This is a bid schedule document prepared by Provo City, Utah for the Fort Utah Park Improvements project located at 200 North Geneva Road in Provo, Utah. The project encompasses multiple construction disciplines including demolition, grading and excavation, electrical and lighting, concrete and hardscapes, asphalt, utility and drainage systems, site structures and furnishings, masonry, landscaping, and irrigation work. The scope focuses on replacing the parking lot curb and gutter, walkways, parking lot surface, and retaining wall. The bid schedule provides a detailed breakdown of individual line items, quantities, and unit costs organized by trade category, allowing bidders to submit pricing for each component of the work. The RFB number is PR2026001035, and the document serves as the pricing template that competing contractors must complete and submit with their sealed bids.

The bid schedule establishes the framework for cost evaluation and contract award determination by requiring bidders to price each work item according to specified quantities and units of measurement. The document is structured to ensure transparent and consistent pricing submissions across all bids received, facilitating objective comparison of proposals. Contractors must carefully review all line items and provide accurate unit pricing to ensure their total project cost reflects the full scope of work. This standardized schedule format is essential for Provo City's evaluation process and will form the basis for the construction contract if the bidder is selected for award.

View the file

Other files

File Type Posted
5-6 RESTROOM SPEC SHEET.xlsx XLSX spreadsheet
6-1 Fort Utah Park Construction 2026 RFB.pdf PDF
4-5 4 ROOM RESTROOM.pdf PDF
3-4 Fort Utah Park Specs Document.pdf PDF
2-3 260716 Fort Utah Park GBD PLANS Document.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

There are active formulas that will automatically multiple Quantity and Unit Cost when entered. ONLY columns E and F should be edited by bidder.

The total construction costs shall be broken down into the categories indicated below to provide the Owner and engineer with a comparable analysis of each proposal submitted and a method for determining value engineering items as necessary. Every numbered item, subtotal and total shall have a dollar amount entered for the trade that you are bidding on. A line item entry that says “included” meaning included in the total is not acceptable.

All pricing shall include all work, materials, labor, fees, etc. to fully complete the work per the plans and specifications whether specifically listed as a bid item on this form or not. This includes all necessary surveying/staking and mobilization for each trade's work. Additional blank lines have been included in each section for necessary work not listed that the Contractor would like to itemize.

BID SCHEDULE
ItemDescriptionUnitQuantityUnit CostTotal Cost
1.Demolition
a.Existing Asphalt Sawcut & Removalsq. ft.0
b.Sawcut Existing Curb for widened Drivewaylin. ft.0
c.Concrete Removal: Sidewalk, Skatebowl, Curb & Guttersq. ft.0
d.Existing Restroom Building, playground, playground boarders, wood chips, and sand pit removal and disposallump0
e.Clear and Grubsq. ft.0
f.Tree Removaleach0
g.Terminate and plug existing sewer laterallump0
h.Site Construction Fencinglump0
i.Preserve and re-install "Baseball Monuments" by field entrylump0
j.0
k.0
Sub Total Demolition0
2.Utilities (Including all trenching, bedding, backfilling, etc.)
a.Sanitary Sewer to New Restroom including manhole, cleanouts, fittings, etc.lin. ft.0
b.lin. ft.0
c.Water Service to Restroom including stop n waste connectionlin. ft.0
d.Poly Line and 1" conduit to Cooling Stationlin. ft.0
e.Sump for Cooling Stationlump0
f.Storm Drain basin and drainage piping. Connection to Catch Basin on Genevalump0
g.0
h.0
Sub Total Utilities0
3.Electrical, Lighting & Communications (to include all trenching, backfilling, etc.)
a.Remove Existing pole and power meter and reconnect irrigation controller to new restroom building conduit and wirelump0
b.Power/Conduit from New Provo Power installed Transformer to Restroomlin. ft.0
c.2 x 2" Conduit with Innerduct for Communication Providers to Restroomlin. ft.0
d.Telecommunication Junction Boxlump0
e.Power, Wire, Conduit, Pull Boxes to Parking Lot Lightslin. ft.0
f.Lighting Control Panellump0
g.Pavilion Lighting and Fixtureslump0
h.Parkling Lot Light Pole and Fixtureeach0
i.Concrete Pole baseseach0
k.Fiberglass Transformer padeach0
l.0
m.0
Sub Total Electrical, Lighting & Communications0
4.Site Grading and Excavation (all necessary general fill material required to raise site per grading plans shall be provided to site by contractor including necessary fill, structural fill, base material, and top soil. Contractor shall place, grade, and compact. Include sub-grade prep for concrete, footings, asphalt and walls)
a.Parking Lotsq. ft.0
b.Walkways/Concretesq. ft.0
c.Trailssq. ft.0
d.Playground (contractor installed 8" compacted roadbase material)sq. ft.0
e.Landscape Areassq. ft.0
f.Misc. Gradingsq. ft.0
g.SWPPP and Erosion Controlslump0
h.Boulder Wallssq. ft.0
i.Pavilionslump0
j.0
k.0
Sub Total Site Grading and Excavation0
5.Roadway and Parking (including all subgrade material)
a.Parking Lot Roadbase Materialsq. ft.0
b.Temporary Asphalt Patch (if winter work in roadway)sq. ft.0
c.Asphalt Parking Lotsq. ft.0
d.Parking Lot Stripinglump0
e.ADA Parking Signagelump0
f.Vehicular Curb Stop with anchorseach0
g.0
h.0
i.0
Sub Total Roadway and Parking0
6.Concrete Walks and Hardscape (including all sub-grade material)
a.Concrete Walksq. ft.0
b.Vehicular Concretesq. ft.0
c.Concrete Plaza/Hardscape (at Entry, Pavilion, and Restroom)sq. ft.0
d.Raised Planter Walllin. ft.0
e.Concrete Retaining Wall - 12" Widelump0
f.Seat Walllin. ft.0
g.Concrete ADA Rampeach0
h.Concrete Drivewayeach0
i.Concrete Waterwaysq. ft.0
j.Concrete Stepseach0
k.Asphalt Trailsq. ft.0
l.12" Mow Curblin. ft.0
m.Bench Padssq. ft.0
n.Cooling station Padsq. ft.0
o.Trash Receptacle Padssq. ft.0
p.Playground Surfacing (By others contractor roadbase prep in item 4d)0
q.Concrete Curb and Gutterlin. ft.0
r.Concrete LID Flush Curblin. ft.0
s.Tactile Warning Striplin. ft.0
t.0
u.0
Sub Total Concrete Walks and Hardscape0
7.Site Structures/Furnishings (including necessary footings)
a.20'x20' Pavilion (By others)0
c.Picnic Tables (By others)0
d.ADA Picnic Tables (By others)0
e.Park Bench (By others)0
f.Cooling Stationeach0
g.Trash Receptacles (By Others)0
h.Playground Equipment (Material and Installation By Others)0
i.Playground Shade Sails (Material and Installation By Others)0
j.48" Ameristar Fencinglin. ft.0
k.Outfield Netting and Postslump0
l.Bike Racks (By Others)0
m.Scooter/Skateboard Racks (By Others)0
n.Bike Pump & Repair Station (By others)0
o.Dumpster Gatelump0
p.Dumpster Bollardeach0
q.Dumpster Enclosurelump0
r.Stairway Railinglump0
s.Guardrail on 12" Wide Retaining Walllump0
t.0
u.0
Sub Total Site Structures/Furnishings0
8.Restroom
a.Restroom Excavation and Backfilllump0
b.Restroom Footing and Foundationlump0
c.Restroom Concrete Floorsq. ft.0
d.Restroom Masonrylump0
f.Restroom Framinglump0
f.Restroom Roofing, Soffit, Facia, Gutterslump0
e.Restroom Sheetrocklump0
g.Restroom Electrical & Fixtureslump0
f.Restroom Plumbing & Fixtureslump0
g.Restroom Doors and Lockslump0
h.Restroom Harwarelump0
i.Restroom Paintlump0
j.0
k.0
Sub Total Restroom0
9.Landscaping and Irrigation
a.Irrigation POClump0
b.Irrigation System - per Drawingslump0
c.4" Imported Topsoil - Bluegrass Sodcu. yd.0
d.12" Imported Topsoil - Shrub Bedscu. yd.0
e.Kentucky Bluegrass Sodsq. ft.0
g.Kentucky Bluegrass Sod Patch and Repairsq. ft.0
h.Deciduous Tree including Planting Backfilleach0
i.Evergreen Tree including Planting Backfilleach0
j.Ornamental Tree including Planting Backfilleach0
k.Shrubs including Planting Backfilleach0
l.Ornamental Grasses including Planting Backfilleach0
m.Perennials including Planting Backfilleach0
n.Rock Mulch3"-4"cu. yd.0
o.Stone Mulch 1"-2"cu. yd.0
p.Stone Mulch 3/4"cu. yd.0
q.Landscape Bouldereach0
r.Natural Shrub Bedsq. ft.0
s.Stone Dustsq. ft.0
t.Irrigation Audit and Audit Reportlump0
u.0
v.0
Sub Total Landscape and Irrigation0
10.Miscellaneous (List items separately. Use additional paper as needed.)
a.Mobilizationlump0
b.Permittinglump0
c.0
d.0
e.0
f.0
Sub Total Miscellaneous0
TOTAL BASE BID =0
OverheadRate%0
ProfitRate%0
TOTAL BID =0
BA1.BID ALTERNATES
a.Concrete Sidewalk from eastside of detention basin to 150 North streetsq. ft.0
b.Bluegrass Seed (replacing line item 9e of base bid)sq. ft.0
c.two Year Maintenance Period (landscape and irrigation)lump0
d.4' Split Rail Rail (replacing line item 7m of base bid)lump0
e.
f.

File details come from the government source that posted it. Updated .