5-Addendum No. 1.pdf

PDF 445 KB Posted

Attached to
Bushkill Drive KSAT Trail Extension Project (2026-BDTE)
Solicitation number
Not on record
Issued by
Northampton County, Pennsylvania

About this file

This is Addendum No. 1 to the bid documents for the City of Easton's Centre Square Seating Wall Project (Project No. 2025-CSW), issued January 7, 2026. The addendum modifies the original contract documents by updating the Schedule of Unit Prices and removing Item #7 from the project scope. The project consists of constructing multiple freestanding seating walls around tree wells in landscaped areas using modular wall units in curved or segmented configurations. The scope includes six line items: mobilization for all bid items; base and foundation preparation involving excavation and compacted crushed stone base installation; installation of four modular wall blocks (Techo-Bloc or Belgard units) to a total height of 18 inches in dry-stack configuration; drainage and backfill work including clean stone drainage layer, filter fabric, and perforated drainpipe installation; cap installation using 3-inch thick stone or concrete caps with outdoor adhesive and 1-2% slope for drainage; and finish grading and cleanup. Bidders must acknowledge receipt of this addendum on their proposals, with failure to do so resulting in rejection.

The bid documents present unit price line items for contractor cost proposals across all six work elements, with a total bid cost field for the complete project. The PennBID Bid Table has been updated to reflect the addendum changes. All bidders must submit proposals using the updated Schedule of Unit Prices provided in the addendum. No specific pricing terms, set-aside requirements, incumbent contractor information, or funding sources are detailed in this addendum document, as it functions solely as a modification notice to the existing contract documents. Contractors must adhere to all manufacturer guidelines for modular wall installation and maintain proper drainage slopes and backfill specifications throughout construction.

View the file

Other files

File Type Posted
3-KSAT Trail Section A.3 to A.4 Plans.pdf PDF
4-KSAT Trail Section A.3 to A.4 Technical Specifications.pdf PDF
5-Contract Forms.pdf PDF
2-PrevWages.pdf PDF
6-Bid Package 070626.pdf PDF
1-Traffic Notification List 2023.pdf PDF
7-PrevWages.pdf PDF
2-Project Bid Form.pdf PDF
3-Bid Package - Full.pdf PDF
4-Contract Forms.pdf PDF
6-Addendum No. 2.pdf PDF
2-EIM Hot Spot Cleanup Tech Specs (12-18-25).pdf PDF
4-Bid Package.pdf PDF
1-Traffic Notification List 2023.pdf PDF
3-Contract Forms.pdf PDF
4-Bid Package - Full.pdf PDF
5-Spray Lining Plan.pdf PDF
1-Traffic Notification List 2023.pdf PDF
3-Spray Lining Plan.pdf PDF
2-CCPspecifications.pdf PDF
5-Bid Package - Full.pdf PDF
4-Contract Forms 8-15.pdf PDF
3-Contract Forms 8-15.pdf PDF
6-Addendum No. 1.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Easton

Centre Square Seating Wall Project

PROJECT No. 2025-CSW

ADDENDUM NO. 1

Dated: 1/7/26

In accordance with the requirements of the “Instructions to Bidders,” this addendum shall be attached to and become a part of the Contract Documents for the above named project.

Schedule of Unit Prices have been updated and Item #7 has been removed. The PennBID

Bid Table has been updated accordingly. See attached.

Bidders shall acknowledge receipt of this addendum on the proposal. The absence of this acknowledgement will be a cause for rejection of the contractor’s proposal.

Mark J. Hammerstone, P.E.

City Engineer

Schedule of Unit Prices

Centre Square Seating Wall Project

Project Bid Form Centre Square Seating Wall Construction

City of Easton

Item 1: Mobilization for All Bid Items

Cost: __________________________

Item 2: Base/Foundation Preparation

Excavate for each wall section, provide compacted crushed stone base (4–6" depth typical).

Item 3: 4 Wall Block Installation (50’-55’ in length, 21’ tall caps included, 100’ face per wall)

Install FOUR Techo-Bloc or Belgard modular wall units per manufacturer’s guide for a total height of 18 inches; stack in dry-stack configuration, stagger joints.

Item 4: Drainage & Backfill

Include a drainage layer of clean stone behind walls with filter fabric in between layers, and perforated drainpipe where necessary.

Item 5: Cap Installation

Install 3" thick stone/concrete caps, dry-fit, trim, and secure with outdoor adhesive; slope

1–2% away from tree wells.

Item 6: Finish Grading & Cleanup

Grade surrounding soil, ensure proper drainage, and clean surfaces for final appearance.

Total Bid Cost: __________________________

Contractor Signature: __________________________

Date: __________________________