16-Attachment C- Specs - PD 1st Fl Specifications.pdf
PDF 13 MB Posted
- Attached to
- Public Defender First Floor Security Lobby
- Solicitation number
- IFB-26-00263
- Issued by
- Hillsborough County, Florida
About this file
This is a specifications document for the Public Defender First Floor Security Lobby project in Hillsborough County, Florida, prepared as part of a capital improvement project (CIP No: C77892000). The project involves construction of approximately 2,910 square feet of interior space at 700 E. Twiggs Street, Tampa, Florida, including expansion of the lobby area, new storefront at the elevator lobby, new offices, security room, and expansion of existing offices with related demolition in the Southeast area of the first floor. The specifications document is organized into two primary divisions: Division 1 covering general requirements such as project management, documentation, quality requirements, and project record documents; and Division 2 addressing selective structure demolition. The document includes detailed sections on submittal procedures, temporary facilities and controls, mobilization, product requirements, contract completion and closeout procedures, and operation and maintenance data. The project includes five additive alternates addressing specific scope items including cabinetry in the entry lobby security area, kitchenette and appliances in Room 118D, specialized cabinetry work, community pantry cabinetry in Lobby 113A, and conveyor belt chute installation with coordination requirements for use agency and county security.
The estimated project cost is $823,000.00, with a goal of 10% participation by Small Business Enterprise (SBE) subcontractors established in connection with this solicitation and its resulting contract. The specifications document references detailed architectural drawings and plans across multiple sheets, including plumbing work, electrical device installation, and LVT flooring specifications, with requirements for maintaining existing data connections in service throughout construction and coordinated scheduling with use agency and county security personnel for sequencing of work activities.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
Public Defender
First Floor Security Lobby
DIVISION 1 - GENERAL REQUIREMENTS
011000
012300
012500
013100
013200
013300
014000
014200
015000
015050
016000
017000
017300
017700
017823
017839
Summary
Alternates
Substitution Procedures
Project Management & Coordination
Construction Progress Documentation
Submittal Procedures
Quality Requirements
References
Temporary Facilities & Controls
Mobilization
Product Requirements
Contract Completion, Start-Up, and Closeout
Execution
Closeout Procedures
Operation & Maintenance Data
Project Record Documents
DIVISION 2 - DEMOLITION
024119 Selective Structure Demolition
REMAINING DIVISIONS
See Drawings for Specialized Items and Requirements
4 Pages
2 Pages
3 Pages
7 Pages
6 Pages
8 Pages
7 Pages
3 Pages
5 Pages
2 Pages
4 Pages
4 Pages
6 Pages
5 Pages
5 Pages
3 Pages
5 Pages
Public Defender 1st Floor Security Lobby- CIP No: C77892000
CorderoAn Typewritten text
| A | Additive Alternate No. 01: 1st Floor Security Lobby Cabinetry |
| Base bid: In entry lobby at west location, existing cabinetry at west wall to remain. | |
| Additive Alternate 1: In entry lobby at west wall add to the scope of work new cabinetry | |
| as shown on sheet No. A12.1 section 3. |
| B | Additive Alternate No. 02: 1st Floor Room 118D |
| Base bid: Enclose Data with new closet. Move existing data box to the right closer to corner | |
| to fit within new data closet. Data box must remain connected and in service throughout | |
| construction. | |
| Additive Alternate 2: Provide and install kitchenette with cabinetry and appliances. All work | |
| as shown on sheet 9/A12.1 plumbing work shown on P0.1 and P4.1, electrical devices | |
| North Wall see sheet E5.1 and LVT flooring specified. |
| C | Additive Alternate No.03: 1st floor Room 118D |
| Base Bid: Enclose Data with new closet. Move existing data box to the right closer to corner | |
| to fit within new data closet. Data box must remain connected and in service throughout | |
| construction. | |
| Additive Alternate 3: Contractor to provide labor and material for the cabinetry in room 118D | |
| as shown on sheet 10/A12.1 and electrical devices on South wall. |
| D | Additive Alternative No. 04: 1st Floor Lobby 113A |
| Base bid: No scope for cabinetry for community pantry. | |
| Additive Alternate 4: Contractor to provide and install all labor and material for cabinetry as | |
| shown on sheet 8/A12.1 and new electrical devices on East Wall of Lobby 113A. |
| E | Additive Alternate No. 05: 1st Floor Lobby Conveyor |
| Base bid: No scope for conveyor belt . Existing conveyor belt to remain. | |
| Additive Alternate 4: Contractor to provide and install all labor and material for conveyor belt | |
| chute as shown on sheet 1/A12.2 . Coordination with Use Agency and County Security for | |
| scheduling and sequencing. |