36E77619B0003-001.pdf

PDF 72 KB Posted

Attached to
Construct Two New Green Homes 5 & 6 Minor - Danville VAMC
Solicitation number
36E77619B0003
Issued by

About this file

36E77619B0003 ATTACHMENT 1 - SOW - Danville Green Homes - 12-10-18.pdf

View the file

Other files

File Type Posted
36E77619C0023-000.docx DOCX document
36E77619B0003-0003002.pdf PDF
36E77619B0003-0003003.pdf PDF
36E77619B0003-0003004.pdf PDF
36E77619B0003-0003005.pdf PDF
36E77619B0003-0003000.docx DOCX document
36E77619B0003-0003006.pdf PDF
36E77619B0003-0003001.pdf PDF
36E77619B0003-0002000.docx DOCX document
36E77619B0003-0001001.pdf PDF
36E77619B0003-0001000.docx DOCX document
36E77619B0003-000.docx DOCX document
36E77619B0003-013.docx DOCX document
36E77619B0003-005.pdf PDF
36E77619B0003-012.pdf PDF
36E77619B0003-002.pdf PDF
36E77619B0003-006.pdf PDF
36E77619B0003-009.pdf PDF
36E77619B0003-007.pdf PDF
36E77619B0003-011.pdf PDF
36E77619B0003-003.pdf PDF
36E77619B0003-010.pdf PDF
36E77619B0003-004.pdf PDF
36E77619B0003-008.pdf PDF
36E77619B0003.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK for 550-316

1. Title of Project:

Construct Two New Green Homes 5 & 6

2. Scope of Work:

VA Illiana Healthcare System (VAIHCS), Danville, IL seeks a contractor to provide all labor, materials, equipment, supervision, and all other resources necessary to construct two new 10-bed, long-term care “Green Homes” each approximately 10,391 gross square feet per the plans and specifications for Project 550-316, Construct Two New Green Homes.

Contractor responsibilities include:

- Contractor shall provide a complete project per the provided plans and specifications.

- Contractor shall be responsible for all traffic control measures during construction.

- Contractor shall be responsible for attaining all necessary permits.

- Contractor shall provide silt fence or other EPA approved means of storm water pollution protection that shall be compliant with EPA permit.

- Contractor shall be responsible for all utility locating.

- Contactor shall provide all utility work needed to support the successful completion of the project.

- Contractor shall be responsible for all Infection Control measures that must be taken to prevent the spread of dust and other construction debris throughout the facility.

- Contactor shall be responsible for all Interim Life Safety Measures necessary for the completion of the project.

3. Information Security:

The Certification and Accreditation (C&A) requirements do not apply. A Security Accreditation Package is not required.

4. Performance Period:

Contractor shall complete all work associated with this project within five hundred forty-eight (548) calendar days of the receipt of the Notice to Proceed (NTP). The campus is a functioning hospital and operations as such must be maintained throughout the duration of the project. Normal working hours are Monday through Friday, 7:00 am to 4:30 pm, excluding Federal Holidays. If for any reason the contractor can’t meet the required period of performance for this project he/she must submit, in writing, to the Contracting Officer, a revised schedule, justification, and request for additional time.

5. Background:

Work will be performed at:

VA Illiana Health Care System 1900 East Main St.

Danville, IL 61832

6. Key Personnel

Key Personnel assigned by the contractor for the performance of work on this contract shall be acceptable to VA in terms of personal and professional conduct and technical knowledge. Should the assignment to this contract of any person by the contractor be deemed to conflict with the interests of VA, or in the event performance is deemed to be unsatisfactory at any time during the life of the contract, the Contracting Officer may notify the contractor and request the person be removed from the assignment. The reason for removal will be documented and a request to receive key personnel replacement within three (3) business days of the notification will be made.

Replacement of key personnel qualifications shall be equal to or greater than those of the key personnel being replaced. Employment and staffing difficulties will not be justification for failure to meet established schedules. The contractor is required to submit a resume with qualifications for the proposed replacement which shall be approved by the COR and CO prior to the replacement starting work.