6-Addendum No. 1.pdf

PDF 3 MB Posted

Attached to
Bushkill Drive KSAT Trail Extension Project (2026-BDTE)
Solicitation number
Not on record
Issued by
Northampton County, Pennsylvania

About this file

This is an Addendum No. 1 for the City of Easton's Centrifugally Cast Iron Pipe Lining Project (Project No. 2025-CCP), issued by the City of Easton's Bureau of Engineering. The addendum updates the Bid Items to show linear footage for three varying pipe sizes: 3'x3' Storm Culvert (47.67 LF), 3.5'x3.5' Storm Culvert (47.67 LF), 4'x6' Storm Culvert (47.67 LF), 48" Diameter Storm Pipe (388 LF), and 7' x 7.5" Storm Culvert (400 LF). Bidders are required to acknowledge receipt of this addendum on their proposal, with failure to do so resulting in proposal rejection.

The project includes a detailed Schedule of Unit Prices and accompanying engineering drawings for sewer and storm collection systems at multiple intersections in Easton, including Bank Street & Spring Garden Street, Bushkill Street & Bank Street, Pearl Street & Locust Street, Church Street & Seventh Street, and Canal Street & Pastor Fred Davis Street. The drawings provide comprehensive technical details including pipe dimensions, depths, grades, connection points, and specific infrastructure elements like stone culverts, brick structures, and various pipe configurations. The project appears to involve rehabilitation and lining of existing storm and sewer infrastructure across different city locations.

View the file

Other files

File Type Posted
3-KSAT Trail Section A.3 to A.4 Plans.pdf PDF
4-KSAT Trail Section A.3 to A.4 Technical Specifications.pdf PDF
5-Contract Forms.pdf PDF
2-PrevWages.pdf PDF
6-Bid Package 070626.pdf PDF
1-Traffic Notification List 2023.pdf PDF
7-PrevWages.pdf PDF
5-Addendum No. 1.pdf PDF
2-Project Bid Form.pdf PDF
3-Bid Package - Full.pdf PDF
4-Contract Forms.pdf PDF
6-Addendum No. 2.pdf PDF
2-EIM Hot Spot Cleanup Tech Specs (12-18-25).pdf PDF
4-Bid Package.pdf PDF
1-Traffic Notification List 2023.pdf PDF
3-Contract Forms.pdf PDF
4-Bid Package - Full.pdf PDF
5-Spray Lining Plan.pdf PDF
1-Traffic Notification List 2023.pdf PDF
3-Spray Lining Plan.pdf PDF
2-CCPspecifications.pdf PDF
5-Bid Package - Full.pdf PDF
4-Contract Forms 8-15.pdf PDF
3-Contract Forms 8-15.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Easton

Centrifugally Cast Iron Pipe Lining Project

PROJECT No. 2025-CCP

ADDENDUM NO. 1

Dated: 8/28/2025

In accordance with the requirements of the “Instructions to Bidders,” this addendum shall be attached to and become a part of the Contract Documents for the above-named project.

The Bid Items have been updated to show linear footage for all 3 varying pipe sizes. The

Plans have also been updated.

Bidders shall acknowledge receipt of this addendum on the proposal. The absence of this acknowledgement will be a cause for rejection of the contractor’s proposal.

Mark J. Hammerstone, P.E.

City Engineer

Schedule of Unit Prices

Centrifugally Cast Iron Pipe Lining Project

Project No. 2025-CCP

Schedule of Unit Prices

Item

No.

Description

Unit

Measure Quantity

Unit

Price Cost

BASE BID

1 Mobilization LS 1 $

2 3’x3’ Storm Culvert LF 47.67 $

3 3.5’x3.5’ Storm Culvert LF 47.67 $

4 4’x6’ Storm Culvert LF 47.67 $

5 48” Diameter Storm Pipe LF 388 $

6 7’ x 7.5” Storm Culvert LF 400 $

TOTAL BASE BID $