This is a Project Bid Form for the Centre Square Seating Wall Construction project issued by the City of Easton, Pennsylvania. The project consists of constructing multiple freestanding seating walls around tree wells in landscaped areas using modular wall units in curved or segmented configurations. The scope of work encompasses seven line items: mobilization for all bid items, base and foundation preparation including excavation and compacted crushed stone base (4-6" depth), installation of four Techo-Bloc or Belgard modular wall units (50'-55' in length, 21' tall with caps included, totaling 100' face per wall) in dry-stack configuration with staggered joints, drainage and backfill installation with clean stone, filter fabric, and perforated drainpipe, cap installation using 3" thick stone or concrete caps with outdoor adhesive and 1-2% slope, finish grading and cleanup, and materials supply including wall units, caps, crushed stone, drainage stone, filter fabric, and adhesive. Bidders are required to complete all seven line items with individual costs and a total bid cost, along with contractor signature and date.

The bid form does not specify response dates, due dates, site visit requirements, or bidders' meetings. No information is provided regarding pricing terms, set-asides, incumbent contractors, contract duration, or renewal options. The form is structured as a straightforward cost estimation template requiring bidders to propose individual line item prices for each construction phase. The City of Easton reserves the right to refuse bids for any reason, consistent with standard municipal procurement practices.

View the file

Other files

File Type Posted
3-KSAT Trail Section A.3 to A.4 Plans.pdf PDF
4-KSAT Trail Section A.3 to A.4 Technical Specifications.pdf PDF
5-Contract Forms.pdf PDF
2-PrevWages.pdf PDF
6-Bid Package 070626.pdf PDF
1-Traffic Notification List 2023.pdf PDF
7-PrevWages.pdf PDF
5-Addendum No. 1.pdf PDF
3-Bid Package - Full.pdf PDF
4-Contract Forms.pdf PDF
6-Addendum No. 2.pdf PDF
2-EIM Hot Spot Cleanup Tech Specs (12-18-25).pdf PDF
4-Bid Package.pdf PDF
1-Traffic Notification List 2023.pdf PDF
3-Contract Forms.pdf PDF
4-Bid Package - Full.pdf PDF
5-Spray Lining Plan.pdf PDF
1-Traffic Notification List 2023.pdf PDF
3-Spray Lining Plan.pdf PDF
2-CCPspecifications.pdf PDF
5-Bid Package - Full.pdf PDF
4-Contract Forms 8-15.pdf PDF
3-Contract Forms 8-15.pdf PDF
6-Addendum No. 1.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Bid Form Centre Square Seating Wall Construction

City of Easton

Item 1: Mobilization for All Bid Items Cost: __________________________

Item 2: Base/Foundation Preparation Excavate for each wall section, provide compacted crushed stone base (4–6" depth typical).

Item 3: 4 Wall Block Installations (50’-55’ in length, 21’ tall caps included, 100’ face per wall) Install FOUR Techo-Bloc or Belgard modular wall units per manufacturer’s guide for a total height of 18 inches; stack in dry-stack configuration, stagger joints.

Item 4: Drainage & Backfill Include a drainage layer of clean stone behind walls with filter fabric in between layers, and perforated drainpipe where necessary.

Item 5: Cap Installation Install 3" thick stone/concrete caps, dry-fit, trim, and secure with outdoor adhesive; slope 1–2% away from tree wells.

Item 6: Finish Grading & Cleanup Grade surrounding soil, ensure proper drainage, and clean surfaces for final appearance.

Item 7: Materials Supply Provide Techo-Bloc or Belgard wall units, caps, crushed stone, drainage stone, filter fabric, and adhesive.

Total Bid Cost: __________________________

Contractor Signature: __________________________ Date: __________________________