Attachment 1 Proposal Breakdown Template.xlsx

XLSX spreadsheet 538 KB Posted

Attached to
Keating US Probation 2nd Fl Office Relocation - Construction Federal contract opportunity
Solicitation number
47PC0221R0011
Issued by
General Services Administration Public Buildings Service Region 2

About this file

This federal contract synopsis describes a construction project opportunity with the General Services Administration. The project involves renovating approximately 9,800 square feet of space on the second floor of the Kenneth B. Keating Federal Building and Courthouse to consolidate and relocate U.S. Probation offices. The work includes construction services such as demolition, abatement, and buildout. There are also three bid options related to mechanical systems, exterior finishes, and additional first floor work. The procurement is set aside for small businesses with a value between $1-5 million. The solicitation is expected to be released on February 10th with bids due March 12th. The construction completion period is approximately 166 calendar days with performance and payment bonds required. Interested parties must register in SAM and complete representations and certifications to receive the solicitation and drawings by email.

View the file

Other files for this federal contract opportunity

Other files attached to Keating US Probation 2nd Fl Office Relocation - Construction, newest first.
File Type Posted
Solicitation Amendment 47PC0221R0011_0002.pdf PDF
Keating RFI Responses 2.pdf PDF
Amendment 2.pdf PDF
EY001_20210304.pdf PDF
Keating RFI Responses.pdf PDF
Amendment 1.pdf PDF
Addendum_02.pdf PDF
Asbestos Survey Assessment Report.pdf PDF
Solicitation Amendment 47PC0221R0011_0001.pdf PDF
AE600_20210304.pdf PDF
U.S. Probation Keating 2nd Fl Office Relocation- Construction Questions.pdf PDF
Site Visit sign in sheet.jpg JPG image
Attachment 4 Monroe WD NY20210010 1.05.21.pdf PDF
Rep and Certs for 47PC0221R0011 US Probation 2nd Floor Office Relocation.pdf PDF
Attachment 6 Past Performance Questionnaire Form.pdf PDF
SBSA GC Agreement 47PC0221R0011 US Probation 2nd Floor Office Relocation.pdf PDF
Attachment 5 Experience on Similar Projects Offeror Form.xlsx XLSX spreadsheet
Attachment 8 Addendum 1 SOW.pdf PDF
Solicitation 47PC0221R0011 US Probation 2nd Floor Office Relocation.pdf PDF
SBU Clause and Form.pdf PDF
Contractors Qual and Financial Info GSA527-15c.pdf PDF
Bid Bond SF24-16d.pdf PDF
Attachment 7 Key Personnel Form.pdf PDF
47PC0221R0011 Form.pdf PDF
Synopsis.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

Contractor Proposal Breakdown Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Signature:
CONTRACT AMOUNT
No.GSACSIDESCRIPTIONSHELLT.I.TOTAL
SUMMARY
01000GENERAL CONDITIONS00$0$0
01000GENERAL CONDITIONS - Option 100$0
01000GENERAL CONDITIONS - Option 200$0
01000GENERAL CONDITIONS - Option 300$0
02000EXISTING CONDITIONS00$0$0
02000EXISTING CONDITIONS - Option 100$0
02000EXISTING CONDITIONS - Option 300$0
03000CONCRETE00$0$0
03000CONCRETE - Option 300$0
04000MASONRY00$0$0
05000METALS00$0$0
05000METALS - Option 200$0
05000METALS - Option 300$0
06000WOOD & PLASTIC00$0$0
06000WOOD & PLASTIC - Option 300$0
07000THERMAL & MOISTURE PROTECTION00$0$0
07000THERMAL & MOISTURE PROTECTION - Option 200$0
07000THERMAL & MOISTURE PROTECTION - Option 300$0
08000DOORS & WINDOWS00$0$0
08000DOORS & WINDOWS - Option 300$0
09000FINISHES00$0$0
09000FINISHES - Option 200$0
09000FINISHES - Option 300$0
10000SPECIALTIES00$0$0
11000EQUIPMENT00$0$0
12000FURNISHINGS00$0$0
12000FURNISHINGS - Option 300$0
13000SPECIAL CONSTRUCTION00$0$0
14000CONVEYING EQUIPMENT00$0$0
21000FIRE PROTECTION00$0$0
21000FIRE PROTECTION - Option 300$0
22000PLUMBING00$0$0
23000HVAC00$0$0
23000HVAC - Option 100$0
23000HVAC - Option 300$0
25000INTEGRATED AUTOMATION00$0$0
26000ELECTRICAL00$0$0
26000ELECTRICAL - Option 100$0
26000ELECTRICAL - Option 300$0
27000COMMUNICATIONS00$0$0
27000COMMUNICATIONS - Option 300$0
28000ELECTRONIC SAFETY & SECURITY00$0$0
28000ELECTRONIC SAFETY & SECURITY - Option 300$0
31000EARTHWORK00$0$0
32000EXTERIOR IMPROVEMENTS00$0$0
33000UTILITIES00$0$0
34000TRANSPORTATION00$0$0
35000WATERWAY & MARINE00$0$0
41000MATERIAL PROCESSING & HANDLING00$0$0
44000POLLUTION & WASTE CONTROLL EQUIP.00$0$0
46000WATER & WASTEWATER EQUIPMENT00$0$0
48000ELECTRICAL POWER GENERATION00$0$0
SUBCONTRACTOR MARKUP - BASE BID0.0%00$0
SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES
SUBCONTRACTOR MARKUP - Option 10.0%00$0
SUBCONTRACTOR MARKUP - Option 20.0%00$0
SUBCONTRACTOR MARKUP - Option 30.0%00$0
OPTION 1 - SUBTOTAL00$0
OPTION 2 - SUBTOTAL00$0
OPTION 3 - SUBTOTAL00$0
BASE BID - SUBTOTAL00$0$0
DESIGN CONTINGENCY0.0%00$0$0
CITY COST FACTOR0.0%00$0$0
BASE BID - SUBTOTAL00$0$0
OVERHEAD0.0%00$0$0
PROFIT0.0%00$0$0
ESCALATION TO MIDPOINT0.0%00$0$0
BONDING0.0%00$0$0
BASE BID - TOTALS (ECCA)$0$0$0$0
CONSTRUCTION CONTINGENCY0.0%$ - 0$ - 0$0$0
BASE BID - TOTALS (ECC)$0$0$0$0
OPTION 1 - SUBTOTAL00$0
MARKUPS0.00%00$0
OPTION 1 - TOTAL (ECCA)00$0
CONSTRUCTION CONTINGENCY0.0%00$0
OPTION 1 - TOTAL (ECC)00$0
OPTION 2 - SUBTOTAL00$0
MARKUPS0.00%00$0
OPTION 2 - TOTAL (ECCA)00$0
CONSTRUCTION CONTINGENCY0.0%00$0
OPTION 2 - TOTAL (ECC)00$0
OPTION 3 - SUBTOTAL00$0
MARKUPS0.00%00$0
OPTION 3 - TOTAL (ECCA)00$0
CONSTRUCTION CONTINGENCY0.0%00$0
OPTION 3 - TOTAL (ECC)00$0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

SUMMARY - LME

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
CONTRACT AMOUNT
No.GSACSIDESCRIPTIONLABORMATERIALEQUIPTOTAL
SUMMARY - Labor/Material/Equipment
01000GENERAL CONDITIONS0.000.000.00$0$0
01000GENERAL CONDITIONS - Option 10.000.000.00$0
01000GENERAL CONDITIONS - Option 20.000.000.00$0
01000GENERAL CONDITIONS - Option 30.000.000.00$0
02000EXISTING CONDITIONS0.000.000.00$0$0
02000EXISTING CONDITIONS - Option 10.000.000.00$0
02000EXISTING CONDITIONS - Option 30.000.000.00$0
03000CONCRETE0.000.000.00$0$0
03000CONCRETE - Option 30.000.000.00$0
04000MASONRY0.000.000.00$0$0
05000METALS0.000.000.00$0$0
05000METALS - Option 20.000.000.00$0
05000METALS - Option 30.000.000.00$0
06000WOOD & PLASTIC0.000.000.00$0$0
06000WOOD & PLASTIC - Option 30.000.000.00$0
07000THERMAL & MOISTURE PROTECTION0.000.000.00$0$0
07000THERMAL & MOISTURE PROTECTION - Option 20.000.000.00$0
07000THERMAL & MOISTURE PROTECTION - Option 30.000.000.00$0
08000DOORS & WINDOWS0.000.000.00$0$0
08000DOORS & WINDOWS - Option 30.000.000.00$0
09000FINISHES0.000.000.00$0$0
09000FINISHES - Option 20.000.000.00$0
09000FINISHES - Option 30.000.000.00$0
10000SPECIALTIES0.000.000.00$0$0
11000EQUIPMENT0.000.000.00$0$0
12000FURNISHINGS0.000.000.00$0$0
12000FURNISHINGS - Option 30.000.000.00$0
13000SPECIAL CONSTRUCTION0.000.000.00$0$0
14000CONVEYING EQUIPMENT0.000.000.00$0$0
21000FIRE PROTECTION0.000.000.00$0$0
21000FIRE PROTECTION - Option 30.000.000.00$0
22000PLUMBING0.000.000.00$0$0
23000HVAC0.000.000.00$0$0
23000HVAC - Option 10.000.000.00$0
23000HVAC - Option 30.000.000.00$0
25000INTEGRATED AUTOMATION0.000.000.00$0$0
26000ELECTRICAL0.000.000.00$0$0
2600ELECTRICAL - Option 10.000.000.00$0
2600ELECTRICAL - Option 30.000.000.00$0
27000COMMUNICATIONS0.000.000.00$0$0
27000COMMUNICATIONS - Option 30.000.000.00$0
28000ELECTRONIC SAFETY & SECURITY0.000.000.00$0$0
28000ELECTRONIC SAFETY & SECURITY - Option 30.000.000.00$0
31000EARTHWORK0.000.000.00$0$0
32000EXTERIOR IMPROVEMENTS0.000.000.00$0$0
33000UTILITIES0.000.000.00$0$0
34000TRANSPORTATION0.000.000.00$0$0
35000WATERWAY & MARINE0.000.000.00$0$0
41000MATERIAL PROCESSING & HANDLING0.000.000.00$0$0
44000POLLUTION & WASTE CONTROLL EQUIP.0.000.000.00$0$0
46000WATER & WASTEWATER EQUIPMENT0.000.000.00$0$0
48000ELECTRICAL POWER GENERATION0.000.000.00$0$0
SUBCONTRACTOR MARKUP - BASE BID0.0%$ - 0$ - 0$ - 0$0
SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES
SUBCONTRACTOR MARKUP - Option 1$ - 0$ - 0$ - 0$0
SUBCONTRACTOR MARKUP - Option 2$ - 0$ - 0$ - 0$0
SUBCONTRACTOR MARKUP - Option 3$ - 0$ - 0$ - 0$0
OPTION 1 - SUBTOTAL0.000.000.00$0
OPTION 2 - SUBTOTAL0.000.000.00$0
OPTION 3 - SUBTOTAL0.000.000.00$0
BASE BID - SUBTOTAL000$0$0
DESIGN CONTINGENCY0%000$0$0
CITY COST FACTOR0%000$0$0
BASE BID - SUBTOTAL000$0$0
OVERHEAD0%000$0$0
PROFIT0%000$0$0
ESCALATION TO MIDPOINT0.0%000$0$0
BONDING0.0%000$0$0
BASE BID - TOTALS (ECCA)$0$0$0$0$0
CONSTRUCTION CONTINGENCY0%$ - 0$ - 0$ - 0$0$0
BASE BID - TOTALS (ECC)$0$0$0$0$0
OPTION 1 - SUBTOTAL0.000.000.00$0
MARKUPS0.00%0.000.000.00$0
OPTION 1 - TOTAL (ECCA)0.000.000.00$0
CONSTRUCTION CONTINGENCY0%0.000.000.00$0
OPTION 1 - TOTAL (ECC)0.000.000.00$0
OPTION 2 - SUBTOTAL0.000.000.00$0
MARKUPS0.00%0.000.000.00$0
OPTION 2 - TOTAL (ECCA)0.000.000.00$0
CONSTRUCTION CONTINGENCY0%0.000.000.00$0
OPTION 2 - TOTAL (ECC)0.000.000.00$0
OPTION 3 - SUBTOTAL0.000.000.00$0
MARKUPS0.00%0.000.000.00$0
OPTION 3 - TOTAL (ECCA)0.000.000.00$0
CONSTRUCTION CONTINGENCY0%0.000.000.00$0
OPTION 3 - TOTAL (ECC)0.000.000.00$0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

GENERAL CONDITIONS

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
CONTRACT AMOUNT
No.GSACSIDESCRIPTIONSUBUMQTYLABORMATERIALEQUIPTOTAL

01000 GENERAL CONDITIONS RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
General Conditions%$0$0$0$0
Security ClearnancesHR$0
Full-Time SuperintendentHR$0
Interim Life Safety Measures (Sprinkler)LS$0
Interim Life Safety Measures (Fire Alarm)LS$0
Subtotal$0
TENANT IMPROVEMENTS
General Conditions%$0$0$0$0
Security ClearnancesHR$0
Full-Time Superintendent - Substantial CompletionHR$0
Fire Protection Mobiliization - First FloorLS$0
Fire Protection Mobilizaqtion - Second FloorLS$0
Interim Life Safety Measures (Sprinkler)LS$0
Interim Life Safety Measures (Fire Alarm)LS$0
Subtotal$0

TOTALS $0 $0 $0 $0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

GENERAL CONDITIONS (1)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
CONTRACT AMOUNT
No.GSACSIDESCRIPTIONSUBUMQTYLABORMATERIALEQUIPTOTAL

01000 GENERAL CONDITIONS - Option 1 RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
General Conditions%$0$0$0$0
Security ClearnancesHR$0
Full-Time SuperintendentHR$0
Interim Life Safety Measures (Sprinkler)LS$0
Interim Life Safety Measures (Fire Alarm)LS$0
Subtotal$0
TENANT IMPROVEMENTS
General Conditions%$0$0$0$0
Security ClearnancesHR$0
Full-Time SuperintendentHR$0
Fire Protection Mobiliization - First FloorLS$0
Fire Protection Mobilizaqtion - Second FloorLS$0
Interim Life Safety Measures (Sprinkler)LS$0
Interim Life Safety Measures (Fire Alarm)LS$0
Subtotal$0

TOTALS $0 $0 $0 $0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

GENERAL CONDITIONS (2)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
CONTRACT AMOUNT
No.GSACSIDESCRIPTIONSUBUMQTYLABORMATERIALEQUIPTOTAL

01000 GENERAL CONDITIONS - Option 2 RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
General Conditions%$0$0$0$0
Security ClearnancesHR$0
Full-Time SuperintendentHR$0
Interim Life Safety Measures (Sprinkler)LS$0
Interim Life Safety Measures (Fire Alarm)LS$0
Subtotal$0
TENANT IMPROVEMENTS
General Conditions%$0$0$0$0
Security ClearnancesHR$0
Full-Time SuperintendentHR$0
Fire Protection Mobiliization - First FloorLS$0
Fire Protection Mobilizaqtion - Second FloorLS$0
Interim Life Safety Measures (Sprinkler)LS$0
Interim Life Safety Measures (Fire Alarm)LS$0
Subtotal$0

TOTALS $0 $0 $0 $0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

GENERAL CONDITIONS (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
CONTRACT AMOUNT
No.GSACSIDESCRIPTIONSUBUMQTYLABORMATERIALEQUIPTOTAL

01000 GENERAL CONDITIONS - Option 3 RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
General Conditions%$0$0$0$0
Security ClearnancesHR$0
Full-Time SuperintendentHR$0
Interim Life Safety Measures (Sprinkler)LS$0
Interim Life Safety Measures (Fire Alarm)LS$0
Subtotal$0
TENANT IMPROVEMENTS
General Conditions%$0$0$0$0
Security ClearnancesHR$0
Full-Time SuperintendentHR$0
Fire Protection Mobiliization - First FloorLS$0
Fire Protection Mobilization - Second FloorLS$0
Interim Life Safety Measures (Sprinkler)LS$0
Interim Life Safety Measures (Fire Alarm)LS$0
Subtotal$0

TOTALS $0 $0 $0 $0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

EXIST. COND.

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
SUBCONTRACT AMOUNT
No.GSACSIDESCRIPTIONY/NUMQTYLABORMATERIALEQUIPTOTAL

02000 EXISTING CONDITIONS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
Second Floor Mastic Abatement$0$0
Second Floor Air Filtration Device$0$0
Second Floor OSHA Testing$0$0
Second Floor Asbestos Disposal Fees$0$0
Second Floor Asbestos Waste Packaging by Hand 3CF Bags$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Second Floor Ceiling Demolition$0$0
Second Floor Flooring Demolition$0$0
Second Floor Existing Wall Demo$0$0
Second Floor Door Demolition$0$0
Second Floor Countertop Demolition$0$0
Second Floor Base Cabinet Demolition$0$0
Second Floor Fire Protection Removals$0$0
Removal of existing pendent sprinkler and branch piping$0$0
Removal of existing 1-1/2" sprinkler main$0$0
Second Floor Plumbing Removals$0$0
Remove kitchen sink and mounting hardware$0$0
Remove dishwasher and hardware$0$0
Remove Lavatory and mounting hardware$0$0
Remove water closet and mounting hardware$0$0
Remove water cooler and mounting hardware$0$0
Remove piping, insulation and hangers$0$0
Second Floor HVAC Removals$0$0
Remove ductwork, hangers$0$0
Remove Fan Coil units and runout piping$0$0
Remove VAV and Accessories$0$0
Remove VAV piping and accessories$0$0
Diffusers$0$0
Controls$0$0
Second Floor Electrical Removals$0$0
Remove lighting and lighting control devices$0$0
Remove conduit & wiring$0$0
Remove FCU wiring$0$0
Remove wiring devices$0$0
Second Floor Communications Removal$0$0
Comm Cable & Equipment$0$0
Second Floor E S&S Removals$0$0
Remove Cameras$0$0
Remove Conduit & wiring$0$0
Remove Notification Appliance$0$0
Rework Continuation of Circuits$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

EXIST. COND. (1)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
SUBCONTRACT AMOUNT
No.GSACSIDESCRIPTIONY/NUMQTYLABORMATERIALEQUIPTOTAL

02000 EXISTING CONDITIONS - Option 1 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
Remove FCU Wiring$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

EXIST. COND. (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
SUBCONTRACT AMOUNT
No.GSACSIDESCRIPTIONY/NUMQTYLABORMATERIALEQUIPTOTAL
02000EXISTING CONDITIONS - Option 3SUB MARKUPRSMeans Line NumberRSMeans DescriptionHow was quantity determined - notes
SHELL
First Floor Mastic Abatement$0$0
First Floor Air Filtration Device$0$0
First Floor OSHA Testing$0$0
First Floor Asbestos Disposal Fees$0$0
First Floor Asbestos Waste Packaging by Hand 3CF Bags$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
First Floor Ceiling Demolition$0$0
First Floor Carpet Removal$0$0
First Floor VCT Removal$0$0
First Floor Existing Wall Demo$0$0
First Floor Door Demolition$0$0
First Floor Window Demo$0$0
First Floor Fire Protection Removals$0$0
Removal of existing pendent sprinkler and branch piping$0$0
First Floor HVAC Removals$0$0
Remove ductwork, hangers$0$0
Remove Diffusers$0$0
Remove Controls$0$0
First Floor Electrical Removals$0$0
Remove lighting and lighting control devices$0$0
Remove conduit & wiring$0$0
Remove wiring devices$0$0
First Floor Communications Removal$0$0
Comm Cable & Equipment$0$0
First Floor E S&S Removals$0$0
Remove Cameras$0$0
Fire Alarm Demo$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TOTALS$0$0$0$0
SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

CONCRETE

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNT
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

03000 CONCRETE SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
Misc. Concrete Patching$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

MASONRY

Contractor Proposal BreakdownDate:12/31/99
0
0
Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:0
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Contractor:0Trade:0
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

04000 MASONRY SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0S
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS 0 0 0

SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

CONCRETE (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNT
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

03000 CONCRETE - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
Misc. Concrete Patching$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

METALS

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

05000 METALS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0S
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
$0$0
Second Floor$0$0
Wall Type 9 - Studs$0$0
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

METALS (2)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

05000 METALS - Option 2 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0S
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
2 1/2" Metal Stud$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

METALS (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

05000 METALS - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0S
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Wall Type 9 - Studs$0$0
Wall Type 20 - Studs$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

WOOD & PLASTIC

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

06000 WOOD AND PLASTIC SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0T
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Misc. Wooden Blocking$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

WOOD & PLASTIC (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

06000 WOOD AND PLASTIC - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0T
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Misc. Wooden Blocking$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

THERM. & MOIST. PROT.

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

07000 THERMAL & MOISTURE PROTECTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal000$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
Second Floor$0$0
Batt Insulation$0$0
Spray Foam Insulation - Metal Blind Throughs$0$0
$0$0
Subtotal000$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

THERM. & MOIST. PROT. (2)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

07000 THERMAL & MOISTURE PROTECTION - Option 2 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
2" Tiger Foam$0$0
Misc Caulking$0$0
$0$0
Subtotal000$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
$0$0
$0$0
Subtotal000$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

THERM. & MOIST. PROT. (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

07000 THERMAL & MOISTURE PROTECTION - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal000$0$0
TENANT IMPROVEMENTS
Batt Insulation$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
Subtotal000$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

DOORS & WINDOWS

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

08000 DOORS AND WINDOWS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0T
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
New 3x7 Full Glass Door$0$0T
New 3x7 Flush Wood Door$0$0T
New 3x7 Flush Wood Door w/ Narrow Lite$0$0T
Sliding Door$0$0T
New Hollow Metal Welded Frame$0$0T
New Thresholds$0$0T
Hardware Set #4$0$0T
Hardware Set #5$0$0T
Hardware Set #6$0$0T
Hardware Set #7$0$0T
Hardware Set #8$0$0T
Hardware Set #9$0$0T
Hardware Set #10$0$0T
Hardware Set #14$0$0

Subtotal $0.00 $0.00 $0.00 $0 $0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

DOORS & WINDOWS (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

08000 DOORS AND WINDOWS - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0T
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
New 3x7 Flush Wood Door$0$0T
New 2'6"x7'0" Flush Wood Door$0$0T
New 3x7 Flush Wood Door w/ Narrow Lite$0$0T
New 3x7 Hollow Metal Welded Frame$0$0T
New 5x7 Hollow Metal Welded Frame$0$0T
Hardware Set #6$0$0T
Hardware Set #8$0$0T
Hardware Set #11$0$0T
Hardware Set #12$0$0T
Hardware Set #13$0$0T
Door Threshold$0$0T
Window Type W1$0$0T
Window Type W2$0$0T
$0$0T
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

FINISHES

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL
09000FINISHESSUB MARKUPRSMeans Line NumberRSMeans DescriptionHow was quantity determined - notes
SHELL
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0$0T
$0$0T
$0$0T
$0$0T
$0$0
$0$0
$0$0
$0$0
Second Floor$0$0
5/8" Type x gypboard$0$0
Flooring$0$0
Ceiling$0$0
Paint - Walls Paint & Primer$0$0
Ceramic Tile$0$0
Luxury Vinyl Tile$0$0
Rubber Base$0$0
$0$0
Window Treatment 1$0$0
Window Treatment 2$0$0
Window Treatment 3$0$0
Window Treatment 4$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43
5/8" Type x gypboardYSF0$1.30$0.45
FlooringYSY934$7.05$40.00
CeilingYSF8407$1.65$4.29
PaintYSF0$1.14$0.27

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

SPECIALTIES

Contractor Proposal BreakdownDate:12/31/99
0
0
Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:0
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Contractor:0Trade:0
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

10000 SPECIALTIES SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0T
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

EQUIPMENT

Contractor Proposal BreakdownDate:12/31/99
0
0
Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:0
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Contractor:0Trade:0
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

11000 EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0T
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0$0T
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

FURNISHINGS

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

12000 FURNISHINGS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
New 18"W Base Cabinet$0$0
New 15"W Base Cabinet$0$0
Countertop$0$0
New 18"W Wall Cabinet$0$0
New 15"W Wall Cabinet$0$0
New 30"W Base Cabinet$0$0
New 30"W Base Cabinet w/ Sink$0$0
New 36"W Wall Cabinet$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

FURNISHINGS (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

12000 FURNISHINGS - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Countertop$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

FINISHES (2)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

09000 FINISHES - Option 2 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
Storefront Exterior Paint - 2 Coats Paint & 1 Coat Primer$0$0
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0$0T
5/8" Gypsum Board$0$0T
Plastic Laminate Backsplash$0$0T
$0$0T
Column Enclosure$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS 0 0 0

SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43
5/8" Type x gypboardYSF0$1.30$0.45
FlooringYSY934$7.05$40.00
CeilingYSF8407$1.65$4.29
PaintYSF0$1.14$0.27

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

FINISHES (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

09000 FINISHES - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
5/8" Type x gypboard$0$0T
Flooring$0$0T
Ceiling$0$0T
Paint - Walls Paint & Primer$0$0T
Paint - Doors$0$0
Rubber Base$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0

SUB MARKUPS 0 0 0

SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43
5/8" Type x gypboardYSF0$1.30$0.45
FlooringYSY934$7.05$40.00
CeilingYSF8407$1.65$4.29
PaintYSF0$1.14$0.27

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

SPECIAL CONST.

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

13000 SPECIAL CONSTRUCTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
456 LF of DIRTT Walls$0$0T
DIRTT Modular Power$0$0
3M Film - 4'0" Band$0$0
3M Film - 4'0" Band Installation$0$0
DIRTT Frieght Shipping to Rochester, NY$0$0
Installation$0$0
Product Delivery to Site, & Trash Removal$0$0
Cleaning Service$0$0
Design & Logistics Contingency$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

CONVEYING

Contractor Proposal BreakdownDate:12/31/99
0
0
Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:0
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Contractor:0Trade:0
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

14000 CONVEYING EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0$0
$0$0
$0$0
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0 $0 $0 $0

SUB MARKUPS000
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

FIRE PROTECTION

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

21000 FIRE PROTECTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Concealed pendent sprinkler with armover/piping, hangers/supports$0.00$0.00
2-1/2" schedule 10 pipe$0.00$0.00
Drain and refill system$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS$0.00$0.00$0.00
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

FIRE PROTECTION (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

21000 FIRE PROTECTION - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Semi-recessed pendent sprinkler with armover/piping, hangers/supports$0.00$0.00
Upright sprinklers with armover/piping, hangers/supports$0.00$0.00
Drain and refill system$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS$0.00$0.00$0.00
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43
EA36$ 150.00$ 300.00
ES13$ 150.00$ 300.00
EA4$200.00$ - 0

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

PLUMBING

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

22000 PLUMBING SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Ball Valve, 1/2", Bronze, soldered$0.00$0.00S
Hangers & Supports$0.00$0.00S
Identification of piping and equipment$0.00$0.00S
Valve tags (brass, 2" diameter)$0.00$0.00S
Pipe labels, plastic snap around$0.00$0.00S
Piping Insulation, 1/2", fiberglass, 1/2" thickness$0.00$0.00S
Piping Insulation, 1", fiberglass, 1/2" thickness$0.00$0.00S
Piping, 1/2" copper, type L$0.00$0.00S
Piping, 1" copper, type L$0.00$0.00S
Sanitary Waste & Vent Piping, 1-1/2" CI, no hub$0.00$0.00S
Sanitary Waste & Vent Piping, 2" CI, no hub$0.00$0.00S
Sanitary Waste & Vent Piping, 4" CI, no hub$0.00$0.00S
Sanitary Drains$0.00$0.00S
Plumbing Fixtures$0.00$0.00S
Water closet$0.00$0.00S
Lavatory$0.00$0.00S
Kitchen sink$0.00$0.00S
Electric Water Cooler$0.00$0.00S
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS$0.00$0.00$0.00
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

HVAC

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

23000 HVAC SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
Second Floor HVAC$0.00$0.00
Metal Ducts$0.00$0.00
Galvanized, MIL90 finish$0.00$0.00
Air Duct Accessories$0.00$0.00
Balancing damper (butterfly)$0.00$0.00
Diffusers, Registers, and Grilles$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
Second Floor$0.00$0.00
Electric Wiring for HVAC Equipment$0.00$0.00
General-Duty Valves$0.00$0.00
Ball valves$0.00$0.00
3/4" soldered$0.00$0.00
Hangers & Supports$0.00$0.00
Testing, Adjusting, and Balancing$0.00$0.00
Air Balancing including VAV testing and balancing$0.00$0.00
Hydronic testing and balancing for FCUs$0.00$0.00
Duct Insulation$0.00$0.00
1-1/2" blanket mineral fiber$0.00$0.00
HVAC Piping Insulation$0.00$0.00
3/4" diameter$0.00$0.00
1" diameter$0.00$0.00
Instrumentation and Control for HVAC$0.00$0.00
FCU sensor programming and BMS grapics$0.00$0.00
Hydronic Piping, Type L copper$0.00$0.00
3/4" diameter piping$0.00$0.00
1" diameter piping$0.00$0.00
3/4" balance valve$0.00$0.00
3/4" strainer$0.00$0.00
3/4" Pressure Independent Control Valve$0.00$0.00
Metal Ducts$0.00$0.00
Galvanized, MIL90 finish$0.00$0.00
Air Duct Accessories$0.00$0.00
Balancing damper (butterfly)$0.00$0.00
Air Terminal Units$0.00$0.00
Diffusers, Registers, and Grilles$0.00$0.00
Fan-Coil units$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS$0.00$0.00$0.00
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

AUTOMATION

Contractor Proposal BreakdownDate:12/31/99
0
0
Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:0
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Contractor:0Trade:0
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

25000 INTEGRATED AUTOMATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS$0.00$0.00$0.00
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

HVAC (1)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

23000 HVAC - Option 1 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
Second Floor$0.00$0.00
Electric Wiring for HVAC Equipment$0.00$0.00
Testing, Adjusting, and Balancing$0.00$0.00
Hydronic testing and balancing for FCUs$0.00$0.00
General-Duty Valves$0.00$0.00
Ball valves$0.00$0.00
3/4" soldered$0.00$0.00
HVAC Piping Insulation$0.00$0.00
3/4" diameter$0.00$0.00
Instrumentation and Control for HVAC$0.00$0.00
FCU sensor programming and BMS grapics$0.00$0.00
Hydronic Piping, Type L copper$0.00$0.00
3/4" diameter piping$0.00$0.00
3/4" balance valve$0.00$0.00
3/4" strainer$0.00$0.00
3/4" Pressure Independent Control Valve$0.00$0.00
Fan-Coil units$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTS
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS$0.00$0.00$0.00
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

HVAC (3)

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL

23000 HVAC - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes

SHELL
Metal Ducts$0.00$0.00
Galvanized, MIL90 finish$0.00$0.00
Air Duct Accessories$0.00$0.00
Balancing damper (butterfly)$0.00$0.00
Diffusers, Registers, and Grilles$0.00$0.00
$0.00$0.00
Subtotal$0.00$0$0
TENANT IMPROVEMENTS
Electric Wiring for HVAC Equipment$0.00$0.00
Hangers & Supports$0.00$0.00
Testing, Adjusting, and Balancing$0.00$0.00
Duct Insulation$0.00$0.00
1-1/2" blanket mineral fiber$0.00$0.00
Instrumentation and Control for HVAC$0.00$0.00
Metal Ducts$0.00$0.00
Galvanized, MIL90 finish$0.00$0.00
Air Duct Accessories$0.00$0.00
Balancing damper (butterfly)$0.00$0.00
Air Terminal Units$0.00$0.00
Diffusers, Registers, and Grilles$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS$0.00$0.00$0.00
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43

&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D

ELECTRICAL

Date:

Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3
Contractor:
Project:Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011
Trade:
DESCRIPTIONSUBCONTRACT AMOUNTS/T
No.GSACSIY/NUMQTYLABORMATERIALEQUIPTOTAL
26000ELECTRICAL`SUB MARKUPRSMeans Line NumberRSMeans DescriptionHow was quantity determined - notes
SHELL
$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0
TENANT IMPROVEMENTSS
Second Floor Elecctrical$0.00$0.00
Low Voltage #12 AWG$0.00$0.00
Low Voltage #12 AWG for FCUs$0.00$0.00
Control-Voltage Elec.$0.00$0.00
Grounding and Bonding$0.00$0.00
Hangers and Supports$0.00$0.00
Sleeves and Sleeve Seals$0.00$0.00
Raceways and Boxes$0.00$0.00
3/4" EMT$0.00$0.00
Misc. fittings and boxes$0.00$0.00
3/4" EMT for Data$0.00$0.00
Lighting Control Devises$0.00$0.00
Wall Occupancy Sensors$0.00$0.00
Ceiling Occupancy Sensors$0.00$0.00
Wire Devices$0.00$0.00
Three-way Switches$0.00$0.00
0-10V Dimmer Switch$0.00$0.00
Duplex Outlets$0.00$0.00
Duplex GFCI Outlets$0.00$0.00
Quadruplex Outlets$0.00$0.00
Furniture Feeds$0.00$0.00
Enclosed Switches$0.00$0.00
Disconnect Switch$0.00$0.00
LED Interior Lighting$0.00$0.00
Type C$0.00$0.00
Type D$0.00$0.00
Type F$0.00$0.00
Type G$0.00$0.00
Type UC$0.00$0.00
Emergency and Exit Lighting$0.00$0.00
Type C/EM$0.00$0.00
Type Exit$0.00$0.00
$0.00$0.00
Subtotal$0.00$0.00$0.00$0$0

TOTALS $0.00 $0.00 $0.00 $0.00

SUB MARKUPS000

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .