This is a Consent of Surety to Change Order form used by Hillsborough County, Florida for construction contracts. The document serves as formal acknowledgment and agreement by a surety company to modifications made to an existing contract between the county and a contractor. The form permits the surety to consent to change orders that may increase or decrease the contract amount and/or extend the completion date by a specified number of calendar days. The document requires execution by an authorized representative of the surety company, either as a direct signatory or as an attorney in fact with attached power of attorney documentation. Notarization by a Florida notary public is required, with the notarization occurring either through physical presence or online methods.

The Consent of Surety form establishes that the performance bond and payment bond originally furnished under the contract are adjusted to reflect any modifications in contract amount and time specified within the change order. The document template includes blank fields for the contract title, principal contractor name, surety company name, agent information, change order number, dollar amount of adjustment, calendar days of extension, and execution date. This form is essential for ensuring that surety bonds remain valid and enforceable following any contractual modifications to Hillsborough County construction projects.

View the file

Other files

File Type Posted
21-Subcontractor Letter of Intent Revised (FINAL 05.08.26).pdf PDF
17-Attachment D- PM - PD 1st Fl Project Map 700 E Twiggs St-Google Maps.pdf PDF
7-Change Order Form.pdf.pdf PDF
13-SBE-2 Goal Participation Tutorial.mp4 MP4 file
19-Bid Bond.doc (2).pdf PDF
23-1. IFB-26-00263 Terms and Conditions.pdf PDF
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
18-Agreement - Construction - Stand Alone.docx (2).pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
20-Attachment E- Insurance Requirements.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
15-Attachment B- Plans - PD 1st Fl Security Lobby-Bid Set 10.28.2025.pdf PDF
3-Application for Payment.pdf.pdf PDF
8-Insurance Certificate.doc.doc DOC document
22-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
12-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
25-Performance Bond 07.02.25 (2).pdf PDF
24-Payment Bond 07.02.25 (2).pdf PDF
14-Attachment A- SC - PD 1st Fl Special Conditions.pdf PDF
16-Attachment C- Specs - PD 1st Fl Specifications.pdf PDF
2-Allowance Authorization Release Form.pdf.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
11-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSENT OF SURETY TO CHANGE ORDER

CONTRACT TITLE:

CONTRACTOR (PRINCIPAL):

SURETY:

AGENT:

The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount

(increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .

This Consent is dated this day of , 20 .

SURETY:

BY: (SEAL)

Authorized Signature

-OR-

BY: (SEAL)

As Attorney in Fact (Attach Power of Attorney)

Printed Name

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person)

________________________ for _________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Know OR Produced Identification

Type of Identification Produced __________________

Revised 03.09.2020