36E77619B0003-010.pdf
PDF 16 MB Posted
- Solicitation number
- 36E77619B0003
About this file
36E77619B0003 ATTACHMENT 10 - Drawings 6 of 7.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0023-000.docx | DOCX document | |
| 36E77619B0003-0003002.pdf | ||
| 36E77619B0003-0003003.pdf | ||
| 36E77619B0003-0003004.pdf | ||
| 36E77619B0003-0003005.pdf | ||
| 36E77619B0003-0003000.docx | DOCX document | |
| 36E77619B0003-0003006.pdf | ||
| 36E77619B0003-0003001.pdf | ||
| 36E77619B0003-0002000.docx | DOCX document | |
| 36E77619B0003-0001001.pdf | ||
| 36E77619B0003-0001000.docx | DOCX document | |
| 36E77619B0003-000.docx | DOCX document | |
| 36E77619B0003-013.docx | DOCX document | |
| 36E77619B0003-005.pdf | ||
| 36E77619B0003-012.pdf | ||
| 36E77619B0003-002.pdf | ||
| 36E77619B0003-006.pdf | ||
| 36E77619B0003-009.pdf | ||
| 36E77619B0003-007.pdf | ||
| 36E77619B0003-011.pdf | ||
| 36E77619B0003-001.pdf | ||
| 36E77619B0003-003.pdf | ||
| 36E77619B0003-004.pdf | ||
| 36E77619B0003-008.pdf | ||
| 36E77619B0003.docx | DOCX document |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES:
1. INSTALLATION OF FIRE ALARM SYSTEM SHALL COMPLY WITH VA FIRE PROTECTION DESIGN
MANUAL (2011), NFPA 72 (2013), NFPA 101 (2015), ABA ACCESSIBILITY STANDARD FOR FEDERAL FACILITIES (2006), AND SPECIFICATION SECTION 283100 "FIRE DETECTION AND ALARM". DESIGN
FEATURES NOT ADDRESSED BY NFPA CODES AND STANDARDS OR THE VA FIRE PROTECTION
DESIGN MANUAL SHALL BE DESIGNED TO COMPLY WITH THE 2015 INTERNATIONAL BUILDING
CODE.
2. THE FIRE ALARM SYSTEM SHALL INCLUDE WIRING, CONDUIT, NOTIFICATION DEVICES, DETECTION
DEVICES, POWER SUPPLIES, AND ALL OTHER ACCESSORIES INCLUDING PROGRAMMING AND
SOFTWARE UPDATES REQUIRED FOR A COMPLETE OPERATING SYSTEM DESIGNED AND INSTALLED
IN ACCORDANCE WITH NFPA 72.
3. SEE FLOOR PLAN FOR LOCATION AND NUMBER OF FIRE ALARM INITIATING AND NOTIFICATION
APPLIANCES. ADDITIONAL NOTIFICATION DEVICES MAY BE REQUIRED TO MEET AUDIBILITY
REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR THE DESIGN, LAYOUT, AND COORDINATION
OF FIRE ALARM DEVICES. CONTRACTOR SHALL ALSO INCLUDE THE MATERIAL AND LABOR ASSOCIATED WITH THE INSTALLATION OF THREE ADDITIONAL NOTIFICATION APPLIANCES AT THE REQUEST OF THE
COR DURING TESTING.
4. DRAWINGS ARE SCHEMATIC IN NATURE AND ARE INTENDED TO SPECIFY BASIC DESIGN PARAMETERS.
DRAWINGS SHOW APPROXIMATE LOCATIONS OF DEVICES. FIRE ALARM CONTRACTOR IS RESPONSIBLE
FOR WIRING DIAGRAMS, BATTERY CALCULATIONS, AND VOLTAGE DROP CALCULATIONS.
5. ALL FIRE ALARM WIRING SHALL BE INSTALLED IN EMT SEPARATE FROM ALL OTHER SYSTEMS.
6. FIRESTOP PENETRATIONS THROUGH RATED ASSEMBLIES WITH APPROVED MATERIALS IN ACCORDANCE
WITH ASTM E-814.
7. FURNISH AND INSTALL MONITOR MODULES FOR ANNUNCIATION OF ALL NONADDRESSABLE DEVICES.
8. ALL MANUAL PULL STATIONS SHALL BE MOUNTED WITH OPERABLE PART 48 INCHES ABOVE THE FINISHED
FLOOR.
9. STROBE NOTIFICATION DEVICES SHALL BE PROVIDED IN PUBLIC AND COMMON AREAS SUCH AS RESTROOMS, CORRIDORS, AND SHARED COMMON AREAS.
10. ALL CANDELA SETTINGS FOR VISUAL NOTIFICATION APPLIANCES SHALL BE SET BASED ON SPACING REQUIREMENTS IN NFPA 72. ALL VISUAL NOTIFICATION APPLIANCES WITHIN THE SAME FIELD OF VIEW SHALL BE SYNCHRONIZED. WALL MOUNTED VISUAL NOTIFICATION APPLIANCES SHALL BE MOUNTED 80 INCHES ABOVE
THE FINISHED FLOOR OR 6 INCHES BELOW THE CEILING, WHICHEVER IS LOWER.
11. NOTIFICATION HORNS SHALL BE LOCATED THROUGHOUT THE BUILDING IN ACCORDANCE WITH NFPA 72.
12. FIRE SUPPRESSION CONTRACTOR'S WORK SHALL BEGIN 5 FEET OUTSIDE OF THE BUILDING.
13. NEW FIRE ALARM CONTROL PANEL SHALL BE COMPATIBLE AND BE FULLY INTEGRATABLE WITH THE EXISTING
ALARM NETWORK (SIMPLEX PLATFORM),
FIRE ALARM LEGEND:
MANUAL PULL STATION
FIRE ALARM ANNUCIATOR
WALL-MOUNTED HORN STROBE
WALL-MOUNTED STROBE
WALL-MOUNTED HORN
AREA SMOKE DETECTOR (PHOTOELECTRIC)
DUCT DETECTOR
DOOR HOLD OPEN DEVICE
FIRE ALARM CONTROL PANEL
MONITIOR MODULE
TAMPER SWITCH
FLOW SWITCH
CONTROL MODULE
WEATER PROOF DEVICE
HEAT TRACING CONTROL PANEL
CARBON MONOXIDE DETECTOR
SMOKE DETECTOR WITH SOUNDER BASE,
LOCAL ALARM ONLY
COOKTOP LOCKOUT
F
SD
F
HS L
A F
F
6' -8
"A F
F
6" B
E
LO
W C
E
IL
IN
G
NOTE: WHERE WALL MOUNTED HORN STROBES ARE SHOWN
ADJACENT TO MANUAL PULL STATIONS AT EXITS AND OTHER
LOCATIONS, INSTALL DEVICES STACKED. DEVICES SHOWN SIDE BY
SIDE ON PLANS FOR CLARITY
TYPICAL MOUNTING HEIGHT
SCALE : NONE
REFER TO FLOOR PLANS FOR
ACTUAL NUMBER OF DEVICES
FIRE ALARM RISER DETAIL
SCALE : NONE
PLAN NOTES:
1. FIRE ALARM PANEL 120V BY ELECTRICAL, SEE ELECTRICAL PLANS.
2. FIBER-OPTIC CONNECTION TO CAMPUS NETWORK. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND INSTALLATION NECESSARY TO CONNECT THE NEW FACP TO THE EXISTING NETWORK IN A MANNER THAT DOES NOT COMPROMISE THE DESIGN OR INTEGRITY OF THE EXISTING NETWORK. SEE DRAWING
ES100 FOR DETAILS OF ROUTING TO CONNECT TO THE CAMPUS NETWORK.
3. PROVIDE SURVIVABILITY LEVEL 3 PATHWAYS.
4. INITIATING DEVICE CIRCUITS, SIGNALING LINE CIRCUITS, AND NOTIFICATION APPLIANCE CIRCUITS SHALL
BE WIRED CLASS B PER NFPA 72.
5. HEAT TRACING CONTROL PANEL SHALL BE MONITORED BY FIRE ALARM SYSTEM IN ACCORDANCE WITH MANUFACTURER RECCOMENDATIONS. DRY CONTACT RELAY OUTPUTS PROVIDED FOR LOSS OF POWER, LOW TEMPERATURE, RTD FAILURE, RELAY FAILURE, AND GROUND-FAULT TRIP. PROVIDE ALL RELAYS AND MODULES REQUIRED. CONTRACTOR TO COORDINATE FINAL LOCATION OF HEAT TRACING
PANEL WITH OWNER.
FAA
HS
L
H
DD
DH
FACP
MM
TS
FS
CM
WP
HT
CO
FSD
FAA
HSLH
DDDH
FACP
MM
TSFS
CMCO MM
INPUT DEVICE
OUTPUT
DUCT SMOKE DETECTOR
AREA SMOKE DETECTOR
MANUAL PULL STATION
SPRINKLER WATERFLOW
SPRINKLER TAMPER
OPEN CIRCUIT, GROUND FAULT, NOTIFICATION
APPLIANCE CRCUIT SHORT
T H
R E
E -P
U
LS
E T
E M
P O
R A
L A
LA
R
M T
O N
E A
N D
A C
T
IV
A T
IO
N
O F
S T
R O
B E
S T
H R
O U
G H
O U
T B
U
IL
D
IN
G
S E
N D
A
LA
R M
S
IG
N A
L T
O D
A N
V
IL
LE
V
A P
O
LI
C E
S E
N D
T R
O U
B
LE
S
IG
N A
L T
O D
A N
V
IL
LE
V
A P
O
LI
C E
S E
N D
S U
B E
R V
IS
O
R Y
S
IG
N A
L T
O D
A N
V
IL
LE
V
A P
O
LI
C E
C
LO
S E
D O
O R
S O
N H
O
LD
O P
E N
D E
V
IC
E S
C
LO
S E
D A
M P
E R
S
S H
U T
D O
W N
A
IR
H A
N D
LE
R
S E
R V
E D
B Y
T H
E D
E T
E C
T O
R
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MM
KITCHEN HOOD SUPPRESSION
HT
F O
U R
P U
LS
E
F
IR
E A
LA
R
M T
O N
E T
H R
O U
G H
O U
T B
U
IL
D
IN
G
S E
N D
C O
A
LA
R M
S
IG
N A
L T
O D
A N
V
IL
LE
P
O
LI
C E
CO DETECTOR
HEAT TRACING OFF NORMAL X
X X
SD
L
LO
KITCHEN SMOKE DETECTOR
WET CHEMICAL SYSTEM ACTIVATION
X
X X X
S H
U T
O F
F F
U E
L S
U P
P
LY
D E
-E N
E R
G
IZ
E C
O O
K T
O P
E Q
U
IP
M E
N T
* FIRE ALARM EVACUATION SCHEME SHALL BE COORDINATED WITH
VA FIRE EMERGENCY PLAN AND EXISTING FIRE EVACUATION SCHEME.
th re e-qu ar te rs in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot
B th re e in ch es o ne fo ot
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Osborne
Barisano
Gasser
Daller
Danville, IL
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veteran Affairs
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley
VanderWoude
PLUMBING ENGINEER Daller
CONSTRUCTION DOCUMENTS 06/21/20171
6/
/2
7:
:1
A
M \\U
R S
In di an ap ol is
\ In di an ap ol is
\ P ro je ct s\
\Y dr aw
\Y F ac ili t\P df
\2
5_ 2_
F ire P ro te ct io n R ed lin es \2
0_
V A
_G re en H om es
_2
4_ M
P .r vt
FA001
FIRE ALARM NOTES, LEGEND, DETAILS
JJCMAG2017.06.21
VA Danville - Construct Two Green HomesOne Indiana Square, Suite 2100
Indianapolis, IN 46204 United States
P: 317 532 5400 F: 317 532 5499 www.URScorp.com
URS PROJECT NO. 25628011
550-316
132132 & 133
THERAPY
i116
BEDROOM
i115
BEDROOM
i113
BEDROOM
i112
BEDROOM
i111
BEDROOM
i109
BEDROOM
i108
BEDROOM
i107
BEDROOM
i106
BEDROOM
i105
TOILET
i126
LAUNDRY
i127
OFFICE
i130
SPD
i129
SOILED
i128
PANTRY
i103B
GARAGE
i117
CORRIDOR
i132
VESTIBULE
i101
SCREENED PORCH
i135
STORAGE
i124
UTILITY
i120
STORAGE
i125
BATHROOM
i115C
BATHROOM
i113C
BATHROOM
i112C
BATHROOM
i111C
BATHROOM
i109C
BATHROOM
i107C
BATHROOM
i106C
BATHROOM
i105C
CLOSET
i105B
CLOSET
i106B
CLOSET
i107B
CLOSET
i109B
VESTIBULE
i110
CLOSET
i111B
CLOSET
i112B
CLOSET
i113B
CLOSET
i115B
PATIO
i136
PORCH
CLOSET
i101B
LINEN
i123
BARIATRIC BEDROOM
i114
BATHROOM
i114C
CLOSET
i114B
CLOSET
i133
CORRIDOR
i132
CORRIDOR
i132
CLOSET
i108B
BATHROOM
i108C
ELECTRICAL
i131
KITCHEN
i103
O2 i119
DATA
i121
HSKP
i118
SPA
i122
DINING
i102
GENERAL NOTES:
1. FOR FIRE ALARM GENERAL NOTES, LEGENDS, AND DETAILS SEE
DRAWING FA001.
PLAN NOTES:
1. COORDINATE LOCATION OF DUCT SMOKE DETECTOR WITH MECHANICAL.
2. CONNECT SUPERVISORY AND ALARM SWITCHES FOR FIRE SUPPRESSION
EQUIPMENT TO THE FIRE ALARM SYSTEM. COORDINATE WITH FIRE
SUPPRESSION CONTRACTOR.
3. CONNECT KITCHEN HOOD SUPPRESSION SYSTEM TO FIRE ALARM SYSTEM.
COORDINATE WITH CONTRACTOR FOR KITCHEN HOOD SUPPRESSION SYSTEM.
ACTIVATION OF HOOD SUPPRESSION SYSTEM SHALL DE-ENERGIZE COOKTOP EQUIPMENT.
COORDINATE WITH ELECTRICAL CONTRACTOR.
4. CONNECT FACP TO THE CAMPUS NETWORK WITH FIBER-OPTIC CABLES.
5. TAMPER SWITCH FOR POST INDICATOR VALVE. SEE CIVIL DRAWINGS FOR EXACT LOCATION.
PROVIDE WEATHER TIGHT CONDUIT LISTED FOR DIRECT BURY. COORDINATE WITH CIVIL AND
ELECTRICAL DRAWINGS.
6. CARBON MONOXIDE DETECTOR CONNECTED TO FIRE ALARM SYSTEM. CONTRACTOR SHALL
PROVIDE DETECTOR AND ALL MODULES REQUIRED FOR CONNECTION OF A FULLY FUNCTIONING
FIRE ALARM SYSTEM. ALARM SHALL SOUND TEMPORAL FOUR ALARM SIGNAL.
7. SYSTEM SMOKE DETECTOR SHALL INITIATE LOCAL ALARM ONLY AND SHALL BE LOCATED
20-25 FEET FROM COOKTOP PER NFPA 101.
8. SYSTEM SMOKE DETECTOR SHALL BE LOCATED A MINIMUM 25 FEET FROM COOKTOP.
9. PROVIDE COOKTOP LOCKOUT SWITCH IN ACCORDANCE WITH NFPA 101 IN A LOCATION
APPROVAL BY VA.
F
TS TSTS
FS
F
HS
WP
TS
FH
L
HS
SD
DD
HS
SD
HS
SD
L F A
A
HS WP
HS WP
HS WP
HS WP
HSF
SDSDSD
DH
DH
HS
SD
HSF
SD
DH
DH
HS
HS
HS
MM
L
F
HS
WP
HS
HS
SD
FACP
SD
L
CO
HS
HS
L
HS
L
WP
TS TSTS
FS
SD
L
LO
th re e-qu ar te rs in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot
B th re e in ch es o ne fo ot
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Osborne
Barisano
Gasser
Daller
Danville, IL
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veteran Affairs
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley
VanderWoude
PLUMBING ENGINEER Daller
CONSTRUCTION DOCUMENTS 06/21/20171
6/
/2
:1 3:
A
M \\U
R S
In di an ap ol is
\ In di an ap ol is
\ P ro je ct s\
\Y dr aw
\Y F ac ili t\P df
\2
5_ 2_
F ire P ro te ct io n R ed lin es \2
0_
V A
_G re en H om es
_2
4_ M
P .r vt
FA101
FIRE ALARM PLAN INDEPENDENCE
AuthorChecker2017.06.21
VA Danville - Construct Two Green HomesOne Indiana Square, Suite 2100
Indianapolis, IN 46204 United States
P: 317 532 5400 F: 317 532 5499 www.URScorp.com
URS PROJECT NO. 25628011
550-316
Scale: 1/8" = 1'-0"
1 FA101 - INDPENDENCE
MECH/PLUMBING
EQUIPMENT. SEE MEP
DRAWINGS.
6'
ICE
O.H. O.H. O.H. O.H.
O.H.
O.H.
O.H.
O.H.
DEN
c116
BEDROOM
c115
BEDROOM
c113
BEDROOM
c112
BEDROOM
c111
BEDROOM
c109
BEDROOM
c108
BEDROOM
c107
BEDROOM
c106
BEDROOM
c105
LIVING
c104
DINING
CORRIDOR
VESTIBULE
c101
SCREENED PORCH
STORAGE
c124
STORAGE
c125
BATHROOM
c115C
BATHROOM
c113C
BATHROOM
c112C
BATHROOM
c111C
BATHROOM
c109C
BATHROOM
c107C
BATHROOM
c106C
BATHROOM
c105C
CLOSET
c105B
CLOSET
c106B
CLOSET
c107B
CLOSET
c109B
VESTIBULE
c110
CLOSET
c111B
CLOSET
c112B
CLOSET
c113B
CLOSET
c115B
PATIO
PORCH
CLOSET
c101B
LIVING
c104
LINEN
c123
BARIATRIC BEDROOM
c114
BATHROOM
c114C
CLOSET
c114B
CLOSET
c133
CORRIDOR
CORRIDOR
CLOSET
c108B
BATHROOM
c108C
KITCHEN
c103
ELECTRICAL
c131
PANTRY
c103B
OFFICE
c130
SPD
c129
SOILED
c128
LAUNDRY
c127
TOILET
c126
DATA
c121
HOUSEKEEPING
c118
GARAGE
c117
O2 c119
UTILITY
c120
SPA
c122
TSTS TS
FS
HSF
HS
WP
TS
F H
L
L
HS
SD
DD
HS
SD
HS
SD
L
F A
A
HSWP
HSWP
HSWP
HSWP
HS F
SD SD SD
DH
DH
HS
SD
HS F
SD
DH
DH
HS
HS
HS
MM
L F
HS
WP
HS
HS
SD
CO
L
FACP
SD
WP
HS
HS
L
GENERAL NOTES:
1. FOR FIRE ALARM GENERAL NOTES, LEGENDS, AND DETAILS SEE
DRAWING FA001.
PLAN NOTES:
1. COORDINATE LOCATION OF DUCT SMOKE DETECTOR WITH MECHANICAL.
2. CONNECT SUPERVISORY AND ALARM SWITCHES FOR FIRE SUPPRESSION
EQUIPMENT TO THE FIRE ALARM SYSTEM. COORDINATE WITH FIRE
SUPPRESSION CONTRACTOR.
3. CONNECT KITCHEN HOOD SUPPRESSION SYSTEM TO FIRE ALARM SYSTEM.
COORDINATE WITH CONTRACTOR FOR KITCHEN HOOD SUPPRESSION SYSTEM.
ACTIVATION OF HOOD SUPPRESSION SYSTEM SHALL DE-ENERGIZE COOKTOP
EQUIPMENT. COORDINATE WITH ELECTRICAL CONTRACTOR.
4. CONNECT FACP TO THE CAMPUS NETWORK WITH FIBER-OPTIC CABLES.
5. TAMPER SWITCH FOR POST INDICATOR VALVE. SEE CIVIL DRAWINGS FOR EXACT LOCATION.
PROVIDE WEATHER TIGHT CONDUIT LISTED FOR DIRECT BURY. COORDINATE WITH CIVIL AND
ELECTRICAL DRAWINGS.
6. CARBON MONOXIDE DETECTOR CONNECTED TO FIRE ALARM SYSTEM. CONTRACTOR SHALL
PROVIDE DETECTOR AND ALL MODULES REQUIRED FOR CONNECTION OF A FULLY FUNCTIONING
FIRE ALARM SYSTEM. ALARM SHALL SOUND TEMPORAL FOUR ALARM SIGNAL.
7. SYSTEM SMOKE DETECTOR SHALL INITIATE LOCAL ALARM ONLY AND SHALL BE LOCATED
20-25 FEET FROM COOKTOP PER NFPA 101.
8. SYSTEM SMOKE DETECTOR SHALL BE LOCATED A MINIMUM 25 FEET FROM COOKTOP.
9. PROVIDE COOKTOP LOCKOUT SWITCH IN ACCORDANCE WITH NFPA 101 IN A LOCATION
APPROVAL BY VA.
SD
L
LO
th re e-qu ar te rs in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot
B th re e in ch es o ne fo ot
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Osborne
Barisano
Gasser
Daller
Danville, IL
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veteran Affairs
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley
VanderWoude
PLUMBING ENGINEER Daller
CONSTRUCTION DOCUMENTS 06/21/20171
6/
/2
:1 3:
A
M \\U
R S
In di an ap ol is
\ In di an ap ol is
\ P ro je ct s\
\Y dr aw
\Y F ac ili t\P df
\2
5_ 2_
F ire P ro te ct io n R ed lin es \2
0_
V A
_G re en H om es
_2
4_ M
P .r vt
FA102
FIRE ALARM PLAN COURAGE
AuthorChecker2017.06.21
VA Danville - Construct Two Green HomesOne Indiana Square, Suite 2100
Indianapolis, IN 46204 United States
P: 317 532 5400 F: 317 532 5499 www.URScorp.com
URS PROJECT NO. 25628011
550-316
Scale: 1/8" = 1'-0"
1 FA102 - COURAGE
GENERAL NOTES:
1. INSTALLATION OF THE WET-PIPE SPRINKLER SYSTEM SHALL COMPLY WITH THE VA FIRE PROTECTION DESIGN MANUAL (2011), NFPA 13 (2013), NFPA 101 (2015), ABA ACCESSIBILITY STANDARD FOR FEDERAL FACILITIES (2006), AND SPECIFICATION SECTION 211313 WET-PIPE SPRINKLER SYSTEMS . DESIGN FEATURES NOT ADDRESSED BY NFPA CODES AND STANDARDS OR THE VA FIRE PROTECTION DESIGN MANUAL SHALL BE DESIGNED TO
COMPLY WITH THE 2015 INTERNATIONAL BUILDING CODE.
2. INSTALL A WET-PIPE SPRINKLER SYSTEM FOR THE GREEN HOME. SPRINKLER PIPING 2 INCHES AND SMALLER SHALL BE SCHEDULE 40 BLACK STEEL PIPE. SPRINKLER PIPING 2.5 INCHES AND LARGER SHALL BE SCHEDULE 10
BLACK STEEL PIPE.
3. THE FIRST FLOOR AND THE ATTIC SHALL BE FULLY SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13, INCLUDING COVERED PORCHES AND PATIOS, ALL COMBUSTIBLE CONCEALED SPACES, AND UNDER ALL
OBSTRUCTIONS GREATER THAN 4 FEET WIDE, UNLESS OTHERWISE NOTED.
4. SPRINKLERS SHALL BE PROVIDED IN ELECTRICAL ROOMS IN ACCORDANCE WITH NFPA 13 AND VA STANDARDS. DO NOT ROUTE
PIPING OR INSTALL SPRINKLERS OVER SWITCH GEAR OR OTHER ELECTRICAL EQUIPMENT.
5. ALL SPRINKLERS ARE TO BE QUICK RESPONSE AND FM APPROVED. ALL AREAS ARE TO BE LIGHT HAZARD
COVERAGE UNLESS NOTED OTHERWISE. CONCEALED SPRINKLERS ARE NOT PERMITTED.
6. PENDENT SPRINKLERS SHALL BE LOCATED ON CENTER OF THE CEILING TILE WHERE DROP CEILING IS
PRESENT.
7. PROVIDE AN INSPECTOR'S TEST CONNECTION PAINTED FIRE PROTECTION RED WITH A RESTRICTED ORIFICE EQUAL TO A SINGLE SPRINKLER ORIFICE. TEST CONNECTION SHALL BE AT THE END OF THE MOST DISTANT SPRINKLER PIPE. DO NOT TERMINATE AT SERVICE DRAINS OR SINKS. PROVIDE DRAIN WITH A MINIMUM OF
2" DIAMETER PIPED TO THE EXTERIOR OVER SPLASH BLOCK.
8. PROVIDE A WALL-TYPE FIRE DEPARTMENT CONNECTION. (FDC). FDC SHALL NOT HAVE INTEGRAL CLAPPER VALVES TO ALLOW
FDC TO BE USED FOR BACKFLOW PREVENTER TESTING.
9. PROVIDE A SPRINKLER CABINET WITH SPARE SPRINKLERS IN THE UTILITY ROOM IN ACCORDANCE WITH NFPA 13.
10. ALL FIRE PROTECTION EQUIPMENT, SUCH AS SPRINKLERS, PIPING, VALVES, ESCHUTCHEONS, HANGERS AND
ASSEMBLIES SHALL BE UL LISTED FOR THEIR INTENDED USE.
11. ALL SPRINKLERS AND HANGERS SHALL BE SPACED PER NFPA 13 AND COORDINATED WITH STRUCTURAL PLANS
AND OTHER EQUIPMENT. PROVIDE ADDITIONAL HANGERS AS REQUIRED.
12. SPRINKLER CONTRACTOR IS RESPONSIBLE FOR HYDRAULICALLY CALCULATING THE SPRINKLER SYSTEMS BASED
ON NFPA 13 (2013) REQUIREMENTS.
13. A WATER FLOW TEST MUST BE CONDUCTED NOT MORE THAN 12 MONTHS PRIOR TO WORKING PLAN SUBMITTAL. RECORD RESULTS ON DRAWING, INCLUDING DATE, LOCATION, MAP, PRESSURES, AND FLOWS PER NFPA 13 AND NFPA 291.
14. ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED IN ACCORDANCE WITH NFPA 13 AT NO LESS THAN 200 PSI FOR 2 HOURS OR 50 PSI ABOVE STATIC PRESSURE IN
EXCESS OF 150 PSI FOR 2 HOURS.
15. CONTRACTOR SHALL PROVIDE IDENTIFICATION SIGNS FOR ALL CONTROL VALVES, INSPECTOR'S TEST CONNECTIONS, AND DRAIN VALVES.
16. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS REQUIRED FOR THE WORK. CONTRACTOR SHALL SUBMIT DRAWINGS
TO ENGINEER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION.
17. SPRINKLER CONTRACTOR SHALL COORDINATE AND PROVIDE ALL SLEEVES REQUIRED FOR WALL AND SLAB PENETRATIONS.
FIRESTOP PENETRATIONS THROUGH ALL FIRE RESISTANCE RATED ASSEMBLIES WITH APPROVED MATERIALS IN
ACCORDANCE WITH ASTM E-814.
18. COORDINATE THE LOCATION OF ALL SPRINKLER PIPING WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL
PLANS.
19. CONTROL VALVES SHALL BE SUPERVISED BY THE FIRE ALARM SYSTEM. WATER FLOW DEVICES SHALL BE CONNECTED TO
THE FIRE ALARM SYSTEM. COORDINATE WITH FIRE ALARM CONTRACTOR.
20. DRAWINGS ARE SCHEMATIC IN NATURE AND ARE INTENDED TO SPECIFY BASIC DESIGN PARAMETERS.
21. FIRE SUPPRESSION CONTRACTOR'S WORK SHALL BEGIN 5 FEET OUTSIDE OF THE BUILDING.
22. SPRINKLER SYSTEMS SHALL BE ZONED BY SMOKE ZONE.
23. 2-INCH MAIN DRAIN FOR RISER ASSEMBLIES SHALL BE ROUTED TO EXTERIOR AND DISCHARGE OVER SPLASH BLOCK.
LOCATION TYPE
ATTIC
ROOMS WITH CEILINGS
UPRIGHT OR SPECIAL APPLICATION
SPRINKLER
SEMI-RECESSED PENDENT
RESPONSE
QUICK
QUICK
TEMPERATURE CLASSIFICATION
INTERMEDIATE
ORDINARY
FINISH
BRASS
CHROME
SPRINKLER SCHEDULE
NOTES:
1. PROVIDE TEMPERATURE RATING PER NFPA 13 WHEN LOCATED NEAR HEAT SOURCE
2. SPRINKLER MUST BE FM APPROVED.
DETAIL 1 - INSPECTOR TEST STATION FOR WET PIPE SYSTEM
NOT TO SCALE
DETAIL 2 - WET PIPE SYSTEM RISER DETAIL
NOT TO SCALE
RISER NOTES:
4" UNDERGROUND SUPPLY
FIRE PROTECTION CONTRACTOR WORK STARTS FIVE FEET FROM BUILDING
PIPE TO FIRE DEPARTMENT CONNECTION (FDC). FDC SHALL NOT HAVE INTEGRAL
CLAPPER TO ALLOW FDC TO BE USED FOR BACKFLOW PREVENTER TESTING.
NORAMALLY CLOSED OS&Y VALVE ON BYPASS LINE
OF FIRE DEPARTMENT CHECK VALVE ALLOWS BACKFLOW
PREVENTOR FORWARD FLOW THROUGH FIRE DEPARTMENT
CONNECTION. VALVE SHALL BE SUPERVISED BY FIRE ALARM SYSTEM.
2" MAIN DRAIN
NOT USED
PIPE STAND BOLTED TO FLOOR (TYPICAL)
INCOMING FIRE WATER SHUTOFF VALVE SUPERVISED BY FIRE ALARM SYSTEM.
RISER LEGEND:
DOUBLE CHECK BACK FLOW PERVENTOR ASSEMBLEY
CHECK VALVE
OS&Y CONTROL VALVE WITH TAMPER
FLOW SWITCH
FS
FS
FROM MOST REMOTE SPRINKLER PIPE IN ATTIC
OUTLET SHALL PROVIDE A FLOW EQUIVALENT TO ONE SPRINKLER
TEST VALVE IN ACCESSIBLE LOCATION
SPLASH BLOCK
12"
COVERED PORCH DRY PENDENT OR SIDEWALL QUICK ORDINARY CHROME
FS
th re e-qu ar te rs in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot
B th re e in ch es o ne fo ot
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Osborne
Barisano
Gasser
Daller
Danville, IL
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veteran Affairs
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley
VanderWoude
PLUMBING ENGINEER Daller
CONSTRUCTION DOCUMENTS 06/21/20171
6/
/2
7:
:2
A
M \\U
R S
In di an ap ol is
\ In di an ap ol is
\ P ro je ct s\
\Y dr aw
\Y F ac ili t\P df
\2
5_ 2_
F ire P ro te ct io n R ed lin es \2
0_
V A
_G re en H om es
_2
4_ M
P .r vt
FS001
FIRE SUPPRESSION NOTES, LEGEND, DETAILS
JJCMAG2017.06.21
VA Danville - Construct Two Green HomesOne Indiana Square, Suite 2100
Indianapolis, IN 46204 United States
P: 317 532 5400 F: 317 532 5499 www.URScorp.com
URS PROJECT NO. 25628011
550-316
NOT TO SCALE
1 FS001
N/A132 & 133
30" HIGH
OPEN
BELOW
MICR
IC
E
MECH/PLUMBING
EQUIPMENT. SEE MEP
DRAWINGS.
SHIPS LADDER UP
UP TO ATTIC
THERAPY
i116
BEDROOM
i115
BEDROOM
i113
BEDROOM
i112
BEDROOM
i111
BEDROOM
i109
BEDROOM
i108
BEDROOM
i107
BEDROOM
i106
BEDROOM
i105
TOILET
i126
LAUNDRY
i127
OFFICE
i130
SPD
i129
SOILED
i128
PANTRY
i103B
GARAGE
i117
CORRIDOR
i132
VESTIBULE
i101
SCREENED PORCH
i135
STORAGE
i124
UTILITY
i120
STORAGE
i125
BATHROOM
i115C
BATHROOM
i113C
BATHROOM
i112C
BATHROOM
i111C
BATHROOM
i109C
BATHROOM
i107C
BATHROOM
i106C
BATHROOM
i105C
CLOSET
i105B
CLOSET
i106B
CLOSET
i107B
CLOSET
i109B
VESTIBULE
i110
CLOSET
i111B
CLOSET
i112B
CLOSET
i113B
CLOSET
i115B
PATIO
i136
PORCH
CLOSET
i101B
LINEN
i123
BARIATRIC BEDROOM
i114
BATHROOM
i114C
CLOSET
i114B
CLOSET
i133
CORRIDOR
i132
CORRIDOR
i132
CLOSET
i108B
BATHROOM
i108C
ELECTRICAL
i131
KITCHEN
i103
O2 i119
DATA
i121
HSKP
i118
SPA
i122
DINING
i102
R E
F
DB
OV REF
FD
FD
FD
FD
FD FD
R E
F
D W
FD
GENERAL NOTES:
1. FOR FIRE SUPPRESSION GENERAL NOTES, LEGENDS, AND DETAILS SEE
DRAWING FS001.
PLAN NOTES:
1. WET-TYPE SPRINKLER RISER ASSEMBLY FOR FIRST FLOOR AND ATTIC SPRINKLERS. SEE FS001 FOR RISER DETAIL.
2. SPARE SPRINKLER CABINET.
3. FIRE DEPARTMENT CONNECTION WITH 2 x 2-1/2" CONNECTIONS WITH LOCAL FIRE DEPARTMENT THREADS.
4. NEW DEDICATED 4" FIRE PROTECTION WATER MAIN. SEE PLUMBING DRAWINGS FOR DETAILS. FIRE PROTECTION CONTRACTOR'S
WORK BEGINS 5 FT FROM BUILDING.
5. DO NOT ROUTE PIPING OVER ELECTRICAL EQUIPMENT.
6.WET PIPE SYSTEM INSPECTOR'S TEST STATION LOCATED AT THE END OF THE MOST DISTANT SPRINKLER PIPE IN THE ATTIC. SEE DETAIL ON FS001
7. PIPE UP TO ATTIC.
8. WET CHEMICAL FIRE SUPPRESSION SYSTEM FOR STOVE. WORK PERFORMED BY OTHERS.
9. SPRINKLER LOCATIONS MUST COMPLY WITH THE SPRINKLER OBSTRUCTION REQUIERMENTS OF NFPA 13 FOR AREAS WITH FIXED RAILS FOR THE PATIENT LIFTING SYSTEM. TYPICAL FOR ALL BEDROOMS AND BATHROOMS.
10. PROVIDE DRY BARREL SIDEWALL SPRINKLERS FOR UNHEATED AREA.
11. PROVIDE A LISTED HEAT-TRACING SYSTEM TO PROTECT SPRINKLER PIPE IN UNHEATED AREA WHERE COVERAGE CANNOT BE ACHIEVED BY DRY
BARREL SIDEWALL SPRINKLERS.
FIRE SUPPRESSION DESIGN CRITERIA
FIRST FLOOR: LIGHT HAZARD UNLESS NOTED OTHERWISE . (0.1 GPM OVER 1,950 SF, MAX COVERAGE 225 SF, MAX SPACING 15 FT, HOSE STREAM 100 GPM).
ORDINARY HAZARD GROUP 1 (0.15 GPM OVER 1.950 SF, MAX COVERAGE 130 SF, MAX SPACING 15 FT, HOSE STREAM 250 GPM).
ORDINARY HAZARD GROUP 2 (0.2 GPM OVER 1.950 SF, MAX COVERAGE 130 SF, MAX SPACING 15 FT, HOSE STREAM 250 GPM).2
FULLY SPRINKLERED FIRST FLOOR
TYPICAL
th re e-qu ar te rs in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot
B th re e in ch es o ne fo ot
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Osborne
Barisano
Gasser
Daller
Danville, IL
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veteran Affairs
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley
VanderWoude
PLUMBING ENGINEER Daller
CONSTRUCTION DOCUMENTS 06/21/20171
6/
/2
7:
:2
A
M \\U
R S
In di an ap ol is
\ In di an ap ol is
\ P ro je ct s\
\Y dr aw
\Y F ac ili t\P df
\2
5_ 2_
F ire P ro te ct io n R ed lin es \2
0_
V A
_G re en H om es
_2
4_ M
P .r vt
FS101
FIRE SUPPRESSION PLAN - INDEPENDENCE
AuthorChecker2017.06.21
VA Danville - Construct Two Green HomesOne Indiana Square, Suite 2100
Indianapolis, IN 46204 United States
P: 317 532 5400 F: 317 532 5499 www.URScorp.com
URS PROJECT NO. 25628011
550-316
Scale: 1/8" = 1'-0"
1 FS101 - INDEPENDENCE
ATTIC
GENERAL NOTES:
1. FOR FIRE SUPPRESSION GENERAL NOTES, LEGENDS, AND DETAILS SEE DRAWING FS001
PLAN NOTES:
1. 4" PIPE FROM RISER IN UTILITY ROOM TO ATTIC AND FIRST FLOOR SPRINKLERS.
2. ROUTE FROM END OF THE MOST DISTANT SPRINKLER PIPE IN THE ATTIC TO
THE INSPECTOR'S TEST CONNECTION.
FULLY SPRINKLED ATTIC2
th re e-qu ar te rs in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot
B th re e in ch es o ne fo ot
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Osborne
Barisano
Gasser
Daller
Danville, IL
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veteran Affairs
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley
VanderWoude
PLUMBING ENGINEER Daller
CONSTRUCTION DOCUMENTS 06/21/20171
6/
/2
7:
:2
A
M \\U
R S
In di an ap ol is
\ In di an ap ol is
\ P ro je ct s\
\Y dr aw
\Y F ac ili t\P df
\2
5_ 2_
F ire P ro te ct io n R ed lin es \2
0_
V A
_G re en H om es
_2
4_ M
P .r vt
FS102
FIRE SUPPRESSION PLAN - ATTIC -
INDEPENDENCE
AuthorChecker2017.06.21
VA Danville - Construct Two Green HomesOne Indiana Square, Suite 2100
Indianapolis, IN 46204 United States
P: 317 532 5400 F: 317 532 5499 www.URScorp.com
URS PROJECT NO. 25628011
550-316
Scale: 1/8" = 1'-0"
1 FS102 - INDEPENDENCE
DEN
c116
BEDROOM
c115
BEDROOM
c113
BEDROOM
c112
BEDROOM
c111
BEDROOM
c109
BEDROOM
c108
BEDROOM
c107
BEDROOM
c106
BEDROOM
c105
LIVING
c104
DINING
CORRIDOR
VESTIBULE
c101
SCREENED PORCH
STORAGE
c124
STORAGE
c125
BATHROOM
c115C
BATHROOM
c113C
BATHROOM
c112C
BATHROOM
c111C
BATHROOM
c109C
BATHROOM
c107C
BATHROOM
c106C
BATHROOM
c105C
CLOSET
c105B
CLOSET
c106B
CLOSET
c107B
CLOSET
c109B
VESTIBULE
c110
CLOSET
c111B
CLOSET
c112B
CLOSET
c113B
CLOSET
c115B
PATIO
PORCH
CLOSET
c101B
LIVING
c104
LINEN
c123
BARIATRIC BEDROOM
c114
BATHROOM
c114C
CLOSET
c114B
CLOSET
c133
CORRIDOR
CORRIDOR
CLOSET
c108B
BATHROOM
c108C
KITCHEN
c103
ELECTRICAL
c131
PANTRY
c103B
OFFICE
c130
SPD
c129
SOILED
c128
LAUNDRY
c127
TOILET
c126
DATA
c121
HOUSEKEEPING
c118
GARAGE
c117
O2 c119
UTILITY
c120
SPA
c122
FULLY SPRINKLERED FIRST FLOOR
TYPICAL
GENERAL NOTES:
1. FOR FIRE SUPPRESSION GENERAL NOTES, LEGENDS, AND DETAILS SEE
DRAWING FS001.
PLAN NOTES:
1. WET-TYPE SPRINKLER RISER ASSEMBLY FOR FIRST FLOOR AND ATTIC SPRINKLERS. SEE FS001 FOR RISER DETAIL.
2. SPARE SPRINKLER CABINET.
3. FIRE DEPARTMENT CONNECTION WITH 2 x 2-1/2" CONNECTIONS WITH LOCAL FIRE DEPARTMENT THREADS.
4. NEW DEDICATED 4" FIRE PROTECTION WATER MAIN. SEE PLUMBING DRAWINGS FOR DETAILS. FIRE PROTECTION CONTRACTOR'S
WORK BEGINS 5 FT FROM BUILDING.
5. DO NOT ROUTE PIPING OVER ELECTRICAL EQUIPMENT.
6. WET PIPE SYSTEM INSPECTOR'S TEST STATION LOCATED AT THE END OF THE MOST DISTANT SPRINKLER PIPE IN THE ATTIC. SEE DETAIL ON FS001
7. PIPE UP TO ATTIC.
8. WET CHEMICAL FIRE SUPPRESSION SYSTEM FOR STOVE. WORK PERFORMED BY OTHERS.
9. SPRINKLER LOCATIONS MUST COMPLY WITH THE SPRINKLER OBSTRUCTION REQUIERMENTS OF NFPA 13 FOR AREAS WITH FIXED RAILS FOR THE PATIENT LIFTING SYSTEM. TYPICAL FOR ALL BEDROOMS AND BATHROOMS.
10. PROVIDE DRY BARREL SIDEWALL SPRINKLERS FOR UNHEATED AREA.
11. PROVIDE A LISTED HEAT-TRACING SYSTEM TO PROTECT SPRINKLER PIPE IN UNHEATED AREA WHERE COVERAGE CANNOT BE ACHIEVED BY DRY
BARREL SIDEWALL SPRINKLER.
FIRE SUPPRESSION DESIGN CRITERIA
FIRST FLOOR: LIGHT HAZARD UNLESS NOTED OTHERWISE . (0.1 GPM OVER 1,950 SF, MAX COVERAGE 225 SF, MAX SPACING 15 FT, HOSE STREAM 100 GPM).
ORDINARY HAZARD GROUP 1 (0.15 GPM OVER 1.950 SF, MAX COVERAGE 130 SF, MAX SPACING 15 FT, HOSE STREAM 250 GPM).
ORDINARY HAZARD GROUP 2 (0.2 GPM OVER 1.950 SF, MAX COVERAGE 130 SF, MAX SPACING 15 FT, HOSE STREAM 250 GPM).2 th re e-qu ar te rs in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot
B th re e in ch es o ne fo ot
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Osborne
Barisano
Gasser
Daller
Danville, IL
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veteran Affairs
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley
VanderWoude
PLUMBING ENGINEER Daller
CONSTRUCTION DOCUMENTS 06/21/20171
6/
/2
7:
:2
A
M \\U
R S
In di an ap ol is
\ In di an ap ol is
\ P ro je ct s\
\Y dr aw
\Y F ac ili t\P df
\2
5_ 2_
F ire P ro te ct io n R ed lin es \2
0_
V A
_G re en H om es
_2
4_ M
P .r vt
FS103
FIRE SUPPRESSION PLAN - COURAGE
AuthorChecker2017.06.21
VA Danville - Construct Two Green HomesOne Indiana Square, Suite 2100
Indianapolis, IN 46204 United States
P: 317 532 5400 F: 317 532 5499 www.URScorp.com
URS PROJECT NO. 25628011
550-316
Scale: 1/8" = 1'-0"
1 FS103 - COURAGE
ATTIC
FULLY SPRINKLED ATTIC
GENERAL NOTES:
1. FOR FIRE SUPPRESSION GENERAL NOTES, LEGENDS, AND DETAILS SEE DRAWING FS001
PLAN NOTES:
1. 4" PIPE FROM RISER IN UTILITY ROOM TO ATTIC AND FIRST FLOOR SPRINKLERS.
2. ROUTE FROM END OF THE MOST DISTANT SPRINKLER PIPE IN THE ATTIC TO
THE INSPECTOR'S TEST CONNECTION.
th re e-qu ar te rs in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch o ne fo ot
B th re e in ch es o ne fo ot
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Osborne
Barisano
Gasser
Daller
Danville, IL
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veteran Affairs
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley
VanderWoude
PLUMBING ENGINEER Daller
CONSTRUCTION DOCUMENTS 06/21/20171
6/
/2
7:
:2
A
M \\U
R S
In di an ap ol is
\ In di an ap ol is
\ P ro je ct s\
\Y dr aw
\Y F ac ili t\P df
\2
5_ 2_
F ire P ro te ct io n R ed lin es \2
0_
V A
_G re en H om es
_2
4_ M
P .r vt
FS104
FIRE SUPPRESSION PLAN - ATTIC - COURAGE
FTAMV2017.06.21
VA Danville - Construct Two Green HomesOne Indiana Square, Suite 2100
Indianapolis, IN 46204 United States
P: 317 532 5400 F: 317 532 5499 www.URScorp.com
URS PROJECT NO. 25628011
550-316
Scale: 1/8" = 1'-0"
1 FS104 - COURAGE
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
CONSTRUCTION DOCUMENTS 06/21/20171
SJDTG
132 & 133
ELECTRICAL LEGENDS
AND GENERAL NOTES
E001
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
CONSTRUCTION DOCUMENTS 06/21/20171
DEGSJD
132 & 133
ELECTRICAL SITE PLAN
ES100
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
CONSTRUCTION DOCUMENTS 06/21/20171
DEGSJD
132 & 133
ELECTRICAL SITE PLAN
ES101
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
CONSTRUCTION DOCUMENTS 06/21/20171
SJDBGF
BLDG 132 INDEPENDENCE
FIRST FLOOR PLAN - LIGHTING
EL101
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
CONSTRUCTION DOCUMENTS 06/21/20171
SJDBGF
BLDG 132 INDEPENDENCE
ATTIC PLAN - LIGHTING AND POWER
EP102
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
CONSTRUCTION DOCUMENTS 06/21/20171
SJDBGF
BLDG 133 INDEPENDENCE
FIRST FLOOR PLAN - LIGHTING
EL201
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
CONSTRUCTION DOCUMENTS 06/21/20171
SJDBGF
BLDG 133 COURAGE
ATTIC PLAN - LIGHTING AND POWER
EP202
SJDTG
132 & 133
ELECTRICAL
ONE-LINE DIAGRAM
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
CONSTRUCTION DOCUMENTS 06/21/20171
E301
BLDG 132 INDEPENDENCE
PANEL SCHEDULES
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
E401
LIGHTING FIXTURE LEGEND
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
E403
MAJOR GROUNDING
ELECTRODE SYSTEM SCHEMATIC
GROUNDING BAR DETAIL (MTGB, TGB)
POWER MANHOLE DETAILS
DUCT BANK DETAILS
MANHOLE GROUNDING DETAILS
TRANSFORMER GROUNDING PLAN (TYP.)
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
B
A
C
D
E
F
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
CONSTRUCTION DOCUMENTS 06/21/20171
HAND HOLE DETAILS
GENERATOR GROUNDING PLAN (TYP.)
GENERATOR PAD DETAIL
SJDTG
132 & 133
ELECTRICAL DETAILS
E501
TRANSFORMER PAD DETAIL
ELECTRICAL DETAILS
thr ee
-q ua rte rs inc h = on e f oo t on e-qu ar ter in ch on e f oo t on e-eig hth in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc h = on e f oo t
B thr ee in ch es on e f oo t
SCALE
PROJECT PRINCIPAL
PROJECT ARCHITECT
ELECTRICAL ENGINEER
PROJECT MANAGER
MECHANICAL ENGINEER
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
Robinson
Robinson Fischer
Gobreski Daller
Drawing Title
Approved:
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
550-316
LANDSCAPE ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
Cyr
Meneley VanderWoude
PLUMBING ENGINEER Daller
VA DANVILLE - CONSTRUCT TWO
GREEN HOMES
E502
File details come from the government source that posted it.