22-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf

PDF 99 KB Posted

Attached to
Public Defender First Floor Security Lobby
Solicitation number
IFB-26-00263
Issued by
Hillsborough County, Florida

About this file

This is an SBE-1 Form for the Hillsborough County Small Business Encouragement Program related to a Public Defender First Floor Security Lobby construction project in Tampa, Florida. The project involves construction of approximately 2,910 square feet of interior space at 700 E. Twiggs Street, Tampa, FL 33602, including expansion of the lobby area, new storefront at the elevator lobby, new offices, a security room, and expansion of existing offices with related demolition at the Southeast area of the first floor. The estimated project cost is $823,000.00. Bidders are required to complete this form listing all registered Small Business Enterprise (SBE) subcontractors and material suppliers to be utilized on the project, including business names, scopes of work or work item numbers, and estimated dollar amounts for each item.

The solicitation establishes a 10% SBE participation goal for this contract. All SBEs listed as "registered" must either be registered with Hillsborough County or possess reciprocal eligibility with supporting documentation as specified in the County's solicitation document. Registered SBE material suppliers—defined as firms that furnish supplies but do not manufacture them—receive partial credit at 50% toward the project's SBE participation goal. Bidders must also list any non-SBE subcontractors and material suppliers with their respective scopes of work and estimated dollar amounts. Failure to complete the requirements of this form may result in the entire bid being rejected.

View the file

Other files

File Type Posted
23-1. IFB-26-00263 Terms and Conditions.pdf PDF
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
18-Agreement - Construction - Stand Alone.docx (2).pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
20-Attachment E- Insurance Requirements.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
15-Attachment B- Plans - PD 1st Fl Security Lobby-Bid Set 10.28.2025.pdf PDF
3-Application for Payment.pdf.pdf PDF
8-Insurance Certificate.doc.doc DOC document
12-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
25-Performance Bond 07.02.25 (2).pdf PDF
21-Subcontractor Letter of Intent Revised (FINAL 05.08.26).pdf PDF
17-Attachment D- PM - PD 1st Fl Project Map 700 E Twiggs St-Google Maps.pdf PDF
7-Change Order Form.pdf.pdf PDF
13-SBE-2 Goal Participation Tutorial.mp4 MP4 file
19-Bid Bond.doc (2).pdf PDF
24-Payment Bond 07.02.25 (2).pdf PDF
14-Attachment A- SC - PD 1st Fl Special Conditions.pdf PDF
16-Attachment C- Specs - PD 1st Fl Specifications.pdf PDF
2-Allowance Authorization Release Form.pdf.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
4-Consent of Surety-Change Order.pdf.pdf PDF
11-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBE – 1 FORM

(Revised 12/2025)

HILLSBOROUGH COUNTY

SMALL BUSINESS ENCOURAGEMENT PROGRAM

SUBCONTRACTORS/MATERIAL SUPPLIERS LIST (SBE-1 FORM)

BID NO.: BIDDER NAME:

List all registered Small Business Enterprise (SBE) subcontractors/material suppliers1 to be utilized on this project.

Include business name, scope of work/work item number to be performed, and estimated dollar amount of each item.

If the solicitation is a “Work Order/Term Contract”, the “Estimated Dollar Amount” may be left blank. All SBEs that are listed as “registered” must either be registered with Hillsborough County or have reciprocal eligibility

(provide supporting documentation) as specifically set forth in the County’s solicitation document.

A Bidders failure to complete the requirements of this page may result in their entire Bid being rejected.

Registered SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated

Dollar Amount

1Material Suppliers: Registered SBE firms that furnish supplies for projects, but do not manufacture the supplies, will be partially credited at fifty percent (50%) towards the project’s SBE participation goal.

List all other subcontracted scopes of work or work item numbers to be performed by non-registered SBE subcontractors/material suppliers on this project and estimated dollar amount of each item:

Non-SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated

Dollar Amount

File details come from the government source that posted it. Updated .