This document appears to be a building floor plan for Building 86 at the Sheridan VA Medical Center, related to a federal contract opportunity.

The key details are:

  • The contract opportunity is to renovate the Canteen Dishwashing Room utilities in Building 86 at the Sheridan VAMC, including upgrading the plumbing, floor drain, hand sink, and exhaust system.
  • The work must be completed within 180 calendar days and includes demolition, negative pressure environment, new walls, and finishes per VA construction standards.
  • The contractor must follow all safety and infection control requirements, as the building has active patient areas.
  • The contractor is responsible for all electrical, carpentry, mechanical, and other work needed, and must test and commission all new components.
  • At the end of the project, the contractor must provide the VA with redlined as-built drawings.

View the file

Other files

File Type Posted
36C25924Q0678 0009.docx DOCX document
36C25924Q0678 0008.docx DOCX document
S05 - RFI Site Visit - Questions - 2.docx DOCX document
S04 - Site Visit 3 Sign In Sheet - FE.pdf PDF
S04 - Site Visit 3 Meeting Doc - FE.docx DOCX document
36C25924Q0678 0007.docx DOCX document
36C25924Q0678 0006.docx DOCX document
S04 - Site Visit 2 Attendance - FE.pdf PDF
36C25924Q0678 0005.docx DOCX document
S04 - Site Visit 2 Meeting Doc - FE.docx DOCX document
S02 - Site Visit 1 RFI - Responses.docx DOCX document
P09 - SOW - Revised - 10 03 2024.docx DOCX document
36C25924Q0678 0003.docx DOCX document
S04 - Site Visit Meeting Doc - FE.docx DOCX document
S02 - Plumbing Plans B86.pdf PDF
S04 - Sign in Sheet - FE.pdf PDF
S02 - 16 666-14-108 M303 Bldg 86 1st-S Piping Plan.pdf PDF
36C25924Q0678 0002.docx DOCX document
S02 - 18 666-14-108 M501 Details.pdf PDF
S02 - 1992-08-21 - 86 - Nursing Home Care Remodel Bldg 86 - 50 Bed Unit - 066 HVAC Floor Plan Level One South - 86-H2 - 66 of 92.pdf PDF
S02 - 17 666-14-108 M401 Schedules.pdf PDF
36C25924Q0678 0001.docx DOCX document
36C25924Q0678.docx DOCX document
S22 - LOS - Attachment - 852.219-75 Blank -.docx DOCX document
S02 - Replace Canteen Dishwasher Utilities - Drawing.pdf PDF
PPQ Blank - Past Performance Questionnaire -.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 86

FIRST FLOOR HVAC PLAN - SOUTH

SCALE: 1/8" = 1'-0" BUILDING 86

143A

144A

141A

139B

139C

139A

135A

151A

152A

133A

132A

OXYGEN

STORAGE

DAY

ROOM

BEDROOM-

2 BED

BEDROOM-

2 BED

BEDROOM-

2 BED

TOILET,

CONGREGATE

TOILET

BEDROOM-

1 BED

TOILET,

CONGREGATE

UTILITY,

CLEAN

MEDICATION

PREP

STORAGE,

WARD

SUPPLIES

BATH/SHOWER

ROOM

UTILITY

SOILED

MECH

ROOM

STOR.

TOILET,

EMPLOYEE

BEDROOM-

2 BED

BEDROOM-

2 BED

NURSING

HOME

NURSING

HOME

TOILET,

CONGREGATE

TOILET,

CONGREGATE

TOILET,

CONGREGATE

BEDROOM-

1 BED

SUPPORT,

NURSE STATION

HOUSEKEEPING

AID CLOSET

MEDICATION

ROOM

BEDROOM-

1 BED

ELECTRICAL

ROOM

BEDROOM-

2 BED

BEDROOM-

1 BED

BEDROOM-

1 BED

TOILET,

CONGREGATE

TOILET,

CONGREGATE

S166

STAIR SW

E171

ELEVATOR

WEST

E170

ELEVATOR

CENTER

C162

SOUTH

CORRIDOR

BEDROOM-

2 BED

CONFERENCE

ROOM

T T

T T T

T

T T

T T

T

T

T

T

T

T

T

T

T

T

T

T

N

N

N

S-2

S-2

S-2

S-2

S-2

S-1

S-1

S-1

S-1

S-1

S-1

R-1

R-1

R-1

FC

FC

FC

FC

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-1

S-1

S-1

S-1

S-1

S-1

S-1

R-1

R-1

R-1

R-1

R-1

R-1

R-1

R-1

FC

FC

FC

FC

FC

FC

FC

FC

FC

S-2

R-1

S-1

S-2

S-2

R-1

FC

FC

S-2

R-1

S-2

R-1

FC

S-2

S-2

S-2

FC

R-1

S-2

S-2

S-1

S-1

S-1

FC

FC

S-2

S-2

S-2

R-1

FC

S-2

S-2

R-1

FC

FC

S-2

S-2

S-2

R-1

R-1

FC

ERV

FC

R-1

SCALE: N.T.S.

SITE KEY PLAN

SCALE: N.T.S.

FIRST FLOOR KEY PLAN

R-1

8"Ø 8"Ø

8"Ø

8"Ø

8"Ø

12/8

10/6

8"Ø

R-1

8"Ø

8"Ø

10/8

8/8

6"Ø

6"Ø

10/8

8/8

6"Ø

6"Ø

8"Ø 8"Ø

10/8

8/10

12/8

10/10

8"Ø 8"Ø

10/6

6/10

8"Ø

12/8

10/10

8"Ø 8"Ø

8"Ø

8"Ø

8"Ø

12/10

10/10

8/6

6/8

6"Ø

R-1

10/10

8"Ø 8"Ø

10/6

6/10

10/10

8"Ø

8"Ø

12/10 12/10

8"Ø

8"Ø

8"Ø

12/10 12/10

8"Ø

8"Ø

8"Ø

8/66/8

6"Ø

10/6

8/8

6"Ø 6"Ø

8/6

8"Ø

6/8

8"Ø

6"Ø

10/8

8"Ø

12/8

8"Ø

8"Ø

8"Ø

12/810/10

8"Ø

8"Ø

12/10

8"Ø

8"Ø

8"Ø

12/10

R-1

GENERAL NOTES:

A. ALL WORK ON THIS SHEET SHALL BE INCLUDED WITH THE

BASE BID EXCEPT AS NOTED OTHERWISE.

ADD ALT #2

STORAGE/

GENERAL

E-

E-

E-

E-

E-

E-

E-

E-

E-

E-1

E-

E-

E-

E-

E-

E-

6/6

E-

SD

SD

SD

SD

SD

SPECIFIC NOTES:

PROVIDE SMOKE DAMPER IN FRESH AIR DUCT TO

PROTECT MEANS OF EGRESS.

PROVIDE CONNECTION TO EXISTING FRESH AIR DUCT

WITH MANUAL BALANCING DAMPER.

REFER TO DETAIL 13/M501 (TYPICAL).

PROVIDE NEW DUCT TO EXISTING DUCT MAIN. SIZE NEW

DUCT WORK TO MATCH EXISTING DUCT.

HC

12/20 OA UP

12/20 EA UP

28/14

28/14

12/20

12/20

16/12

4/4

4/4

6/4

6/4

6/4

6/4

6/4

6/4

10/8

4/4

6/4

6/4

6/4

6/4

6/4

4/4

8/4

4/4

4/4

4/4

6/4

6/4

6/4

10/4

14/4 14/4

6/4

10/4

14/4 14/4

10/4

14/4

EA

16/16

T

8"Ø

S-2

6/10

8/8

FC

4/4

RECORD DOCUMENTS

T C.

ARCHITECTURE

ENGINEERING

GIS

SURVEYING

These Record Documents conforming to the marked-up prints, drawings and other data furnished to the Design Professional by the Contractor. This set of Record Documents will show the reported location of the Work and significant changes made during the construction process. These Record

Documents are based on information provided by other parties which will be assumed reliable. The

Design Professional has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions which may be incorporated herein as a result.

RECORD DOCUMENTS

File details come from the government source that posted it. Updated .