BID SCHEDULE
There are active formulas that will automatically multiple Quantity and Unit Cost when entered. ONLY columns E and F should be edited by bidder.
The total construction costs shall be broken down into the categories indicated below to provide the Owner and engineer with a comparable analysis of each proposal submitted and a method for determining value engineering items as necessary. Every numbered item, subtotal and total shall have a dollar amount entered for the trade that you are bidding on. A line item entry that says “included” meaning included in the total is not acceptable.
All pricing shall include all work, materials, labor, fees, etc. to fully complete the work per the plans and specifications whether specifically listed as a bid item on this form or not. This includes all necessary surveying/staking and mobilization for each trade's work. Additional blank lines have been included in each section for necessary work not listed that the Contractor would like to itemize.
| BID SCHEDULE | | | | | | |
| Item | Description | | Unit | Quantity | Unit Cost | Total Cost |
| 1. | Demolition | | | | | |
| a. | Existing Asphalt Sawcut & Removal | sq. ft. | | | 0 |
| b. | Sawcut Existing Curb for widened Driveway | lin. ft. | | | 0 |
| c. | Concrete Removal: Sidewalk, Skatebowl, Curb & Gutter | sq. ft. | | | 0 |
| d. | Existing Restroom Building, playground, playground boarders, wood chips, and sand pit removal and disposal | lump | | | 0 |
| e. | Clear and Grub | sq. ft. | | | 0 |
| f. | Tree Removal | each | | | 0 |
| g. | Terminate and plug existing sewer lateral | lump | | | 0 |
| h. | Site Construction Fencing | lump | | | 0 |
| i. | Preserve and re-install "Baseball Monuments" by field entry | lump | | | 0 |
| j. | | | | | 0 |
| k. | | | | | 0 |
| Sub Total Demolition | | | | | 0 |
| 2. | Utilities (Including all trenching, bedding, backfilling, etc.) | | | |
| a. | Sanitary Sewer to New Restroom including manhole, cleanouts, fittings, etc. | lin. ft. | 0 |
| b. | | lin. ft. | 0 |
| c. | Water Service to Restroom including stop n waste connection | lin. ft. | 0 |
| d. | Poly Line and 1" conduit to Cooling Station | lin. ft. | 0 |
| e. | Sump for Cooling Station | lump | 0 |
| f. | Storm Drain basin and drainage piping. Connection to Catch Basin on Geneva | lump | 0 |
| g. | | | 0 |
| h. | | | 0 |
| Sub Total Utilities | | | 0 |
| 3. | Electrical, Lighting & Communications (to include all trenching, backfilling, etc.) | | | |
| a. | Remove Existing pole and power meter and reconnect irrigation controller to new restroom building conduit and wire | lump | 0 |
| b. | Power/Conduit from New Provo Power installed Transformer to Restroom | lin. ft. | 0 |
| c. | 2 x 2" Conduit with Innerduct for Communication Providers to Restroom | lin. ft. | 0 |
| d. | Telecommunication Junction Box | lump | 0 |
| e. | Power, Wire, Conduit, Pull Boxes to Parking Lot Lights | lin. ft. | 0 |
| f. | Lighting Control Panel | lump | 0 |
| g. | Pavilion Lighting and Fixtures | lump | 0 |
| h. | Parkling Lot Light Pole and Fixture | each | 0 |
| i. | Concrete Pole bases | each | 0 |
| k. | Fiberglass Transformer pad | each | 0 |
| l. | | | 0 |
| m. | | | 0 |
| Sub Total Electrical, Lighting & Communications | | | 0 |
| 4. | Site Grading and Excavation (all necessary general fill material required to raise site per grading plans shall be provided to site by contractor including necessary fill, structural fill, base material, and top soil. Contractor shall place, grade, and compact. Include sub-grade prep for concrete, footings, asphalt and walls) | | | |
| a. | Parking Lot | sq. ft. | 0 |
| b. | Walkways/Concrete | sq. ft. | 0 |
| c. | Trails | sq. ft. | 0 |
| d. | Playground (contractor installed 8" compacted roadbase material) | sq. ft. | 0 |
| e. | Landscape Areas | sq. ft. | 0 |
| f. | Misc. Grading | sq. ft. | 0 |
| g. | SWPPP and Erosion Controls | lump | 0 |
| h. | Boulder Walls | sq. ft. | 0 |
| i. | Pavilions | lump | 0 |
| j. | | | 0 |
| k. | | | 0 |
| Sub Total Site Grading and Excavation | | | 0 |
| 5. | Roadway and Parking (including all subgrade material) | | | |
| a. | Parking Lot Roadbase Material | sq. ft. | 0 |
| b. | Temporary Asphalt Patch (if winter work in roadway) | sq. ft. | 0 |
| c. | Asphalt Parking Lot | sq. ft. | 0 |
| d. | Parking Lot Striping | lump | 0 |
| e. | ADA Parking Signage | lump | 0 |
| f. | Vehicular Curb Stop with anchors | each | 0 |
| g. | | | 0 |
| h. | | | 0 |
| i. | | | 0 |
| Sub Total Roadway and Parking | | | 0 |
| 6. | Concrete Walks and Hardscape (including all sub-grade material) | | | |
| a. | Concrete Walk | sq. ft. | 0 |
| b. | Vehicular Concrete | sq. ft. | 0 |
| c. | Concrete Plaza/Hardscape (at Entry, Pavilion, and Restroom) | sq. ft. | 0 |
| d. | Raised Planter Wall | lin. ft. | 0 |
| e. | Concrete Retaining Wall - 12" Wide | lump | 0 |
| f. | Seat Wall | lin. ft. | 0 |
| g. | Concrete ADA Ramp | each | 0 |
| h. | Concrete Driveway | each | 0 |
| i. | Concrete Waterway | sq. ft. | 0 |
| j. | Concrete Steps | each | 0 |
| k. | Asphalt Trail | sq. ft. | 0 |
| l. | 12" Mow Curb | lin. ft. | 0 |
| m. | Bench Pads | sq. ft. | 0 |
| n. | Cooling station Pad | sq. ft. | 0 |
| o. | Trash Receptacle Pads | sq. ft. | 0 |
| p. | Playground Surfacing (By others contractor roadbase prep in item 4d) | | 0 |
| q. | Concrete Curb and Gutter | lin. ft. | 0 |
| r. | Concrete LID Flush Curb | lin. ft. | 0 |
| s. | Tactile Warning Strip | lin. ft. | 0 |
| t. | | | 0 |
| u. | | | 0 |
| Sub Total Concrete Walks and Hardscape | | | 0 |
| 7. | Site Structures/Furnishings (including necessary footings) | | | |
| a. | 20'x20' Pavilion (By others) | | 0 |
| c. | Picnic Tables (By others) | | 0 |
| d. | ADA Picnic Tables (By others) | | 0 |
| e. | Park Bench (By others) | | 0 |
| f. | Cooling Station | each | 0 |
| g. | Trash Receptacles (By Others) | | 0 |
| h. | Playground Equipment (Material and Installation By Others) | | 0 |
| i. | Playground Shade Sails (Material and Installation By Others) | | 0 |
| j. | 48" Ameristar Fencing | lin. ft. | 0 |
| k. | Outfield Netting and Posts | lump | 0 |
| l. | Bike Racks (By Others) | | 0 |
| m. | Scooter/Skateboard Racks (By Others) | | 0 |
| n. | Bike Pump & Repair Station (By others) | | 0 |
| o. | Dumpster Gate | lump | 0 |
| p. | Dumpster Bollard | each | 0 |
| q. | Dumpster Enclosure | lump | 0 |
| r. | Stairway Railing | lump | 0 |
| s. | Guardrail on 12" Wide Retaining Wall | lump | 0 |
| t. | | | 0 |
| u. | | | 0 |
| Sub Total Site Structures/Furnishings | | | 0 |
| 8. | Restroom | | | |
| a. | Restroom Excavation and Backfill | lump | 0 |
| b. | Restroom Footing and Foundation | lump | 0 |
| c. | Restroom Concrete Floor | sq. ft. | 0 |
| d. | Restroom Masonry | lump | 0 |
| f. | Restroom Framing | lump | 0 |
| f. | Restroom Roofing, Soffit, Facia, Gutters | lump | 0 |
| e. | Restroom Sheetrock | lump | 0 |
| g. | Restroom Electrical & Fixtures | lump | 0 |
| f. | Restroom Plumbing & Fixtures | lump | 0 |
| g. | Restroom Doors and Locks | lump | 0 |
| h. | Restroom Harware | lump | 0 |
| i. | Restroom Paint | lump | 0 |
| j. | | | 0 |
| k. | | | 0 |
| Sub Total Restroom | | | 0 |
| 9. | Landscaping and Irrigation | | | |
| a. | Irrigation POC | lump | 0 |
| b. | Irrigation System - per Drawings | lump | 0 |
| c. | 4" Imported Topsoil - Bluegrass Sod | cu. yd. | 0 |
| d. | 12" Imported Topsoil - Shrub Beds | cu. yd. | 0 |
| e. | Kentucky Bluegrass Sod | sq. ft. | 0 |
| g. | Kentucky Bluegrass Sod Patch and Repair | sq. ft. | 0 |
| h. | Deciduous Tree including Planting Backfill | each | 0 |
| i. | Evergreen Tree including Planting Backfill | each | 0 |
| j. | Ornamental Tree including Planting Backfill | each | 0 |
| k. | Shrubs including Planting Backfill | each | 0 |
| l. | Ornamental Grasses including Planting Backfill | each | 0 |
| m. | Perennials including Planting Backfill | each | 0 |
| n. | Rock Mulch3"-4" | cu. yd. | 0 |
| o. | Stone Mulch 1"-2" | cu. yd. | 0 |
| p. | Stone Mulch 3/4" | cu. yd. | 0 |
| q. | Landscape Boulder | each | 0 |
| r. | Natural Shrub Bed | sq. ft. | 0 |
| s. | Stone Dust | sq. ft. | 0 |
| t. | Irrigation Audit and Audit Report | lump | 0 |
| u. | | | 0 |
| v. | | | 0 |
| Sub Total Landscape and Irrigation | | | 0 |
| 10. | Miscellaneous (List items separately. Use additional paper as needed.) | | | | |
| a. | Mobilization | lump | | 0 |
| b. | Permitting | lump | | 0 |
| c. | | | | 0 |
| d. | | | | 0 |
| e. | | | | 0 |
| f. | | | | 0 |
| Sub Total Miscellaneous | | | | 0 |
| TOTAL BASE BID = | | | | 0 |
| | Overhead | Rate | % | 0 |
| | Profit | Rate | % | 0 |
| TOTAL BID = | | | 0 |
| BA1. | BID ALTERNATES | | | |
| a. | Concrete Sidewalk from eastside of detention basin to 150 North street | sq. ft. | 0 |
| b. | Bluegrass Seed (replacing line item 9e of base bid) | sq. ft. | 0 |
| c. | two Year Maintenance Period (landscape and irrigation) | lump | 0 |
| d. | 4' Split Rail Rail (replacing line item 7m of base bid) | lump | 0 |
| e. | | | |
| f. | | | |