36C25618B0375-007.pdf
PDF 11 MB Posted
- Solicitation number
- 36C25618B0375
About this file
36C25618B0375 70_ME_VACLC_2018-01-12_IFB.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25618B0375-00004000.docx | DOCX document | |
| 36C25618B0375-00004003.pdf | ||
| 36C25618B0375-00004005.pdf | ||
| 36C25618B0375-00004004.pdf | ||
| 36C25618B0375-00004001.pdf | ||
| 36C25618B0375-00004006.pdf | ||
| 36C25618B0375-00004002.pdf | ||
| 36C25618B0375-00003000.docx | DOCX document | |
| 36C25618B0375-00002000.docx | DOCX document | |
| 36C25618B0375-00002001.pdf | ||
| 36C25618B0375-00001000.docx | DOCX document | |
| 36C25618B0375-001.docx | DOCX document | |
| 36C25618B0375-009.pdf | ||
| 36C25618B0375-010.pdf | ||
| 36C25618B0375-003.pdf | ||
| 36C25618B0375-004.pdf | ||
| 36C25618B0375-006.pdf | ||
| 36C25618B0375-008.pdf | ||
| 36C25618B0375-005.pdf | ||
| 36C25618B0375-002.pdf | ||
| 36C25618B0375-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D E F
H J K M N O P
R S T U V W
EX 25x23 SA
EX 32x24 SA
DEMO SHOWN ON
ENLARGED PLAN
D0603 & D0604
D0602
1C
D0602
1F
D0602
6F
EX 20x24 RA
EX 30x20 EA
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106GROUND FLOOR - HVAC DEMOLITION
PLAN
D0601
MEM CKH
1/8" = 1'-0" 5F
HVAC DEMO PLAN - GROUND FLOOR
1. COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, SAFETY RULES AND REGULATIONS, OSHA
STANDARDS, VA STANDARDS, AND OTHER GOVERNING BODIES HAVING JURISDICTION.
2. PRIOR TO THE COMMENCEMENT OF DEMOLITION ACTIVITIES, MECHANICAL CONTRACTOR
SHALL REVIEW ALL EXISTING SERVICE (DUCTWORK, PIPING, EQUIPMENT, ETC.) IN THE AREA OF
DEMOLITION AND CONFIRM EQUIPMENT SERVING AREAS OUTSIDE OF THE SCOPE OF
DEMOLITION TO REMAIN.
3. PROTECT DUCTWORK, PIPING, EQUIPMENT, ETC. REMAINING IN PLACE FOR REUSE OR SERVING
AREAS OUTSIDE OF THE SCOPE OF DEMOLITION. REPAIR OR REPLACE EQUIPMENT AND
SYSTEM TO BE REUSED WHICH ARE INADVERTENTLY DAMAGED DURING THE DEMOLITION
PROCESS, AT NO ADDITIONAL COST TO THE OWNER.
4. DO NOT REUSE REMOVED PIPING, DUCTWORK, VALVES, ETC., UNLESS SPECIFICALLY INDICATED
OTHERWISE.
5. PATCH AND REPAIR ALL FINISHES AND PENETRATIONS CAUSED BY OR EXPOSED BY THE
REMOVAL OF MATERIALS AND EQUIPMENT.
6. COORDINATE SHUTDOWN OF MECHANICAL EQUIPMENT WITH THE OWNER'S OPERATIONAL
REQUIREMENTS.
7. PRIOR TO COMMENCEMENT OF DEMOLITION WORK:
A. FIELD VERIFY THE SIZES AND LOCATION OF EQUIPMENT AND SYSTEMS TO BE REMOVED.
B. RECORD ALL AIRFLOW RATES AND SETPOINTS FOR EQUIPMENT TO BE REMOVED THAT
SERVES AREAS OUTSIDE OF THE SCOPE OF DEMOLITION TO BE SUPPORTED BY
TEMPORARY EQUIPMENT DURING CONSTRUCTION ACTIVITIES.
C. VERIFY THAT THE DEMO AREA IS ACCESSIBLE AND THAT DEMO TRAFFIC ROUTES ARE
FREE AND CLEAR.
D. VERIFY THAT EQUIPMENT AND SYSTEMS HAVE BEEN DE-ENERGIZED AND ARE SAFE TO
DISMANTLE. COMPLY WITH OWNER AND CONSTRUCTION SITE LOCK-OUT/TAG-OUT
PROCEDURES.
E. IDENTIFY ELEMENTS OF RISK ASSOCIATED WITH THE DEMOLITION WORK, AND PROVIDE
CONTINGENCY PLANS TO THE OWNER TO MINIMIZE THE RISK TO THE PROJECT.
F. PROVIDE A COMPREHENSIVE DEMOLITION AND PHASING PLAN OUTLINING THE
SCHEDULE OF WORK ACTIVITIES REQUIRED TO EXECUTE THE WORK. INCLUDE
MILESTONE DATES, TEMPORARY CONNECTION POINTS, ELECTRICAL POWER FEED TO
TEMPORARY EQUIPMENT, AND PROPOSED SCHEDULE OF TEMPORARY EQUIPMENT
OPERATION FOR APPROVAL BY THE OWNER AND ENGINEER.
DEMOLITION NOTES
KEYED NOTES:
1. DEMOLISH ALL MECHANICAL EQUIPMENT, HOT WATER, CHILLED WATER,
CONDENSATE AND DUCTWORK WITHIN THE PROJECT BOUNDARY, WITH THE
EXCEPTION OF ALL DUCTWORK, PIPING, AND EQUIPMENT THAT SERVES THE
FIRST FLOOR OR ALLOWS FOR FULL OPERATION OF FIRST FLOOR DURING
CONSTRUCTION. SEE SHEET D0602 FOR MORE INFORMATION.
2. RECORD AIRFLOW AT ALL DIFFUSERS PRIOR TO DEMOLITION. DEMO
DUCTWORK AT BOUNDARY. ALL DUCTWORK, EQUIPMENT, AND PIPING WITHIN
BOUNDARY SHALL REMAIN. PROVIDE CONNECTION TO TEMPORARY
EQUIPMENT TO MAINTAIN FIRST FLOOR OPERABILITY DURING CONSTRUCTION.
REMEDIATE ALL ASBESTOS MATERIAL ON MECHANICAL SYSTEMS WITHIN
BOUNDARY.
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106GROUND FLOOR - HVAC DEMOLITION
PLAN
D0602
MEM CKH
NTS
1F
EXISTING GROUND FLOOR - HVAC DEMO PLAN PIPE BASEMENT/GROUND FLOOR PLAN
NTS
1C
EXISTING GROUND FLOOR - HVAC DEMO PLAN PIPE BASEMENT/GROUND FLOOR
NTS
6F
EXISTING GROUND FLOOR - HVAC DEMO PLAN
1. ALL PIPING IN VIEW 1C AND 1F IS LOCATED
IN PIPE BASEMENT.
2. ALL PIPING AND DUCTWORK IN HATCHED
AREA SHALL BE DEMOLISHED.
DEMOLITION NOTES
K M N O P
EX-AHU-03
EX-AHU-01
Mechanical (E)
G132.1
Mechanical (E)
G132
EX-AHU-02
PHWR
PHWS
HWR PHWS
MPS
M P
S
H W
R
HWR
H W
R
H W
S
HWR
H W
S
P H
W S
PHWR
P H
W S
P H
W R
EX-HX-01
EX-CRU-01
EX-HX-03
EX-HWP-1
EX-HWP-2 EX-HWP-3 EX-HWP-4 EX-HWP-5
EX DUCT
EX DUCT
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106ENLARGED DEMOLITION PLAN
D0603
MEM CKH
1/4" = 1'-0" 5F
ENLARGED MECHANICAL ROOM DEMO - NEW HEAT EXCHANGER
KEYED NOTES:
1. DEMOLISH EXISTING AIR COMPRESSOR AND ASSOCIATED CONTROLS
IN APPROXIMATE LOCATION SHOWN. CONTRACTOR SHALL VERIFY
LOCATIN OF EXISTING CENTRAL COMPRESSED AIR PIPING UPSTREAM
OF THE AIR COMPRESSOR AND CONNECT THE EXISTING
DOWNSTREAM COMPRESSED AIR INTO IT. CONTROLS CONTRACTOR
SHALL VERIFY PROPER OPERATION OF PNEUMATIC CONTROLS
SYSTEM AT THE CONCLUSION OF COMPRESSED AIR PIPING WORK.
COORDINATE SHUTDOWN OF THIS SYSTEM WITH THE OWNER.
K
M
N
O
P
P
L
EX-AHU-03
EX-AHU-01
Mechanical (E)
G132.1
Mechanical (E)
G132
EX-AHU-02
PHWR
MPS
HWR
PHWS
HWR
HWR
P H
W S
H W
R
PHWS
H W
R
H W
R
HWR
P H
W S
P H
W R
H W
R
H W
S
PHWR
H W
R
EX-HWP-5EX-HWP-4EX-HWP-3EX-HWP-2
EX-HWP-1
EX-HX-03
EX-CRU-01
EX-HX-01
EX DUCT
EX DUCT
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106ENLARGED DEMOLITION PLAN -
DEDUCT ALTERNATE
D0604
MEM CKH
1/4" = 1'-0" 4F
ENLARGED MECHANICAL ROOM DEMO - DEDUCT ALTERNATE
KEYED NOTES:
1. DEMOLISH EXISTING AIR COMPRESSOR AND ASSOCIATED CONTROLS IN
APPROXIMATE LOCATION SHOWN. CONTRACTOR SHALL VERIFY LOCATION OF
EXISTING CENTRAL COMPRESSED AIR PIPING UPSTREAM OF THE AIR
COMPRESSOR AND CONNECT THE EXISTING DOWNSTREAM COMPRESSED AIR
INTO IT. CONTROLS CONTRACTOR SHALL VERIFY PROPER OPERATION OF
PNEUMATIC CONTROLS SYSTEM AT THE CONCLUSION OF COMPRESSED AIR
PIPING WORK. COORDINATE SHUTDOWN OF THIS SYSTEM WITH THE OWNER.
A/C AIR CONDITIONING
A/E ARCHITECT/ENGINEER
AAV AUTOMATIC AIR VENT (VALVE)
ABV ABOVE
ACCU AIR-COOLED CONDENSING UNIT
ACH AIR CHANGES PER HOUR
ACU AIR CURTAIN
AD ACCESS DOOR
AF AIR FOIL FAN
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
APPROX APPROXIMATE
ARCH ARCHITECT/ARCHITECTURAL
AS AIR SEPARATOR
ATD AIR TRANSFER DUCT
AUTO AUTOMATIC
AVG AVERAGE
AWT AVERAGE WATER TEMPERATURE
AXF AXIAL FAN
BB BASEBOARD RADIATION
BDD BACK DRAFT DAMPER
BF BOILER FEED WATER
BG BOTTOM GRILLE (3"-12" ABOVE FLOOR)
BHP BRAKE HORSEPOWER
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BOD BOTTOM OF DUCT
BR BOTTOM REGISTER (3"-12" ABOVE FLOOR)
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CA COMPRESSED AIR
CAP CAPACITY
CC COOLING COIL
CCW COUNTER CLOCKWISE
CD CONDENSATE DRAIN
CENTRIF CENTRIFUGAL
CF CUBIC FEET
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CH CABINET HEATER
CHR CHILLER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CL CENTER LINE
CLG COOLING
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION
CONTR CONTRACTOR
CONV CONVECTOR
CP CONTROL PANEL
CT COOLING TOWER
CU CONDENSING/ER UNIT
CU FT CUBIC FEET
CV CONSTANT VOLUME
CV CONSTANT VOLUME
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
D DRAIN OR DRYER
DB DECIBEL OR DRY BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROL
DEG.F DEGREE FAHRENHEIT
DEMO DEMOLISH
DG DOOR GRILLE
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DISCH DISCHARGE
DN DOWN
DP DIFFERENTIAL PRESSURE
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DTR DUAL TEMPERATURE RETURN
DTS DUAL TEMPERATURE SUPPLY
DWDI DOUBLE WIDTH, DOUBLE INLET
DWG DRAWING
DX DIRECT EXPANSION
E/P ELECTRIC-PNEUMATIC
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EBB ELECTRIC BASEBOARD HEATER
EC EXPANSION COMPENSATOR/JOINT
ECWR EQUIPMENT COOLING WATER RETURN
ECWS EQUIPMENT COOLING WATER SUPPLY
EDB ENTERING DRY BULB TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
EHC ELECTRIC HEATING COIL
EL/ELEV ELEVATION
ELEC ELECTRIC/ELECTRICAL
ELEM ELEMENT
ELEV ELEVATOR
EMD END OF MAIN DRIP (STEAM)
EMER EMERGENCY
ENG ENGINEER
ENT ENTERING
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
EST ESTIMATE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
EUH ELECTRIC UNIT HEATER
EV EXHAUST AIR VALVE
EVAP EVAPORATOR
EVF FUME HOOD EXHAUST AIR VALVE
EVL LAB EXHAUST AIR VALVE
H HUMIDISTAT OR HUMIDIFIER
HC HEATING COIL
HEPA HIGH EFFICIENCY PARTICULATE AIR FILTER
HG HOT GAS
HL HIGH LIMIT
HORIZ HORIZONTAL
HP HORSEPOWER OR HEAT PUMP
HPR HIGH PRESSURE CONDENSATE RETURN
HPS HIGH PRESSURE STEAM
HR HOUR
HRC HEAT RECOVERY COIL
HT HEIGHT
HTG HEATING
HTWR HIGH TEMPERATURE WATER RETURN
HTWS HIGH TEMPERATURE WATER SUPPLY
HUM HUMIDIFIER
HVAC HEAT, VENTILATION, & AIR CONDITIONING
HVU HEATING & VENTILATING UNIT
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
ID INSIDE DIAMETER
IN OR " INCHES
IN W.C. INCHES WATER COLUMN
IN W.G. INCHES WATER GAUGE
INSUL INSULATION
INT INTERNAL
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LDB LEAVING DRY BULB TEMPERATURE
LF LINEAR FEET
LPG LIQUID PETROLEUM GAS
LPR LOW PRESSURE CONDENSATE RETURN
LPS LOW PRESSURE STEAM
LRA LOCKED ROTOR AMPERES
LVG LEAVING
LVR LOUVER
LWB LEAVING WET BULB TEMPERATURE
LWT LEAVING WATER TEMPERATURE
M MOTOR OPERATOR
MAINT MAINTENANCE
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MERV MINIMUM EFFICIENCY REPORTING VALUE
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MPR MEDIUM PRESSURE CONDENSATE RETURN
MPS MEDIUM PRESSURE STEAM
MTD MOUNTED
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
NC NOISE CRITERIA
NIC NOT IN CONTRACT
NO. OR # NUMBER
NR NOT REQUIRED
NTS NOT TO SCALE
NV NATURAL VENTILATION
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OBD OPPOSED BLADE DAMPER
OED OPEN END DUCT
OFCI OWNER FURNISHED/CONTRACTOR INSTALLED
OFOI OWNER FURNISHED/OWNER INSTALLED
OH OVERHEAD
OPNG OPENING
∆P/DP DIFFERENTIAL PRESSURE
P PUMP
P/E PNEUMATIC-ELECTRIC SWITCH
PA PASCAL
PCD PUMPED CONDENSATE DISCHARGE/RETURN
PCF POUNDS PER CUBIC FOOT
PCWR PROCESSED CHILLED WATER RETURN
PCWS PROCESSED CHILLED WATER SUPPLY
PD PRESSURE DROP
PF PROPELLER FAN
PG PRESSURE GAUGE
PH PHASE
PLBG PLUMBING
PRESS PRESSURE
PROP PROPELLER
PRV PRESSURE REDUCING VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE IN ABSOLUTE
PSIG POUNDS PER SQUARE IN GAUGE
QTY QUANTITY
R RETURN
RA RETURN AIR
RAD RADIATION
RAF RETURN AIR FAN
REBAL REBALANCE
REG REGISTER
REV REVISED
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RM ROOM
RO RELIEF OPENING
RP RADIANT PANEL
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV REFRIGERANT VENT OR RELIEF VALVE (VENT)
RV RETURN AIR VALVE
S/W SUMMER-WINTER
SA SUPPLY AIR OR SOUND ATTENUATOR
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SENS SENSIBLE LOAD
SF SMOKE-FIRE DAMPER
SHT SHEET
SM SMOKE DAMPER
SOL SOLENOID
SP STATIC PRESSURE
SQ SQUARE
SQ. FT. SQUARE FEET
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STM STEAM
STRUC STRUCTURE/STRUCTURAL
SV SUPPLY AIR VALVE
SWSI SINGLE WIDTH, SINGLE INLET
3SF 3 HOUR SMOKE FIRE DAMPER
TC TEMPERATURE CONTROL
TD TRANSFER DUCT
TEMP TEMPERATURE
TL TOTAL LOAD
TO TRANSFER OPENING
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TYP TYPICAL
UGRD UNDERGROUND
UH UNIT HEATER (HYDRONIC OR STEAM)
UNO UNLESS NOTED OTHERWISE
UPS UNINTERUPTIBLE POWER SUPPLY
UV UNIT VENTILATOR
V VOLT OR VENT
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VEL VELOCITY
VERT VERTICAL
VI VIBRATION ISOLATION
VIF VERIFY IN FIELD
VOL VOLUME
VR VACUUM RETURN
VRV VARIABLE REFRIGERANT VOLUME
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WATT
W.G. WATER GAGE
W/ WITH
W/O WITHOUT
WB WET BULB TEMPERATURE
WC WATER COLUMN
WMS WIRE MESH SCREEN
WPD WATER PRESSURE DROP
WT WEIGHT
WTR WATER
EWB ENTERING WET BULB TEMPERATURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EX EXISTING
EXIST EXISTING
EXT EXTERNAL
F FAHRENHEIT
F&T FLOAT & THERMOSTATIC STEAM TRAP
F.D. FLOOR DRAIN
FA FREE AREA
FC FORWARD CURVED
FCU FAN COIL UNIT
FD FIRE DAMPER
FF FINAL FILTER
FH FUME HOOD
FLA FULL LOAD AMPERES
FLEX FLEXIBLE
FLR FLOOR
FLT FLASH TANK
FM FLOW METER
FOG FUEL OIL GAUGE
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FP FIRE PROTECTION
FPB FAN POWERED TERMINAL UNIT
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FINNED RADIATION
FSTAT FREEZESTAT
FT FEET
FV FACE VELOCITY
G NATURAL GAS
GA GAUGE
GAL GALLON
GCWR GEOTHERMAL CONDENSER WATER RETURN
GCWS GEOTHERMAL CONDENSER WATER SUPPLY
GD GRAVITY DAMPER
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GLYCOL RETURN
GRL GRILLE
GRV GRAVITY RELIEF VENT
GS GLYCOL SUPPLY
GV GRAVITY VENTILOR OR NATURAL GAS VENT
TP
T
M0101
SUPPLY DUCT RISE
RETURN DUCT RISE
SECTION INDICATOR TOP
INDICATES SECTION NUMBER
BOTTOM INDICATES SHEET
NUMBER
VARIABLE SPEED DRIVE
EXHAUST DUCT RISE
OPPOSED BLADE VOLUME
DAMPERS
SAFETY/RELIEF VALVE
PRESSURE REDUCING VALVE
CHECK VALVE (SHOWN W/FLOW)
CONTROL VALVE (3-WAY)
CONTROL VALVE (2-WAY)
BALANCING VALVE
SOLENOID VALVE
DIRECTION OF FLOW
UNION
PIPE ANCHOR
PIPE GUIDE
OR FLEXIBLE DUCT
SINGLE LINE DUCT RISE OR DROP
SINGLE LINE EXHAUST DUCT
ELBOW WITH TURNING VANES
SINGLE LINE RETURN DUCT
SINGLE LINE SUPPLY DUCT
T
R
S
ELECTRICAL CONNECTION (BY DIVISION
23)
ROOM PRESSURIZATION MONITOR
FREEZESTAT
FLOW SWITCH
RELAY
HUMIDITY SENSOR
SWITCH
STRAINER W/BLOWDOWN VALVE
SENSING ELEMENT - AIR STREAM
SENSING ELEMENT - LIQUID SEPARABLE WELL
FLEXIBLE CONNECTION
ROUND (DIAMETER)
TRAP
EXPANSION LOOP
EXPANSION JOINT
PIPING FLOW METER
ANALOG OUTPUT
DIGITAL OUTPUT
DIGITAL INPUT
ELECTRICAL CONNECTION (BY DIVISION
26)
PILOT LIGHT-
LETTER
INDICATES
COLOR:
ANALOG OUTPUT, PNEUMATIC
ELECTRIC-PNEUMATIC SWITCH
PNEUMATIC-ELECTRIC SWITCH
SMOKE
ANALOG INPUT, PRESSURE
ANALOG INPUT, TEMPERATURE
FIRESTAT
SMOKE DETECTOR
DUCT SMOKE DETECTOR
G - GREEN
Y - YELLOW
R - RED
THERMOSTAT WITH LOCKING
COVER
VOLUME DAMPER
CURRENT SENSOR
BACKDRAFT DAMPER
PUMP
FIRE, SMOKE/FIRE, OR SMOKE
DAMPER
SUPPLY DUCT DROP
RETURN DUCT DROP
EXHAUST DUCT DROP
EXISTING SINGLE LINE DUCT
CAPPED DUCTWORK
CAPPED PIPING OR SINGLE DUCTWORK
OR
FD,SF, OR SM
EXISTING ITEM TO BE REMOVED
VALVE
"Ø
DUCT OFF-SET DN (IN DIRECTION OF FLOW)
DUCT OFF-SET UP (IN DIRECTION OF FLOW)
RECTANGULAR DUCT DIMENSIONS
(SIZE IN INCHES, FIRST DIMENSION IS SHOWN)
ROUND DUCT DIMENSIONS (DIAMETER)
OVAL DUCT DIMENSIONS
(SIZE IN INCHES, FIRST DIMENSION IS SHOWN)
MOTORIZED DAMPER
T TEMPERATURE SENSOR (IN DUCT OR PIPE)
CARBON DIOXIDE SENSOR
P PRESSURE GAGE
OR
PUSH BUTTONPB
200-5
200-2
SUPPLY AIR DEVICE -
(REFER TO SCHEDULE FOR SIZE)
FIRST NO. CFM, SECOND NO. TYPE
(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)
LINEAR DIFFUSER
200-14 10x8
SUPPLY/ RETURN/EXHAUST SIDEWALL GRILLE-
FIRST NO. CFM, SECOND NO. TYPE
BOTTOM NO. WIDTH BY HEIGHT OF GRILLE
(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)
RETURN AIR DEVICE -
(REFER TO SCHEDULE FOR SIZE)
FIRST NO. CFM, SECOND NO. TYPE
(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)
EXHAUST AIR DEVICE -
(REFER TO SCHEDULE FOR SIZE)
FIRST NO. CFM, SECOND NO. TYPE
(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)
VSD
RECTANGULAR WYE DUCT FITTING
AIR FLOW MEASURING STATION
OCCUPANCY SENSOR
EXISTING HVAC PIPE
NEW HVAC PIPE
EXISTING HVAC PIPE TO BE REMOVED
PIPE ELBOW DOWN
PIPE ELBOW UP
POINT OF CONNECTION (NEW TO EXISTING)
PIPE BOTTOM DROP
CLEANOUT (CO)
PIPE RISE OR DROP
ANALOG INPUT
TEMPERATURE SENSOR
OXYGEN SENSOR
OFF
ONAUTO
STARTER
HOSE DRAIN VALVE WITH CAP
MANUAL AIR VENT
PRESSURE/TEMPERATURE TEST PORT
ANALOG INPUT, FLOW
FIRE, SMOKE/FIRE, OR SMOKE DAMPER
IN RISER
FD,SF, OR SM
NEW EQUIPMENT
EXISTING EQUIPMENT
CALLOUT INDICATOR TOP
INDICATES NUMBER ON THE SHEET
BOTTOM INDICATES SHEET
NUMBER
NEW DUCT
EXISTING DUCT
DEMOED DUCT
TRIPLE DUTY VALVE
FM26
AI
AIF
AIP
AIT
AO
AOP
BDD
M0101
CO
CO²
CS
DI
DO
24x12 OV
24x12
24"Ø
DN
UP
DE
P E
200-5
EX-XXX
EXISTING
EQUIPMENT TYPE
FIRE
OR
FM
FS
F
H
250-7
CFM
TYPE
LENGTH
NO. OF SLOTS
SLOT WIDTH (INCHES)
4LF-2-1
XXX-1
TYPE NO.
EQUIPMENT TYPE
OS
O²
E P
G
DEMO EXTENTS
1. ALL MITERED ELBOWS AND TEES SHALL BE PROVIDED WITH SINGLE THICKNESS TURNING VANES.
2. COMPLY WITH APPLICABLE LOCAL, STATE, FEDERAL, AND VA CODES, STANDARDS, AND DESIGN GUIDES DURING THE EXECUTION OF WORK
DESCRIBED ON DRAWINGS AND OTHER CONTRACT DOCUMENTS.
3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR ALL CEILING AIR DEVICE LOCATIONS.
4. LOCATE ALL DUCT BALANCING DAMPERS AND TERMINAL UNITS ABOVE ACCESSIBLE CEILINGS, OR PROVIDE ACCESS DOORS. MINIMUM ACCESS DOOR SIZE SHALL BE 18"x18" UNLESS OTHERWISE APPROVED BY ENGINEER.
5. THE DRAWINGS ARE DIAGRAMMATIC AND ARE PROVIDED TO SHOW THE INTENT OF THE WORK. PROVIDE WORK AND EQUIPMENT NECESSARY TO COMPLETE THE INSTALLATION IN ACCORDANCE WITH APPLICABLE BUILDING CODES, STATE AND LOCAL BUILDING CODES, OWNERS INSURANCE UNDERWRITER(S), NFPA, AND OTHER GOVERNING AUTHORITIES HAVING JURISDICTION.
6. REFER TO ARCHITECTURAL ELEVATION DRAWINGS FOR LOCATION OF WALL MOUNTED MECHANICAL ITEMS.
7. INSTALL ALL FLOOR MOUNTED HVAC EQUIPMENT, INCLUDING AHUS, PUMPS, CHILLER, ETC. ON 4" MINIMUM CONCRETE PAD. COORDINATE AIR HANDLING UNIT CONCRETE PAD HEIGHT WITH CONDENSATE DRAIN TRAP HEIGHT REQUIREMENT AND LAYOUT BASED ON FINAL
EQUIPMENT TO BE INSTALLED.
8. ALL HYDRONIC PIPING CONNECTIONS TO INDIVIDUAL EQUIPMENT SHALL BE 3/4" UNLESS NOTED OTHERWISE.
9. MECHANICAL DRAWINGS ARE SCHEMATIC IN NATURE. RESOLVE ALL INTERFERENCES BETWEEN NEW WORK AND EXISTING BUILDING COMPONENTS PRIOR TO FABRICATION AND INSTALLATION. COORDINATION WITH ALL TRADES IS REQUIRED.
10. DUCTWORK, PIPING, AND EQUIPMENT CONNECTIONS SHOWN ON THE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE PROVIDED AS A GUIDE FOR THE INSTALLATION OF EQUIPMENT AND ASSOCIATED SYSTEMS. THE DRAWINGS SHALL NOT BE SCALED FOR ROUGHING IN MEASUREMENTS OR TO SERVE AS SHOP DRAWINGS. PROVIDE ADJUSTMENTS TO THE DUCTWORK, PIPING, AND EQUIPMENT LOCATIONS AS REQUIRED TO SUIT FIELD CONDITIONS WITHOUT ADDITIONAL COST TO THE OWNER. MAJOR DEVIATIONS TO THE DESIGN REQUIRE PRIOR APPROVAL BEFORE STARTING WORK. PROMPTLY REPORT UNRESOLVED INTERFERENCES AND CONFLICTS TO OWNER.
11. SUPPORTS, ROOF AND WALL OPENINGS, EQUIPMENT CONNECTIONS, EQUIPMENT ARRANGEMENT, AND ELECTRICAL POWER PROVISIONS FOR MECHANICAL EQUIPMENT ARE BASED ON PRELIMINARY INFORMATION FOR THE EQUIPMENT DESIGN BASIS SELECTION. PROVIDE AND INSTALL EQUIPMENT SUPPORTS, MAKE ROOF AND WALL OPENINGS, ADJUST CONNECTION SIZE AND TYPE, ADJUST EQUIPMENT SPACE ARRANGEMENT, AND PROVIDE ELECTRICAL BRANCH CIRCUIT AND DISTRIBUTION MODIFICATIONS BASED UPON CERTIFIED EQUIPMENT
DRAWINGS WITHOUT ADDITIONAL COST TO THE OWNER.
12. PREPARE AND SUBMIT DUCTWORK, PIPING, AND EQUIPMENT SHOP DRAWINGS FOR APPROVAL, PRIOR TO PERFORMING FABRICATION WORK IN ACCORDANCE WITH SPECIFICATIONS. INCLUDE DUCTWORK, PIPING, AND EQUIPMENT PLANS, ELEVATIONS, AND SECTIONS, SHOWING FITTINGS, EQUIPMENT CONNECTIONS, AND ACCESS REQUIREMENTS.
13. PROVIDE WORK IN STRICT ACCORDANCE WITH APPROVED SHOP DRAWINGS. THE ENGINEER RESERVES THE RIGHT TO REJECT WORK NOT
IN ACCORDANCE WITH THE APPROVED SHOP DRAWINGS.
14. FURNISH AND INSTALL THE NECESSARY APPURTENANCES AND MINOR AUXILIARIES REQUIRED TO MAKE EACH SYSTEM COMPLETE AND OPERABLE IN EVERY RESPECT. FURNISH AND INSTALL WORK DESCRIBED IN THE SPECIFICATIONS AND NOT SHOWN ON THE DRAWINGS, OR
VICE VERSA.
15. TEST AND ADJUST INSTALLED EQUIPMENT AND SYSTEMS IN ACCORDANCE WITH CONTRACT DOCUMENTS. CORRECT DEFECTS AND
SYSTEM DEFICIENCIES DISCLOSED BY TESTING, WITHOUT ADDITIONAL COST TO THE OWNER.
16. OPERATION OF THE EQUIPMENT, DUCTWORK, OR INSTALLED PIPING DOES NOT CONSTITUTE AN ACCEPTANCE OF THE WORK BY THE OWNER OR SUBSTANTIAL COMPLETION. FINAL ACCEPTANCE AND SUBSTANTIAL COMPLETION IS DEFINED IN THE CONTRACT DOCUMENTS.
17. FURNISH CERTIFICATES OF APPROVAL FROM ALL AUTHORITIES HAVING JURISDICTION AS PART OF THE SYSTEM ACCEPTANCE
DOCUMENTATION.
18. PROVIDE VOLUME DAMPERS AT ALL SUPPLY, RETURN, AND EXHAUST BRANCH DUCTWORK CONNECTIONS.
19. PROVIDE ACCESS DOORS IN DUCTWORK TO SERVICE HEATING COILS, FIRE DAMPERS, AUTOMATIC AND MANUAL DAMPERS, CONTROL HARDWARE, LOUVER SCREENS, ETC. WHERE ACCESS IS REQUIRED FOR MAINTENANCE AND AS REQUIRED BY BUILDING CODES, MECHANICAL CODES, AND FIRE CODES.
20. LOCATIONS SHOWN ON DRAWINGS FOR THERMOSTATS, HUMIDISTATS AND LOCAL INDICATING PANELS ARE APPROXIMATE. COORDINATE FINAL LOCATION TO SUIT FIELD CONDITIONS, FURNITURE, OTHER PROJECT INSTALLATIONS, OR AS DIRECTED BY OWNER.
21. INSTALL PIPING TO HVAC HEATING AND COOLING COIL(S) TO ALLOW CLEAR REMOVAL SPACE FOR THE COILS, AIR FILTERS, UNIT
CONTROLS, FANS, AND MOTORS.
22. COIL PIPING SHALL NOT BLOCK FILTER OR MOTOR ACCESS.
23. RUN DUCTWORK AND PIPE INSULATION CONTINUOUSLY THROUGH FLOOR, ROOF, AND WALL PENETRATIONS.
24. PENETRATIONS NOT OTHERWISE NOTED SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR.
25. EQUIPMENT MAINTENANCE ACCESS SPACE SHOWN WITH DASHED LINES. COMPLY WITH NEC REQUIREMENTS FOR CLEARANCE AROUND
ELECTRICAL ENCLOSURES. 24V PANELS SHALL HAVE A MINIMUM OF 18" FRONT CLEARANCE.
26. PROVIDE (1) PAIR OF SPARE TAPS, SHUTOFF VALVES, AND CAPS FOR EVERY HYDRONIC UTILITY PER BUILDING FLOOR AND PER MAJOR
FLOOR WING. SIZE SHALL MATCH THE HEADER CONNECTION.
27. INSTALL 3/4" MANUAL HIGH POINT VENTS AND LOW POINT DRAINS IN ALL RELATIVE HIGH AND LOW POINTS IN HYDRONIC PIPE SYSTEMS TO
PREVENT TRAPPING OF AIR DURING FILLING AND TO FACILITATE COMPLETE DRAINAGE.
28. CONTRACTOR SHALL COORDINATE ALL FCU'S AND ASSOCIATED DUCTWORK & PIPING WITH OTHER DISCIPLINES EQUIPMENT TO ENSURE REQUIRED ACCESS AND CLEARANCES ARE MAINTAINED. DO NOT LOCATE FCUS, VAV TERMINALS, AND MAINTENANCE ITEMS OVER WORK
TABLES, ELECTRONIC EQUIPMENT, OR PATIENT BEDS.
29. ALL CONTROL DEVICES SHALL BE 24 V UNLESS NOTED OTHERWISE.
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES
M0001
MEM CKH
ABBREVIATIONS
SYMBOLS GENERAL NOTES
PROPOSED LOCATION
FOR TEMPORARY
AHUS
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106SITE PLAN
M0051
MEM CKH
NTS
5F
VA CLC Site Plan
TEMPORARY EQUIPMENT OPERATION NOTES
1. IN ORDER TO MAINTAIN OPERATION OF AREAS OF THE BUILDING OUTSIDE OF THE SCOPE OF DEMOLITION WHICH ARE SERVED BY AIR HANDLING EQUIPMENT TO BE REPLACED, THE MECHANICAL CONTRACTOR SHALL SOURCE, FURNISH, AND INSTALL A TEMPORARY PACKAGED AIR HANDLING UNIT FOR USE DURING CONSTRUCTION. CONTRACTOR SHALL PROVIDE TEMPORARY EQUIPMENT WITH SUFFICIENT CAPACITY TO
CONDITION SPACES SERVED FOR CONTINUED OPERATION.
2. TEMPORARY AHUS MAY BE PLACED ON THE ROOF ONLY IF THEIR WEIGHTS ARE LESS THAN 40 POUNDS
PER SQUARE FOOT.
3. PROVIDE TEMPORARY HOT WATER AND GLYCOL BOILERS TO SERVE MAINTAIN EXISTING SYSTEMS
DURING CONSTRUCTION (PROVIDED ONLY IF DEDUCT IS NOT ACCEPTED).
4. TEMPORARY CONNECTION POINTS SHALL BE INSTALLED ON THE DEMOLITION PLAN PRIOR TO SHUTDOWN OF EXISTING EQUIPMENT. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION RELATED TO
POWER SUPPLY FOR TEMPORARY MECHANICAL EQUIPMENT.
5. INSTALLATION LOCATION OF TEMPORARY AIR HANDLING EQUIPMENT SHALL BE DETERMINED BY THE
MECHANICAL CONTRACTOR AND COORDINATED WITH THE OWNER. PROPOSED LOCATION SHOWN ON
THIS SHEET IS PRELIMINARY AND REQUIRES COORDINATION WITH THE OWNER AND OTHER BUILDING
ACTIVITIES AT THE TIME OF CONSTRUCTION.
6. ROUTING OF TEMPORARY DUCTWORK SHALL BE COORDINATED WITH CONSTRUCTION ACTIVITIES TO PROVIDE CONTINUOUS OPERATION OF TEMPORARY AIR HANDLING EQUIPMENT DURING CONSTRUCTION
TO MAINTAIN BUILDING OPERATION.
7. APPROXIMATE TEMPORARY EQUIPMENT CAPACITIES AND LENGTH OF RENTAL:
A. (1) 1000 MBH BOILER, 6 MONTHS.
B. (1) 4000 CFM, 100% OA AHU, 12 MONTHS.
C. (1) 6000 CFM 50% OA AHU 12 MONTHS.
R S T U V W
50x20 EA UP
18x36 EA UP x
E
A
40x14 RA
40x14 RA
14x40 RA UP
40x14 RA UP 50x20
50x20 EA x
R
A
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106PIPE BASEMENT - HVAC DUCTWORK
PLAN
M0100
MEM CKH
1/8" = 1'-0" 4F
M0100 - HVAC DUCTWORK PLAN - PIPE BASEMENT
KEYED NOTES:
1. PROVIDE 18"x36" FSD AT FLOOR PENETRATION.
2. PROVIDE 14"x40" FSD AT FLOOR PENETRATION.
3. PROVIDE 40"x14" FSD AT FLOOR PENETRATION.
FCU-12
FCU-13
FCU-14 FCU-15 FCU-16
FCU-17
FCU-18FCU-19
FCU-20
FCU-21
FCU-23
A B C D E F
H J K M N O P
R S T U V W x
S
A
36x12 SA 40x22 x
S
A
20x12 12x10
16x10
12x10
20x12 EA18x10 14x10
VAV-01
VAV-02
VAV-03
VAV-04
VAV-05
VAV-06
48x22 SA x
S
A
14"Ø
12"Ø
"Ø
8"Ø
12x10
12"Ø x
VAV-07
V A
V -0
VAV-09
V A
V -1
VAV-11
V A
V -1
VAV-13 VAV-14
VAV-15
V A
V -1
VAV-20
VAV-16
VAV-17
V A
V -1
VAV-21
10"Ø
6"Ø
12"Ø
10"Ø
6"Ø x x
18x12 SA x
S
A x x
S
A
FCU-11
FCU-10FCU-09FCU-08FCU-07
FCU-06
FCU-05FCU-04FCU-03FCU-02
125-4
285-4 300-4
125-4 125-4
335-4 300-4
125-4 125-4
300-4 335-4
125-4
125-5
-5 300-5
125-5 125-5
335-5 300-5
125-5 125-5
300-5 335-5
125-5
300-4
125-4
125-5
385-5
125-5
385-4
125-4
-4
290-4
335-4
125-4 125-4
385-4 385-4
300-4
125-5125-5125-5125-5
250-5 250-5
200-4 200-4
125-4
175-4
175-4
300-4
250-4 250-4 250-4
200-4 200-4
250-4 250-4 250-4
125-4
425-4
385-4
125-4 125-4
335-4 225-4
125-4 125-4
385-4
250-4
300-4125-4
125-4
335-4300-4
125-4125-4
300-4285-4
125-4
290-5 300-5
125-5 125-5 125-5
300-5 335-5
125-5
-5
250-4
385-5
125-5125-5125-5
335-5 2
-5
125-5
385-52
-5
125-5
125-5 425-5
250-5250-5
275-5
250-5250-5
150-4
225-5 225-5
150-4
250-4
125-5
100-4
100-5
350-5
300-5
250-4250-4
300-5
-5
225-5
275-4375-5
225-5
150-4 150-4
50-5
150-4
250-4
300-4
290-4
290-4
350-4
325-4
150-4
250-4 100-5
150-5
125-5
75-5
75-5125-4
150-4
325-5
325-4
290-5
290-5
150-4
50-4
150-5 75-475-5
100-4
200-4
450-5
385-5335-52
-5
385-5
250-4
250-4
250-4
300-5
-5
350-5
325-5
225-5
150-4
200-5
150-4
175-4
M0301
4E
50-4
12"Ø 10"Ø
10"Ø
"Ø
"Ø
8"Ø1
"Ø
10"Ø
"Ø
8"Ø
12"Ø
8"Ø
"Ø
8"Ø
"Ø
12"Ø
"Ø
"Ø
12"Ø 10"Ø
12x1210"Ø
6"Ø
10"Ø12"Ø
"Ø
12"Ø 10"Ø10"Ø
"Ø
"Ø
10"Ø
"Ø
"Ø
8"Ø x x
10x10 x
"Ø x x
20x10
12x12 x x
"Ø
"Ø
"Ø
"Ø
8"Ø
"Ø
"Ø
"Ø
"Ø
10"Ø
12"Ø x
14"Ø
"Ø
6"Ø
8"Ø
"Ø
"Ø
"Ø
10"Ø 12"Ø
"Ø 1
"Ø x
"Ø6
"Ø
"Ø
"Ø
"Ø
"Ø
"Ø
EF-1
450-5
32x12 x x
"Ø
12x10
12"Ø
12"Ø x x
FCU-22
290-4
-5 x x
8"Ø
-5
285-4 x x
300-4
125-4 x
290-4
10"Ø x
285-5 x x
10x10
325-4
-5 x
-5
200-4 x
-5
425-5
425-4
12"Ø
Sitting Area
G104
"Ø
8"Ø
12x10
10x1010x10
10"Ø
"Ø
"Ø x
20x12 SA
20x12 EA x
ERU-1
12x10
Oxygen Storage - Full
G121.1 x
10"Ø
"Ø
"Ø
"Ø
"Ø
10"Ø
10"Ø
"Ø
8"Ø x x
R
A x
6"Ø x x1
10"Ø
12x10
10"Ø x x
40x14 30x12 RA
36x12 EA
"Ø
12x12
10x108"Ø
20x12 x
Bedroom
G148
Bedroom
G149 Bedroom
G150 Bedroom
G151
Bedroom
G152 Bedroom
G153
Bedroom
G142
Bedroom
G143
Bedroom
G144 Bedroom
G145
Bedroom
G146 Bedroom, Bariatric
G141
Bath Suite
G154
Bedroom, Bariatric
G161
Soiled Utility
G174
Clean Utility
G173
Bedroom
G172
Bedroom
G171
Bedroom
G170
Bedroom
G169
Bedroom
G168
Bedroom
G166
Bedroom
G165
Bedroom
G164
Bedroom
G163
Bedroom
G162
Office
G123
Family Lounge
G107
Medicine Storage
G106
Telecom Closet
G113
Conference
G131
Staff Lounge
G126
Office
G127
Office
G128
Mechanical (E)
G132
Mechanical (E)
G132.1
Concierge Station
G105
Multi-Purpose Area
G112
Laundry
G109
Storage
G140.2
Storage
G140.1 Elec
G160.2
Storage
G160.4
Shared Office
G129
Toilet
G148.1 Toilet
G149.1
Toilet
G150.1
Toilet
G151.1
Toilet
G152.1 Toilet
G153.1
Toilet
G146.1
Toilet
G145.1 Toilet
G144.1
Toilet
G143.1
Toilet
G142.1
Toilet
G141.1
Toilet
G172.1
Toilet
G171.1
Toilet
G170.1 Toilet
G169.1
Toilet
G168.1
Toilet
G166.1
Toilet
G165.1
Toilet
G164.1
Toilet
G163.1
Toilet
G162Toilet
G161.1
Corridor
G140
Corridor
G160
Stairs
G167 Stairs
G147
Stairs
G133
Lobby
G103
Oxygen Storage- Empty
G121
Vestibule
G100
Foyer
G101
Locker Room
G130
Storage/Linen Storage
G110
Kitchen
G111
Office
G124
Closet
G114
Multi-Purpose Area
G102
Storage
G140.3
Toilet
G130.1
Elec
G120.1
Toilet
G130.2
House Keeping
G122
Corridor
G175
Public Toilet
G108
Storage
G160.3
200-5
100-5
Elec Closet
G140.4
EA
"Ø
"Ø
"Ø
10"Ø
M0302
4F
SDSD
SD
SD
FSD
SD
SD
SD
SD
FD
FD
FD
FD
FD
"Ø
"Ø
8"Ø
"Ø
S D
S D
"Ø
10"Ø
8"Ø
20x12 EA x
12x10
10x10 x
"Ø
FSD
FSD
"Ø
"Ø
6"Ø
6"Ø
12"Ø
12"Ø x
10"Ø
10"Ø
"Ø
"Ø
"Ø
"Ø
10x108"Ø
"Ø 10"Ø
8"Ø 10"Ø
14x14
14x12
10"Ø
"Ø
12"Ø
18x12
10"Ø x
10"Ø
10x10 x
8"Ø
6"Ø
10"Ø x
E
A x
10"Ø
FCU-25
14x10
FCU-24
F C
U -2
14x14
150-4
EF-2
x
6"ØFD
FD
"Ø
10x8 8 "Ø
"Ø
"Ø
125-4
265-4260-4
"Ø x
8"Ø
12x10
"Ø 8 "Ø
"Ø
12x10 x
12x10 x x x x
10"Ø 1
"Ø x
"Ø x
8"Ø
12x10 10"Ø
"Ø
"Ø x
"Ø
"Ø
"Ø x
12x10
10x8
12x10 x
10x8
FSD
6x6
TERMINATE AT LOUVER.
SEE ARCH FOR SIZE.
100-15
"Ø
E A
FCU-27
CO
325-5 325-5 14x10 RA x
14x12 RA
SD
SD10"Ø
"Ø
12x12
425-5
-5
12"Ø
"Ø
14x12
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106GROUND FLOOR - HVAC DUCTWORK
PLAN
M0101
MEM CKH
1/8" = 1'-0" 5F
M0101 - HVAC DUCTWORK PLAN - GROUND FLOOR
KEYED NOTES:
1. PROViDE WELDED 316L STAINLESS STEEL DUCTWORK FOR EXHAUST CONNECTED TO EF-1. INSTALL
EF-1 10'-9" ABOVE LEVEL 01.
2. 40"x14" RA DOWN TO PIPE BASEMENT BELOW.
3. 36"x18" EA DOWN TO PIPE BASEMENT BELOW.
4. (4) EA DN TO WASHER/DRYER UNIT. COORINDATE SIZE WITH EXHAUST CONNECTION ON EQUIPMENT.
5. TERMINATE DRYER EXHAUST WITH GOOSENECK.
6. INSTALL ERU ON CONCRETE PAD. SEE SHEET M0701, DETAIL 7B.
7. RECONNECT EXISTING MECHANICAL SYSTEMS INTO NEW MECHANICAL AIR & HYDRONIC SYSTEMS.
REBALANCE TO PREVIOUSLY MEASURED AIRFLOWS.
8. CONNECT 18"x50" EA DUCT UP FROM PIPE BASEMENT TO 76"x18" EA DUCT.
9. ROUTE 6"x6" EA DUCT DOWN TIGHT TO WALL AND TERMINATE WITH AN ELBOW AND 6"x6" GRILLE 1'-0"
AFF.
R S T U V W
3" GS/GR UP
3" GS/GR UP
3" GS
3" GR
C D
3" CD 3" CD
C D
3" CD 3" CD
C D
C D
3" CD3" CD
C D
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106PIPE BASEMENT - HVAC PIPING PLAN
M0200
MEM CKH
1/8" = 1'-0" 4F
M0200 - HVAC PIPING PLAN - PIPE BASEMENT
KEYED NOTES:
1. TERMINATE 3" CONDENSATE AT SUMP PIT. MINIMUM 1"
AIR GAP BETWEEN TERMINATION AND GRATE.
2. 3" CD UP IN PLUMBING CHASE TO GROUD FLOOR.
COORDINATE CONDENSATE ROUTING IN CHASE WITH
PLUMBING CONTRACTOR.
T
T T T T T T
TT
T
TT
T
T
T
T T T T T
T
TTTT
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
T
A B C D E F
H J K M N O P
R S T U V W
FCU-13 FCU-14 FCU-15 FCU-16 FCU-17
FCU-22
FCU-21 FCU-20 FCU-19 FCU-18
FCU-23
VAV-15
VAV-13
VAV-14
VAV-12
FCU-06
FCU-05
FCU-04FCU-01 FCU-02
FCU-03
FCU-07 FCU-08 FCU-09 FCU-10
FCU-11
HWR
HWS
HWR
HWS
FCU-12
VAV-11
VAV-10
VAV-07
VAV-09
VAV-08
VAV-01
VAV-02
VAV-03
VAV-04
VAV-05
VAV-06
VAV-21
VAV-16
VAV-17
VAV-18
V A
V -1
VAV-20
C H
W S
C H
W R
CHWR
CHWS
ERP-2
ERP-1
ERU-1
2 1/2"
2 1/2"
2" 2"
1"
1"
2" 2"
2" 2"
2" 2"
1" 1"
1 1/4" 1 1/4"
EF-1
3/4"
3/4"
3/4" 3/4"
1 1/2"
1 1/2"
3/4"
3/4"
Bedroom
G148
Bedroom
G149
Bedroom
G150
Bedroom
G151
Bedroom
G152 Bedroom
G153
Bedroom
G142 Bedroom
G143
Bedroom
G144
Bedroom
G145 Bedroom
G146
Bedroom, Bariatric
G141
Bath Suite
G154
Bedroom, Bariatric
G161
Soiled Utility
G174
Clean Utility
G173
Bedroom
G172
Bedroom
G171 Bedroom
G170 Bedroom
G169
Bedroom
G168
Bedroom
G166
Bedroom
G165
Bedroom
G164
Bedroom
G163Bedroom
G162
Office
G123
Family Lounge
G107
Medicine Storage
G106
Telecom Closet
G113
Conference
G131
Staff Lounge
G126
Office
G127
Office
G128
Mechanical (E)
G132
Mechanical (E)
G132.1
Concierge Station
G105
Sitting Area
G104
Multi-Purpose Area
G112
Laundry
G109
Storage
G140.2 Storage
G140.1 Elec
G160.2
Storage
G160.4
Shared Office
G129
Toilet
G148.1 Toilet
G149.1
Toilet
G150.1
Toilet
G151.1 Toilet
G152.1 Toilet
G153.1
Toilet
G146.1
Toilet
G145.1 Toilet
G144.1
Toilet
G143.1 Toilet
G142.1 Toilet
G141.1
Toilet
G172.1 Toilet
G171.1
Toilet
G170.1
Toilet
G169.1
Toilet
G168.1
Toilet
G166.1
Toilet
G165.1
Toilet
G164.1
Toilet
G163.1
Toilet
G162
Toilet
G161.1
Corridor
G140
Corridor
G160
Stairs
G167
Stairs
G147
Stairs
G133
Lobby
G103
Oxygen Storage- Empty
G121
Locker Room
G130
Storage/Linen Storage
G110
Kitchen
G111
Office
G124
Closet
G114
Multi-Purpose Area
G102
Storage
G140.3
Toilet
G130.1
STC?
Elec
G120.1
Toilet
G130.2
House Keeping
G122
Corridor
G175
Oxygen Storage - Full
G121.1
Public Toilet
G108
1 3/4" 3/4"
3/4"
3/4"
1" 1"1"
1"3/4"
1 1/4" 1 1/4"
1 1/2" 1 1/2"
2" 2"
2" 2"
M0301
4E
CD CD
1"2"
2"
CD
1"
CD
1"
1"
2"
CD CD
CD
1" 2"
2"
1"
CD
1"
2"
1"
4 4
CD
2"
2"
1"
4 4
CD
1"
CD CD
2"
1"
1"
2"
CD
1"
1 1/2" 1 1/2"
2"
2"
1 1/2" 1 1/2"
1 1/2" 1 1/4" 1 1/4"
1"
3/4"
3/4" 3/4"
1" 1"
1 1/2"
1" CD
FCU-25
1"
1"
F C
U -2
1 1/2" 1 1/2"
1"
C D
2"
2"
2 1/2" 2 1/2"
FCU-24
3/4" 3/4"
1" 1"
3/4" 3/4"
1 1/4"
1 1/4"
3/4" 3/4"
1" 1"1 1/2" 1 1/4"
1 1/4"
1 1/2" 1 1/4"
1" 1"
2" 2"
1 1/4"1 1/4"
1"
3/4"3/4"
1"
3" GR
3"
3/4" 3/4" 3/4" 3/4"
3/4" 3/4"
1" 1"
3/4" 3/4"
3/4" 3/4"
3/4"3/4" 3/4"
3/4"
3/4" 3/4" 3/4" 3/4"
3/4" 3/4"
3/4"
3/4"
3/4" 3/4"
3/4" 3/4"
3/4" 3/4" 3/4" 3/4"
3/4"
3/4"
3/4"
3/4"
3/4" 3/4"
3/4" 3/4"
3/4" 3/4"
3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
3/4"
3/4"
3/4" 3/4"
3/4"3/4"
3/4" 3/4"
3/4"
3/4"
1"
1"
3/4" 3/4"
3/4" 3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
3/4" 3/4"
3/4" 3/4" 3/4"
3/4"
3/4" 3/4"
3/4" 3/4"
3/4" 3/4" 1"
1"
3/4" 3/4"
3/4" 3/4" 3/4" 3/4" 3/4"
3/4" 3/4" 3/4" 3/4"
3/4" 3/4" 3/4" 3/4"
3/4"
3/4" 3/4" 3/4"
3/4" 3/4"
3/4" 3/4"
3/4" 3/4"
3/4"
3/4"
3/4"
3/4"
1"
3/4"3/4"
3/4" 3/4"
3/4"
3/4"
3/4"
3/4"
3/4" 3/4"
3/4" 3/4"
3/4"3/4"
3/4"
3/4"
3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
3/4" 3/4"
1"
1" 3/4"
1" 1"
1 1/4" 1 1/4"
1" 1"
Office
G125
3/4"
HWR
HWS
CHWR
CHWS
3/4"
1" 1"
HWR
HWS
3/4"
3/4"
1"
H W
R H
W S
H W
R H
W S
3/4" 3/4"
CD
CD
2"
2"
EF-2
FCU-27
/4
/4
3/4" CD
5 5
1"
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106GROUND FLOOR - HVAC PIPING PLAN
M0201
MEM CKH
1/8" = 1'-0" 4F
M0201 - HVAC PIPING PLAN - GROUND FLOOR
KEYED NOTES
1. PROVIDE SHUT OFF VALVES AND CAP 1-1/2" HWS/R FOR FUTURE CONNECTIONS.
2. PROVIDE SHUT OFF VALVES AND CAP 1-1/2" CHWS/R FOR FUTURE CONNECTIONS.
3. INSTALL PUMPS INSIDE INSULATED HEATED ENCLOSURE. PROVIDE 4" HOUSEKEEPING PAD,
EXTEND HOUSEKEEPING PAD 6" BEYOND ENCLOSURE. PROVIDE 1" THICK MINIMUM
INSULATED ENCLOSURE, 1.5 KW 120V WALL HEATER. HUBBELL POWER SYSTEMS SINGLE
ALUMINUM HOT BOX OR EQUAL. CONTRACTOR PROVIDE SIZE BASED ON FINAL LAYOUT.
MAINTAIN MINIMUM MANUFACTURER EQUIPMENT MAINTANCE ACCESS.
4. ROUTE 2" CD DN PIPING CHASE TO PIPE BASEMENT.
5. HOT WATER SYSTEM DIFFERENTIAL PRESSURE SENSOR LOCATION.
D
K
M
N
O
P
P
L
AHU-02
EX-AHU-01
VAV-22
Mechanical (E)
G132.1
Mechanical (E)
G132
48x28
44x20
13" CHWR
3" CHWS
2" HWS
2" HWR
HWP-2 HWP-1
HX-2 HX-1
3" HWS
ET-1
ET-2
x
1 1/2"
1 1/2" 2"
2 1/2"
2 1/2"
1 1/2"
/2
3" HWR
/2
H W
S
H W
R
2 1/2" CHWS
C H
W S
C H
W R
3" 3"
3" GS/GR DN TO PIPE
BASEMENT.
2"
1 1/2"
2"
/2
/2
/2
1 1/2"
HWP-4
HWP-3
HWP-5
4" MPS
M P
S
2 1/2"
/2
2" PCD DN TO
EXISTING.
/2
/2
/2
SD
1 1/2"
2 1/2"
3"
EX-AHU-03
/4
H
W R
H W
S
C D
/2
M P
S
H W
S
4" MPS
/2
H W
R
H W
S x
/4
AS-1
AS-2
/2
V
CRU-1
SD
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106ENLARGED PLANS AND SECTIONS
M0301
MEM CKH
1/4" = 1'-0" 4E
ENLARGED MECHANICAL ROOM - NEW HEAT EXCHANGER
KEYED NOTES:
1. 40"x14" RA UP FROM PIPE BASEMENT BELOW. INSTALL FIRE
DAMPER AT FLOOR. COORDINATE DUCT WITH OPENING IN
FLOOR.
2. ROUTE 1" CONDENSATE DRAIN TO NEAREST FLOOR DRAIN.
3. ROUTE 1 1/2" CONDENSATE VENT TO EXTERIOR. TERMINATE
IN GOOSENECK.
4. PROVIDE SCREEN ON VAV OUTLET.
5. PROVIDE SMOKE DAMPER AT AHU-03 OUTLET.
CONNECT DUCT TO EXISTING LOUVER
K M N O P
AHU-02
EX-AHU-03
EX-AHU-01
VAV-22
GS
GR
Mechanical (E)
G132.1
Mechanical (E)
G132
40x22
48x28
44x20
CHWR
CHWS
HWS
HWR
EX PHWR
EX HWR
EX PHWS
EX HWR
EX HWR
E X
P H
W S
E X
H W
R
E X
M P
S
AS-1
1" CD
EX MPS
ET-1
CONNECT DUCT TO EXISTING LOUVER
C H
W R
C H
W S
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106ENLARGED PLANS AND SECTIONS -
DEDUCT ALTERNATE
M0302
MEM CKH
1/4" = 1'-0" 4F
ENLARGED MECHANICAL ROOM - DEDUCT ALTERNATE
KEYED NOTES:
1. 40"x14" RA UP FROM PIPE BASEMENT BELOW. INSTALL FIRE
DAMPER AT FLOOR. COORDINATE DUCT WITH OPENING IN
FLOOR.
2. PROVIDE SCREEN ON VAV OUTLET.
3. PROVIDE SMOKE DETECTOR AT AHU-03 OUTLET.
GROUND FLOOR
FIRST FLOOR
PIPE BASEMENT
MECHANICAL ROOM
CHWS
CHWR
HWS
HWR
EX-CHWS
EX-CHWR
EX-HWS
EX-HWR
ERS
ERR
ERS
ERR
ERS
ERR
ERU-1
CHWS/R AND
HWS/R, TO AND
FROM NEW
VAV/FCU
EXISTING CHWS/R
AND HWS/R
BUILDING
EXTERIOR
BUILDING
INTERIOR
EX-CHWS
EX-CHWR
EX-HPS
EX-PCD
EX-CHWS/R,
HPS, AND PCD
TO AND FROM
CUP
GROUND FLOOR
FIRST FLOOR
PIPE BASEMENT
MECHANICAL ROOM
MA SA
MA RA
OA
EX-MA SA
EX-MA RA
EX-OA
EX-EA
ERU-1
MA SA, MA RA, OA,
AND EA TO/FROM
GROUND FLOOR
EXISTING MA SA,
MA RA, OA, AND EA
BUILDING
EXTERIOR
BUILDING
INTERIOR
EA
EAMA RA
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106RISER DIAGRAMS
M0401
MEM CKH
NTS
4C
HYDRONIC RISER DIAGRAM
NTS
4E
AIR SYSTEM RISER DIAGRAM
AIR DEVICE SCHEDULE
TYPE
1, 2, 3, 4
1, 2, 3, 4
1, 2, 3, 4
1, 2, 3, 4
1, 2, 3, 4
SERVICE STYLE
SUPPLY
RETURN/EXHAUST
PLAQUE
FACE
SIZE (IN)
24 x 24
NECK
SIZE (IN)
6" Ø
AIR FLOW
RANGE (CFM)
0 - 100
REMARKS
24 x 24 8" Ø 101 - 175
24 x 24 10" Ø 176 - 250
24 x 24 12" Ø 251 - 350
24 x 24 14" Ø 351 - 450
RETURN/EXHAUST
RETURN/EXHAUST
RETURN/EXHAUST
RETURN/EXHAUST
24 x 24
24 x 24
24 x 24
24 x 24
12 x 12
10" Ø
12" Ø
14" Ø
15 x 15
6" Ø
201 - 325
326 - 450
451 - 600
601 - 950
0 - 100
15 RETURN/EXHAUST LOUVERED 8 x 8 8 x 8 0 - 100
15 RETURN/EXHAUST 12 x 8 12 x 8 101 - 200
15 RETURN/EXHAUST 14 x 10 201 - 400
15 RETURN/EXHAUST 16 x 12 401 - 600
LOUVERED
LOUVERED
LOUVERED
14 x 10
16 x 12
5 RETURN/EXHAUST 12 x 12 8" Ø 101 - 200
SUPPLY
SUPPLY
SUPPLY
SUPPLY
NOTES:
1. ALL BRANCH DUCTWORK TAPS CONNECTING TO DIFFUSERS SHALL BE EQUAL TO DIFFUSER
NECK SIZE AS SPECIFICED IN THE AIR DEVICE SCHEDULE.
PLAQUE
PLAQUE
PLAQUE
PLAQUE
PLAQUE
PLAQUE
PLAQUE
PLAQUE
PLAQUE
PLAQUE
15 LOUVERED 6 x 6 6 x 6 0 - 100 1RETURN/EXHAUST
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 66Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106SCHEDULES
M0501
MEM CKH
VAV TERMINAL UNIT SCHEDULE
MARK SIZE AIRFLOW
(CFM)
MIN AIRFLOW
(CFM)
HEATING
AIRFLOW
(CFM)
REHEAT COIL
REMARKSCAPACITY
(MBH)
EAT (°F) LAT (°F) EWT (°F) LWT (°F) GPM
VAV-01 12 575 275 275 9.0 55 85 180 150 0.7 1,2
VAV-02 8 350 175 175 5.7 55 85 180 150 0.4 1,2
VAV-03 8 525 525 525 17.1 55 85 180 150 1.2 1,2
VAV-04 8 325 175 175 5.7 55 85 180 150 0.4 1,2
VAV-05 10 325 175 175 5.7 55 85 180 150 0.4 1,2
VAV-06 8 125 125 125 4.1 55 85 180 150 0.3 1,2
VAV-07 10 550 250 250 8.2 55 85 180 150 0.6 1,2
VAV-08 8 100 100 100 3.3 55 85 180 150 0.3 1,2
VAV-09 6 50 50 50 1.7 55 85 180 150 0.2 1,2
VAV-10 6 150 100 100 3.3 55 85 180 150 0.3 1,2
VAV-11 8 400 125 125 4.1 55 85 180 150 0.3 1,2
VAV-12 12 875 825 825 26.9 55 85 180 150 1.9 1,2
VAV-13 12 750 500 500 16.3 55 85 180 150 1.1 1,2
VAV-14 12 575 450 450 14.7 55 85 180 150 1.0 1,2
VAV-15 12 750 500 500 16.3 55 85 180 150 1.1 1,2
VAV-16 8 300 675 675 22.0 55 85 180 150 1.5 1,2
VAV-17 6 300 50 50 1.7 55 85 180 150 0.2 1,2
VAV-18 10 825 250 250 8.2 55 85 180 150 0.6 1,2
VAV-19 8 100 300 300 9.8 55 85 180 150 0.7 1,2
VAV-20 10 475 800 800 26.1 55 85 180 150 1.8 1,2
VAV-21 8 1650 1650 1650 53.8 55 85 180 150 3.7 1,2
VAV-22 10 1550 1500 1500 48.9 55 85 180 150 3.3 1,2
FOUR-PIPE FAN COIL UNIT SCHEDULE
UNIT NO. CONFIG.
COOLING
AIRFLOW
(CFM)
HEATING
AIRFLOW
(CFM)
ESP
(IN. WG)
COOLING COIL HEATING COIL ELECTRICAL
EMERGENCY
POWER
FILTER
REMARKS
TOTAL
COOLING
CAPACITY
(MBH)
SENSIBLE
COOLING
CAPACITY
(MBH) EAT (ºF)
LAT
(ºF)
EST.
FLOW
(GPM)
EWT
(ºF)
LWT
(ºF)
MAX
WPD
(FT)
HEATING
CAPACITY
(MBH)
EAT
(ºF)
LAT
(ºF)
EST.
FLOW
(GPM)
EWT
(ºF)
LWT
(ºF)
MAX
WPD
(FT) MCA V/PH/HZ MERV
FCU-01 HORIZONTAL 575 250 0.5 13.24 12.88 70/58 49.54 2.64 43 53 3.3 8 70 92.3 0.9 180 150 0.59 4.7 277/1/60 N 8 1
FCU-02 HORIZONTAL 300 125 0.5 6.49 6.35 70/58 49.98 1.29 43 53 0.84 4 70 95.5 0.6 180 150 0.21 4.7 277/1/60 N 8 1
FCU-03 HORIZONTAL 335 190 0.5 7.25 7.08 70/58 50 1.45 43 53 1.02 6 70 94.2 0.6 180 150 0.23 4.7 277/1/60 N 8 1
FCU-04 HORIZONTAL 300 125 0.5 6.49 6.35 70/58 49.98 1.29 43 53 0.84 4 70 95.5 0.6 180 150 0.21 4.7 277/1/60 N 8 1
FCU-05 HORIZONTAL 300 125 0.5 6.49 6.35 70/58 49.98 1.29 43 53 0.84 4 70 95.5 0.6 180 150 0.21 4.7 277/1/60 N 8 1
FCU-06 HORIZONTAL 335 155 0.5 7.25 7.8 70/58 50 1.45 43 53 1.02 5 70 94.2 0.6 180 150 0.23 4.7 277/1/60 N 8 1
FCU-07 HORIZONTAL 385 125 0.5 8.28 8.8 70/58 50.09 1.65 43 53 1.29 4 70 92.7 0.6 180 150 0.27 4.7 277/1/60 N 8 1
FCU-08 HORIZONTAL 525 190 0.5 12.27 11.86 70/58 49.36 2.44 43 53 2.87 6 70 93.4 0.9 180 150 0.54 4.7 277/1/60 N 8 1
FCU-09 HORIZONTAL 335 125 0.5 7.25 7.08 70/58 50 1.45 43 53 1.02 4 70 94.2 0.6 180 150 0.23 4.7 277/1/60 N 8 1
FCU-10 HORIZONTAL 385 125 0.5 8.28 8.08 70/58 50.09 1.65 43 53 1.29 4 70 92.7 0.6 180 150 0.27 4.7 277/1/60 N 8 1
FCU-11 HORIZONTAL 385 155 0.5 8.28 8.08 70/58 50.09 1.65 43 53 1.29 5 70 92.7 0.6 180 150 0.27 4.7 277/1/60 N 8 1
FCU-12 HORIZONTAL 900 280 0.5 24.92 22.04 70/58 47.63 4.97 43 53 5.91 9 70 101.7 2.1 180 150 4.12 4.7 277/1/60 N 8 1
FCU-13…
This is the start of the file's text. The full file is on GovTribe.