16-Attachment C- Specs - PD 1st Fl Specifications.pdf

PDF 13 MB Posted

Attached to
Public Defender First Floor Security Lobby
Solicitation number
IFB-26-00263
Issued by
Hillsborough County, Florida

About this file

This is a specifications document for the Public Defender First Floor Security Lobby project in Hillsborough County, Florida, prepared as part of a capital improvement project (CIP No: C77892000). The project involves construction of approximately 2,910 square feet of interior space at 700 E. Twiggs Street, Tampa, Florida, including expansion of the lobby area, new storefront at the elevator lobby, new offices, security room, and expansion of existing offices with related demolition in the Southeast area of the first floor. The specifications document is organized into two primary divisions: Division 1 covering general requirements such as project management, documentation, quality requirements, and project record documents; and Division 2 addressing selective structure demolition. The document includes detailed sections on submittal procedures, temporary facilities and controls, mobilization, product requirements, contract completion and closeout procedures, and operation and maintenance data. The project includes five additive alternates addressing specific scope items including cabinetry in the entry lobby security area, kitchenette and appliances in Room 118D, specialized cabinetry work, community pantry cabinetry in Lobby 113A, and conveyor belt chute installation with coordination requirements for use agency and county security.

The estimated project cost is $823,000.00, with a goal of 10% participation by Small Business Enterprise (SBE) subcontractors established in connection with this solicitation and its resulting contract. The specifications document references detailed architectural drawings and plans across multiple sheets, including plumbing work, electrical device installation, and LVT flooring specifications, with requirements for maintaining existing data connections in service throughout construction and coordinated scheduling with use agency and county security personnel for sequencing of work activities.

View the file

Other files

File Type Posted
21-Subcontractor Letter of Intent Revised (FINAL 05.08.26).pdf PDF
17-Attachment D- PM - PD 1st Fl Project Map 700 E Twiggs St-Google Maps.pdf PDF
7-Change Order Form.pdf.pdf PDF
13-SBE-2 Goal Participation Tutorial.mp4 MP4 file
19-Bid Bond.doc (2).pdf PDF
23-1. IFB-26-00263 Terms and Conditions.pdf PDF
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
18-Agreement - Construction - Stand Alone.docx (2).pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
20-Attachment E- Insurance Requirements.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
15-Attachment B- Plans - PD 1st Fl Security Lobby-Bid Set 10.28.2025.pdf PDF
3-Application for Payment.pdf.pdf PDF
8-Insurance Certificate.doc.doc DOC document
22-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf PDF
12-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
25-Performance Bond 07.02.25 (2).pdf PDF
24-Payment Bond 07.02.25 (2).pdf PDF
14-Attachment A- SC - PD 1st Fl Special Conditions.pdf PDF
2-Allowance Authorization Release Form.pdf.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
4-Consent of Surety-Change Order.pdf.pdf PDF
11-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

Public Defender

First Floor Security Lobby

DIVISION 1 - GENERAL REQUIREMENTS

011000

012300

012500

013100

013200

013300

014000

014200

015000

015050

016000

017000

017300

017700

017823

017839

Summary

Alternates

Substitution Procedures

Project Management & Coordination

Construction Progress Documentation

Submittal Procedures

Quality Requirements

References

Temporary Facilities & Controls

Mobilization

Product Requirements

Contract Completion, Start-Up, and Closeout

Execution

Closeout Procedures

Operation & Maintenance Data

Project Record Documents

DIVISION 2 - DEMOLITION

024119 Selective Structure Demolition

REMAINING DIVISIONS

See Drawings for Specialized Items and Requirements

4 Pages

2 Pages

3 Pages

7 Pages

6 Pages

8 Pages

7 Pages

3 Pages

5 Pages

2 Pages

4 Pages

4 Pages

6 Pages

5 Pages

5 Pages

3 Pages

5 Pages

Public Defender 1st Floor Security Lobby- CIP No: C77892000

CorderoAn Typewritten text

AAdditive Alternate No. 01: 1st Floor Security Lobby Cabinetry
Base bid: In entry lobby at west location, existing cabinetry at west wall to remain.
Additive Alternate 1: In entry lobby at west wall add to the scope of work new cabinetry
as shown on sheet No. A12.1 section 3.
BAdditive Alternate No. 02: 1st Floor Room 118D
Base bid: Enclose Data with new closet. Move existing data box to the right closer to corner
to fit within new data closet. Data box must remain connected and in service throughout
construction.
Additive Alternate 2: Provide and install kitchenette with cabinetry and appliances. All work
as shown on sheet 9/A12.1 plumbing work shown on P0.1 and P4.1, electrical devices
North Wall see sheet E5.1 and LVT flooring specified.
CAdditive Alternate No.03: 1st floor Room 118D
Base Bid: Enclose Data with new closet. Move existing data box to the right closer to corner
to fit within new data closet. Data box must remain connected and in service throughout
construction.
Additive Alternate 3: Contractor to provide labor and material for the cabinetry in room 118D
as shown on sheet 10/A12.1 and electrical devices on South wall.
DAdditive Alternative No. 04: 1st Floor Lobby 113A
Base bid: No scope for cabinetry for community pantry.
Additive Alternate 4: Contractor to provide and install all labor and material for cabinetry as
shown on sheet 8/A12.1 and new electrical devices on East Wall of Lobby 113A.
EAdditive Alternate No. 05: 1st Floor Lobby Conveyor
Base bid: No scope for conveyor belt . Existing conveyor belt to remain.
Additive Alternate 4: Contractor to provide and install all labor and material for conveyor belt
chute as shown on sheet 1/A12.2 . Coordination with Use Agency and County Security for
scheduling and sequencing.

File details come from the government source that posted it. Updated .