized-steel wire nails with low-profile metal or plastic caps, 1-inch-minimum diameter.
E. Vent Pipe Boots: Black EPDM pipe flashing with metal base.
1. Basis-of-Design: Aztec Washer Company “Master Flash.”
2. Equal approved by Architect.
2.6 METAL FLASHING AND TRIM
A. Comply with requirements in Section 076200 "Sheet Metal Flashing and Trim."
1. Sheet Metal: Metallic-coated steel sheet with coil-coated finish. .
B. Fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's
"Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of the item unless otherwise specified in this Section or indicated on Drawings.
1. Step Flashings: Fabricate with a headlap of 2 inches and a minimum extension of 4 inches over the underlying asphalt shingle and up the vertical surface.
2. Open-Valley Flashings: Fabricate from metal sheet not less than 24 inches wide in lengths not exceeding 10 feet, with 1-inch-high, inverted-V profile water diverter at center of valley and equal flange widths of not less than 11.
a. Add stiffening ribs in flashings to promote drainage.
ASPHALT SHINGLES 073113 - 5
3. Drip Edges: Fabricate in lengths not exceeding 10 feet with minimum 2-inch roof-deck flange and 1-1/2-inch fascia flange with 3/8-inch drip at lower edge.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
1. Examine roof sheathing to verify that sheathing joints are supported by framing and blocking or metal clips and that installation is within flatness tolerances.
2. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and completely anchored and that provisions have been made for flashings and penetrations through asphalt shingles.
3. Verify that vent stacks and other penetrations through roofing are installed and securely fastened.
B. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION OF UNDERLAYMENT MATERIALS
A. Comply with asphalt shingle and underlayment manufacturers' written installation instructions and with recommendations in NRCA's "The NRCA Roofing Manual: Steep-Slope Roof
Systems" applicable to products and applications indicated unless more stringent requirements are specified in this Section or indicated on Drawings.
B. Primary Underlayment: Self-Adhering, Polymer-Modified Bitumen Sheet: Install, wrinkle free, on roof deck.
1. Comply with low-temperature installation restrictions of underlayment manufacturer.
2. Install lapped in direction that sheds water.
a. Lap sides not less than 4 inches.
b. Lap ends not less than 6 inches, staggered 24 inches between succeeding courses.
c. Roll laps with roller.
3. Prime metal surfaces to receive self-adhering sheet.
4. Valleys: Extend from lowest to highest point 18 inches on each side of centerline.
5. Cover underlayment within seven days.
C. Metal-Flashed, Open-Valley Underlayment: Install one layer of minimum 36-inch-wide underlayment centered in valley.
1. Use same underlayment as installed on field of roof.
2. Stagger end laps between layers at least 72 inches.
3. Lap ends of each layer at least 12 inches in direction that sheds water, and seal with asphalt roofing cement.
ASPHALT SHINGLES 073113 - 6
4. Fasten each layer to roof deck with underlayment nails located as far from valley center as possible and only to extent necessary to hold underlayment in place until installation of valley flashing.
5. Lap roof-deck underlayment over first layer of valley underlayment at least 6 inches.
D. Slip Sheet: Asphalt-Saturated Felt: Install on roof deck parallel with and starting at eaves and fasten with underlayment nails.
1. Single-Layer Installation:
a. Lap sides a minimum of 4 inches over underlying course.
b. Lap ends a minimum of 4 inches.
c. Stagger end laps between succeeding courses at least 72 inches.
3.3 INSTALLATION OF METAL FLASHING AND TRIM
A. Install metal flashings and trim to comply with requirements in Section 076200 "Sheet Metal
Flashing and Trim."
1. Install metal flashings in accordance with recommendations in ARMA's "Asphalt
Roofing Residential Manual - Design and Application Methods" and NRCA's "NRCA
Guidelines for Asphalt Shingle Roof Systems."
2. Bed flanges of metal flashings using asphalt roofing cement or elastomeric flashing sealant.
B. Step Flashings: Install with a headlap of 2 inches and extend over underlying shingle and up the vertical face.
1. Install with lower edge of flashing just upslope of, and concealed by, butt of overlying shingle.
2. Fasten to roof deck only.
C. Open-Valley Flashings: Install centered in valleys, lapping ends at least 8 inches in direction that sheds water. Fasten upper end of each length to roof deck beneath overlap.
1. Adhere minimum 9-inch-wide strips of self-adhering, polymer-modified bitumen sheet to metal flanges and to underlying self-adhering sheet, polymer-modified bitumen sheet.
a. Place strips parallel to and over flanges so that they will be just concealed by installed shingles.
2. Provide a closure at the end of the inverted-V profile of the valley metal to minimize water and ice infiltration.
D. Rake Drip Edges: Install over underlayment materials and fasten to roof deck.
E. Eave Drip Edges: Install below underlayment materials and fasten to roof deck.
F. Pipe Flashings: Form flashing around pipe penetrations and asphalt shingles. Fasten and seal to asphalt shingles as recommended by manufacturer.
3.4 INSTALLATION OF ASPHALT SHINGLES
A. Install asphalt shingles in accordance with manufacturer's written instructions and recommendations in ARMA's "Asphalt Roofing Residential Manual - Design and Application
Methods" and NRCA's "NRCA Guidelines for Asphalt Shingle Roof Systems."
ASPHALT SHINGLES 073113 - 7
B. Install starter strip along lowest roof edge, consisting of an asphalt shingle strip at least 7 inches with self-sealing strip face up at roof edge.
1. Extend asphalt shingles 1/2 inch over fasciae at eaves and rakes.
2. Install starter strip along rake edge.
C. Install first and remaining courses of laminated asphalt shingles stair-stepping diagonally across roof deck with manufacturer's recommended offset pattern at succeeding courses, maintaining uniform exposure.
D. Fasten asphalt shingle strips with a minimum of six roofing nails, but not less than the number indicated in manufacturer's written instructions for roof slope and design wind speed indicated on Drawings and for warranty requirements specified in this Section.
1. Locate fasteners in accordance with manufacturer's written instructions.
2. When ambient temperature during installation is below 50 degrees F , hand seal self-sealing asphalt shingles by applying asphalt roofing cement spots between course overlaps after nailing the upper course.
E. Open Valleys: Cut and fit asphalt shingles at open valleys, trimming upper concealed corners of shingle strips.
1. Maintain uniform width of exposed open valley from highest to lowest point.
2. Extend shingle a minimum of 4 inches over valley metal.
3. Set valley edge of asphalt shingles in a 3-inch-wide bed of asphalt roofing cement.
4. Do not nail asphalt shingles to metal open-valley flashings.
F. Hip and Ridge Shingles: Maintain same exposure of cap shingles as roofing-shingle exposure.
Lap cap shingles at ridges to shed water away from direction of prevailing winds.
1. Fasten with roofing nails of sufficient length to penetrate sheathing.
3.5 WARRRANTY SIGN
A. Provide State of Utah Division of Facilities Management and Construction (DFCM) standard warranty sign.
1. Aluminum sign, 20 gauge minimum thickness, maximum 14 inches wide by 10 inches high, with 1/2-inch radius rounded corners and no sharp edges, landscape orientation.
2. Screen printed background and lettering.
3. Locate sign on interior side of garage wall.
END OF SECTION 073113