6-1 Fort Utah Park Construction 2026 RFB.pdf

PDF 454 KB Posted

Attached to
PROVO CITY – Fort Utah Park Improvements RFB
Solicitation number
PR2026001035
Issued by
Utah County, Utah

About this file

This is a Request for Bids (RFB) issued by Provo City Corporation Parks and Recreation Department for the Fort Utah Park Improvements project located at 200 North Geneva Road in Provo, Utah. The project encompasses demolition, grading and excavation, electrical and lighting, concrete and hardscapes, asphalt, utility and drainage systems, site structures and furnishings, masonry, landscaping, and irrigation work to renovate the existing park. Scope of work includes replacement of parking lot curb and gutter, walkways, parking lot, and retaining wall, along with construction of a new restroom building with utilities, mechanical systems, plumbing, and site electrical work. The RFB was released on July 20, 2026, with a non-mandatory pre-bid meeting scheduled for July 28, 2026 at 2:00 p.m. at the worksite. The final clarification submission deadline is August 3, 2026 at 1:00 p.m., and sealed bids are due August 7, 2026 at 1:00 p.m. via the Utah Public Procurement Place (U3P) website. The Notice of Award is anticipated for August 19, 2026. The contract requires project completion within 258 consecutive calendar days from the Notice to Proceed, with a target completion date of May 30, 2027, though preference is given to contractors capable of opening the parking lot by April 15, 2026.

Pricing must be submitted on a firm fixed-fee basis with unit prices provided for each line item on the Bid Unit Price Schedule, with all prices inclusive of transportation, freight, materials, labor, permits, and applicable sales tax. Contractors must demonstrate previous experience with similar park, trail, parking lot, and public restroom construction projects completed within the past three years. Evaluation criteria are weighted as follows: construction materials and alternates (10%), previous experience (40%), detailed work plan and schedule control (30%), and price quotation (20%). Contractors must provide proof of immigration status verification compliance, sign a non-collusion affidavit, and submit performance and payment bonds after award. The contractor is responsible for all permits, SWPPP, fugitive dust control, cleanup, and debris disposal. Liquidated damages are assessed at $1,000 per calendar day for any delay beyond the completion deadline. A two-year warranty on all materials and workmanship is required from the date of project acceptance.

View the file

Other files

File Type Posted
5-6 RESTROOM SPEC SHEET.xlsx XLSX spreadsheet
1-2 07-20-2026 FORT UTAH Bid Schedule.xlsx XLSX spreadsheet
4-5 4 ROOM RESTROOM.pdf PDF
3-4 Fort Utah Park Specs Document.pdf PDF
2-3 260716 Fort Utah Park GBD PLANS Document.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Provo Parks and Recreation Department Request for Bids (RFB) PROVO CITY – Fort Utah Park Improvements RFB RFB No. PR2026001035

Bid Release Date: July 20, 2026

Bid Due Date: August 7, 2026 at 1:00 P.M.

Submission Place: Utah Public Procurement Place (U3P)

Identify your submission as: "Provo City – Fort Utah Park Improvements Request for Bid”.

Carefully read all instructions, requirements, and specifications. Fill out all forms properly and completely.

Submit your RFB with all the required elements electronically via U3P website.

For additional information, contact: Mr. John Bunderson, Project Manager Provo City Parks and Recreation Department

(801) 852-6643 jbunderson@provo.gov

You must sign below; failure to sign WILL disqualify the offer. All prices must be typewritten or written in ink.

Total Amount of RFB: $____________________________________________________

For Unit Pricing see attached line-item Bid Schedule in Project Manual.

Company Name: _______________________________________________________

Company Address: _______________________________________________________

Telephone Number: __________________________

Contact email: ___________________________

Print Name: _____________________________________________________________

Signature: ______________________________________________________________

[As the signer, you attest to have the authority to respond to the RFB on behalf of the Company. The company offers to provide the goods and/or services in this RFB according to the published provisions of this Job. When an award letter is issued, it becomes a part of this contract. Contract is not valid until Purchase Order is issued.] mailto:jbunderson@provo.gov

TABLE OF CONTENTS

NOTICE INVITING BIDS

GENERAL BID INFORMATION

SECTION 1: INTRODUCTION

1.1 SCOPE OF THE WORK

1.2 UNIT PRICING

SECTION 2: GENERAL REQUIREMENTS

2.1 SCOPE OF TERMS & CONDITIONS

2.2 STATEMENT ON IMMIGRATION STATUS

2.3 SUBMISSION OF BID

2.4 AWARD OF CONTRACT

2.5 ADDENDA TO THE BID

2.6 SUBSTANTIVE BIDS

2.7 BID BINDING

2.8 ECONOMY OF BID

2.9 QUALIFICATIONS

2.10 INDEMNIFICATION

2.11 INSURANCE

2.12 EVALUATION PROCESS & SELECTION CRITERIA

2.13 PRICES

2.14 INDEPENDENT CONTRACTOR

2.15 ASSIGNMENT AND SUBCONTRACTING

2.16 RIGHT OF OWNER TO TERMINATE CONTRACT

2.17 LAWS AND ORDINANCES

2.18 CONFIDENTIAL MATTERS

2.19 FORCE MAJEURE

2.20 BONDS

2.21 CHANGE ORDER

2.22 SAFETY OBLIGATION

SECTION 3: SPECIAL REQUIREMENTS / INSTRUCTIONS

3.1 CONTRACTOR'S FAMILIARITY WITH SITE AND WORK

3.2 INFORMATION REQUIRED OF RESPONDENT

CONTRACTOR INFORMATION

WORK EXPERIENCE

MATERIAL SOURCE INFORMATION:

NON-COLLUSION AFFIDAVIT OF CONTRACTOR

3.3 TIME FOR COMPLETION

3.4 LIQUIDATED DAMAGES

3.5 RESPONSIBILITIES OF CONTRACTOR

3.6 COMMUNICATIONS

3.7 CONTRACT DOCUMENTS AND DRAWINGS

3.8 CHANGES IN THE WORK

3.9 PAYMENTS TO CONTRACTOR

3.10 PROPOSED SELECTION AND PROJECT SCHEDULE

NOTICE OF AWARD

AGREEMENT

PERFORMANCE BOND

PAYMENT BOND

CHANGE ORDER FORM

PROVO – DELTA GATEWAY PARK – SITE (approximate)

BID UNIT PRICE SCHEDULE

NOTICE INVITING BIDS

Provo City is accepting SEALED REQUESTS FOR BIDS for PROVO CITY – Fort Utah Park Improvements bid, for a replacement parking lot curb and gutter, walkways, parking lot, and retaining wall at 200 North Geneva Road in Provo, UT. RFB NO. PR2026001035 for the following services: Demolition, Grading & Excavation, Electrical & Lighting, Concrete & Hardscapes, Asphalt, Utility & Drainage Systems, Site Structures & Furnishings, Masonry, Landscaping, and Irrigation.

APPROXIMATE SITE DESCRIPTION as follows: The PROVO CITY – Fort Utah Park Improvements bid Project is for the development of the Fort Utah Park near 200 North Geneva Road in Provo, Utah as shown in the construction document bid set. Refer to the Project Bid Set for a more complete description of the project and proposed improvements.

Owner: Provo City Corporation Parks and Recreation Department 1417 S 350 E Provo, Utah 84606 Contact: John Bunderson, Projects Manager 801-852-6643 jbunderson@provo.gov

GENERAL BID INFORMATION

Provo City Parks and Recreation is seeking qualified professional general contractors to provide construction services to renovate the Provo Fort Utah Park near 200 North Geneva Road, Provo, UT, 84601 (Worksite).

NON-Mandatory Pre-BID meeting on July 28, 2026 at 2:00 P.M. starting at the parking lot of Worksite location.

Plan on up to 1 hour of site walk through.

RFB documents including Contract Documents, Project Specifications and Construction Drawings may be downloaded from U3P website at https://utah.bonfirehub.com/portal/?tab=openOpportunities

Requests for clarification must be submitted in writing through the U3P website. Each question should reference a specific section, page and item of this document. Answers to the written questions will be posted on the U3P web site for all parties to view. Final clarification submission August 3, 2026 at 1:00 P.M.

Except to postpone the Bid opening, no Addenda shall be issued within 48 hours of the Bid closing.

BID SUBMISSION: SEALED BIDS will be received via U3P website until August 7, 2026 at 1:00 P.M. local time (https://utah.bonfirehub.com/portal/?tab=openOpportunities ).

BIDS received after this time will not be accepted. After the RFB submission time has ended the proposals will be received, reviewed and scored according to the parameters set forth in this document.

The right is reserved by Provo City to reject any or all RFB’s and to waive defects in order to make awards to the most competitive and responsible respondent.

https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities

SECTION 1: INTRODUCTION

1.1 SCOPE OF THE WORK

Provo City is located along the Wasatch Range of the Rocky Mountains, forty miles south of Salt Lake City. With a growing population of over 116,000, Provo is a community that values park and recreation facilities and resources.

Provo City is soliciting this BID from qualified general contractors to renovate the Provo Fort Utah Park Improvements near 200 North Geneva Road, Provo, UT, 84601. Refer to the Project Specifications Bid Set for a more complete description of the Project and proposed construction. Contractors are responsible for all permits, clean-up and disposal of excess construction debris, SWPPP, Fugitive dust control plan, and dust control. It is expected that the chosen Contractor will follow the contents of this document and the accompanying drawings and specifications within the specified schedule.

The Scope of Work is divided into three specific areas. The project timing is estimated to be September 15, 2026 to May 30th, 2026 preference will be given to contractors who submit and are capable of a condensed build schedule and able to open the new parking lot by April 15th, 2026.

I. Permitting Owner has obtained a plan approval for this project. All other necessary permitting must be obtained by Contractor and include the associated costs in bid estimate.

a. All Provo City permits including building, night work, noise, etc. may be required depending on the work plan.

II. Demolition:

Include complete costs of demolition of existing site to construct new restroom, parking lot, detention basin irrigation and landscape as per plan set, including:

a) Demolition and debris removal of existing concrete and asphalt surfaces, fencing, trees, turf grass and concrete walkways that are designated to be removed within the area.

b) Provide trail closure and detour plan before demolition to preserve a recreational route alternative to construction area.

c) Grub any vegetative materials and remove them from site unless materials are designed to be reused with in project area as per plan.

d) Removal of excess soil material within new project limits. Remove existing topsoil, screen and reuse on site where needed. Dispose of all other excess material.

e) Remove all concrete and asphalt in designated demolition area identified in plan set. Asphalt may be pulverized and used as base course material, as per plan set.

f) Grade soil for trails and landscape subgrade as needed.

g) Before digging call Blue Stakes for the location of underground utilities; - 800-662-4111 or 811.

h) Contractor will be responsible to repair any utility damage to the owners’ satisfaction and the work will be paid for by the Contractor.

i) Coordinate the disconnection of utilities before demolition.

III. Construction:

The project construction is to be per plan set and include but not be limited to the following elements:

a) Assure that all construction submittal documents are reviewed and authorized by Parks Project Manager before initializing construction.

b) Supply subgrade aggregate material, labor and equipment for grading and compaction for subgrade material.

c) Landscape and vegetation restoration of demolished areas and new installation as designed.

d) Ensure proper surface drainage of all impacted areas impacted by construction.

e) Irrigation installation as designed in plan set.

f) Allow room for supply of and installation of signage by others.

g) Gates and fencing as per plan.

h) New dumpster enclosure.

i) New retaining walls.

j) New and replacement concrete and asphalt.

k) New fencing, handrails, and outfield netting.

l) New Restroom building to be built as per plan:

a. Utilities

b. Restroom Structure

c. Restroom Mechanical

d. Restroom Plumbing

e. Walkways/ Concrete

f. Handrailing

g. Building and Site Electrical

h. All remaining miscellaneous items to construct as per plan.

m) Construction Line items as approved by Provo City Parks & Recreation.

n) Warranty - Any material or workmanship found to be defective or out of specification shall be replaced, at the sole cost of the contractor, for a period of two (2) years from date of acceptance.

1.2 UNIT PRICING

Any BID in which a total price for all items is submitted without quoting a unit price for each and every separate item may be considered non-responsive and during bid review may be rejected. Contractors may restrict their BID to consideration in the aggregate by so stating but shall name a single unit price on each item. Unit prices given will be totaled by Owner’s representatives in order to determine lowest price. In the event Contractor makes arithmetic mistakes in the quoted total BID price, provided unit prices will govern.

The Contractor, as part of this BID, shall complete the unit price schedule and enter a dollar amount for every line item listed. The items enumerated shall be listed in a Unit Price Schedule, by item number, item description, item quantity, item unit cost and item extended cost.

The quantities, if provided in the bid schedule, are for convenience only. The contractor is required to verify all quantities and notify the Owner if discrepancies exist. By submitting a bid, the contractor confirms that the quantities are verified.

SECTION 2: GENERAL REQUIREMENTS

2.1 SCOPE OF TERMS & CONDITIONS

Before submitting a BID, the Contractor shall be thoroughly familiar with all contract conditions referred to in this document and any addenda issued before the BID submission date. Such addenda shall form a part of the BID. It shall be the Contractor’s responsibility to ascertain that the BID includes all addenda issued prior to the BID submission date.

Contractors, by virtue of submission of a BID, acknowledge and accept these Terms and Conditions.

General Requirements apply to all advertised BIDS, however, these may be superseded, whole or in part, by SECTION 3: SPECIAL REQUIREMENTS/INSTRUCTIONS OR OTHER DATA CONTAINED HEREIN. All Contractors should carefully review SECTION 3.2, INFORMATION REQUIRED OF RESPONDENT and be sure that the BID submittal is complete.

2.2 STATEMENT ON IMMIGRATION STATUS

All Responders are reminded of the requirements of the Utah Code Section 63G-12-302 that Provo City is prohibited from entering into any contract for the performance of services with any successful Contractor who does not provide the City with proof of registration and participation in a federally approved immigration status verification system.

Failure to provide the required proof is grounds for rejection of BID.

2.3 SUBMISSION OF BID

Contractors must fill out and submit bid electronically on U3P. The BID must be received no later than August 7, 2026 at 1:00 P.M. local time.

All BIDS become the property of Provo City (the Owner) upon receipt of same by the Owner. The content of all BIDS will be kept confidential until an award is made, after which the content will no longer be kept confidential.

An authorized representative of the Contractor shall sign the Cover Sheet. This contract will be binding only when signed by the Owner and a Purchase Order has been issued.

Provo City is not liable for any cost incurred by Contractor associated with the preparation of a BID or the negotiation of a contract for services. This Request for Bids does not commit Provo City to award a contract, to pay any costs incurred in the preparation of bid proposals to this request or to procure contract services. Provo City reserves the right to accept or reject any or all proposals received as a result of this request, to negotiate with any qualified contractor or to cancel in part or in its entirety the Request for Bid, if it is in the best interest of Provo City, or the Construction Services are not deemed feasible.

2.4 AWARD OF CONTRACT

Contract may be negotiated with Contractor whose BID is determined to be most responsive to the Owner’s needs and most advantageous to the Owner, considering cost as well as other factors based on the criteria described herein, all as solely determined by the Owner. AWARD OF CONTRACT MAY BE MADE WITHOUT DISCUSSION AFTER BIDS ARE RECEIVED. BIDS should, therefore, be submitted initially on the most favorable terms, from price, service and technical standpoints.

The Owner reserves the right to reject any and all BIDS and to waive any formality in BIDS received, to accept or reject any or all of the items in the BID, and award the contract in whole or in part, if it is deemed in the Owner’s best interest.

The Owner reserves the right to negotiate any and all elements of the BID, if such action is deemed in the best interest of the Owner.

2.5 ADDENDA TO THE BID

If it becomes necessary to revise any part of this REQUEST FOR BID an addendum will be provided to all potential Contractors on U3P who have indicated an intent to respond. All potential Contractors finding inconsistencies or ambiguities should use U3P to seek clarification through written questions.

A statement issued in an Addendum shall have the effect of modifying a portion of the Bid Documents when the statement in the Addendum specifies a particular section, paragraph or text and states that it is to be so modified. Only the specific section, paragraph or text shall be so modified, and all other portions of the Bid Documents shall remain in effect.

Contractors shall sign to acknowledge their receipt of all Addenda issued. Contractors shall also acknowledge receipt of all Addenda in the space provided in the Bid.

2.6 SUBSTANTIVE BIDS

The Contractor certifies that (a) Contractor’s BID is genuine and is not made in the interest of, or on behalf of, an undisclosed person, firm or corporation; (b) Contractor has not directly or indirectly induced or solicited any other Contractor(s) to put in a false or sham BID; c) Contractor has not solicited or induced any other person, firm or corporation to refrain or abstain from proposing a BID; (d) Contractor has not sought by collusion to obtain for themselves any advantage over any other Contractor(s) or over the Owner; and (e) Contractor shall not violate or cause any person to violate the Utah Code of Ethics.

2.7 BID BINDING

Contractors are advised that BIDS shall be binding upon the Contractor for sixty (60) calendar days from the BID due date. A Contractor may withdraw or modify their BID any time prior to the BID due date by a written request, signed in the same manner and by the same person who signed the BID.

2.8 ECONOMY OF BID

Contractor must submit a complete and concise response in their BID not to exceed 15 pages in total length. All BIDS received will be retained by the Owner. BIDS should be prepared simply and economically, while providing complete details of the Contractor’s abilities to meet the requirements of this BID. All information must be legible. Any and all corrections and/or erasures must be initialed. Each BID shall be accompanied by a transmittal letter signed in ink by an authorized representative of the Contractor. The required signed Cover Sheet may serve also as the required transmittal letter. The contents of the BID submitted by the successful Contractor may become part of any contract awarded as a result of this REQUEST FOR BID.

2.9 QUALIFICATIONS

Each Contractor may additionally be required to show that they have satisfactorily provided service and performed similar work in the past and that no claims of any kind are pending against such work. No BID will be accepted from a Contractor who is engaged on any work, which would impair their ability to perform or finance this work. All such work shall be revealed in the BID.

No BID will be accepted from, nor will a contract be awarded to, any Contractor who is in arrears to the Owner, upon any debt or contract, or who is in default, as surety or otherwise, upon any obligation to the Owner, or is deemed to be irresponsible or unreliable by the Owner.

2.10 INDEMNIFICATION

To the fullest extent by law, the Contractor shall indemnify, defend and hold harmless the Owner and any subsidiary or affiliate, and its past, present and future agents, representatives and employees from and against all claims, damages, losses and expenses, including but not limited to attorney's fees, directly or indirectly arising out of or based in whole or in part upon:

1. The Contractor's breach of any covenant or warranty of this Agreement.

2. Any damage or loss to any property caused in whole or in part by the Contractor or any one directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable, except damages or loss attributable solely to acts or omissions of the Owner or its agents or employees and not attributable to the fault or negligence of the Contractor.

3. The Contractor's failure to comply with any applicable law, rule or ordinance.

4. The indemnity obligations of this paragraph are in addition to the indemnity obligation of the Contractor under the indemnification section.

The indemnity obligation is intended to include the indemnification of Owner indemnified hereunder for damages apportioned to the Contractor or any directly or indirectly employed by any of them or anyone for whose acts any of them may be liable. Such obligation shall not be construed to negate, abridge or otherwise reduce any other right or obligation of indemnity, which may otherwise exist in favor of the Owner. In any and all claims against the Owner, or any subsidiary of affiliate, or any of its past, present or future agents, representatives or employees by any employee of the Contractor or any one directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or types of damages, compensations or benefits payable by or for the Contractor, or any under the worker's or workman's compensation acts, disability benefit acts or other employee benefit acts.

2.11 INSURANCE

The Contractor shall provide the following minimum insurance coverage from companies holding a General Rating of "A" or better as set forth in the most current issue of Best's Key Rating Insurance Guide written for not less than the following, or greater if required by law and all such insurance to be primary to any insurance maintained by Owner, shall name Owner as additional insured with waiver of subrogation:

A. The Successful Contractor shall not commence work under this Agreement until it has obtained all insurance required by the contract documents and such insurance has been approved by Provo City. The Contractor shall not allow any subcontractor to commence work on this project until all similar insurance required of the subcontractor has been obtained and approved. For the duration of this Agreement, the Contractor must maintain the insurance coverage required in this section.

B. The Successful Contractor shall procure and maintain, at its own cost, the following policy or policies of insurance.

The Contractor shall not be relieved of any liability, claims, demands, or other obligations assumed pursuant to the contract documents by reason of its failure to procure or maintain insurance or by reason of its failure to procure or maintain insurance in sufficient amounts, durations, or types.

C. Successful Contractor shall procure and maintain and shall cause each Subcontractor of the Contractor to procure and maintain (or shall insure the activity of Contractor’s Subcontractors in Contractor’s own policy with respect to), the minimum insurance coverages listed below. Such coverages shall be procured and maintained with forms and insurers acceptable to the City. All coverages shall be continuously maintained from the date of commencement of the Work. In the case of any claims-made policy, the necessary retroactive dates and extended reporting periods shall be procured to maintain such continuous coverage.

1. Worker’s Compensation insurance to cover obligations imposed by the Workers’ Compensation Act of Utah and any other applicable laws for any employee engaged in the performance of Work under this contract, and Employers’ Liability insurance with minimum limits of One Million Dollars ($1,000,000) each accident, One Million Dollars ($1,000,000) disease – policy limit, and One Million Dollars ($1,000,000) disease – each employee.

2. Comprehensive General Liability insurance with minimum single limits of Two Million Dollars ($2,000,000) each occurrence and Two Million Dollars ($2,000,000) aggregate. The policy shall be applicable to all premises and operations. The policy shall include coverage for bodily injury, broad form property damage (including completed operations), personal injury (including coverage for contractual and employee acts), blanket contractual, independent contractors, products, and completed operations. The policy shall include coverage for explosion, collapse, and underground hazards. The policy shall contain a severability of interest’s provision.

3. Comprehensive Automobile Liability insurance with minimum combined single limits for bodily injury and property damage of not less than One Million Dollars ($1,000,000) each occurrence and One Million Dollars ($1,000,000) aggregate with respect to each of Contractor’s owned, hired and/or non-owned vehicles assigned to or used in performance of the services. The policy shall contain a severability of interest’s provision.

4. The Contractor’s Professional liability (errors & omissions) insurance coverage shall be written for not less than $1,000,000. Insurance shall be maintained for two (2) years after work has been completed.

5. The policies required above, except for the Workers’ Compensation insurance and Employer’s Liability insurance, shall be endorsed to include Provo City, and its officers and employees, as additional insured. Every policy required above shall be primary insurance, and any insurance carried by the City, its officers or its employees, shall be excess and not contributory insurance to that provided by Contractor. The additional insured endorsement for the Comprehensive General Liability insurance required above shall not contain any exclusion for bodily injury or property damage arising from completed operations. The Contractor shall be solely responsible for any deductible losses under each of the policies required above.

6. If the Contractor uses any sub-Contractors, Contractor will provide for Contractors or require the same insurance provisions for its sub-Contractors.

7. Certificates of insurance shall be completed by the Contractor’s insurance agent as evidence that policies providing the required coverages, conditions, and minimum limits are in full force and effect, and copies of such certificates shall be forwarded to the City prior to start of Work. Each certificate shall identify the Project and shall provide that the coverages afforded under the policies shall not be cancelled, terminated or materially changed until at least 30 days prior written notice has been given to the City. If the words “endeavor to” appear in the portion of the certificate addressing cancellation, those words shall be stricken from the certificate by the agent(s) completing the certificate. The City reserves the right to request and receive a certified copy of any policy and any endorsement thereto.

8. Failure on the part of the Contractor to procure or maintain policies providing the required coverages, conditions, and minimum limits shall constitute a material breach of contract upon which the City may immediately terminate the contract, or at its discretion may procure or renew any such policy or any extended reporting period thereto and may pay any and all premiums in connection therewith, and all monies so paid by the City shall be repaid by the Contractor to the City upon demand, or the City may offset the cost of the premiums against any monies due to Contractor from the Owner.

2.12 EVALUATION PROCESS & SELECTION CRITERIA

These guidelines are intended to standardize the preparation and assure consistency in format and content of submittals by all interested Contractors. The submittal should provide the Selection Review Committee with an understanding of the Contractor’s ability to undertake and complete the proposed project in a thorough and timely manner.

The submittal should contain the following information in the order listed and not exceed 15 pages in total length.

1. Signed Cover Sheet Y/N

2. Introductory Letter Y/N

3. Statement on employee Immigration verification status Y/N

4. Attend NON-Mandatory Pre-BID Meeting Y/N

5. Construction Materials and/or proposed alternates 10%

6. Previous park, trail, parking lot and public restroom construction experience 40%

7. Detailed Work Plan & Schedule Control 30%

8. Price Quotation 20%

It is very important that submittals be clear and concise in the recommended format so they can be evaluated in an objective manner by the Selection Review Committee. Each section in the submittal should be tabbed for easy reference and will be evaluated using the following selection criteria and according to the weighted scale noted.

1. Signed Cover Sheet – All bids to include a signed Cover Sheet as provided by owner that includes the total bid cost, company information and contractor authorized representative signature.

2. Introductory Letter - The introductory letter should be addressed to:

Mr. John Bunderson, Project Manager

1417 South 350 East Provo, Utah 84606

This letter should contain an expression of the Contractor’s interest in the work, a statement regarding the qualifications of the Contractor to do the work, a description of the services the Contractor will provide and any summary information on the project team or the Contractor that may be useful or informative to the Selection Review Committee.

Evaluation weight Y/N.

3. Statement on employee Immigration verification Status - All responders are reminded of the requirements of Utah Code Annotated 63G-12-302 that Provo City is prohibited from entering into any contract for the performance of services with any successful bidder who does not provide the City with proof of registration and participation in a federally approved immigration status verification system. Failure to provide the required proof may be grounds for rejection of a submitted proposal.

Evaluation weight Y/N

4. NON-Mandatory Pre-BID meeting on July 28, 2026 at 2:00 P.M. starting at the parking lot of Worksite location by General Contractor representative. Plan on up to 1 hour of site walk through. A sign in sheet will be provided and persons may elect to be listed as a plan holder or subcontractor on the sheet.

Evaluation weight Y/N

5. Construction Materials and/or proposed alternates - The evaluation will consider how well the proposed parks, trails and furnished materials are aligned with the specified equipment in construction plans. Preference will be given by the selection review committee for best quality materials if pricing is comparable between submissions.

The owner reserves the right to request proposed materials be changed to the specified equipment in the plan set if the qualifying bid otherwise meets the bid requirements and have bidder revise unit price.

Evaluation weight 10%

6. Previous park, trail, parking lot and public restroom construction experience - The evaluation will consider how well the Contractor has historically planned a course of action, identified alternatives and/or innovative approaches, and what provisions are identified for dealing with the potential impact, impediments, or conflicts to this project’s construction. Describe how objectives or tasks listed in the Scope of Services will be achieved through a logical, innovative and rational plan. Be specific, concise and complete. Describe methodology in enough detail to permit an evaluation of the probability of success in meeting the project objectives. Include the titles of personnel who will perform each phase or task of the work or if the task will be performed by sub-contractor(s).

Evaluation weight 40%

7. Detailed Work Plan & Schedule Control - The evaluation will be based on the internal measures Contractor will use to ensure timely completion along with their demonstrated reputation. Identify internal methods that will be used for project schedule control, assuming two hundred and fifty-eight (258) calendar days completion schedule September 15th 2026 to May 30th, 2027. Outline what work scope may extend past the May 30th, 2027 deadline. Owner has a preference to maintain trail operations throughout the construction period.

List current references who can confirm the firm’s ability for timely project completion. Operations shall be suspended at any time when satisfactory results cannot be obtained due to rain, freezing, or other unsatisfactory weather conditions in the field as dictated by Owner. Provide description of the reliability of the equipment and staffing proposed to perform the work.

The evaluation will consider the Contractor’s capability to perform the work including internal quality and cost control procedures. Describe the firm’s capability to perform the work. Emphasize the strengths and specialties of the firm.

List project type, name of client, location, scope of work, services provided, Contractor fee, change orders, reasons for change orders, date completed, contact person, telephone number and size (dollar amount) of recent work of a similar nature performed in the last three (3) years. Explain the firm’s function or project involvement (primary Contractor, sub- Contractor, project management, technical support, etc.). Explain internal policies and procedures related to work quality and cost control. List and describe any potential conflicts of interest or other projects being performed concurrently to this project. Provide detailed work timelines when various phases of this project will be accomplished.

Include the number and type of meetings needed throughout the construction process. For example: How will your firm work with the following entities to complete project on time, on budget: Onsite conditions, permitting, supply chain, Parks and Recreation Department staff, invoicing, etc.

Evaluation weight 30%

8. Price Quotation - Provide a fixed fee for the total Scope of Services as described in the Request for Bid. The total cost for services must be submitted on the Cover Sheet included in this bid. The bid information must be submitted on the Bid Form provided and itemized in the Unit Price Bid Schedule sheet with all materials.

Evaluation weight 20%

2.13 PRICES

Prices for all goods and/or services shall be firm for the duration of this contract and shall be stated on the Pricing/Delivery Information form. Prices shall be all inclusive: No price changes, additions or subsequent qualifications will be honored during the course of the contract. All prices must be written in ink or typewritten.

Pricing on all transportation, freight, drayage and other charges are to be prepaid by the Contractor and included in the BID prices. If there are any additional charges of any kind, other than those mentioned above, specified or unspecified, Contractor MUST indicate the items required and attendant costs or forfeit the right to payment for such items.

Sales Tax:

All materials installed and/or any materials converted to real property by someone other than a city, county or state employee are generally subject to sales tax. Contractors/Subcontractors are responsible for remitting applicable sales tax on all materials purchased or placed in service that are subject to sales tax. Bidders should consider and include the impact of sales tax in all cost models/bids. The contractor/subcontractor will be responsible to pay and remit all applicable sales and use taxes.

2.14 INDEPENDENT CONTRACTOR

The relationship of the Contractor to Owner shall be that of an independent Contractor. Neither Contractor nor any of its employees shall be held or deemed in any way to be an agent, employee, or official of Owner. Contractor shall be responsible for, and hold Owner harmless from any liability for, unemployment taxes or contributions, payroll taxes, or other federal or state employment taxes and worker's compensation insurance coverage as may be required by law.

2.15 ASSIGNMENT AND SUBCONTRACTING

The Contractor shall not assign or subcontract the work, or any part thereof, without the previous written consent of Owner, nor shall they assign, by power of attorney or otherwise, any of the money payable under the Contract unless written consent of Owner has been obtained. No right under the Contract, nor claim for any money due or to become due shall be asserted against Owner, or persons acting for Owner, by reason of any so-called assignment of the Contract or any part thereof, unless such assignment has been authorized by the written consent of Owner. In case the

Contractor is permitted to assign monies due or to become due under the Contract, the instrument of assignment shall contain a clause subordinating the claim of the assignee to all prior liens for services rendered or materials supplied for the performance of the work.

2.16 RIGHT OF OWNER TO TERMINATE CONTRACT

Owner may terminate this Agreement for convenience upon 10 days’ notice or for cause immediately. Grantee may reimburse the Contractor for products delivered or services performed through the date of cancellation or reduction, and Owner shall not be liable for any future commitments, penalties or liquidated damages. Examples of cause include and are not limited to:

• Failure to respond to communications in a timely manner.

• Destruction to property.

• Negligent behavior of sub-recipient.

The Contractor shall not be entitled, nor shall Owner give any consideration to claims for any costs or for loss of anticipated revenue(s), including overhead and profit, due to the abandonment or termination of this Contract, or any part hereof, by Owner.

Owner shall determine the amount of work satisfactorily performed by the Contractor and Owner’s evaluation shall be used as a basis to determine the amount of compensation due the Contractor for performed Work.

2.17 LAWS AND ORDINANCES

The laws of the State of Utah shall govern any contract executed between the successful Contractor and Owner.

Further, the place of performance and transaction of business shall be deemed to be in the County of Utah, State of Utah, and in the event of litigation, exclusive venue and place of jurisdiction shall be the State of Utah, and more specifically, the district court of Utah County, Utah.

2.18 CONFIDENTIAL MATTERS

All data and information gathered by the Contractor, and all reports, recommendations, documents, and data shall be treated by the Contractor as confidential. The Contractor must agree not to communicate or disclose the aforesaid matters to a third party or use them in advertising, publicity, or propaganda and/or in any other job, unless prior written consent is obtained from Owner.

2.19 FORCE MAJEURE

“FORCE MAJEURE” shall be considered to be an act of God, fire, or explosion that, due to its consequences, threatens to delay the timely performance of the parties’ obligations hereunder. Whenever either party has knowledge of any event of Force Majeure or other situation that is delaying or threatens to delay the timely performance of any obligation called for by this Contract, that party shall immediately give written notice thereof, including all relevant information with respect thereto, to the other party.

Neither party to this Contract shall be liable for delay or failure to perform pursuant to the terms of this Contract, if and to the extent such delay or failure is due to the event of Force Majeure as defined above provided that:

1. Neither party may claim the benefit of this section unless the delay or failure to perform is due to causes beyond its control and without its fault or negligence; and

2. Any delay or failure by a Contractor at any tier of either party shall not be excusable unless such delay or failure arises out of causes beyond the control of Contractor, and the services to be furnished by Contractor are not obtainable from other sources at comparable costs in sufficient time to permit its commitments to be met pursuant to this Contract.

2.20 BONDS

This BID does not require the submission of a BID guarantee. This BID does require the submission of performance and payment bonds after the Notice of Award is executed and prior to final approval of the Contract Agreement by the City.

Failure of a Contractor to obtain the performance and payment bonds will void the Notice of Award and the City will award the contract to the next responsible bidding Contractor.

2.21 CHANGE ORDER

Any change in the scope or description of the material or service, or in the contract price, shall be executed by written order of Owner. No change order shall affect the validity of the contract or any terms or conditions not expressly changed.

2.22 SAFETY OBLIGATION

The Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures and for coordinating and supervising all portions of the Work under the Contract. The Contractor shall conduct the Work in such manner as to protect the Owner and all other persons from accidents and injury, and in such a manner as to avoid damage to the Property, adjacent properties, or any improvements or personal property located thereon. The Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work.

The Contractor shall comply with all State and Federal OSHA, health environmental, and safety regulations, rules and laws. The Contractor shall erect and maintain, as required by existing conditions and the progress of the Work, all reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent utilities. Contractor shall examine the Property to its satisfaction prior to the commencement of any Work to become familiar with the condition of the Property to the extent necessary and appropriate to properly perform the Work. In this regard, Contractor shall (i) inspect the Property in order to determine the nature, extent and location of any dangerous or unsafe conditions on and in the vicinity of the Property, and (ii) specifically instruct its employees regarding appropriate safety practices and procedures in connection with any dangerous or unsafe conditions that may be encountered.

Owner makes no representations or warranties with respect to the condition of the Property, or for the accuracy or completeness of any information provided by Owner with respect thereto. Any harm or injury to Contractor, Contractor’s employees, agents, or any other persons performing any portion of the Work under an agreement with Contractor that is or may be attributable to the condition of the Property including, with limitation, the condition of improvements thereon, shall be the sole responsibility of, and at the sole risk of, Contractor. The presence on the job site of persons representing the Owner shall not in any way be construed to limit the Contractor’s full responsibility hereunder for safety of all persons and property at the job site. Liability of the Contractor for all damages to persons or public or private property arising from the Contractor’s execution of the Work shall not be diminished because of any inspection, testing or observation of the Work by agents of the Owner.

SECTION 3: SPECIAL REQUIREMENTS / INSTRUCTIONS

Where these specific requirements differ from the preceding General Requirements, these specific requirements shall control.

3.1 CONTRACTOR'S FAMILIARITY WITH SITE AND WORK

By submitting this BID or BID documents, the Contractor acknowledges that they have visited the site, have familiarized themselves with the local conditions under which the work is to be performed and understands the scope of work as defined in the contract documents.

3.2 INFORMATION REQUIRED OF RESPONDENT

The Respondent shall furnish the following information with their BID on either the following provided sheets 16-19 or use supplemental pages for submission:

1. Cover sheet.

2. Statement of Immigration Status.

3. Contractor information.

4. Three recently completed projects.

5. Materials source information.

6. Non-collusion affidavit of Contractor.

7. The unit price schedules.

Failure to comply with this requirement will render the BID non-responsive and may cause BID rejection. Additional sheets shall be attached as required.

CONTRACTOR INFORMATION

CONTRACTOR'S name and address:

CONTRACTOR'S:

Telephone number: (xxx)xxx-xxxx Primary classification:

Utah License # and date of expiration:

Number of years as a Contractor in construction work of this type:

NAMES and titles of all officers of CONTRACTOR'S firm:

NAME, address, and telephone number of Surety Company and agent who will provide the required bonds on this contract:

ATTACH TO THIS BID the experience resume of the person who will be designated chief construction superintendent or on-site construction manager.

WORK EXPERIENCE

Contractor MUST list three (3) projects completed as of recent date involving work of similar type, scope and complexity. Include with this information the name, address and telephone number of the owner, the contract price and final price. Insufficient experience with construction of this type, scope, and/or complexity will render the respondent non-qualified and therefore ineligible for award of contract. Contractor may use format below or supply additional descriptive document.

Project:

Name:

Address:

Telephone #:

Contract Price:

Final Price:

Project:

Name:

Address:

Telephone #:

Contract Price:

Final Price:

Project:

Name:

Address:

Telephone #:

Contract Price:

Final Price:

MATERIAL SOURCE INFORMATION:

Respondent shall indicate opposite each item of material listed below, the name of the manufacturer of any alternative materials to be furnished under the BID, not specified in bid documents. The listing of more than one manufacturer for each material to be furnished with the words "and/or" will not be permitted.

1. .

2. .

3. .

4. .

5. .

NON-COLLUSION AFFIDAVIT OF CONTRACTOR

State of Utah

County of Utah

, being first duly sworn, deposes and says that:

1. They are __________________________________________ (owner, partner, officer, representative or agent) of _________________________________________________ herein after referred to as the "Contractor"

2. They are fully informed respecting the preparation and contents of the Contractor's BID submitted by the Contractor for PROVO CITY – Fort Utah Park Improvements bid. The Contractor for certain work in connection with the improvement Project Contract pertaining to the Project in Provo City, Utah;

3. Such Contractor's BID is genuine and is not a collusive or sham BID;

4. Neither the Contractor nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Respondent, firm or person to submit a collusive or sham BID in connection with such Contract or to refrain from submitting a BID in connection with such Contract, or has in any manner, directly or indirectly, sought by unlawful agreement or connivance with any other Respondent, firm or person to fix the price or prices in said Contractor's BID or to secure through collusion, conspiracy, connivance or unlawful agreement any advantage against the Provo City Corporation (Local Public Agency) or any person interested in the Proposed Contract: and

5. The price or prices quoted in the Contractor's BID are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Respondent or any of its agents, representatives, owners, employees or parties in interest, including this affiant.

Signed

Title __________________________________

Subscribed and sworn to before me this day of , 2022.

Notary

My commission expires , 20 .

3.3 TIME FOR COMPLETION

The work which the Contractor is required to perform under this Contract shall be commenced at the time stipulated by the Owner in the Notice to Proceed to the Contractor and shall be fully completed within two hundred and fifty-eight

(258) calendar days (consecutively) thereafter weather permitting. If the contractor does not think this timeline is feasible, please submit a schedule that is feasible for review and approval as part of the bid submission.

3.4 LIQUIDATED DAMAGES

Liquidated damages shall be assessed as follows:

a) As actual damages for any delay in completion of the work which the Contractor is required to perform under this contract are impossible of determination, the Contractor and their Sureties shall be liable for and shall pay to the Owner the sum of $1,000.00 as fixed, agreed and liquidated damages for each calendar day of delay from the above stipulated time for completion.

3.5 RESPONSIBILITIES OF CONTRACTOR

1. Except as otherwise specifically stated in the Contract Documents and technical specifications, the Contractor shall provide and pay for all materials, labor, tolls, equipment, water, light, heat, power, transportation, superintendence, temporary construction of every nature, charges, levies, fees, permits or other expenses and all other services and facilities of every nature whatsoever necessary for the performance of the Contract and to deliver all improvements embraced in this contract for site preparation complete in every respect within the specified time.

2. The Contractor shall carefully review the Contract Documents and shall promptly report any errors, inconsistencies or omissions they may discover.

3. The work shall be laid out to true lines and grades in full accord with the drawings. Surveying of lines and grades, from a base line and benchmark established by the owner at the construction site, and staking thereof, shall be accomplished by the Contractor. Monuments should be substantially established, protected and maintained in place by the Contractor for the duration of the contract or until such other time as their removal may be authorized by the owner or their representative.

4. The Contractor shall secure proper written authorization for any corrective work which becomes the responsibility of the owner.

5. The Contractor shall submit a schedule indicating the intended starting date of the work, the different phases and timetable if possible, and the intended date of completion.

6. The Contractor shall inform the Owner of any delays, and causes of such, that affect the completion of the work.

7. The Contractor shall be responsible for the supervision and direction of the work. They shall direct their authorized staff and/or Contractors as deemed necessary and consistent with good construction practices.

8. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the work. Unless specifically noted otherwise, the Contractor shall provide and pay for all labor, materials, equipment, tools, construction machinery and transportation necessary for proper execution and completion of the work.

9. The Contractor shall erect and maintain barricades, canopies, guards, lights, and warning signs to the extent required by law or reasonably necessary for protection of the public.

10. The Contractor shall at all times keep the premises clean and free of accumulated waste materials and rubbish caused by the operations. At the final completion of the job, the Contractor shall restore all areas damaged in the course of the work.

11. The Contractor performing any part of the work and any Contractors under the contract shall guarantee their respective work against defective materials or workmanship for one year from the date of filing notice of completion by the Contractor and acceptance of such by the owner.

3.6 COMMUNICATIONS

1. All notices, demands, requests, instructions, approvals, BIDS and claims must be in writing.

2. Any notice to or demand upon the Contractor shall be sufficiently given if delivered at the office of the Contractor stated on the signature page of the Agreement (or at such other office as the Contractor may from time to time designate in writing to the Owner), or if deposited in the United States mail in a sealed, postage prepaid envelope, in each case addressed to such…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .