36E77619B0003-003.pdf

PDF 4 MB Posted

Attached to
Construct Two New Green Homes 5 & 6 Minor - Danville VAMC
Solicitation number
36E77619B0003
Issued by

About this file

36E77619B0003 ATTACHMENT 3 - Specifications Volume 2 of 3.pdf

View the file

Other files

File Type Posted
36E77619C0023-000.docx DOCX document
36E77619B0003-0003002.pdf PDF
36E77619B0003-0003003.pdf PDF
36E77619B0003-0003004.pdf PDF
36E77619B0003-0003005.pdf PDF
36E77619B0003-0003000.docx DOCX document
36E77619B0003-0003006.pdf PDF
36E77619B0003-0003001.pdf PDF
36E77619B0003-0002000.docx DOCX document
36E77619B0003-0001001.pdf PDF
36E77619B0003-0001000.docx DOCX document
36E77619B0003-000.docx DOCX document
36E77619B0003-013.docx DOCX document
36E77619B0003-005.pdf PDF
36E77619B0003-012.pdf PDF
36E77619B0003-002.pdf PDF
36E77619B0003-006.pdf PDF
36E77619B0003-009.pdf PDF
36E77619B0003-007.pdf PDF
36E77619B0003-011.pdf PDF
36E77619B0003-001.pdf PDF
36E77619B0003-010.pdf PDF
36E77619B0003-004.pdf PDF
36E77619B0003-008.pdf PDF
36E77619B0003.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCT TWO GREEN HOMES

PROJECT 550-316

DEPARTMENT OF VETERANS AFFAIRS

Construction Documents June 21, 2017

Project Manual 100% Bid Documents

Volume 2

Construct Two Green Homes - Project No. 550-316 00 01 10

Department of Veterans Affairs Table of Contents

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

VOLUME ONE

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 10 Table of Contents 12-04

00 01 15 List of Drawing Sheets 09-11

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 10-14

01 12 16 Work Schedules 01-11

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 04-13

01 33 23 Shop Drawings, Product Data, and Samples 03-12

01 33 24 Electronic Submittal Procedures 05/16

01 35 26 Safety Requirements 05-16

01 42 19 Reference Standards 09-11

01 45 29 Testing Laboratory Services 07-13

01 57 19 Temporary Environmental Controls 01-11

01 74 19 Construction Waste Management 09-13

01 81 13 Sustainable Design Requirements 09-15

01 91 00 General Commissioning Requirements 06-13

01 92 00 Stormwater Data

Storm Water Management Report

DIVISION 02 – EXISTING CONDITIONS

02 21 00 Site Surveys 05-13

02 41 00 Demolition 05-13

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 10-14

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 09-11

04 05 16 Masonry Grouting 09-11

04 20 00 Unit Masonry 05-12

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-12

05 36 00 Composite Metal Decking 07-11

05 50 00 Metal Fabrications 07-14

05 51 00 Metal Stairs 09-11

00 01 10-2

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 09-11

06 16 63 Cementitious Sheathing 05-12

06 17 53 Shop- Fabricated Wood Trusses 10-15

06 20 00 Finish Carpentry 06-13

06 65 00 Polymer Countertops 12-15

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 Bituminous Damproofing 10-11

07 13 00 Sheet Waterproofing 04-13

07 21 13 Thermal Insulation 06-12

07 24 00 Adhered Masonry Systems 10-11

07 31 13 Asphalt Shingles 05-12

07 46 43 Fiber-Reinforced Cementitious Siding

07 60 00 Flashing and Sheet Metal 07-14

07 84 00 Firestopping 10-11

07 92 00 Joint Sealants 12-11

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-13

08 14 00 Interior Wood Doors 10-12

08 31 13 Access Doors and Frames 10-11

08 36 13 Sectional Doors 10-11

08 52 15 Aluminum Clad Wood Windows 10-15

08 71 00 Door Hardware 11-14

08 71 13 Automatic Door Operators 12-13

08 80 00 Glazing 05-14

08 90 00 Louvers and Vents 10-11

DIVISION 09 – FINISHES

09 06 00 Schedule For Finishes 07-13

09 29 00 Gypsum Board 11-14

09 30 13 Ceramic/Porcelain Tiling 11-14

09 51 00 Acoustical Ceilings 12-13

09 65 13 Resilient Base and Accessories 10-11

09 65 16 Resilient Sheet Flooring 07-13

09 65 19 Resilient Tile Flooring 03-11

09 68 00 Carpeting 10-11

09 72 16 Vinyl-Coated Fabric Wall Covering 10-15

09 91 00 Painting 07-13

DIVISION 10 – SPECIALTIES

10 21 23 Cubicle Curtain Tracks 11-11

10 26 00 Wall and Door Protection 01-11

10 28 00 Toilet, Bath, and Laundry Accessories 11-11

00 01 10-3

10 30 90 Electric Fireplaces 12-15

10 44 13 Fire Extinguisher Cabinets 08-14

DIVISION 11 – EQUIPMENT

11 73 00 Ceiling Mounted Patient Lift System 09-14

11 79 13 Hydrotherapy Equipment 11-11

DIVISION 12 – FURNISHINGS

12 22 16 Drapery Track and Accessories 11-11

12 24 00 Window Shades 11-11

12 32 00 Manufactured Wood Casework 11-11

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

VOLUME TWO

DIVISION 21- FIRE SUPPRESSION

21 05 11 Common Work Results for Fire Suppression 11-09

21 08 00 Commissioning of Fire Suppression System 06-13

21 13 13 Wet-Pipe Sprinkler Systems 05-08

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-14

22 05 23 General-Duty Valves for Plumbing Piping 07-14

22 07 11 Plumbing Insulation 05-11

22 08 00 Commissioning of Plumbing Systems 06-13

22 11 00 Facility Water Distribution 01-14

22 11 23 Domestic Water Pumps 01-14

22 13 00 Facility Sanitary and Vent Piping 07-14

22 13 23 Sanitary Waste Interceptors 07-14

22 31 11 Water Softeners 01-14

22 34 00 Fuel-Fired Domestic Water Heaters 07-14

22 40 00 Plumbing Fixtures 01-14

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 11-10

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

11-10

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

11-10

23 05 93 Testing, Adjusting, and Balancing for HVAC 05-11

23 07 11 HVAC and Boiler Plant Insulation 05-11

23 08 00 Commissioning of HVAC Systems 06-13

23 09 23 Direct-Digital Control System for HVAC 09-11

00 01 10-4

23 11 23 Facility Natural-Gas Piping 05-11

23 23 00 Refrigerant Piping 02-10

23 31 00 HVAC Ducts and Casings 03-13

23 34 00 HVAC Fans 11-09

23 37 00 Air Outlets and Inlets 11-09

23 38 13 Commercial-Kitchen Hoods 01-11

23 40 00 HVAC Air Cleaning Devices 02-12

23 70 00 Variable Refrigerant Flow System 12-15

23 72 00 Air-to-Air Energy Recovery Equipment 05-11

23 73 00 Indoor Central-Station Air-Handling Units 04-11

23 82 00 Convection Heating and Cooling Units 04-11

23 82 16 Air Coils 04-11

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 12-12

26 05 13 Medium-Voltage Cables 12-12

26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13

26 05 26 Grounding and Bonding for Electrical Systems 12-12

26 05 33 Raceways and Boxes for Electrical Systems 05-14

26 05 41 Underground Electrical Construction 12-12

26 05 73 Overcurrent Protective Device Coordination Study 12-12

26 08 00 Commissioning of Electrical Systems 06-13

26 09 23 Lighting Controls 05-14

26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 12-12

26 24 16 Panelboards 05-14

26 27 26 Wiring Devices 08-14

26 29 11 Motor Controllers 08-14

26 29 21 Enclosed Switches and Circuit Breakers 12-12

26 32 13 Engine Generators 12-12

26 33 53 Static Uninterruptible Power Supply 12-12

26 36 23 Automatic Transfer Switches 12-12

26 41 00 Facility Lightning Protection 12-12

26 43 13 Surge Protective Devices 12-12

26 51 00 Interior Lighting 08-14

26 56 00 Exterior Lighting 05-14

VOLUME THREE

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 05-10

27 05 26 Grounding and Bonding for Communications Systems 05-10

27 05 33 Raceways and Boxes for Communications Systems 05-10

27 08 00 Commissioning of Communications Systems 06-13

27 10 00 Structured Cabling 12-05

27 11 00 Communications Equipment Room Fittings 06-13

27 15 00 Communications Horizontal Cabling 06-13

27 41 31 Master Antenna Television Equipment and Systems 06-13

27 52 23 Nurse Call and Code Blue Systems 06-13

27 52 31 Security Emergency Call, Duress Alarm, and

Telecommunications

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

00 01 10-5

28 05 00 Common Work Results for Electronic Safety and Security 09-11

28 05 13 Conductors and Cables for Electronic Safety and

Security

09-11

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 06-13

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection And Alarm 07-13

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 10-12

31 23 19 Dewatering 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 05-13

32 12 16 Asphalt Paving 10-09

32 17 23 Pavement Markings 04-10

32 31 19 Decorative Metal Fences and Gates 11-16

32 90 00 Planting 10-11

DIVISION 33 – UTILITIES

33 10 00 Water Utilities 01-14

33 30 00 Sanitary Sewer Utilities 06-13

33 40 00 Storm Sewer Utilities 10-11

33 51 00 Natural-Gas Distribution 10-11

Construct Two Green Homes – Project 550-316 21 05 11

Department of Veterans Affairs Common Work Results for Fire Suppression

21 11 00 - 1

SECTION 21 05 11

COMMON WORK RESULTS FOR FIRE SUPPRESSION

PART 1 - GENERAL

1.1 DESCRIPTION

A. The requirements of this Section apply to all sections of Division 21.

B. Definitions:

1. Exposed: Piping and equipment exposed to view in finished rooms.

2. Option or optional: Contractor's choice of an alternate material or method.

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS.

B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

C. Excavation and Backfill: Section 31 20 00, EARTH MOVING.

D. Concrete and Grout: Section 03 30 00, CAST-IN-PLACE CONCRETE.

E. Section 07 84 00, FIRESTOPPING.

F. Section 07 92 00, JOINT SEALANTS.

G. Section 09 91 00, PAINTING.

H. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

1.3 QUALITY ASSURANCE

A. Products Criteria:

1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products for at least 3 years. See other specification sections for any exceptions.

2. Equipment Service: Products shall be supported by a service organization which maintains a complete inventory of repair parts and is located reasonably close to the site.

3. Multiple Units: When two or more units of materials or equipment of the same type or class are required, these units shall be products of one manufacturer.

4. Assembled Units: Manufacturers of equipment assemblies, which use components made by others, assume complete responsibility for the final assembled product.

5. Nameplates: Nameplate bearing manufacturer's name or identifiable trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast integrally with equipment, stamped or otherwise permanently marked on each item of equipment.

21 11 00 - 2

6. Asbestos products or equipment or materials containing asbestos shall not be used.

B. Manufacturer's Recommendations: Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the COR prior to installation. Installation of the item shall not be allowed to proceed until the recommendations are received. Failure to furnish these recommendations can be cause for rejection of the material.

C. Guaranty: In GENERAL CONDITIONS.

D. Supports for sprinkler piping shall be in conformance with NFPA 13.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Manufacturer's Literature and Data: Submit under the pertinent section rather than under this section.

1. Equipment and materials identification.

2. Fire-stopping materials.

3. Hangers, inserts, supports and bracing. Provide load calculations for variable spring and constant support hangers.

4. Wall, floor, and ceiling plates.

C. Coordination Drawings: Provide detailed layout drawings of all piping systems. Provide details of the following.

1. Mechanical and equipment rooms.

2. Attic space.

3. Hangers, inserts, supports, and bracing.

4. Pipe sleeves.

5. Equipment penetrations of floors, walls, ceilings, or roofs.

D. Maintenance Data and Operating Instructions:

1. Maintenance and operating manuals in accordance with Section 01 00

00, GENERAL REQUIREMENTS, Article, INSTRUCTIONS, for systems and equipment.

2. Provide a listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment. Include in the listing belts for equipment.

1.5 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

21 11 00 - 3

B. American Society for Testing and Materials (ASTM):

A36/A36M-2001...........Carbon Structural Steel

A575-96.................Steel Bars, Carbon, Merchant Quality, M-Grades R

(2002)

E84-2003................Standard Test Method for Burning Characteristics of Building Materials

E119-2000...............Standard Test Method for Fire Tests of Building

Construction and Materials

C. National Fire Protection Association (NFPA):

13-2013.................Installation of Sprinkler Systems

25-2014.................Inspection, Testing, and Maintenance of Water-

Based Fire Protection Systems

72-2013.................National Fire Alarm and Signaling Code

99-2015.................Health Care Facilities Code

101-2015................Life Safety Code

170-2015................Fire Safety Symbols

PART 2 - PRODUCTS

2.1 LIFTING ATTACHMENTS

Provide equipment with suitable lifting attachments to enable equipment to be lifted in its normal position. Lifting attachments shall withstand any handling conditions that might be encountered, without bending or distortion of shape, such as rapid lowering and braking of load.

2.2 EQUIPMENT AND MATERIALS IDENTIFICATION

A. Use symbols, nomenclature and equipment numbers specified, shown on the drawings and shown in the maintenance manuals. Identification for piping is specified in Section 09 91 00, PAINTING.

B. Valve Tags and Lists:

1. Valve tags: Engraved black filled numbers and letters not less than

13 mm (1/2-inch) high for number designation, and not less than 6.4 mm(1/4-inch) for service designation on 19 gage 38 mm (1-1/2 inches) round brass disc, attached with brass "S" hook or brass chain.

2. Valve lists: Typed or printed plastic coated card(s), sized 216 mm

(8-1/2 inches) by 280 mm (11 inches) showing tag number, valve function and area of control, for each service or system. Punch sheets for a 3-ring notebook.

3. Provide detailed plan for each floor of the building indicating the location and valve number for each valve. Identify location of each valve with a color coded thumb tack in ceiling.

21 11 00 - 4

2.3 FIRESTOPPING

Section 07 84 00, FIRESTOPPING specifies an effective barrier against the spread of fire, smoke and gases where penetrations occur for piping.

2.4 PIPE PENETRATIONS

A. Install sleeves during construction for other than blocked out floor openings for risers.

B. To prevent accidental liquid spills from passing to a lower level, provide the following:

1. For sleeves: Extend sleeve 25 mm (one inch) above finished floor and provide sealant for watertight joint.

2. For blocked out floor openings: Provide 40 mm (1-1/2 inch) angle set in silicone adhesive around opening.

3. For drilled penetrations: Provide 40 mm (1-1/2 inch) angle ring or square set in silicone adhesive around penetration.

C. Penetrations are not allowed through beams or ribs, but shall be installed in concrete beam flanges. Any deviation from this requirement shall receive prior approval of COR.

D. Sheet Metal, Plastic, or Moisture-resistant Fiber Sleeves: Provide for pipe passing through floors, interior walls, and partitions, unless brass or steel pipe sleeves are specifically called for below.

E. Sleeve Clearance: Sleeve through floors, walls, partitions, and beam flanges shall be one inch greater in diameter than external diameter of pipe. Sleeve for pipe with insulation shall be large enough to accommodate the insulation. Interior openings shall be caulked tight with fire stopping material and sealant to prevent the spread of fire, smoke, and gases.

F. Sealant and Adhesives: Shall be as specified in Section 07 92 00, JOINT

SEALANTS.

2.5 TOOLS AND LUBRICANTS

A. Furnish, and turn over to the COR, special tools not readily available commercially, that are required for disassembly or adjustment of equipment and machinery furnished.

B. Grease Guns with Attachments for Applicable Fittings: One for each type of grease required for each motor or other equipment.

C. Lubricants: A minimum of 0.95 L (one quart) of oil, and 0.45 kg (one pound) of grease, of equipment manufacturer's recommended grade and type, in unopened containers and properly identified as to use for each different application.

21 11 00 - 5

PART 3 - EXECUTION

3.1 INSTALLATION

A. Coordinate location of piping, sleeves, inserts, hangers, and equipment.

Locate piping, sleeves, inserts, hangers, and equipment clear of windows, doors, openings, light outlets, and other services and utilities. Follow manufacturer's published recommendations for installation methods not otherwise specified.

B. Protection and Cleaning:

1. Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations and as approved by the COR. Damaged or defective items in the opinion of the COR, shall be replaced.

2. Protect all finished parts of equipment, such as shafts and bearings where accessible, from rust prior to operation by means of protective grease coating and wrapping. Close pipe openings with caps or plugs during installation. Tightly cover and protect equipment against dirt, water chemical, or mechanical injury. At completion of all work thoroughly exposed materials and equipment.

C. Install gages, valves, and other devices with due regard for ease in reading or operating and maintaining said devices. Locate and position gages to be easily read by operator or staff standing on floor or walkway provided. Servicing shall not require dismantling adjacent equipment or pipe work.

D. Inaccessible Equipment:

1. Where the Government determines that the Contractor has installed equipment not conveniently accessible for operation and maintenance, equipment shall be removed and reinstalled or remedial action performed as directed at no additional cost to the Government.

2. The term "conveniently accessible" is defined as capable of being reached without the use of ladders, or without climbing or crawling under or over obstacles such as motors, fans, pumps, belt guards, transformers, high voltage lines, piping, and ductwork.

3.2 LUBRICATION

Field check and lubricate equipment requiring lubrication prior to initial operation.

3.3 OPERATING AND PERFORMANCE TESTS

A. Prior to the final inspection, perform required tests as specified in

Section 01 00 00, GENERAL REQUIREMENTS and Section 21 13 13 Wet-Pipe

21 11 00 - 6

Sprinkler Systems and 21 08 00 Commissioning for Fire Suppression

Systems and submit the test reports and records to the COR.

B. Shall evidence of malfunction in any tested system, or piece of equipment or component part thereof, occur during or as a result of tests, make proper corrections, repairs or replacements, and repeat tests at no additional cost to the Government.

C. When completion of certain work or system occurs at a time when final control settings and adjustments cannot be properly made to make performance tests, then make performance tests for heating systems and for cooling systems respectively during first actual seasonal use of respective systems following completion of work.

3.4 INSTRUCTIONS TO VA PERSONNEL

Provide in accordance with Article, INSTRUCTIONS, of Section 01 00 00, GENERAL REQUIREMENTS.

- - - E N D - - -

Construct Two Green Homes Project 550-316 21 08 00

Department Of Veterans Affairs Commissioning Of

Fire Suppression Systems

21 08 00 - 1

SECTION 21 08 00

COMMISSIONING OF FIRE SUPPRESSION SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The requirements of this Section apply to all sections of Division 21.

B. This project shall have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A

Commissioning Agent (CxA) appointed by the VA shall manage the commissioning process.

1.2 RELATED WORK

A. Section 01 00 00 GENERAL REQUIREMENTS.

B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.

C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

D. Section 21 13 13 WET-PIPE SPRINKLER SYSTEMS

E. Section 28 31 00 FIRE DETECTION AND ALARM

1.3 SUMMARY

A. This Section includes requirements for commissioning the Fire

Suppression systems, subsystems and equipment. This Section supplements the general requirements specified in Section 01 91 00

General Commissioning Requirements.

B. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.

C. Contractor shall provide the following documents to the Commissioning

Agent for review:

1. Contractor performed water flow test data.

2. Hydraulic Calculations

3. Contractor’s Material and Test Certificate for Above Ground

Piping, including the following test results:

a. Functional Test of alarm devices

b. Main drain test

c. Hydrostatic testing

21 08 00 - 2

4. Contractor’s Material and Test Certificate for Underground

Piping.

5. Approved Product Data including alarm devices.

6. Approved Shop Drawings.

7. Approved Redlined As-built drawings.

1.4 DEFINITIONS

A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.

1.5 COMMISSIONED SYSTEMS

A. Commissioning of a system or systems specified in Division 21 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel in accordance with the requirements of Section 01 91 00 and of Division 21, is required in cooperation with the VA and the

Commissioning Agent.

B. The Fire Suppression systems commissioning shall include the systems listed in Section 01 19 00 General Commissioning Requirements:

1.6 SUBMITTALS

A. The commissioning process requires review of selected Submittals. The

Commissioning Agent shall provide a list of submittals that shall be reviewed by the Commissioning Agent. This list shall be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to

Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.

B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL

COMMISSIONING REQUIREMENTS.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 CONSTRUCTION INSPECTIONS

A. Commissioning of the building fire suppression systems shall require inspection of individual elements of the fire suppression construction throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 19 00 and

21 08 00 - 3 the Commissioning plan to schedule inspections as required to support the Commissioning Process.

3.2 PRE-FUNCTIONAL CHECKLISTS

A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The

Commissioning Agent shall prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent shall return the marked-up checklist to the Contractor for correction and resubmission. If the

Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning

Agent shall select a broader sample of checklists for review. If the

Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment shall be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING

REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.

3.3 CONTRACTORS TESTS

A. Contractor tests as required by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL

REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The Commissioning Agent shall witness selected

Contractor tests at the sole discretion of the Commissioning Agent.

Contractor tests shall be completed prior to scheduling Systems

Functional Performance Testing.

3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING

A. The Commissioning Process includes Systems Functional Performance

Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in

21 08 00 - 4 operating conditions, and system performance under emergency conditions. The Commissioning Agent shall prepare detailed Systems

Functional Performance Test procedures for review and approval by the

COR. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent shall witness and document the testing.

The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional details.

B. The following Tests shall be witnessed by the Commissioning Agent:

1. Wet Pipe hydrostatic pressure test

2. Functional testing of wet pipe suppression system alarm devices.

3. Wet Pipe System Main drain test

3.5 TRAINING OF VA PERSONNEL

A. Training of the VA operation and maintenance personnel is required in cooperation with the COR and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 19 00. The instruction shall be scheduled in coordination with the VA COR after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING

REQUIREMENTS and Division 21 Sections for additional Contractor training requirements.

----- END -----

Construct Two Green Homes Project 550-316 21 13 13

Department of Veterans Affairs Wet-Pipe Sprinkler Systems

21 13 13 - 1

SECTION 21 13 13

WET-PIPE SPRINKLER SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

A. Design, installation and testing shall be in accordance with

NFPA 13.

B. The design and installation of a hydraulically-calculated automatic wet-pipe system complete and ready for operation for the Green Homes buildings. The wet-pipe sprinkler system shall serve the first floor and the attic, including covered porches and patios, all combustible concealed spaces, and under all obstructions greater than 4 feet wide, unless otherwise noted. Dry barrel sprinklers or heat-tracing system shall be used for unheated porches and patios.

1.2 RELATED WORK

A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Section 33 10 00, WATER UTILITIES.

C. Section 07 84 00, FIRESTOPPING.

D. Section 09 91 00, PAINTING.

E. Section 28 31 00, FIRE DETECTION AND ALARM.

1.3 DESIGN CRITERIA

A. Design Basis Information: Provide design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system in accordance with the requirements of NFPA 13 and manufacturer’s instructions.

1. Perform hydraulic calculations in accordance with NFPA 13. Do not restrict design area reductions permitted for using quick response sprinklers throughout by the required use of standard response sprinklers in the areas identified in this section. The design basis is for one riser for the building. Contractor shall determine if additional risers are required.

2. Sprinkler Protection: Sprinkler hazard classifications shall be in accordance with NFPA 13. To determining spacing and sizing, apply the following coverage classifications:

a. Light Hazard Occupancies: Resident care and living areas.

21 13 13 - 2

b. Ordinary Hazard Group 1 Occupancies: Mechanical Equipment Rooms and Electric Closets

c. Ordinary Hazard Group 2 Occupancies: Storage rooms, clean and soiled linen rooms, laundry, kitchen, kitchen storage areas, building management storage, and garage

d. Request clarification from the Government for any hazard classification not identified.

3. Hydraulic Calculations: Calculated demand including hose stream requirements shall fall no less than 10 percent below the available water supply curve.

4. Water Supply: Contractor shall conduct a water flow test not more than 12 months prior to working plan submittal to be used as the basis of design.

1.4 SUBMITTALS

A. Submit as one package in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals shall not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in

Paragraphs 1.4(A)1 through 1.4(A)5 electronically in pdf format on a compact disc or as directed by the COR. Submittals shall include the following:

1. Qualifications:

a. Provide a copy of the installing contractor’s fire sprinkler and state contractor’s license.

b. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a

Registered Professional Engineer licensed in the field of Fire

Protection Engineering.

21 13 13 - 3

c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.

2. Water flow test: Provide a water flow test report per NFPA 13 requirements. Water flow test shall be conducted by the contractor no more than 12 months prior to submitting test report.

3. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA

13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test location.

4. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.

5. Calculation Sheets:

a. Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of the Plans and

Calculations chapter of NFPA 13.

6. Valve Charts: Provide a valve chart that identifies the location of each control valve. Coordinate nomenclature and identification of control valves with COR. Where existing nomenclature does not exist, the chart shall include no less than the following: Tag ID

No., Valve Size, Service (control valve, main drain, aux. drain, inspectors test valve.), and Location.

7. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in

Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include the following:

a. A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.

1) One full size (or size as directed by the COR) printed copy.

2) One complete set in electronic pdf format.

21 13 13 - 4

3) One complete set in AutoCAD format or a format as directed by the COR.

b. Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA

13. Certificates shall be provided to document all parts of the installation.

c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that shall be kept in stock by the owner for routine maintenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address and telephone number, for each item of equipment.

d. One paper copy of the Material and Testing Certificates and the

Operations and Maintenance Manuals above shall be provided in a binder. In addition, these materials shall be provided in pdf format on a compact disc or as directed by the COR.

e. Provide one additional copy of the Operations and Maintenance

Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser or as directed by the COR.

1.5 QUALITY ASSURANCE

A. Installer Reliability: The installer shall possess a valid State of

Illinois fire sprinkler contractor's license. The installer shall have been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.

B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL or approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicated otherwise on the contract drawings.

21 13 13 - 5

1.6 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. National Fire Protection Association (NFPA):

13-2013.................Installation of Sprinkler Systems

25-2014.................Inspection, Testing, and Maintenance of Water-

Based Fire Protection Systems

72-2013.................National Fire Alarm and Signaling Code

99-2015.................Health Care Facilities Code

101-2015................Life Safety Code

170-2015................Fire Safety Symbols

C. Underwriters Laboratories, Inc. (UL):

Fire Protection Equipment Directory -2014

D. Factory Mutual Engineering Corporation (FM):

Approval Guide

PART 2 - PRODUCTS

2.1 PIPING & FITTINGS

A. Piping and fittings for private underground water mains shall be in accordance with NFPA 13.

1. Pipe and fittings from inside face of building 12 in. above finished floor to a distance of approximately 5 ft. outside building: Ductile

Iron, flanged fittings and 316 stainless steel bolting.

B. Piping and fittings for sprinkler systems shall be in accordance with

NFPA 13.

1. Plain-end pipe fittings with locking lugs or shear bolts are not permitted.

2. Piping sizes 50 mm (2 inches) and smaller shall be black steel

Schedule 40 with threaded end connections.

3. Piping sizes 65 mm (2 ½ inches) and larger shall be black steel

Schedule 10 with grooved connections. Grooves in Schedule 10 piping shall be rolled grooved only.

4. Plastic piping shall not be permitted except for drain piping.

2.2 VALVES

A. General:

1. Valves shall be in accordance with NFPA 13.

21 13 13 - 6

2. Do not use quarter turn ball valves for 50 mm (2 inch) or larger drain valves.

B. Control Valve: The control valves shall be a listed indicating type.

Control valves shall be UL Listed or FM Approved for fire protection installations. System control valve shall be rated for normal system pressure but in no case less than 175 PSI.

C. Check Valve: Shall be of the swing type with a flanged cast iron body and flanged inspection plate.

D. Automatic Ball Drips: Cast brass 20 mm (3/4 inch) in-line automatic ball drip with both ends threaded with iron pipe threads.

E. Backflow Preventer: Provide a horizontal double check backflow preventer with OS&Y gate valves. Provide means to forward flow test the backflow preventer in accordance with NFPA 13. Backflow preventer shall be UL Listed and FM Approved.

2.3 FIRE DEPARTMENT SIAMESE CONNECTION

A. Brass, wall type, exterior fire department connection with brass escutcheon plate, connections threaded to match those on the local fire protection service, with polished brass caps and chains. Provide escutcheon with integral raised letters "Automatic Sprinkler". Install an automatic ball drip between fire department connection and check valve with drain piping routed to the exterior of the building.

2.4 SPRINKLERS

A. Provide FM approved quick response sprinklers in all areas, except where specifically prohibited by their listing or approval.

B. Temperature Ratings: In accordance with NFPA 13. Install intermediate temperature sprinklers when required by NFPA 13 for sprinklers close to a unit heater.

C. Provide sprinkler guards in accordance with NFPA 13 and when the elevation of the sprinkler head is less than 7 feet 6 inches above finished floor. The sprinkler guard shall be UL listed or FM approved for use with the corresponding sprinkler.

2.5 SPRINKLER CABINET

A. Provide sprinkler cabinet with the required number of sprinkler heads of all ratings and types installed, and a sprinkler wrench for each type of sprinkler in accordance with NFPA 13. Locate adjacent to the riser.

21 13 13 - 7

B. Provide a list of sprinklers installed in the property in the cabinet.

The list shall include the following:

1. Manufacturer, model, orifice, deflector type, thermal sensitivity, and pressure for each type of sprinkler in the cabinet.

2. General description of where each sprinkler is used.

3. Quantity of each type present in the cabinet.

4. Issue or revision date of list.

2.6 SPRINKLER SYSTEM SIGNAGE

Rigid plastic, steel or aluminum signs with white lettering on a red background with holes for easy attachment. Sprinkler system signage shall be attached to the valve or piping with chain.

2.7 SWITCHES:

A. OS&Y Valve Supervisory Switches shall be in a weatherproof die cast/red baked enamel, oil resistant, aluminum housing with tamper resistant screws, 13 mm (1/2 inch) conduit entrance and necessary facilities for attachment to the valves. Provide two SPDT switches rated at 2.5 amps at 24 VDC.

B. Water flow Alarm Switches: Mechanical, non-coded, non-accumulative retard and adjustable from 0 to 60 seconds minimum. Set flow switches at an initial setting between 20 and 30 seconds.

C. Valve Supervisory Switches for Ball and Butterfly Valves: Shall be integral with the valve.

2.8 GAUGES

Provide gauges as required by NFPA 13. Provide gauges where the normal pressure of the system is at the midrange of the gauge.

2.9 PIPE HANGERS, SUPPORTS AND RESTRAINT OF SYSTEM PIPING

Pipe hangers, supports, and restraint of system piping shall be in accordance with NFPA 13.

2.10 WALL, FLOOR AND CEILING PLATES

Provide chrome plated steel escutcheon plates for exposed piping passing through walls, floors, or ceilings.

2.11 VALVE TAGS

Engraved black filled numbers and letters not less than 15 mm (1/2 inch) high for number designation, and not less than 8 mm (1/4 inch) for service designation on 19 gage, 40 mm (1-1/2 inches) round brass disc, attached with brass "S" hook, brass chain, or nylon twist tie.

21 13 13 - 8

3.1 INSTALLATION

A. Installation shall be accomplished by the licensed contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.

B. Installation of Piping: Accurately cut pipe to measurements established by the installer and work into place without springing or forcing. In any situation where bending of the pipe is required, use a standard pipe-bending template. Concealed piping in spaces that have finished ceilings. Where ceiling mounted equipment exists, such as resident lifting systems in bedrooms, install sprinklers so as not to obstruct the movement or operation of the equipment. Sidewall heads shall need to be utilized. Piping shall not obstruct the minimum means of egress clearances required by NFPA 101. Pipe hangers, supports, and restraint of system piping, shall be installed accordance with NFPA 13.

C. Welding: Conform to the requirements and recommendations of NFPA 13.

D. Drains: Provide drips and drains, including low point drains, in accordance with NFPA 13. Pipe drains to discharge at safe points outside of the building or to sight cones attached to drains of adequate size to readily carry the full flow from each drain under maximum pressure. Do not provide a direct drain connection to sewer system or discharge into sinks. Install drips and drains where necessary and required by NFPA 13. The drain piping shall not be restricted or reduced and shall be of the same diameter as the drain collector.

E. Supervisory Switches: Provide supervisory switches for sprinkler control valves.

F. Waterflow Alarm Switches: Install waterflow alarm switches and valves in easily accessible locations.

G. Inspector's Test Connection: Install and supply in accordance with NFPA

13, locate in a secured area, and discharge to the exterior of the building over a splash block.

H. Affix cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connections to the respective waterflow switch or pipe connection near to the pipe from where they were cut.

21 13 13 - 9

I. Provide escutcheon plates for exposed piping passing through walls, floors or ceilings.

J. Sleeves: Provide for pipes passing through masonry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fire stop material in accordance with Section 07 84 00, FIRESTOPPING. Where core drilling is used in lieu of sleeves, also seal space. Seal penetrations of walls, floors and ceilings of other types of construction, in accordance with

Section 07 84 00, FIRESTOPPING.

K. (NOT USED)

L. Provide pressure gauges at each water flow alarm switch location and at each main drain connection.

M. For each fire department connection, provide the symbolic sign given in

NFPA 170 and locate 2400 to 3000 mm (8 to 10 feet) above each connection location. Size the sign to 450 by 450 mm (18 by 18 inches) with the symbol being at least 350 by 350 mm (14 by 14 inches).

N. Firestopping shall be provided for all penetrations of fire resistance rated construction. Firestopping shall comply with Section 07 84 00, FIRESTOPPING.

O. Painting of Pipe: In finished areas where walls and ceilings have been painted, paint primed surfaces with two coats of paint to match adjacent surfaces, except paint valves and operating accessories with two coats of gloss red enamel. Exercise care to avoid painting sprinklers. Painting of sprinkler systems in attic spaces is not required. Painting shall comply with Section 09 91 00, PAINTING. Any painted sprinkler shall be replaced with a new sprinkler.

P. Sprinkler System Signage: Provide rigid sprinkler system signage in accordance with NFPA 13 and NFPA 25. Sprinkler system signage shall include the following:

1. Identification Signs:

a. Provide signage for each control valve, drain valve, sprinkler cabinet, and inspector’s test.

b. Provide valve tags for each operable valve. Coordinate nomenclature and identification of operable valves with COR.

Where existing nomenclature does not exist, the Tag

Identification shall include no less than the following: (FP-B-

F/SZ-#) Fire Protection, Building Number, Floor Number/Smoke Zone

21 13 13 - 10

(if applicable), and Valve Number. (E.g., FP-500-1E-001) Fire

Protection, Building 500, First Floor East, Number 001.)

2. Instruction/Information Signs:

a. Provide signage for each control valve to indicate valve function and to indicate what system is being controlled.

b. Provide signage indicating the number and location of low point drains.

3. Hydraulic Placards:

a. Provide signage indicating hydraulic design information. The placard shall include location of the design area, discharge densities, required flow and residual pressure at the base of riser, occupancy classification, hose stream allowance, flow test information, and installing contractor. Locate hydraulic placard information signs at each alarm check valve.

Q. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler system by the installer at no additional expense to the Government.

3.2 INSPECTION AND TEST

A. Preliminary Testing: Flush newly installed systems prior to performing hydrostatic tests in order to remove any debris which shall have been left as well as ensuring piping is unobstructed. Hydrostatically test system, including the fire department connections, as specified in NFPA

13, in the presence of the Contracting Officers Representative (COR) or his designated representative. Test and flush underground water line prior to performing these hydrostatic tests.

B. Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections have been accomplished, advise COR to schedule a final inspection and test.

Connection to the fire alarm system shall have been in service for at least ten calendar days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labor and materials required for the tests and provide the services of the installation foreman or other competent representative of the installer to perform the tests. Correct deficiencies and retest system as necessary, prior to the final acceptance. Include the operation of all features of the systems under normal operations in test

21 13 13 - 11

3.3 INSTRUCTIONS

Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation and maintenance of the system, on the dates requested by the COR.

- - - E N D - - -

Construct Two Green Homes – Project 550-316 22 05 11

Department of Veterans Affairs Common Work Results for Plumbing

22 05 11 - 1

SECTION 22 05 11

COMMON WORK RESULTS FOR PLUMBING

PART 1 - GENERAL

1.1 DESCRIPTION

A. The requirements of this Section shall apply to all sections of

Division 22.

B. Definitions:

1. Exposed: Piping and equipment exposed to view in finished rooms.

C. Abbreviations/Acronyms:

1. ABS: Acrylonitrile Butadiene Styrene

2. AISI: American Iron and Steel Institute

3. AWG: American Wire Gauge

4. BACnet: Building Automation and Control Network

5. BSG: Borosilicate Glass Pipe

6. CDA: Copper Development Association

7. CO: Carbon Monoxide

8. COR: Contracting Officer’s Representative

9. CPVC: Chlorinated Polyvinyl Chloride

10. CR: Chloroprene

11. CWP: Cold Working Pressure

12. db(A): Decibels (A weighted)

13. DDC: Direct Digital Control

14. DISS: Diameter Index Safety System

15. DWV: Drainage, Waste and Vent

16. ECC: Engineering Control Center

17. EPDM: Ethylene Propylene Diene Monomer

18. EPT: Ethylene Propylene Terpolymer

19. ETO: Ethylene Oxide

20. FAR: Federal Acquisition Regulations

21. FD: Floor Drain

22. FG: Fiberglass

23. FNPT: Female National Pipe Thread

24. FPM: Fluoroelastomer Polymer

25. HDPE: High Density Polyethylene

26. HOA: Hands-Off-Automatic

27. HP: Horsepower

28. ID: Inside Diameter

29. MAWP: Maximum Allowable Working Pressure

30. NPTF: National Pipe Thread Female

22 05 11 - 2

31. NPS: Nominal Pipe Size

32. NPT: National Pipe Thread

33. OD: Outside Diameter

34. OSD: Open Sight Drain

35. OS&Y: Outside Stem and Yoke

36. PP: Polypropylene

37. PTFE: Polytetrafluoroethylene

38. PVC: Polyvinyl Chloride

39. PVDF: Polyvinylidene Fluoride

40. RTRP: Reinforced Thermosetting Resin Pipe

41. SPS: Sterile Processing Services

42. SUS: Saybolt Universal Second

43. SWP: Steam Working Pressure

44. TFE: Tetrafluoroethylene

45. THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire

46. THWN: Thermoplastic Heat & Water Resistant Nylon Coated Wire

47. USDA: U.S. Department of Agriculture

48. VAC: Voltage in Alternating Current

49. WOG: Water, Oil, Gas

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS.

B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

C. Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT.

D. Section 01 81 13, SUSTAINABLE DESIGN REQUIREMENTS.

E. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.

G. Section 03 30 00, CAST-IN-PLACE CONCRETE: Concrete and Grout.

J. Section 05 50 00, METAL FABRICATIONS.

K. Section 07 60 00, FLASHING AND SHEET METAL: Flashing for Wall and Roof

Penetrations.

L. Section 07 84 00, FIRESTOPPING.

M. Section 07 92 00, JOINT SEALANTS.

N. Section 09 91 00, PAINTING.

P. Section 22 05 11, GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT.

Q. Section 22 07 11, PLUMBING INSULATION.

R. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.

S. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.

T. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.

U. Section 26 29 11, MOTOR CONTROLLERS.

22 05 11 - 3

V. Section 31 20 00, EARTHWORKS: Excavation and Backfill.

1.3 APPLICABLE PUBLICATIONS

A. The publications listed below shall form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. American Society of Mechanical Engineers (ASME):

ASME Boiler and Pressure Vessel Code -

BPVC Section IX-2013....Welding, Brazing, and Fusing Qualifications

B31.1-2012..............Power Piping

C. American Society for Testing and Materials (ASTM):

A36/A36M-2012...........Standard Specification for Carbon Structural

Steel

A575-96(R2013)e1........Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades

E84-2013a...............Standard Test Method for Surface Burning

Characteristics of Building Materials

E119-2012a..............Standard…