6-Addendum No. 1.pdf
PDF 3 MB Posted
- Solicitation number
- Not on record
- Issued by
- Northampton County, Pennsylvania
About this file
This is an Addendum No. 1 for the City of Easton's Centrifugally Cast Iron Pipe Lining Project (Project No. 2025-CCP), issued by the City of Easton's Bureau of Engineering. The addendum updates the Bid Items to show linear footage for three varying pipe sizes: 3'x3' Storm Culvert (47.67 LF), 3.5'x3.5' Storm Culvert (47.67 LF), 4'x6' Storm Culvert (47.67 LF), 48" Diameter Storm Pipe (388 LF), and 7' x 7.5" Storm Culvert (400 LF). Bidders are required to acknowledge receipt of this addendum on their proposal, with failure to do so resulting in proposal rejection.
The project includes a detailed Schedule of Unit Prices and accompanying engineering drawings for sewer and storm collection systems at multiple intersections in Easton, including Bank Street & Spring Garden Street, Bushkill Street & Bank Street, Pearl Street & Locust Street, Church Street & Seventh Street, and Canal Street & Pastor Fred Davis Street. The drawings provide comprehensive technical details including pipe dimensions, depths, grades, connection points, and specific infrastructure elements like stone culverts, brick structures, and various pipe configurations. The project appears to involve rehabilitation and lining of existing storm and sewer infrastructure across different city locations.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Easton
Centrifugally Cast Iron Pipe Lining Project
PROJECT No. 2025-CCP
ADDENDUM NO. 1
Dated: 8/28/2025
In accordance with the requirements of the “Instructions to Bidders,” this addendum shall be attached to and become a part of the Contract Documents for the above-named project.
The Bid Items have been updated to show linear footage for all 3 varying pipe sizes. The
Plans have also been updated.
Bidders shall acknowledge receipt of this addendum on the proposal. The absence of this acknowledgement will be a cause for rejection of the contractor’s proposal.
Mark J. Hammerstone, P.E.
City Engineer
Schedule of Unit Prices
Centrifugally Cast Iron Pipe Lining Project
Project No. 2025-CCP
Schedule of Unit Prices
Item
No.
Description
Unit
Measure Quantity
Unit
Price Cost
BASE BID
1 Mobilization LS 1 $
2 3’x3’ Storm Culvert LF 47.67 $
3 3.5’x3.5’ Storm Culvert LF 47.67 $
4 4’x6’ Storm Culvert LF 47.67 $
5 48” Diameter Storm Pipe LF 388 $
6 7’ x 7.5” Storm Culvert LF 400 $
TOTAL BASE BID $