SUMMARY
Contractor Proposal Breakdown Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 |
| Contractor: | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 |
| Signature: | |
| | | | CONTRACT AMOUNT | | | | |
| No. | GSA | CSI | DESCRIPTION | | SHELL | T.I. | TOTAL | |
| | | SUMMARY | | | | | |
| | 01000 | GENERAL CONDITIONS | | 0 | 0 | $0 | $0 |
| | 01000 | GENERAL CONDITIONS - Option 1 | | 0 | 0 | $0 | |
| | 01000 | GENERAL CONDITIONS - Option 2 | | 0 | 0 | $0 | |
| | 01000 | GENERAL CONDITIONS - Option 3 | | 0 | 0 | $0 | |
| | 02000 | EXISTING CONDITIONS | | 0 | 0 | $0 | $0 |
| | 02000 | EXISTING CONDITIONS - Option 1 | | 0 | 0 | $0 | |
| | 02000 | EXISTING CONDITIONS - Option 3 | | 0 | 0 | $0 | |
| | 03000 | CONCRETE | | 0 | 0 | $0 | $0 |
| | 03000 | CONCRETE - Option 3 | | 0 | 0 | $0 | |
| | 04000 | MASONRY | | 0 | 0 | $0 | $0 |
| | 05000 | METALS | | 0 | 0 | $0 | $0 |
| | 05000 | METALS - Option 2 | | 0 | 0 | $0 | |
| | 05000 | METALS - Option 3 | | 0 | 0 | $0 | |
| | 06000 | WOOD & PLASTIC | | 0 | 0 | $0 | $0 |
| | 06000 | WOOD & PLASTIC - Option 3 | | 0 | 0 | $0 | |
| | 07000 | THERMAL & MOISTURE PROTECTION | | 0 | 0 | $0 | $0 |
| | 07000 | THERMAL & MOISTURE PROTECTION - Option 2 | | 0 | 0 | $0 | |
| | 07000 | THERMAL & MOISTURE PROTECTION - Option 3 | | 0 | 0 | $0 | |
| | 08000 | DOORS & WINDOWS | | 0 | 0 | $0 | $0 |
| | 08000 | DOORS & WINDOWS - Option 3 | | 0 | 0 | $0 | |
| | 09000 | FINISHES | | 0 | 0 | $0 | $0 |
| | 09000 | FINISHES - Option 2 | | 0 | 0 | $0 | |
| | 09000 | FINISHES - Option 3 | | 0 | 0 | $0 | |
| | 10000 | SPECIALTIES | | 0 | 0 | $0 | $0 |
| | 11000 | EQUIPMENT | | 0 | 0 | $0 | $0 |
| | 12000 | FURNISHINGS | | 0 | 0 | $0 | $0 |
| | 12000 | FURNISHINGS - Option 3 | | 0 | 0 | $0 | |
| | 13000 | SPECIAL CONSTRUCTION | | 0 | 0 | $0 | $0 |
| | 14000 | CONVEYING EQUIPMENT | | 0 | 0 | $0 | $0 |
| | 21000 | FIRE PROTECTION | | 0 | 0 | $0 | $0 |
| | 21000 | FIRE PROTECTION - Option 3 | | 0 | 0 | $0 | |
| | 22000 | PLUMBING | | 0 | 0 | $0 | $0 |
| | 23000 | HVAC | | 0 | 0 | $0 | $0 |
| | 23000 | HVAC - Option 1 | | 0 | 0 | $0 | |
| | 23000 | HVAC - Option 3 | | 0 | 0 | $0 | |
| | 25000 | INTEGRATED AUTOMATION | | 0 | 0 | $0 | $0 |
| | 26000 | ELECTRICAL | | 0 | 0 | $0 | $0 |
| | 26000 | ELECTRICAL - Option 1 | | 0 | 0 | $0 | |
| | 26000 | ELECTRICAL - Option 3 | | 0 | 0 | $0 | |
| | 27000 | COMMUNICATIONS | | 0 | 0 | $0 | $0 |
| | 27000 | COMMUNICATIONS - Option 3 | | 0 | 0 | $0 | |
| | 28000 | ELECTRONIC SAFETY & SECURITY | | 0 | 0 | $0 | $0 |
| | 28000 | ELECTRONIC SAFETY & SECURITY - Option 3 | | 0 | 0 | $0 | |
| | 31000 | EARTHWORK | | 0 | 0 | $0 | $0 |
| | 32000 | EXTERIOR IMPROVEMENTS | | 0 | 0 | $0 | $0 |
| | 33000 | UTILITIES | | 0 | 0 | $0 | $0 |
| | 34000 | TRANSPORTATION | | 0 | 0 | $0 | $0 |
| | 35000 | WATERWAY & MARINE | | 0 | 0 | $0 | $0 |
| | 41000 | MATERIAL PROCESSING & HANDLING | | 0 | 0 | $0 | $0 |
| | 44000 | POLLUTION & WASTE CONTROLL EQUIP. | | 0 | 0 | $0 | $0 |
| | 46000 | WATER & WASTEWATER EQUIPMENT | | 0 | 0 | $0 | $0 |
| | 48000 | ELECTRICAL POWER GENERATION | | 0 | 0 | $0 | $0 |
| SUBCONTRACTOR MARKUP - BASE BID | 0.0% | 0 | 0 | $0 |
| SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES | | | | |
| SUBCONTRACTOR MARKUP - Option 1 | 0.0% | 0 | 0 | $0 |
| SUBCONTRACTOR MARKUP - Option 2 | 0.0% | 0 | 0 | $0 |
| SUBCONTRACTOR MARKUP - Option 3 | 0.0% | 0 | 0 | $0 |
| OPTION 1 - SUBTOTAL | 0 | 0 | $0 |
| OPTION 2 - SUBTOTAL | 0 | 0 | $0 |
| OPTION 3 - SUBTOTAL | 0 | 0 | $0 |
| BASE BID - SUBTOTAL | | 0 | 0 | $0 | $0 |
| DESIGN CONTINGENCY | 0.0% | 0 | 0 | $0 | $0 |
| CITY COST FACTOR | 0.0% | 0 | 0 | $0 | $0 |
| BASE BID - SUBTOTAL | | 0 | 0 | $0 | $0 |
| OVERHEAD | 0.0% | 0 | 0 | $0 | $0 |
| PROFIT | 0.0% | 0 | 0 | $0 | $0 |
| ESCALATION TO MIDPOINT | 0.0% | 0 | 0 | $0 | $0 |
| BONDING | 0.0% | 0 | 0 | $0 | $0 |
| BASE BID - TOTALS (ECCA) | | $0 | $0 | $0 | $0 |
| CONSTRUCTION CONTINGENCY | 0.0% | $ - 0 | $ - 0 | $0 | $0 |
| BASE BID - TOTALS (ECC) | | $0 | $0 | $0 | $0 |
| OPTION 1 - SUBTOTAL | | 0 | 0 | $0 |
| MARKUPS | 0.00% | 0 | 0 | $0 |
| OPTION 1 - TOTAL (ECCA) | | 0 | 0 | $0 |
| CONSTRUCTION CONTINGENCY | 0.0% | 0 | 0 | $0 |
| OPTION 1 - TOTAL (ECC) | | 0 | 0 | $0 |
| OPTION 2 - SUBTOTAL | | 0 | 0 | $0 |
| MARKUPS | 0.00% | 0 | 0 | $0 |
| OPTION 2 - TOTAL (ECCA) | | 0 | 0 | $0 |
| CONSTRUCTION CONTINGENCY | 0.0% | 0 | 0 | $0 |
| OPTION 2 - TOTAL (ECC) | | 0 | 0 | $0 |
| OPTION 3 - SUBTOTAL | | 0 | 0 | $0 |
| MARKUPS | 0.00% | 0 | 0 | $0 |
| OPTION 3 - TOTAL (ECCA) | | 0 | 0 | $0 |
| CONSTRUCTION CONTINGENCY | 0.0% | 0 | 0 | $0 |
| OPTION 3 - TOTAL (ECC) | | 0 | 0 | $0 |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
SUMMARY - LME
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | | CONTRACT AMOUNT | | | | | |
| No. | GSA | CSI | DESCRIPTION | | LABOR | MATERIAL | EQUIP | TOTAL | |
| | | SUMMARY - Labor/Material/Equipment | | | | | | |
| | 01000 | GENERAL CONDITIONS | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 01000 | GENERAL CONDITIONS - Option 1 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 01000 | GENERAL CONDITIONS - Option 2 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 01000 | GENERAL CONDITIONS - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 02000 | EXISTING CONDITIONS | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 02000 | EXISTING CONDITIONS - Option 1 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 02000 | EXISTING CONDITIONS - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 03000 | CONCRETE | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 03000 | CONCRETE - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 04000 | MASONRY | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 05000 | METALS | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 05000 | METALS - Option 2 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 05000 | METALS - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 06000 | WOOD & PLASTIC | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 06000 | WOOD & PLASTIC - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 07000 | THERMAL & MOISTURE PROTECTION | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 07000 | THERMAL & MOISTURE PROTECTION - Option 2 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 07000 | THERMAL & MOISTURE PROTECTION - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 08000 | DOORS & WINDOWS | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 08000 | DOORS & WINDOWS - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 09000 | FINISHES | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 09000 | FINISHES - Option 2 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 09000 | FINISHES - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 10000 | SPECIALTIES | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 11000 | EQUIPMENT | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 12000 | FURNISHINGS | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 12000 | FURNISHINGS - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 13000 | SPECIAL CONSTRUCTION | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 14000 | CONVEYING EQUIPMENT | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 21000 | FIRE PROTECTION | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 21000 | FIRE PROTECTION - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 22000 | PLUMBING | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 23000 | HVAC | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 23000 | HVAC - Option 1 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 23000 | HVAC - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 25000 | INTEGRATED AUTOMATION | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 26000 | ELECTRICAL | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 2600 | ELECTRICAL - Option 1 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 2600 | ELECTRICAL - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 27000 | COMMUNICATIONS | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 27000 | COMMUNICATIONS - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 28000 | ELECTRONIC SAFETY & SECURITY | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 28000 | ELECTRONIC SAFETY & SECURITY - Option 3 | | 0.00 | 0.00 | 0.00 | $0 | |
| | 31000 | EARTHWORK | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 32000 | EXTERIOR IMPROVEMENTS | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 33000 | UTILITIES | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 34000 | TRANSPORTATION | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 35000 | WATERWAY & MARINE | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 41000 | MATERIAL PROCESSING & HANDLING | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 44000 | POLLUTION & WASTE CONTROLL EQUIP. | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 46000 | WATER & WASTEWATER EQUIPMENT | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| | 48000 | ELECTRICAL POWER GENERATION | | 0.00 | 0.00 | 0.00 | $0 | $0 |
| SUBCONTRACTOR MARKUP - BASE BID | 0.0% | $ - 0 | $ - 0 | $ - 0 | $0 |
| SUBCONTRACTOR MARKUPS ARE CALCULATED FOR EACH LINE ITEM, TOTAL ABOVE IS FOR INFORMATIONAL PURPOSES | | | | | |
| SUBCONTRACTOR MARKUP - Option 1 | | $ - 0 | $ - 0 | $ - 0 | $0 |
| SUBCONTRACTOR MARKUP - Option 2 | | $ - 0 | $ - 0 | $ - 0 | $0 |
| SUBCONTRACTOR MARKUP - Option 3 | | $ - 0 | $ - 0 | $ - 0 | $0 |
| OPTION 1 - SUBTOTAL | 0.00 | 0.00 | 0.00 | $0 |
| OPTION 2 - SUBTOTAL | 0.00 | 0.00 | 0.00 | $0 |
| OPTION 3 - SUBTOTAL | 0.00 | 0.00 | 0.00 | $0 |
| BASE BID - SUBTOTAL | | 0 | 0 | 0 | $0 | $0 |
| DESIGN CONTINGENCY | 0% | 0 | 0 | 0 | $0 | $0 |
| CITY COST FACTOR | 0% | 0 | 0 | 0 | $0 | $0 |
| BASE BID - SUBTOTAL | | 0 | 0 | 0 | $0 | $0 |
| OVERHEAD | 0% | 0 | 0 | 0 | $0 | $0 |
| PROFIT | 0% | 0 | 0 | 0 | $0 | $0 |
| ESCALATION TO MIDPOINT | 0.0% | 0 | 0 | 0 | $0 | $0 |
| BONDING | 0.0% | 0 | 0 | 0 | $0 | $0 |
| BASE BID - TOTALS (ECCA) | | $0 | $0 | $0 | $0 | $0 |
| CONSTRUCTION CONTINGENCY | 0% | $ - 0 | $ - 0 | $ - 0 | $0 | $0 |
| BASE BID - TOTALS (ECC) | | $0 | $0 | $0 | $0 | $0 |
| OPTION 1 - SUBTOTAL | | 0.00 | 0.00 | 0.00 | $0 |
| MARKUPS | 0.00% | 0.00 | 0.00 | 0.00 | $0 |
| OPTION 1 - TOTAL (ECCA) | | 0.00 | 0.00 | 0.00 | $0 |
| CONSTRUCTION CONTINGENCY | 0% | 0.00 | 0.00 | 0.00 | $0 |
| OPTION 1 - TOTAL (ECC) | | 0.00 | 0.00 | 0.00 | $0 |
| OPTION 2 - SUBTOTAL | | 0.00 | 0.00 | 0.00 | $0 |
| MARKUPS | 0.00% | 0.00 | 0.00 | 0.00 | $0 |
| OPTION 2 - TOTAL (ECCA) | | 0.00 | 0.00 | 0.00 | $0 |
| CONSTRUCTION CONTINGENCY | 0% | 0.00 | 0.00 | 0.00 | $0 |
| OPTION 2 - TOTAL (ECC) | | 0.00 | 0.00 | 0.00 | $0 |
| OPTION 3 - SUBTOTAL | | 0.00 | 0.00 | 0.00 | $0 |
| MARKUPS | 0.00% | 0.00 | 0.00 | 0.00 | $0 |
| OPTION 3 - TOTAL (ECCA) | | 0.00 | 0.00 | 0.00 | $0 |
| CONSTRUCTION CONTINGENCY | 0% | 0.00 | 0.00 | 0.00 | $0 |
| OPTION 3 - TOTAL (ECC) | | 0.00 | 0.00 | 0.00 | $0 |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
GENERAL CONDITIONS
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | | | CONTRACT AMOUNT | | | | | |
| No. | GSA | CSI | DESCRIPTION | SUB | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
01000 GENERAL CONDITIONS RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| General Conditions | % | $0 | $0 | $0 | $0 |
| Security Clearnances | HR | | | | $0 |
| Full-Time Superintendent | HR | | | | $0 |
| Interim Life Safety Measures (Sprinkler) | LS | | | | $0 |
| Interim Life Safety Measures (Fire Alarm) | LS | | | | $0 |
| Subtotal | | | | | $0 |
| TENANT IMPROVEMENTS | | | | | |
| General Conditions | % | $0 | $0 | $0 | $0 |
| Security Clearnances | HR | | | | $0 |
| Full-Time Superintendent - Substantial Completion | HR | | | | $0 |
| Fire Protection Mobiliization - First Floor | LS | | | | $0 |
| Fire Protection Mobilizaqtion - Second Floor | LS | | | | $0 |
| Interim Life Safety Measures (Sprinkler) | LS | | | | $0 |
| Interim Life Safety Measures (Fire Alarm) | LS | | | | $0 |
| Subtotal | | | | | $0 |
TOTALS $0 $0 $0 $0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
GENERAL CONDITIONS (1)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | | | CONTRACT AMOUNT | | | | | |
| No. | GSA | CSI | DESCRIPTION | SUB | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
01000 GENERAL CONDITIONS - Option 1 RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| General Conditions | % | $0 | $0 | $0 | $0 |
| Security Clearnances | HR | | | | $0 |
| Full-Time Superintendent | HR | | | | $0 |
| Interim Life Safety Measures (Sprinkler) | LS | | | | $0 |
| Interim Life Safety Measures (Fire Alarm) | LS | | | | $0 |
| Subtotal | | | | | $0 |
| TENANT IMPROVEMENTS | | | | | |
| General Conditions | % | $0 | $0 | $0 | $0 |
| Security Clearnances | HR | | | | $0 |
| Full-Time Superintendent | HR | | | | $0 |
| Fire Protection Mobiliization - First Floor | LS | | | | $0 |
| Fire Protection Mobilizaqtion - Second Floor | LS | | | | $0 |
| Interim Life Safety Measures (Sprinkler) | LS | | | | $0 |
| Interim Life Safety Measures (Fire Alarm) | LS | | | | $0 |
| Subtotal | | | | | $0 |
TOTALS $0 $0 $0 $0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
GENERAL CONDITIONS (2)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | | | CONTRACT AMOUNT | | | | | |
| No. | GSA | CSI | DESCRIPTION | SUB | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
01000 GENERAL CONDITIONS - Option 2 RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| General Conditions | % | $0 | $0 | $0 | $0 |
| Security Clearnances | HR | | | | $0 |
| Full-Time Superintendent | HR | | | | $0 |
| Interim Life Safety Measures (Sprinkler) | LS | | | | $0 |
| Interim Life Safety Measures (Fire Alarm) | LS | | | | $0 |
| Subtotal | | | | | $0 |
| TENANT IMPROVEMENTS | | | | | |
| General Conditions | % | $0 | $0 | $0 | $0 |
| Security Clearnances | HR | | | | $0 |
| Full-Time Superintendent | HR | | | | $0 |
| Fire Protection Mobiliization - First Floor | LS | | | | $0 |
| Fire Protection Mobilizaqtion - Second Floor | LS | | | | $0 |
| Interim Life Safety Measures (Sprinkler) | LS | | | | $0 |
| Interim Life Safety Measures (Fire Alarm) | LS | | | | $0 |
| Subtotal | | | | | $0 |
TOTALS $0 $0 $0 $0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
GENERAL CONDITIONS (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | | | CONTRACT AMOUNT | | | | | |
| No. | GSA | CSI | DESCRIPTION | SUB | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
01000 GENERAL CONDITIONS - Option 3 RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| General Conditions | % | $0 | $0 | $0 | $0 |
| Security Clearnances | HR | | | | $0 |
| Full-Time Superintendent | HR | | | | $0 |
| Interim Life Safety Measures (Sprinkler) | LS | | | | $0 |
| Interim Life Safety Measures (Fire Alarm) | LS | | | | $0 |
| Subtotal | | | | | $0 |
| TENANT IMPROVEMENTS | | | | | |
| General Conditions | % | $0 | $0 | $0 | $0 |
| Security Clearnances | HR | | | | $0 |
| Full-Time Superintendent | HR | | | | $0 |
| Fire Protection Mobiliization - First Floor | LS | | | | $0 |
| Fire Protection Mobilization - Second Floor | LS | | | | $0 |
| Interim Life Safety Measures (Sprinkler) | LS | | | | $0 |
| Interim Life Safety Measures (Fire Alarm) | LS | | | | $0 |
| Subtotal | | | | | $0 |
TOTALS $0 $0 $0 $0
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EXIST. COND.
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | | SUB | CONTRACT AMOUNT | | | | | |
| No. | GSA | CSI | DESCRIPTION | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
02000 EXISTING CONDITIONS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| Second Floor Mastic Abatement | | | | $0 | $0 |
| Second Floor Air Filtration Device | | | | $0 | $0 |
| Second Floor OSHA Testing | | | | $0 | $0 |
| Second Floor Asbestos Disposal Fees | | | | $0 | $0 |
| Second Floor Asbestos Waste Packaging by Hand 3CF Bags | | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| Second Floor Ceiling Demolition | | | | $0 | $0 |
| Second Floor Flooring Demolition | | | | $0 | $0 |
| Second Floor Existing Wall Demo | | | | $0 | $0 |
| Second Floor Door Demolition | | | | $0 | $0 |
| Second Floor Countertop Demolition | | | | $0 | $0 |
| Second Floor Base Cabinet Demolition | | | | $0 | $0 |
| Second Floor Fire Protection Removals | | | | $0 | $0 |
| Removal of existing pendent sprinkler and branch piping | | | | $0 | $0 |
| Removal of existing 1-1/2" sprinkler main | | | | $0 | $0 |
| Second Floor Plumbing Removals | | | | $0 | $0 |
| Remove kitchen sink and mounting hardware | | | | $0 | $0 |
| Remove dishwasher and hardware | | | | $0 | $0 |
| Remove Lavatory and mounting hardware | | | | $0 | $0 |
| Remove water closet and mounting hardware | | | | $0 | $0 |
| Remove water cooler and mounting hardware | | | | $0 | $0 |
| Remove piping, insulation and hangers | | | | $0 | $0 |
| Second Floor HVAC Removals | | | | $0 | $0 |
| Remove ductwork, hangers | | | | $0 | $0 |
| Remove Fan Coil units and runout piping | | | | $0 | $0 |
| Remove VAV and Accessories | | | | $0 | $0 |
| Remove VAV piping and accessories | | | | $0 | $0 |
| Diffusers | | | | $0 | $0 |
| Controls | | | | $0 | $0 |
| Second Floor Electrical Removals | | | | $0 | $0 |
| Remove lighting and lighting control devices | | | | $0 | $0 |
| Remove conduit & wiring | | | | $0 | $0 |
| Remove FCU wiring | | | | $0 | $0 |
| Remove wiring devices | | | | $0 | $0 |
| Second Floor Communications Removal | | | | $0 | $0 |
| Comm Cable & Equipment | | | | $0 | $0 |
| Second Floor E S&S Removals | | | | $0 | $0 |
| Remove Cameras | | | | $0 | $0 |
| Remove Conduit & wiring | | | | $0 | $0 |
| Remove Notification Appliance | | | | $0 | $0 |
| Rework Continuation of Circuits | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EXIST. COND. (1)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | | SUB | CONTRACT AMOUNT | | | | | |
| No. | GSA | CSI | DESCRIPTION | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
02000 EXISTING CONDITIONS - Option 1 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| Remove FCU Wiring | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EXIST. COND. (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | | SUB | CONTRACT AMOUNT | | | | | | | | | |
| No. | GSA | CSI | DESCRIPTION | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | | | | |
| | 02000 | EXISTING CONDITIONS - Option 3 | | | | | | | | SUB MARKUP | RSMeans Line Number | RSMeans Description | How was quantity determined - notes |
| | | SHELL | | | | | | | | | | | |
| | | First Floor Mastic Abatement | | | | | | | $0 | $0 | | | |
| | | First Floor Air Filtration Device | | | | | | | $0 | $0 | | | |
| | | First Floor OSHA Testing | | | | | | | $0 | $0 | | | |
| | | First Floor Asbestos Disposal Fees | | | | | | | $0 | $0 | | | |
| | | First Floor Asbestos Waste Packaging by Hand 3CF Bags | | | | | | | $0 | $0 | | | |
| | | Subtotal | | | | $0.00 | $0.00 | $0.00 | $0 | $0 | | | |
| | | TENANT IMPROVEMENTS | | | | | | | | | | | |
| | | First Floor Ceiling Demolition | | | | | | | $0 | $0 | | | |
| | | First Floor Carpet Removal | | | | | | | $0 | $0 | | | |
| | | First Floor VCT Removal | | | | | | | $0 | $0 | | | |
| | | First Floor Existing Wall Demo | | | | | | | $0 | $0 | | | |
| | | First Floor Door Demolition | | | | | | | $0 | $0 | | | |
| | | First Floor Window Demo | | | | | | | $0 | $0 | | | |
| | | First Floor Fire Protection Removals | | | | | | | $0 | $0 | | | |
| | | Removal of existing pendent sprinkler and branch piping | | | | | | | $0 | $0 | | | |
| | | First Floor HVAC Removals | | | | | | | $0 | $0 | | | |
| | | Remove ductwork, hangers | | | | | | | $0 | $0 | | | |
| | | Remove Diffusers | | | | | | | $0 | $0 | | | |
| | | Remove Controls | | | | | | | $0 | $0 | | | |
| | | First Floor Electrical Removals | | | | | | | $0 | $0 | | | |
| | | Remove lighting and lighting control devices | | | | | | | $0 | $0 | | | |
| | | Remove conduit & wiring | | | | | | | $0 | $0 | | | |
| | | Remove wiring devices | | | | | | | $0 | $0 | | | |
| | | First Floor Communications Removal | | | | | | | $0 | $0 | | | |
| | | Comm Cable & Equipment | | | | | | | $0 | $0 | | | |
| | | First Floor E S&S Removals | | | | | | | $0 | $0 | | | |
| | | Remove Cameras | | | | | | | $0 | $0 | | | |
| | | Fire Alarm Demo | | | | | | | $0 | $0 | | | |
| | | | | | | | | | $0 | $0 | | | |
| | | Subtotal | | | | $0.00 | $0.00 | $0.00 | $0 | $0 | | | |
| | | TOTALS | | | | $0 | $0 | $0 | $0 | | | | |
| | | | SUB MARKUPS | | | 0 | 0 | 0 | | | | | |
| | | | | | | SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | | | | | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
CONCRETE
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
03000 CONCRETE SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| Misc. Concrete Patching | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
MASONRY
| Contractor Proposal Breakdown | | Date: | 12/31/99 |
| 0 | | | |
| 0 | | | |
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | | |
| Contractor: | 0 | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | | |
| Contractor: | 0 | Trade: | 0 |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
04000 MASONRY SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | | |
| | | | $0 | $0 | S |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
SUB MARKUPS 0 0 0
SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
CONCRETE (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL |
03000 CONCRETE - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| Misc. Concrete Patching | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
METALS
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
05000 METALS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | | |
| | | | $0 | $0 | S |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Second Floor | | | | $0 | $0 |
| Wall Type 9 - Studs | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
METALS (2)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
05000 METALS - Option 2 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | | |
| | | | $0 | $0 | S |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| TENANT IMPROVEMENTS | | | | | |
| 2 1/2" Metal Stud | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
METALS (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
05000 METALS - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | | |
| | | | $0 | $0 | S |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| TENANT IMPROVEMENTS | | | | | |
| Wall Type 9 - Studs | | | | $0 | $0 |
| Wall Type 20 - Studs | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
WOOD & PLASTIC
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
06000 WOOD AND PLASTIC SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | | |
| | | | $0 | $0 | T |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| TENANT IMPROVEMENTS | | | | | |
| Misc. Wooden Blocking | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
WOOD & PLASTIC (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
06000 WOOD AND PLASTIC - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | | |
| | | | $0 | $0 | T |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| TENANT IMPROVEMENTS | | | | | |
| Misc. Wooden Blocking | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
THERM. & MOIST. PROT.
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
07000 THERMAL & MOISTURE PROTECTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | 0 | 0 | 0 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Second Floor | | | | $0 | $0 |
| Batt Insulation | | | | $0 | $0 |
| Spray Foam Insulation - Metal Blind Throughs | | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | 0 | 0 | 0 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
THERM. & MOIST. PROT. (2)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
07000 THERMAL & MOISTURE PROTECTION - Option 2 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| 2" Tiger Foam | | | | $0 | $0 |
| Misc Caulking | | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | 0 | 0 | 0 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | 0 | 0 | 0 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
THERM. & MOIST. PROT. (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
07000 THERMAL & MOISTURE PROTECTION - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | 0 | 0 | 0 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| Batt Insulation | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | 0 | 0 | 0 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
DOORS & WINDOWS
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
08000 DOORS AND WINDOWS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | T |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| TENANT IMPROVEMENTS | | | |
| New 3x7 Full Glass Door | $0 | $0 | T |
| New 3x7 Flush Wood Door | $0 | $0 | T |
| New 3x7 Flush Wood Door w/ Narrow Lite | $0 | $0 | T |
| Sliding Door | $0 | $0 | T |
| New Hollow Metal Welded Frame | $0 | $0 | T |
| New Thresholds | $0 | $0 | T |
| Hardware Set #4 | $0 | $0 | T |
| Hardware Set #5 | $0 | $0 | T |
| Hardware Set #6 | $0 | $0 | T |
| Hardware Set #7 | $0 | $0 | T |
| Hardware Set #8 | $0 | $0 | T |
| Hardware Set #9 | $0 | $0 | T |
| Hardware Set #10 | $0 | $0 | T |
| Hardware Set #14 | $0 | $0 | |
Subtotal $0.00 $0.00 $0.00 $0 $0
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
DOORS & WINDOWS (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
08000 DOORS AND WINDOWS - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | | |
| | | | $0 | $0 | |
| | | | $0 | $0 | T |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| TENANT IMPROVEMENTS | | | | | | |
| New 3x7 Flush Wood Door | | | | $0 | $0 | T |
| New 2'6"x7'0" Flush Wood Door | | | | $0 | $0 | T |
| New 3x7 Flush Wood Door w/ Narrow Lite | | | | $0 | $0 | T |
| New 3x7 Hollow Metal Welded Frame | | | | $0 | $0 | T |
| New 5x7 Hollow Metal Welded Frame | | | | $0 | $0 | T |
| Hardware Set #6 | | | | $0 | $0 | T |
| Hardware Set #8 | | | | $0 | $0 | T |
| Hardware Set #11 | | | | $0 | $0 | T |
| Hardware Set #12 | | | | $0 | $0 | T |
| Hardware Set #13 | | | | $0 | $0 | T |
| Door Threshold | | | | $0 | $0 | T |
| Window Type W1 | | | | $0 | $0 | T |
| Window Type W2 | | | | $0 | $0 | T |
| | | | $0 | $0 | T |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FINISHES
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
| 09000 | FINISHES | | | | | SUB MARKUP | RSMeans Line Number | RSMeans Description | How was quantity determined - notes |
| SHELL | | | | | | | | |
| | | | | $0 | $0 | | | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | | | |
| TENANT IMPROVEMENTS | | | | | | |
| | | | $0 | $0 | T |
| | | | $0 | $0 | T |
| | | | $0 | $0 | T |
| | | | $0 | $0 | T |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Second Floor | | | | $0 | $0 | |
| 5/8" Type x gypboard | | | | $0 | $0 | |
| Flooring | | | | $0 | $0 | |
| Ceiling | | | | $0 | $0 | |
| Paint - Walls Paint & Primer | | | | $0 | $0 | |
| Ceramic Tile | | | | $0 | $0 | |
| Luxury Vinyl Tile | | | | $0 | $0 | |
| Rubber Base | | | | $0 | $0 | |
| | | | $0 | $0 | |
| Window Treatment 1 | | | | $0 | $0 | |
| Window Treatment 2 | | | | $0 | $0 | |
| Window Treatment 3 | | | | $0 | $0 | |
| Window Treatment 4 | | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
TOTALS $0.00 $0.00 $0.00 $0
| SUB MARKUPS | | | 0 | 0 | 0 |
| | | | SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
| 5/8" Type x gypboard | Y | SF | 0 | $1.30 | $0.45 | |
| Flooring | Y | SY | 934 | $7.05 | $40.00 | |
| Ceiling | Y | SF | 8407 | $1.65 | $4.29 | |
| Paint | Y | SF | 0 | $1.14 | $0.27 | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
SPECIALTIES
| Contractor Proposal Breakdown | | Date: | 12/31/99 |
| 0 | | | |
| 0 | | | |
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | | |
| Contractor: | 0 | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | | |
| Contractor: | 0 | Trade: | 0 |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
10000 SPECIALTIES SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | | |
| | | | $0 | $0 | T |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
EQUIPMENT
| Contractor Proposal Breakdown | | Date: | 12/31/99 |
| 0 | | | |
| 0 | | | |
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | | |
| Contractor: | 0 | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | | |
| Contractor: | 0 | Trade: | 0 |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
11000 EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | | |
| | | | $0 | $0 | T |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
| TENANT IMPROVEMENTS | | | | | | |
| | | | $0 | $0 | T |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
TOTALS $0 $0 $0 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FURNISHINGS
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
12000 FURNISHINGS SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| New 18"W Base Cabinet | | | | $0 | $0 |
| New 15"W Base Cabinet | | | | $0 | $0 |
| Countertop | | | | $0 | $0 |
| New 18"W Wall Cabinet | | | | $0 | $0 |
| New 15"W Wall Cabinet | | | | $0 | $0 |
| New 30"W Base Cabinet | | | | $0 | $0 |
| New 30"W Base Cabinet w/ Sink | | | | $0 | $0 |
| New 36"W Wall Cabinet | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FURNISHINGS (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
12000 FURNISHINGS - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| Countertop | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FINISHES (2)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
09000 FINISHES - Option 2 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| Storefront Exterior Paint - 2 Coats Paint & 1 Coat Primer | | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | | |
| | | | $0 | $0 | T |
| 5/8" Gypsum Board | | | | $0 | $0 | T |
| Plastic Laminate Backsplash | | | | $0 | $0 | T |
| | | | $0 | $0 | T |
| Column Enclosure | | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0 0
| | | | SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | |
| 5/8" Type x gypboard | Y | SF | 0 | $1.30 | $0.45 |
| Flooring | Y | SY | 934 | $7.05 | $40.00 |
| Ceiling | Y | SF | 8407 | $1.65 | $4.29 |
| Paint | Y | SF | 0 | $1.14 | $0.27 |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FINISHES (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
09000 FINISHES - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | | |
| 5/8" Type x gypboard | | | | $0 | $0 | T |
| Flooring | | | | $0 | $0 | T |
| Ceiling | | | | $0 | $0 | T |
| Paint - Walls Paint & Primer | | | | $0 | $0 | T |
| Paint - Doors | | | | $0 | $0 | |
| Rubber Base | | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
TOTALS $0.00 $0.00 $0.00 $0
SUB MARKUPS 0 0 0
| | | | SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | |
| 5/8" Type x gypboard | Y | SF | 0 | $1.30 | $0.45 |
| Flooring | Y | SY | 934 | $7.05 | $40.00 |
| Ceiling | Y | SF | 8407 | $1.65 | $4.29 |
| Paint | Y | SF | 0 | $1.14 | $0.27 |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
SPECIAL CONST.
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
13000 SPECIAL CONSTRUCTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | | |
| 456 LF of DIRTT Walls | | | | $0 | $0 | T |
| DIRTT Modular Power | | | | $0 | $0 | |
| 3M Film - 4'0" Band | | | | $0 | $0 | |
| 3M Film - 4'0" Band Installation | | | | $0 | $0 | |
| DIRTT Frieght Shipping to Rochester, NY | | | | $0 | $0 | |
| Installation | | | | $0 | $0 | |
| Product Delivery to Site, & Trash Removal | | | | $0 | $0 | |
| Cleaning Service | | | | $0 | $0 | |
| Design & Logistics Contingency | | | | $0 | $0 | |
| | | | $0 | $0 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
TOTALS $0 $0 $0 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
CONVEYING
| Contractor Proposal Breakdown | | Date: | 12/31/99 |
| 0 | | | |
| 0 | | | |
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | | |
| Contractor: | 0 | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | | |
| Contractor: | 0 | Trade: | 0 |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
14000 CONVEYING EQUIPMENT SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0 | $0 |
| | | | $0 | $0 |
| | | | $0 | $0 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0 $0 $0 $0
| SUB MARKUPS | 0 | 0 | 0 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FIRE PROTECTION
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
21000 FIRE PROTECTION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| Concealed pendent sprinkler with armover/piping, hangers/supports | | | | $0.00 | $0.00 |
| 2-1/2" schedule 10 pipe | | | | $0.00 | $0.00 |
| Drain and refill system | | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
| SUB MARKUPS | $0.00 | $0.00 | $0.00 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
FIRE PROTECTION (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
21000 FIRE PROTECTION - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| Semi-recessed pendent sprinkler with armover/piping, hangers/supports | | | | $0.00 | $0.00 |
| Upright sprinklers with armover/piping, hangers/supports | | | | $0.00 | $0.00 |
| Drain and refill system | | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
| SUB MARKUPS | | | $0.00 | $0.00 | $0.00 |
| | | SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
| EA | 36 | $ 150.00 | $ 300.00 | |
| ES | 13 | $ 150.00 | $ 300.00 | |
| EA | 4 | $200.00 | $ - 0 | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
PLUMBING
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
22000 PLUMBING SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | | |
| Ball Valve, 1/2", Bronze, soldered | | | | $0.00 | $0.00 | S |
| Hangers & Supports | | | | $0.00 | $0.00 | S |
| Identification of piping and equipment | | | | $0.00 | $0.00 | S |
| Valve tags (brass, 2" diameter) | | | | $0.00 | $0.00 | S |
| Pipe labels, plastic snap around | | | | $0.00 | $0.00 | S |
| Piping Insulation, 1/2", fiberglass, 1/2" thickness | | | | $0.00 | $0.00 | S |
| Piping Insulation, 1", fiberglass, 1/2" thickness | | | | $0.00 | $0.00 | S |
| Piping, 1/2" copper, type L | | | | $0.00 | $0.00 | S |
| Piping, 1" copper, type L | | | | $0.00 | $0.00 | S |
| Sanitary Waste & Vent Piping, 1-1/2" CI, no hub | | | | $0.00 | $0.00 | S |
| Sanitary Waste & Vent Piping, 2" CI, no hub | | | | $0.00 | $0.00 | S |
| Sanitary Waste & Vent Piping, 4" CI, no hub | | | | $0.00 | $0.00 | S |
| Sanitary Drains | | | | $0.00 | $0.00 | S |
| Plumbing Fixtures | | | | $0.00 | $0.00 | S |
| Water closet | | | | $0.00 | $0.00 | S |
| Lavatory | | | | $0.00 | $0.00 | S |
| Kitchen sink | | | | $0.00 | $0.00 | S |
| Electric Water Cooler | | | | $0.00 | $0.00 | S |
| | | | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
TOTALS $0.00 $0.00 $0.00 $0.00
| SUB MARKUPS | $0.00 | $0.00 | $0.00 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
HVAC
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
23000 HVAC SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| Second Floor HVAC | | | | $0.00 | $0.00 |
| Metal Ducts | | | | $0.00 | $0.00 |
| Galvanized, MIL90 finish | | | | $0.00 | $0.00 |
| Air Duct Accessories | | | | $0.00 | $0.00 |
| Balancing damper (butterfly) | | | | $0.00 | $0.00 |
| Diffusers, Registers, and Grilles | | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| Second Floor | | | | $0.00 | $0.00 |
| Electric Wiring for HVAC Equipment | | | | $0.00 | $0.00 |
| General-Duty Valves | | | | $0.00 | $0.00 |
| Ball valves | | | | $0.00 | $0.00 |
| 3/4" soldered | | | | $0.00 | $0.00 |
| Hangers & Supports | | | | $0.00 | $0.00 |
| Testing, Adjusting, and Balancing | | | | $0.00 | $0.00 |
| Air Balancing including VAV testing and balancing | | | | $0.00 | $0.00 |
| Hydronic testing and balancing for FCUs | | | | $0.00 | $0.00 |
| Duct Insulation | | | | $0.00 | $0.00 |
| 1-1/2" blanket mineral fiber | | | | $0.00 | $0.00 |
| HVAC Piping Insulation | | | | $0.00 | $0.00 |
| 3/4" diameter | | | | $0.00 | $0.00 |
| 1" diameter | | | | $0.00 | $0.00 |
| Instrumentation and Control for HVAC | | | | $0.00 | $0.00 |
| FCU sensor programming and BMS grapics | | | | $0.00 | $0.00 |
| Hydronic Piping, Type L copper | | | | $0.00 | $0.00 |
| 3/4" diameter piping | | | | $0.00 | $0.00 |
| 1" diameter piping | | | | $0.00 | $0.00 |
| 3/4" balance valve | | | | $0.00 | $0.00 |
| 3/4" strainer | | | | $0.00 | $0.00 |
| 3/4" Pressure Independent Control Valve | | | | $0.00 | $0.00 |
| Metal Ducts | | | | $0.00 | $0.00 |
| Galvanized, MIL90 finish | | | | $0.00 | $0.00 |
| Air Duct Accessories | | | | $0.00 | $0.00 |
| Balancing damper (butterfly) | | | | $0.00 | $0.00 |
| Air Terminal Units | | | | $0.00 | $0.00 |
| Diffusers, Registers, and Grilles | | | | $0.00 | $0.00 |
| Fan-Coil units | | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
| SUB MARKUPS | $0.00 | $0.00 | $0.00 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
AUTOMATION
| Contractor Proposal Breakdown | | Date: | 12/31/99 |
| 0 | | | |
| 0 | | | |
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | | |
| Contractor: | 0 | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | | |
| Contractor: | 0 | Trade: | 0 |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
25000 INTEGRATED AUTOMATION SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
| SUB MARKUPS | $0.00 | $0.00 | $0.00 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
HVAC (1)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
23000 HVAC - Option 1 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | | | |
| Second Floor | | | | $0.00 | $0.00 |
| Electric Wiring for HVAC Equipment | | | | $0.00 | $0.00 |
| Testing, Adjusting, and Balancing | | | | $0.00 | $0.00 |
| Hydronic testing and balancing for FCUs | | | | $0.00 | $0.00 |
| General-Duty Valves | | | | $0.00 | $0.00 |
| Ball valves | | | | $0.00 | $0.00 |
| 3/4" soldered | | | | $0.00 | $0.00 |
| HVAC Piping Insulation | | | | $0.00 | $0.00 |
| 3/4" diameter | | | | $0.00 | $0.00 |
| Instrumentation and Control for HVAC | | | | $0.00 | $0.00 |
| FCU sensor programming and BMS grapics | | | | $0.00 | $0.00 |
| Hydronic Piping, Type L copper | | | | $0.00 | $0.00 |
| 3/4" diameter piping | | | | $0.00 | $0.00 |
| 3/4" balance valve | | | | $0.00 | $0.00 |
| 3/4" strainer | | | | $0.00 | $0.00 |
| 3/4" Pressure Independent Control Valve | | | | $0.00 | $0.00 |
| Fan-Coil units | | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
| SUB MARKUPS | $0.00 | $0.00 | $0.00 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
HVAC (3)
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | S/T |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | |
23000 HVAC - Option 3 SUB MARKUP RSMeans Line Number RSMeans Description How was quantity determined - notes
| SHELL | | | |
| Metal Ducts | | $0.00 | $0.00 |
| Galvanized, MIL90 finish | | $0.00 | $0.00 |
| Air Duct Accessories | | $0.00 | $0.00 |
| Balancing damper (butterfly) | | $0.00 | $0.00 |
| Diffusers, Registers, and Grilles | | $0.00 | $0.00 |
| | $0.00 | $0.00 |
| Subtotal | $0.00 | $0 | $0 |
| TENANT IMPROVEMENTS | | | | | |
| Electric Wiring for HVAC Equipment | | | | $0.00 | $0.00 |
| Hangers & Supports | | | | $0.00 | $0.00 |
| Testing, Adjusting, and Balancing | | | | $0.00 | $0.00 |
| Duct Insulation | | | | $0.00 | $0.00 |
| 1-1/2" blanket mineral fiber | | | | $0.00 | $0.00 |
| Instrumentation and Control for HVAC | | | | $0.00 | $0.00 |
| Metal Ducts | | | | $0.00 | $0.00 |
| Galvanized, MIL90 finish | | | | $0.00 | $0.00 |
| Air Duct Accessories | | | | $0.00 | $0.00 |
| Balancing damper (butterfly) | | | | $0.00 | $0.00 |
| Air Terminal Units | | | | $0.00 | $0.00 |
| Diffusers, Registers, and Grilles | | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| | | | $0.00 | $0.00 |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 |
TOTALS $0.00 $0.00 $0.00 $0.00
| SUB MARKUPS | $0.00 | $0.00 | $0.00 |
| SUMPRODUCT(--($F$14:$F$17="Y"),$H$14:$H$17,I$14:I$17)*SUMMARY!$H$43+SUMPRODUCT(--($F$21:$F$24="Y"),$H$21:$H$24,I$21:I$24)*SUMMARY!$H$43 | | |
&"Arial,Regular"&8&F &"Arial,Regular"&8Page &P of &N &"Arial,Regular"&8Printed &T &D
ELECTRICAL
Date:
| Contractor Pricing Breakdown - Base Bid and Options 1, 2, 3 | |
| Contractor: | | |
| Project: | Keating 2nd Floor US Probation Office Relocation- Construction / 47PC0221R0011 | |
| | Trade: |
| | | DESCRIPTION | SUB | CONTRACT AMOUNT | | | | | | | S/T | | |
| No. | GSA | CSI | | Y/N | UM | QTY | LABOR | MATERIAL | EQUIP | TOTAL | | | | |
| | 26000 | ELECTRICAL | | | | | | ` | | SUB MARKUP | RSMeans Line Number | RSMeans Description | How was quantity determined - notes |
| | | SHELL | | | | | | | | | | | |
| | | | | | | | | | $0.00 | $0.00 | | | |
| | | | | | | | | | $0.00 | $0.00 | | | |
| | | Subtotal | | | | $0.00 | $0.00 | $0.00 | $0 | $0 | | | |
| TENANT IMPROVEMENTS | | | | | | S |
| Second Floor Elecctrical | | | | $0.00 | $0.00 | |
| Low Voltage #12 AWG | | | | $0.00 | $0.00 | |
| Low Voltage #12 AWG for FCUs | | | | $0.00 | $0.00 | |
| Control-Voltage Elec. | | | | $0.00 | $0.00 | |
| Grounding and Bonding | | | | $0.00 | $0.00 | |
| Hangers and Supports | | | | $0.00 | $0.00 | |
| Sleeves and Sleeve Seals | | | | $0.00 | $0.00 | |
| Raceways and Boxes | | | | $0.00 | $0.00 | |
| 3/4" EMT | | | | $0.00 | $0.00 | |
| Misc. fittings and boxes | | | | $0.00 | $0.00 | |
| 3/4" EMT for Data | | | | $0.00 | $0.00 | |
| Lighting Control Devises | | | | $0.00 | $0.00 | |
| Wall Occupancy Sensors | | | | $0.00 | $0.00 | |
| Ceiling Occupancy Sensors | | | | $0.00 | $0.00 | |
| Wire Devices | | | | $0.00 | $0.00 | |
| Three-way Switches | | | | $0.00 | $0.00 | |
| 0-10V Dimmer Switch | | | | $0.00 | $0.00 | |
| Duplex Outlets | | | | $0.00 | $0.00 | |
| Duplex GFCI Outlets | | | | $0.00 | $0.00 | |
| Quadruplex Outlets | | | | $0.00 | $0.00 | |
| Furniture Feeds | | | | $0.00 | $0.00 | |
| Enclosed Switches | | | | $0.00 | $0.00 | |
| Disconnect Switch | | | | $0.00 | $0.00 | |
| LED Interior Lighting | | | | $0.00 | $0.00 | |
| Type C | | | | $0.00 | $0.00 | |
| Type D | | | | $0.00 | $0.00 | |
| Type F | | | | $0.00 | $0.00 | |
| Type G | | | | $0.00 | $0.00 | |
| Type UC | | | | $0.00 | $0.00 | |
| Emergency and Exit Lighting | | | | $0.00 | $0.00 | |
| Type C/EM | | | | $0.00 | $0.00 | |
| Type Exit | | | | $0.00 | $0.00 | |
| | | | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0 | $0 | |
TOTALS $0.00 $0.00 $0.00 $0.00