36C25618B0375-007.pdf

PDF 11 MB Posted

Attached to
Project: 586-16-106, 586-18-3-1513-0001 Construction
Solicitation number
36C25618B0375
Issued by

About this file

36C25618B0375 70_ME_VACLC_2018-01-12_IFB.pdf

View the file

Other files

File Type Posted
36C25618B0375-00004000.docx DOCX document
36C25618B0375-00004003.pdf PDF
36C25618B0375-00004005.pdf PDF
36C25618B0375-00004004.pdf PDF
36C25618B0375-00004001.pdf PDF
36C25618B0375-00004006.pdf PDF
36C25618B0375-00004002.pdf PDF
36C25618B0375-00003000.docx DOCX document
36C25618B0375-00002000.docx DOCX document
36C25618B0375-00002001.pdf PDF
36C25618B0375-00001000.docx DOCX document
36C25618B0375-001.docx DOCX document
36C25618B0375-009.pdf PDF
36C25618B0375-010.pdf PDF
36C25618B0375-003.pdf PDF
36C25618B0375-004.pdf PDF
36C25618B0375-006.pdf PDF
36C25618B0375-008.pdf PDF
36C25618B0375-005.pdf PDF
36C25618B0375-002.pdf PDF
36C25618B0375-000.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C D E F

H J K M N O P

R S T U V W

EX 25x23 SA

EX 32x24 SA

DEMO SHOWN ON

ENLARGED PLAN

D0603 & D0604

D0602

1C

D0602

1F

D0602

6F

EX 20x24 RA

EX 30x20 EA

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106GROUND FLOOR - HVAC DEMOLITION

PLAN

D0601

MEM CKH

1/8" = 1'-0" 5F

HVAC DEMO PLAN - GROUND FLOOR

1. COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, SAFETY RULES AND REGULATIONS, OSHA

STANDARDS, VA STANDARDS, AND OTHER GOVERNING BODIES HAVING JURISDICTION.

2. PRIOR TO THE COMMENCEMENT OF DEMOLITION ACTIVITIES, MECHANICAL CONTRACTOR

SHALL REVIEW ALL EXISTING SERVICE (DUCTWORK, PIPING, EQUIPMENT, ETC.) IN THE AREA OF

DEMOLITION AND CONFIRM EQUIPMENT SERVING AREAS OUTSIDE OF THE SCOPE OF

DEMOLITION TO REMAIN.

3. PROTECT DUCTWORK, PIPING, EQUIPMENT, ETC. REMAINING IN PLACE FOR REUSE OR SERVING

AREAS OUTSIDE OF THE SCOPE OF DEMOLITION. REPAIR OR REPLACE EQUIPMENT AND

SYSTEM TO BE REUSED WHICH ARE INADVERTENTLY DAMAGED DURING THE DEMOLITION

PROCESS, AT NO ADDITIONAL COST TO THE OWNER.

4. DO NOT REUSE REMOVED PIPING, DUCTWORK, VALVES, ETC., UNLESS SPECIFICALLY INDICATED

OTHERWISE.

5. PATCH AND REPAIR ALL FINISHES AND PENETRATIONS CAUSED BY OR EXPOSED BY THE

REMOVAL OF MATERIALS AND EQUIPMENT.

6. COORDINATE SHUTDOWN OF MECHANICAL EQUIPMENT WITH THE OWNER'S OPERATIONAL

REQUIREMENTS.

7. PRIOR TO COMMENCEMENT OF DEMOLITION WORK:

A. FIELD VERIFY THE SIZES AND LOCATION OF EQUIPMENT AND SYSTEMS TO BE REMOVED.

B. RECORD ALL AIRFLOW RATES AND SETPOINTS FOR EQUIPMENT TO BE REMOVED THAT

SERVES AREAS OUTSIDE OF THE SCOPE OF DEMOLITION TO BE SUPPORTED BY

TEMPORARY EQUIPMENT DURING CONSTRUCTION ACTIVITIES.

C. VERIFY THAT THE DEMO AREA IS ACCESSIBLE AND THAT DEMO TRAFFIC ROUTES ARE

FREE AND CLEAR.

D. VERIFY THAT EQUIPMENT AND SYSTEMS HAVE BEEN DE-ENERGIZED AND ARE SAFE TO

DISMANTLE. COMPLY WITH OWNER AND CONSTRUCTION SITE LOCK-OUT/TAG-OUT

PROCEDURES.

E. IDENTIFY ELEMENTS OF RISK ASSOCIATED WITH THE DEMOLITION WORK, AND PROVIDE

CONTINGENCY PLANS TO THE OWNER TO MINIMIZE THE RISK TO THE PROJECT.

F. PROVIDE A COMPREHENSIVE DEMOLITION AND PHASING PLAN OUTLINING THE

SCHEDULE OF WORK ACTIVITIES REQUIRED TO EXECUTE THE WORK. INCLUDE

MILESTONE DATES, TEMPORARY CONNECTION POINTS, ELECTRICAL POWER FEED TO

TEMPORARY EQUIPMENT, AND PROPOSED SCHEDULE OF TEMPORARY EQUIPMENT

OPERATION FOR APPROVAL BY THE OWNER AND ENGINEER.

DEMOLITION NOTES

KEYED NOTES:

1. DEMOLISH ALL MECHANICAL EQUIPMENT, HOT WATER, CHILLED WATER,

CONDENSATE AND DUCTWORK WITHIN THE PROJECT BOUNDARY, WITH THE

EXCEPTION OF ALL DUCTWORK, PIPING, AND EQUIPMENT THAT SERVES THE

FIRST FLOOR OR ALLOWS FOR FULL OPERATION OF FIRST FLOOR DURING

CONSTRUCTION. SEE SHEET D0602 FOR MORE INFORMATION.

2. RECORD AIRFLOW AT ALL DIFFUSERS PRIOR TO DEMOLITION. DEMO

DUCTWORK AT BOUNDARY. ALL DUCTWORK, EQUIPMENT, AND PIPING WITHIN

BOUNDARY SHALL REMAIN. PROVIDE CONNECTION TO TEMPORARY

EQUIPMENT TO MAINTAIN FIRST FLOOR OPERABILITY DURING CONSTRUCTION.

REMEDIATE ALL ASBESTOS MATERIAL ON MECHANICAL SYSTEMS WITHIN

BOUNDARY.

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106GROUND FLOOR - HVAC DEMOLITION

PLAN

D0602

MEM CKH

NTS

1F

EXISTING GROUND FLOOR - HVAC DEMO PLAN PIPE BASEMENT/GROUND FLOOR PLAN

NTS

1C

EXISTING GROUND FLOOR - HVAC DEMO PLAN PIPE BASEMENT/GROUND FLOOR

NTS

6F

EXISTING GROUND FLOOR - HVAC DEMO PLAN

1. ALL PIPING IN VIEW 1C AND 1F IS LOCATED

IN PIPE BASEMENT.

2. ALL PIPING AND DUCTWORK IN HATCHED

AREA SHALL BE DEMOLISHED.

DEMOLITION NOTES

K M N O P

EX-AHU-03

EX-AHU-01

Mechanical (E)

G132.1

Mechanical (E)

G132

EX-AHU-02

PHWR

PHWS

HWR PHWS

MPS

M P

S

H W

R

HWR

H W

R

H W

S

HWR

H W

S

P H

W S

PHWR

P H

W S

P H

W R

EX-HX-01

EX-CRU-01

EX-HX-03

EX-HWP-1

EX-HWP-2 EX-HWP-3 EX-HWP-4 EX-HWP-5

EX DUCT

EX DUCT

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106ENLARGED DEMOLITION PLAN

D0603

MEM CKH

1/4" = 1'-0" 5F

ENLARGED MECHANICAL ROOM DEMO - NEW HEAT EXCHANGER

KEYED NOTES:

1. DEMOLISH EXISTING AIR COMPRESSOR AND ASSOCIATED CONTROLS

IN APPROXIMATE LOCATION SHOWN. CONTRACTOR SHALL VERIFY

LOCATIN OF EXISTING CENTRAL COMPRESSED AIR PIPING UPSTREAM

OF THE AIR COMPRESSOR AND CONNECT THE EXISTING

DOWNSTREAM COMPRESSED AIR INTO IT. CONTROLS CONTRACTOR

SHALL VERIFY PROPER OPERATION OF PNEUMATIC CONTROLS

SYSTEM AT THE CONCLUSION OF COMPRESSED AIR PIPING WORK.

COORDINATE SHUTDOWN OF THIS SYSTEM WITH THE OWNER.

K

M

N

O

P

P

L

EX-AHU-03

EX-AHU-01

Mechanical (E)

G132.1

Mechanical (E)

G132

EX-AHU-02

PHWR

MPS

HWR

PHWS

HWR

HWR

P H

W S

H W

R

PHWS

H W

R

H W

R

HWR

P H

W S

P H

W R

H W

R

H W

S

PHWR

H W

R

EX-HWP-5EX-HWP-4EX-HWP-3EX-HWP-2

EX-HWP-1

EX-HX-03

EX-CRU-01

EX-HX-01

EX DUCT

EX DUCT

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106ENLARGED DEMOLITION PLAN -

DEDUCT ALTERNATE

D0604

MEM CKH

1/4" = 1'-0" 4F

ENLARGED MECHANICAL ROOM DEMO - DEDUCT ALTERNATE

KEYED NOTES:

1. DEMOLISH EXISTING AIR COMPRESSOR AND ASSOCIATED CONTROLS IN

APPROXIMATE LOCATION SHOWN. CONTRACTOR SHALL VERIFY LOCATION OF

EXISTING CENTRAL COMPRESSED AIR PIPING UPSTREAM OF THE AIR

COMPRESSOR AND CONNECT THE EXISTING DOWNSTREAM COMPRESSED AIR

INTO IT. CONTROLS CONTRACTOR SHALL VERIFY PROPER OPERATION OF

PNEUMATIC CONTROLS SYSTEM AT THE CONCLUSION OF COMPRESSED AIR

PIPING WORK. COORDINATE SHUTDOWN OF THIS SYSTEM WITH THE OWNER.

A/C AIR CONDITIONING

A/E ARCHITECT/ENGINEER

AAV AUTOMATIC AIR VENT (VALVE)

ABV ABOVE

ACCU AIR-COOLED CONDENSING UNIT

ACH AIR CHANGES PER HOUR

ACU AIR CURTAIN

AD ACCESS DOOR

AF AIR FOIL FAN

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

APPROX APPROXIMATE

ARCH ARCHITECT/ARCHITECTURAL

AS AIR SEPARATOR

ATD AIR TRANSFER DUCT

AUTO AUTOMATIC

AVG AVERAGE

AWT AVERAGE WATER TEMPERATURE

AXF AXIAL FAN

BB BASEBOARD RADIATION

BDD BACK DRAFT DAMPER

BF BOILER FEED WATER

BG BOTTOM GRILLE (3"-12" ABOVE FLOOR)

BHP BRAKE HORSEPOWER

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BOD BOTTOM OF DUCT

BR BOTTOM REGISTER (3"-12" ABOVE FLOOR)

BSMT BASEMENT

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CA COMPRESSED AIR

CAP CAPACITY

CC COOLING COIL

CCW COUNTER CLOCKWISE

CD CONDENSATE DRAIN

CENTRIF CENTRIFUGAL

CF CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CH CABINET HEATER

CHR CHILLER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CL CENTER LINE

CLG COOLING

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS, CONTINUATION

CONTR CONTRACTOR

CONV CONVECTOR

CP CONTROL PANEL

CT COOLING TOWER

CU CONDENSING/ER UNIT

CU FT CUBIC FEET

CV CONSTANT VOLUME

CV CONSTANT VOLUME

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DRAIN OR DRYER

DB DECIBEL OR DRY BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROL

DEG.F DEGREE FAHRENHEIT

DEMO DEMOLISH

DG DOOR GRILLE

DIA DIAMETER

DIAG DIAGONAL

DIFF DIFFUSER

DIM DIMENSION

DISCH DISCHARGE

DN DOWN

DP DIFFERENTIAL PRESSURE

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DTR DUAL TEMPERATURE RETURN

DTS DUAL TEMPERATURE SUPPLY

DWDI DOUBLE WIDTH, DOUBLE INLET

DWG DRAWING

DX DIRECT EXPANSION

E/P ELECTRIC-PNEUMATIC

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EBB ELECTRIC BASEBOARD HEATER

EC EXPANSION COMPENSATOR/JOINT

ECWR EQUIPMENT COOLING WATER RETURN

ECWS EQUIPMENT COOLING WATER SUPPLY

EDB ENTERING DRY BULB TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EFF EFFICIENCY

EHC ELECTRIC HEATING COIL

EL/ELEV ELEVATION

ELEC ELECTRIC/ELECTRICAL

ELEM ELEMENT

ELEV ELEVATOR

EMD END OF MAIN DRIP (STEAM)

EMER EMERGENCY

ENG ENGINEER

ENT ENTERING

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

EST ESTIMATE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EV EXHAUST AIR VALVE

EVAP EVAPORATOR

EVF FUME HOOD EXHAUST AIR VALVE

EVL LAB EXHAUST AIR VALVE

H HUMIDISTAT OR HUMIDIFIER

HC HEATING COIL

HEPA HIGH EFFICIENCY PARTICULATE AIR FILTER

HG HOT GAS

HL HIGH LIMIT

HORIZ HORIZONTAL

HP HORSEPOWER OR HEAT PUMP

HPR HIGH PRESSURE CONDENSATE RETURN

HPS HIGH PRESSURE STEAM

HR HOUR

HRC HEAT RECOVERY COIL

HT HEIGHT

HTG HEATING

HTWR HIGH TEMPERATURE WATER RETURN

HTWS HIGH TEMPERATURE WATER SUPPLY

HUM HUMIDIFIER

HVAC HEAT, VENTILATION, & AIR CONDITIONING

HVU HEATING & VENTILATING UNIT

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HX HEAT EXCHANGER

HZ HERTZ

ID INSIDE DIAMETER

IN OR " INCHES

IN W.C. INCHES WATER COLUMN

IN W.G. INCHES WATER GAUGE

INSUL INSULATION

INT INTERNAL

KW KILOWATT

KWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LDB LEAVING DRY BULB TEMPERATURE

LF LINEAR FEET

LPG LIQUID PETROLEUM GAS

LPR LOW PRESSURE CONDENSATE RETURN

LPS LOW PRESSURE STEAM

LRA LOCKED ROTOR AMPERES

LVG LEAVING

LVR LOUVER

LWB LEAVING WET BULB TEMPERATURE

LWT LEAVING WATER TEMPERATURE

M MOTOR OPERATOR

MAINT MAINTENANCE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MBH THOUSAND BTU PER HOUR

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MERV MINIMUM EFFICIENCY REPORTING VALUE

MEZZ MEZZANINE

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MPR MEDIUM PRESSURE CONDENSATE RETURN

MPS MEDIUM PRESSURE STEAM

MTD MOUNTED

N.C. NORMALLY CLOSED

N.O. NORMALLY OPEN

NC NOISE CRITERIA

NIC NOT IN CONTRACT

NO. OR # NUMBER

NR NOT REQUIRED

NTS NOT TO SCALE

NV NATURAL VENTILATION

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OBD OPPOSED BLADE DAMPER

OED OPEN END DUCT

OFCI OWNER FURNISHED/CONTRACTOR INSTALLED

OFOI OWNER FURNISHED/OWNER INSTALLED

OH OVERHEAD

OPNG OPENING

∆P/DP DIFFERENTIAL PRESSURE

P PUMP

P/E PNEUMATIC-ELECTRIC SWITCH

PA PASCAL

PCD PUMPED CONDENSATE DISCHARGE/RETURN

PCF POUNDS PER CUBIC FOOT

PCWR PROCESSED CHILLED WATER RETURN

PCWS PROCESSED CHILLED WATER SUPPLY

PD PRESSURE DROP

PF PROPELLER FAN

PG PRESSURE GAUGE

PH PHASE

PLBG PLUMBING

PRESS PRESSURE

PROP PROPELLER

PRV PRESSURE REDUCING VALVE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE IN ABSOLUTE

PSIG POUNDS PER SQUARE IN GAUGE

QTY QUANTITY

R RETURN

RA RETURN AIR

RAD RADIATION

RAF RETURN AIR FAN

REBAL REBALANCE

REG REGISTER

REV REVISED

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RM ROOM

RO RELIEF OPENING

RP RADIANT PANEL

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV REFRIGERANT VENT OR RELIEF VALVE (VENT)

RV RETURN AIR VALVE

S/W SUMMER-WINTER

SA SUPPLY AIR OR SOUND ATTENUATOR

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SENS SENSIBLE LOAD

SF SMOKE-FIRE DAMPER

SHT SHEET

SM SMOKE DAMPER

SOL SOLENOID

SP STATIC PRESSURE

SQ SQUARE

SQ. FT. SQUARE FEET

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STM STEAM

STRUC STRUCTURE/STRUCTURAL

SV SUPPLY AIR VALVE

SWSI SINGLE WIDTH, SINGLE INLET

3SF 3 HOUR SMOKE FIRE DAMPER

TC TEMPERATURE CONTROL

TD TRANSFER DUCT

TEMP TEMPERATURE

TL TOTAL LOAD

TO TRANSFER OPENING

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TYP TYPICAL

UGRD UNDERGROUND

UH UNIT HEATER (HYDRONIC OR STEAM)

UNO UNLESS NOTED OTHERWISE

UPS UNINTERUPTIBLE POWER SUPPLY

UV UNIT VENTILATOR

V VOLT OR VENT

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VEL VELOCITY

VERT VERTICAL

VI VIBRATION ISOLATION

VIF VERIFY IN FIELD

VOL VOLUME

VR VACUUM RETURN

VRV VARIABLE REFRIGERANT VOLUME

VSD VARIABLE SPEED DRIVE

VTR VENT THROUGH ROOF

W WATT

W.G. WATER GAGE

W/ WITH

W/O WITHOUT

WB WET BULB TEMPERATURE

WC WATER COLUMN

WMS WIRE MESH SCREEN

WPD WATER PRESSURE DROP

WT WEIGHT

WTR WATER

EWB ENTERING WET BULB TEMPERATURE

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EX EXISTING

EXIST EXISTING

EXT EXTERNAL

F FAHRENHEIT

F&T FLOAT & THERMOSTATIC STEAM TRAP

F.D. FLOOR DRAIN

FA FREE AREA

FC FORWARD CURVED

FCU FAN COIL UNIT

FD FIRE DAMPER

FF FINAL FILTER

FH FUME HOOD

FLA FULL LOAD AMPERES

FLEX FLEXIBLE

FLR FLOOR

FLT FLASH TANK

FM FLOW METER

FOG FUEL OIL GAUGE

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FP FIRE PROTECTION

FPB FAN POWERED TERMINAL UNIT

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FINNED RADIATION

FSTAT FREEZESTAT

FT FEET

FV FACE VELOCITY

G NATURAL GAS

GA GAUGE

GAL GALLON

GCWR GEOTHERMAL CONDENSER WATER RETURN

GCWS GEOTHERMAL CONDENSER WATER SUPPLY

GD GRAVITY DAMPER

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GR GLYCOL RETURN

GRL GRILLE

GRV GRAVITY RELIEF VENT

GS GLYCOL SUPPLY

GV GRAVITY VENTILOR OR NATURAL GAS VENT

TP

T

M0101

SUPPLY DUCT RISE

RETURN DUCT RISE

SECTION INDICATOR TOP

INDICATES SECTION NUMBER

BOTTOM INDICATES SHEET

NUMBER

VARIABLE SPEED DRIVE

EXHAUST DUCT RISE

OPPOSED BLADE VOLUME

DAMPERS

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE

CHECK VALVE (SHOWN W/FLOW)

CONTROL VALVE (3-WAY)

CONTROL VALVE (2-WAY)

BALANCING VALVE

SOLENOID VALVE

DIRECTION OF FLOW

UNION

PIPE ANCHOR

PIPE GUIDE

OR FLEXIBLE DUCT

SINGLE LINE DUCT RISE OR DROP

SINGLE LINE EXHAUST DUCT

ELBOW WITH TURNING VANES

SINGLE LINE RETURN DUCT

SINGLE LINE SUPPLY DUCT

T

R

S

ELECTRICAL CONNECTION (BY DIVISION

23)

ROOM PRESSURIZATION MONITOR

FREEZESTAT

FLOW SWITCH

RELAY

HUMIDITY SENSOR

SWITCH

STRAINER W/BLOWDOWN VALVE

SENSING ELEMENT - AIR STREAM

SENSING ELEMENT - LIQUID SEPARABLE WELL

FLEXIBLE CONNECTION

ROUND (DIAMETER)

TRAP

EXPANSION LOOP

EXPANSION JOINT

PIPING FLOW METER

ANALOG OUTPUT

DIGITAL OUTPUT

DIGITAL INPUT

ELECTRICAL CONNECTION (BY DIVISION

26)

PILOT LIGHT-

LETTER

INDICATES

COLOR:

ANALOG OUTPUT, PNEUMATIC

ELECTRIC-PNEUMATIC SWITCH

PNEUMATIC-ELECTRIC SWITCH

SMOKE

ANALOG INPUT, PRESSURE

ANALOG INPUT, TEMPERATURE

FIRESTAT

SMOKE DETECTOR

DUCT SMOKE DETECTOR

G - GREEN

Y - YELLOW

R - RED

THERMOSTAT WITH LOCKING

COVER

VOLUME DAMPER

CURRENT SENSOR

BACKDRAFT DAMPER

PUMP

FIRE, SMOKE/FIRE, OR SMOKE

DAMPER

SUPPLY DUCT DROP

RETURN DUCT DROP

EXHAUST DUCT DROP

EXISTING SINGLE LINE DUCT

CAPPED DUCTWORK

CAPPED PIPING OR SINGLE DUCTWORK

OR

FD,SF, OR SM

EXISTING ITEM TO BE REMOVED

VALVE

"Ø

DUCT OFF-SET DN (IN DIRECTION OF FLOW)

DUCT OFF-SET UP (IN DIRECTION OF FLOW)

RECTANGULAR DUCT DIMENSIONS

(SIZE IN INCHES, FIRST DIMENSION IS SHOWN)

ROUND DUCT DIMENSIONS (DIAMETER)

OVAL DUCT DIMENSIONS

(SIZE IN INCHES, FIRST DIMENSION IS SHOWN)

MOTORIZED DAMPER

T TEMPERATURE SENSOR (IN DUCT OR PIPE)

CARBON DIOXIDE SENSOR

P PRESSURE GAGE

OR

PUSH BUTTONPB

200-5

200-2

SUPPLY AIR DEVICE -

(REFER TO SCHEDULE FOR SIZE)

FIRST NO. CFM, SECOND NO. TYPE

(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)

LINEAR DIFFUSER

200-14 10x8

SUPPLY/ RETURN/EXHAUST SIDEWALL GRILLE-

FIRST NO. CFM, SECOND NO. TYPE

BOTTOM NO. WIDTH BY HEIGHT OF GRILLE

(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)

RETURN AIR DEVICE -

(REFER TO SCHEDULE FOR SIZE)

FIRST NO. CFM, SECOND NO. TYPE

(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)

EXHAUST AIR DEVICE -

(REFER TO SCHEDULE FOR SIZE)

FIRST NO. CFM, SECOND NO. TYPE

(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)

VSD

RECTANGULAR WYE DUCT FITTING

AIR FLOW MEASURING STATION

OCCUPANCY SENSOR

EXISTING HVAC PIPE

NEW HVAC PIPE

EXISTING HVAC PIPE TO BE REMOVED

PIPE ELBOW DOWN

PIPE ELBOW UP

POINT OF CONNECTION (NEW TO EXISTING)

PIPE BOTTOM DROP

CLEANOUT (CO)

PIPE RISE OR DROP

ANALOG INPUT

TEMPERATURE SENSOR

OXYGEN SENSOR

OFF

ONAUTO

STARTER

HOSE DRAIN VALVE WITH CAP

MANUAL AIR VENT

PRESSURE/TEMPERATURE TEST PORT

ANALOG INPUT, FLOW

FIRE, SMOKE/FIRE, OR SMOKE DAMPER

IN RISER

FD,SF, OR SM

NEW EQUIPMENT

EXISTING EQUIPMENT

CALLOUT INDICATOR TOP

INDICATES NUMBER ON THE SHEET

BOTTOM INDICATES SHEET

NUMBER

NEW DUCT

EXISTING DUCT

DEMOED DUCT

TRIPLE DUTY VALVE

FM26

AI

AIF

AIP

AIT

AO

AOP

BDD

M0101

CO

CO²

CS

DI

DO

24x12 OV

24x12

24"Ø

DN

UP

DE

P E

200-5

EX-XXX

EXISTING

EQUIPMENT TYPE

FIRE

OR

FM

FS

F

H

250-7

CFM

TYPE

LENGTH

NO. OF SLOTS

SLOT WIDTH (INCHES)

4LF-2-1

XXX-1

TYPE NO.

EQUIPMENT TYPE

OS

O²

E P

G

DEMO EXTENTS

1. ALL MITERED ELBOWS AND TEES SHALL BE PROVIDED WITH SINGLE THICKNESS TURNING VANES.

2. COMPLY WITH APPLICABLE LOCAL, STATE, FEDERAL, AND VA CODES, STANDARDS, AND DESIGN GUIDES DURING THE EXECUTION OF WORK

DESCRIBED ON DRAWINGS AND OTHER CONTRACT DOCUMENTS.

3. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR ALL CEILING AIR DEVICE LOCATIONS.

4. LOCATE ALL DUCT BALANCING DAMPERS AND TERMINAL UNITS ABOVE ACCESSIBLE CEILINGS, OR PROVIDE ACCESS DOORS. MINIMUM ACCESS DOOR SIZE SHALL BE 18"x18" UNLESS OTHERWISE APPROVED BY ENGINEER.

5. THE DRAWINGS ARE DIAGRAMMATIC AND ARE PROVIDED TO SHOW THE INTENT OF THE WORK. PROVIDE WORK AND EQUIPMENT NECESSARY TO COMPLETE THE INSTALLATION IN ACCORDANCE WITH APPLICABLE BUILDING CODES, STATE AND LOCAL BUILDING CODES, OWNERS INSURANCE UNDERWRITER(S), NFPA, AND OTHER GOVERNING AUTHORITIES HAVING JURISDICTION.

6. REFER TO ARCHITECTURAL ELEVATION DRAWINGS FOR LOCATION OF WALL MOUNTED MECHANICAL ITEMS.

7. INSTALL ALL FLOOR MOUNTED HVAC EQUIPMENT, INCLUDING AHUS, PUMPS, CHILLER, ETC. ON 4" MINIMUM CONCRETE PAD. COORDINATE AIR HANDLING UNIT CONCRETE PAD HEIGHT WITH CONDENSATE DRAIN TRAP HEIGHT REQUIREMENT AND LAYOUT BASED ON FINAL

EQUIPMENT TO BE INSTALLED.

8. ALL HYDRONIC PIPING CONNECTIONS TO INDIVIDUAL EQUIPMENT SHALL BE 3/4" UNLESS NOTED OTHERWISE.

9. MECHANICAL DRAWINGS ARE SCHEMATIC IN NATURE. RESOLVE ALL INTERFERENCES BETWEEN NEW WORK AND EXISTING BUILDING COMPONENTS PRIOR TO FABRICATION AND INSTALLATION. COORDINATION WITH ALL TRADES IS REQUIRED.

10. DUCTWORK, PIPING, AND EQUIPMENT CONNECTIONS SHOWN ON THE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE PROVIDED AS A GUIDE FOR THE INSTALLATION OF EQUIPMENT AND ASSOCIATED SYSTEMS. THE DRAWINGS SHALL NOT BE SCALED FOR ROUGHING IN MEASUREMENTS OR TO SERVE AS SHOP DRAWINGS. PROVIDE ADJUSTMENTS TO THE DUCTWORK, PIPING, AND EQUIPMENT LOCATIONS AS REQUIRED TO SUIT FIELD CONDITIONS WITHOUT ADDITIONAL COST TO THE OWNER. MAJOR DEVIATIONS TO THE DESIGN REQUIRE PRIOR APPROVAL BEFORE STARTING WORK. PROMPTLY REPORT UNRESOLVED INTERFERENCES AND CONFLICTS TO OWNER.

11. SUPPORTS, ROOF AND WALL OPENINGS, EQUIPMENT CONNECTIONS, EQUIPMENT ARRANGEMENT, AND ELECTRICAL POWER PROVISIONS FOR MECHANICAL EQUIPMENT ARE BASED ON PRELIMINARY INFORMATION FOR THE EQUIPMENT DESIGN BASIS SELECTION. PROVIDE AND INSTALL EQUIPMENT SUPPORTS, MAKE ROOF AND WALL OPENINGS, ADJUST CONNECTION SIZE AND TYPE, ADJUST EQUIPMENT SPACE ARRANGEMENT, AND PROVIDE ELECTRICAL BRANCH CIRCUIT AND DISTRIBUTION MODIFICATIONS BASED UPON CERTIFIED EQUIPMENT

DRAWINGS WITHOUT ADDITIONAL COST TO THE OWNER.

12. PREPARE AND SUBMIT DUCTWORK, PIPING, AND EQUIPMENT SHOP DRAWINGS FOR APPROVAL, PRIOR TO PERFORMING FABRICATION WORK IN ACCORDANCE WITH SPECIFICATIONS. INCLUDE DUCTWORK, PIPING, AND EQUIPMENT PLANS, ELEVATIONS, AND SECTIONS, SHOWING FITTINGS, EQUIPMENT CONNECTIONS, AND ACCESS REQUIREMENTS.

13. PROVIDE WORK IN STRICT ACCORDANCE WITH APPROVED SHOP DRAWINGS. THE ENGINEER RESERVES THE RIGHT TO REJECT WORK NOT

IN ACCORDANCE WITH THE APPROVED SHOP DRAWINGS.

14. FURNISH AND INSTALL THE NECESSARY APPURTENANCES AND MINOR AUXILIARIES REQUIRED TO MAKE EACH SYSTEM COMPLETE AND OPERABLE IN EVERY RESPECT. FURNISH AND INSTALL WORK DESCRIBED IN THE SPECIFICATIONS AND NOT SHOWN ON THE DRAWINGS, OR

VICE VERSA.

15. TEST AND ADJUST INSTALLED EQUIPMENT AND SYSTEMS IN ACCORDANCE WITH CONTRACT DOCUMENTS. CORRECT DEFECTS AND

SYSTEM DEFICIENCIES DISCLOSED BY TESTING, WITHOUT ADDITIONAL COST TO THE OWNER.

16. OPERATION OF THE EQUIPMENT, DUCTWORK, OR INSTALLED PIPING DOES NOT CONSTITUTE AN ACCEPTANCE OF THE WORK BY THE OWNER OR SUBSTANTIAL COMPLETION. FINAL ACCEPTANCE AND SUBSTANTIAL COMPLETION IS DEFINED IN THE CONTRACT DOCUMENTS.

17. FURNISH CERTIFICATES OF APPROVAL FROM ALL AUTHORITIES HAVING JURISDICTION AS PART OF THE SYSTEM ACCEPTANCE

DOCUMENTATION.

18. PROVIDE VOLUME DAMPERS AT ALL SUPPLY, RETURN, AND EXHAUST BRANCH DUCTWORK CONNECTIONS.

19. PROVIDE ACCESS DOORS IN DUCTWORK TO SERVICE HEATING COILS, FIRE DAMPERS, AUTOMATIC AND MANUAL DAMPERS, CONTROL HARDWARE, LOUVER SCREENS, ETC. WHERE ACCESS IS REQUIRED FOR MAINTENANCE AND AS REQUIRED BY BUILDING CODES, MECHANICAL CODES, AND FIRE CODES.

20. LOCATIONS SHOWN ON DRAWINGS FOR THERMOSTATS, HUMIDISTATS AND LOCAL INDICATING PANELS ARE APPROXIMATE. COORDINATE FINAL LOCATION TO SUIT FIELD CONDITIONS, FURNITURE, OTHER PROJECT INSTALLATIONS, OR AS DIRECTED BY OWNER.

21. INSTALL PIPING TO HVAC HEATING AND COOLING COIL(S) TO ALLOW CLEAR REMOVAL SPACE FOR THE COILS, AIR FILTERS, UNIT

CONTROLS, FANS, AND MOTORS.

22. COIL PIPING SHALL NOT BLOCK FILTER OR MOTOR ACCESS.

23. RUN DUCTWORK AND PIPE INSULATION CONTINUOUSLY THROUGH FLOOR, ROOF, AND WALL PENETRATIONS.

24. PENETRATIONS NOT OTHERWISE NOTED SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR.

25. EQUIPMENT MAINTENANCE ACCESS SPACE SHOWN WITH DASHED LINES. COMPLY WITH NEC REQUIREMENTS FOR CLEARANCE AROUND

ELECTRICAL ENCLOSURES. 24V PANELS SHALL HAVE A MINIMUM OF 18" FRONT CLEARANCE.

26. PROVIDE (1) PAIR OF SPARE TAPS, SHUTOFF VALVES, AND CAPS FOR EVERY HYDRONIC UTILITY PER BUILDING FLOOR AND PER MAJOR

FLOOR WING. SIZE SHALL MATCH THE HEADER CONNECTION.

27. INSTALL 3/4" MANUAL HIGH POINT VENTS AND LOW POINT DRAINS IN ALL RELATIVE HIGH AND LOW POINTS IN HYDRONIC PIPE SYSTEMS TO

PREVENT TRAPPING OF AIR DURING FILLING AND TO FACILITATE COMPLETE DRAINAGE.

28. CONTRACTOR SHALL COORDINATE ALL FCU'S AND ASSOCIATED DUCTWORK & PIPING WITH OTHER DISCIPLINES EQUIPMENT TO ENSURE REQUIRED ACCESS AND CLEARANCES ARE MAINTAINED. DO NOT LOCATE FCUS, VAV TERMINALS, AND MAINTENANCE ITEMS OVER WORK

TABLES, ELECTRONIC EQUIPMENT, OR PATIENT BEDS.

29. ALL CONTROL DEVICES SHALL BE 24 V UNLESS NOTED OTHERWISE.

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106SYMBOLS, ABBREVIATIONS, AND

GENERAL NOTES

M0001

MEM CKH

ABBREVIATIONS

SYMBOLS GENERAL NOTES

PROPOSED LOCATION

FOR TEMPORARY

AHUS

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106SITE PLAN

M0051

MEM CKH

NTS

5F

VA CLC Site Plan

TEMPORARY EQUIPMENT OPERATION NOTES

1. IN ORDER TO MAINTAIN OPERATION OF AREAS OF THE BUILDING OUTSIDE OF THE SCOPE OF DEMOLITION WHICH ARE SERVED BY AIR HANDLING EQUIPMENT TO BE REPLACED, THE MECHANICAL CONTRACTOR SHALL SOURCE, FURNISH, AND INSTALL A TEMPORARY PACKAGED AIR HANDLING UNIT FOR USE DURING CONSTRUCTION. CONTRACTOR SHALL PROVIDE TEMPORARY EQUIPMENT WITH SUFFICIENT CAPACITY TO

CONDITION SPACES SERVED FOR CONTINUED OPERATION.

2. TEMPORARY AHUS MAY BE PLACED ON THE ROOF ONLY IF THEIR WEIGHTS ARE LESS THAN 40 POUNDS

PER SQUARE FOOT.

3. PROVIDE TEMPORARY HOT WATER AND GLYCOL BOILERS TO SERVE MAINTAIN EXISTING SYSTEMS

DURING CONSTRUCTION (PROVIDED ONLY IF DEDUCT IS NOT ACCEPTED).

4. TEMPORARY CONNECTION POINTS SHALL BE INSTALLED ON THE DEMOLITION PLAN PRIOR TO SHUTDOWN OF EXISTING EQUIPMENT. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION RELATED TO

POWER SUPPLY FOR TEMPORARY MECHANICAL EQUIPMENT.

5. INSTALLATION LOCATION OF TEMPORARY AIR HANDLING EQUIPMENT SHALL BE DETERMINED BY THE

MECHANICAL CONTRACTOR AND COORDINATED WITH THE OWNER. PROPOSED LOCATION SHOWN ON

THIS SHEET IS PRELIMINARY AND REQUIRES COORDINATION WITH THE OWNER AND OTHER BUILDING

ACTIVITIES AT THE TIME OF CONSTRUCTION.

6. ROUTING OF TEMPORARY DUCTWORK SHALL BE COORDINATED WITH CONSTRUCTION ACTIVITIES TO PROVIDE CONTINUOUS OPERATION OF TEMPORARY AIR HANDLING EQUIPMENT DURING CONSTRUCTION

TO MAINTAIN BUILDING OPERATION.

7. APPROXIMATE TEMPORARY EQUIPMENT CAPACITIES AND LENGTH OF RENTAL:

A. (1) 1000 MBH BOILER, 6 MONTHS.

B. (1) 4000 CFM, 100% OA AHU, 12 MONTHS.

C. (1) 6000 CFM 50% OA AHU 12 MONTHS.

R S T U V W

50x20 EA UP

18x36 EA UP x

E

A

40x14 RA

40x14 RA

14x40 RA UP

40x14 RA UP 50x20

50x20 EA x

R

A

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106PIPE BASEMENT - HVAC DUCTWORK

PLAN

M0100

MEM CKH

1/8" = 1'-0" 4F

M0100 - HVAC DUCTWORK PLAN - PIPE BASEMENT

KEYED NOTES:

1. PROVIDE 18"x36" FSD AT FLOOR PENETRATION.

2. PROVIDE 14"x40" FSD AT FLOOR PENETRATION.

3. PROVIDE 40"x14" FSD AT FLOOR PENETRATION.

FCU-12

FCU-13

FCU-14 FCU-15 FCU-16

FCU-17

FCU-18FCU-19

FCU-20

FCU-21

FCU-23

A B C D E F

H J K M N O P

R S T U V W x

S

A

36x12 SA 40x22 x

S

A

20x12 12x10

16x10

12x10

20x12 EA18x10 14x10

VAV-01

VAV-02

VAV-03

VAV-04

VAV-05

VAV-06

48x22 SA x

S

A

14"Ø

12"Ø

"Ø

8"Ø

12x10

12"Ø x

VAV-07

V A

V -0

VAV-09

V A

V -1

VAV-11

V A

V -1

VAV-13 VAV-14

VAV-15

V A

V -1

VAV-20

VAV-16

VAV-17

V A

V -1

VAV-21

10"Ø

6"Ø

12"Ø

10"Ø

6"Ø x x

18x12 SA x

S

A x x

S

A

FCU-11

FCU-10FCU-09FCU-08FCU-07

FCU-06

FCU-05FCU-04FCU-03FCU-02

125-4

285-4 300-4

125-4 125-4

335-4 300-4

125-4 125-4

300-4 335-4

125-4

125-5

-5 300-5

125-5 125-5

335-5 300-5

125-5 125-5

300-5 335-5

125-5

300-4

125-4

125-5

385-5

125-5

385-4

125-4

-4

290-4

335-4

125-4 125-4

385-4 385-4

300-4

125-5125-5125-5125-5

250-5 250-5

200-4 200-4

125-4

175-4

175-4

300-4

250-4 250-4 250-4

200-4 200-4

250-4 250-4 250-4

125-4

425-4

385-4

125-4 125-4

335-4 225-4

125-4 125-4

385-4

250-4

300-4125-4

125-4

335-4300-4

125-4125-4

300-4285-4

125-4

290-5 300-5

125-5 125-5 125-5

300-5 335-5

125-5

-5

250-4

385-5

125-5125-5125-5

335-5 2

-5

125-5

385-52

-5

125-5

125-5 425-5

250-5250-5

275-5

250-5250-5

150-4

225-5 225-5

150-4

250-4

125-5

100-4

100-5

350-5

300-5

250-4250-4

300-5

-5

225-5

275-4375-5

225-5

150-4 150-4

50-5

150-4

250-4

300-4

290-4

290-4

350-4

325-4

150-4

250-4 100-5

150-5

125-5

75-5

75-5125-4

150-4

325-5

325-4

290-5

290-5

150-4

50-4

150-5 75-475-5

100-4

200-4

450-5

385-5335-52

-5

385-5

250-4

250-4

250-4

300-5

-5

350-5

325-5

225-5

150-4

200-5

150-4

175-4

M0301

4E

50-4

12"Ø 10"Ø

10"Ø

"Ø

"Ø

8"Ø1

"Ø

10"Ø

"Ø

8"Ø

12"Ø

8"Ø

"Ø

8"Ø

"Ø

12"Ø

"Ø

"Ø

12"Ø 10"Ø

12x1210"Ø

6"Ø

10"Ø12"Ø

"Ø

12"Ø 10"Ø10"Ø

"Ø

"Ø

10"Ø

"Ø

"Ø

8"Ø x x

10x10 x

"Ø x x

20x10

12x12 x x

"Ø

"Ø

"Ø

"Ø

8"Ø

"Ø

"Ø

"Ø

"Ø

10"Ø

12"Ø x

14"Ø

"Ø

6"Ø

8"Ø

"Ø

"Ø

"Ø

10"Ø 12"Ø

"Ø 1

"Ø x

"Ø6

"Ø

"Ø

"Ø

"Ø

"Ø

"Ø

EF-1

450-5

32x12 x x

"Ø

12x10

12"Ø

12"Ø x x

FCU-22

290-4

-5 x x

8"Ø

-5

285-4 x x

300-4

125-4 x

290-4

10"Ø x

285-5 x x

10x10

325-4

-5 x

-5

200-4 x

-5

425-5

425-4

12"Ø

Sitting Area

G104

"Ø

8"Ø

12x10

10x1010x10

10"Ø

"Ø

"Ø x

20x12 SA

20x12 EA x

ERU-1

12x10

Oxygen Storage - Full

G121.1 x

10"Ø

"Ø

"Ø

"Ø

"Ø

10"Ø

10"Ø

"Ø

8"Ø x x

R

A x

6"Ø x x1

10"Ø

12x10

10"Ø x x

40x14 30x12 RA

36x12 EA

"Ø

12x12

10x108"Ø

20x12 x

Bedroom

G148

Bedroom

G149 Bedroom

G150 Bedroom

G151

Bedroom

G152 Bedroom

G153

Bedroom

G142

Bedroom

G143

Bedroom

G144 Bedroom

G145

Bedroom

G146 Bedroom, Bariatric

G141

Bath Suite

G154

Bedroom, Bariatric

G161

Soiled Utility

G174

Clean Utility

G173

Bedroom

G172

Bedroom

G171

Bedroom

G170

Bedroom

G169

Bedroom

G168

Bedroom

G166

Bedroom

G165

Bedroom

G164

Bedroom

G163

Bedroom

G162

Office

G123

Family Lounge

G107

Medicine Storage

G106

Telecom Closet

G113

Conference

G131

Staff Lounge

G126

Office

G127

Office

G128

Mechanical (E)

G132

Mechanical (E)

G132.1

Concierge Station

G105

Multi-Purpose Area

G112

Laundry

G109

Storage

G140.2

Storage

G140.1 Elec

G160.2

Storage

G160.4

Shared Office

G129

Toilet

G148.1 Toilet

G149.1

Toilet

G150.1

Toilet

G151.1

Toilet

G152.1 Toilet

G153.1

Toilet

G146.1

Toilet

G145.1 Toilet

G144.1

Toilet

G143.1

Toilet

G142.1

Toilet

G141.1

Toilet

G172.1

Toilet

G171.1

Toilet

G170.1 Toilet

G169.1

Toilet

G168.1

Toilet

G166.1

Toilet

G165.1

Toilet

G164.1

Toilet

G163.1

Toilet

G162Toilet

G161.1

Corridor

G140

Corridor

G160

Stairs

G167 Stairs

G147

Stairs

G133

Lobby

G103

Oxygen Storage- Empty

G121

Vestibule

G100

Foyer

G101

Locker Room

G130

Storage/Linen Storage

G110

Kitchen

G111

Office

G124

Closet

G114

Multi-Purpose Area

G102

Storage

G140.3

Toilet

G130.1

Elec

G120.1

Toilet

G130.2

House Keeping

G122

Corridor

G175

Public Toilet

G108

Storage

G160.3

200-5

100-5

Elec Closet

G140.4

EA

"Ø

"Ø

"Ø

10"Ø

M0302

4F

SDSD

SD

SD

FSD

SD

SD

SD

SD

FD

FD

FD

FD

FD

"Ø

"Ø

8"Ø

"Ø

S D

S D

"Ø

10"Ø

8"Ø

20x12 EA x

12x10

10x10 x

"Ø

FSD

FSD

"Ø

"Ø

6"Ø

6"Ø

12"Ø

12"Ø x

10"Ø

10"Ø

"Ø

"Ø

"Ø

"Ø

10x108"Ø

"Ø 10"Ø

8"Ø 10"Ø

14x14

14x12

10"Ø

"Ø

12"Ø

18x12

10"Ø x

10"Ø

10x10 x

8"Ø

6"Ø

10"Ø x

E

A x

10"Ø

FCU-25

14x10

FCU-24

F C

U -2

14x14

150-4

EF-2

x

6"ØFD

FD

"Ø

10x8 8 "Ø

"Ø

"Ø

125-4

265-4260-4

"Ø x

8"Ø

12x10

"Ø 8 "Ø

"Ø

12x10 x

12x10 x x x x

10"Ø 1

"Ø x

"Ø x

8"Ø

12x10 10"Ø

"Ø

"Ø x

"Ø

"Ø

"Ø x

12x10

10x8

12x10 x

10x8

FSD

6x6

TERMINATE AT LOUVER.

SEE ARCH FOR SIZE.

100-15

"Ø

E A

FCU-27

CO

325-5 325-5 14x10 RA x

14x12 RA

SD

SD10"Ø

"Ø

12x12

425-5

-5

12"Ø

"Ø

14x12

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106GROUND FLOOR - HVAC DUCTWORK

PLAN

M0101

MEM CKH

1/8" = 1'-0" 5F

M0101 - HVAC DUCTWORK PLAN - GROUND FLOOR

KEYED NOTES:

1. PROViDE WELDED 316L STAINLESS STEEL DUCTWORK FOR EXHAUST CONNECTED TO EF-1. INSTALL

EF-1 10'-9" ABOVE LEVEL 01.

2. 40"x14" RA DOWN TO PIPE BASEMENT BELOW.

3. 36"x18" EA DOWN TO PIPE BASEMENT BELOW.

4. (4) EA DN TO WASHER/DRYER UNIT. COORINDATE SIZE WITH EXHAUST CONNECTION ON EQUIPMENT.

5. TERMINATE DRYER EXHAUST WITH GOOSENECK.

6. INSTALL ERU ON CONCRETE PAD. SEE SHEET M0701, DETAIL 7B.

7. RECONNECT EXISTING MECHANICAL SYSTEMS INTO NEW MECHANICAL AIR & HYDRONIC SYSTEMS.

REBALANCE TO PREVIOUSLY MEASURED AIRFLOWS.

8. CONNECT 18"x50" EA DUCT UP FROM PIPE BASEMENT TO 76"x18" EA DUCT.

9. ROUTE 6"x6" EA DUCT DOWN TIGHT TO WALL AND TERMINATE WITH AN ELBOW AND 6"x6" GRILLE 1'-0"

AFF.

R S T U V W

3" GS/GR UP

3" GS/GR UP

3" GS

3" GR

C D

3" CD 3" CD

C D

3" CD 3" CD

C D

C D

3" CD3" CD

C D

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106PIPE BASEMENT - HVAC PIPING PLAN

M0200

MEM CKH

1/8" = 1'-0" 4F

M0200 - HVAC PIPING PLAN - PIPE BASEMENT

KEYED NOTES:

1. TERMINATE 3" CONDENSATE AT SUMP PIT. MINIMUM 1"

AIR GAP BETWEEN TERMINATION AND GRATE.

2. 3" CD UP IN PLUMBING CHASE TO GROUD FLOOR.

COORDINATE CONDENSATE ROUTING IN CHASE WITH

PLUMBING CONTRACTOR.

T

T T T T T T

TT

T

TT

T

T

T

T T T T T

T

TTTT

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

A B C D E F

H J K M N O P

R S T U V W

FCU-13 FCU-14 FCU-15 FCU-16 FCU-17

FCU-22

FCU-21 FCU-20 FCU-19 FCU-18

FCU-23

VAV-15

VAV-13

VAV-14

VAV-12

FCU-06

FCU-05

FCU-04FCU-01 FCU-02

FCU-03

FCU-07 FCU-08 FCU-09 FCU-10

FCU-11

HWR

HWS

HWR

HWS

FCU-12

VAV-11

VAV-10

VAV-07

VAV-09

VAV-08

VAV-01

VAV-02

VAV-03

VAV-04

VAV-05

VAV-06

VAV-21

VAV-16

VAV-17

VAV-18

V A

V -1

VAV-20

C H

W S

C H

W R

CHWR

CHWS

ERP-2

ERP-1

ERU-1

2 1/2"

2 1/2"

2" 2"

1"

1"

2" 2"

2" 2"

2" 2"

1" 1"

1 1/4" 1 1/4"

EF-1

3/4"

3/4"

3/4" 3/4"

1 1/2"

1 1/2"

3/4"

3/4"

Bedroom

G148

Bedroom

G149

Bedroom

G150

Bedroom

G151

Bedroom

G152 Bedroom

G153

Bedroom

G142 Bedroom

G143

Bedroom

G144

Bedroom

G145 Bedroom

G146

Bedroom, Bariatric

G141

Bath Suite

G154

Bedroom, Bariatric

G161

Soiled Utility

G174

Clean Utility

G173

Bedroom

G172

Bedroom

G171 Bedroom

G170 Bedroom

G169

Bedroom

G168

Bedroom

G166

Bedroom

G165

Bedroom

G164

Bedroom

G163Bedroom

G162

Office

G123

Family Lounge

G107

Medicine Storage

G106

Telecom Closet

G113

Conference

G131

Staff Lounge

G126

Office

G127

Office

G128

Mechanical (E)

G132

Mechanical (E)

G132.1

Concierge Station

G105

Sitting Area

G104

Multi-Purpose Area

G112

Laundry

G109

Storage

G140.2 Storage

G140.1 Elec

G160.2

Storage

G160.4

Shared Office

G129

Toilet

G148.1 Toilet

G149.1

Toilet

G150.1

Toilet

G151.1 Toilet

G152.1 Toilet

G153.1

Toilet

G146.1

Toilet

G145.1 Toilet

G144.1

Toilet

G143.1 Toilet

G142.1 Toilet

G141.1

Toilet

G172.1 Toilet

G171.1

Toilet

G170.1

Toilet

G169.1

Toilet

G168.1

Toilet

G166.1

Toilet

G165.1

Toilet

G164.1

Toilet

G163.1

Toilet

G162

Toilet

G161.1

Corridor

G140

Corridor

G160

Stairs

G167

Stairs

G147

Stairs

G133

Lobby

G103

Oxygen Storage- Empty

G121

Locker Room

G130

Storage/Linen Storage

G110

Kitchen

G111

Office

G124

Closet

G114

Multi-Purpose Area

G102

Storage

G140.3

Toilet

G130.1

STC?

Elec

G120.1

Toilet

G130.2

House Keeping

G122

Corridor

G175

Oxygen Storage - Full

G121.1

Public Toilet

G108

1 3/4" 3/4"

3/4"

3/4"

1" 1"1"

1"3/4"

1 1/4" 1 1/4"

1 1/2" 1 1/2"

2" 2"

2" 2"

M0301

4E

CD CD

1"2"

2"

CD

1"

CD

1"

1"

2"

CD CD

CD

1" 2"

2"

1"

CD

1"

2"

1"

4 4

CD

2"

2"

1"

4 4

CD

1"

CD CD

2"

1"

1"

2"

CD

1"

1 1/2" 1 1/2"

2"

2"

1 1/2" 1 1/2"

1 1/2" 1 1/4" 1 1/4"

1"

3/4"

3/4" 3/4"

1" 1"

1 1/2"

1" CD

FCU-25

1"

1"

F C

U -2

1 1/2" 1 1/2"

1"

C D

2"

2"

2 1/2" 2 1/2"

FCU-24

3/4" 3/4"

1" 1"

3/4" 3/4"

1 1/4"

1 1/4"

3/4" 3/4"

1" 1"1 1/2" 1 1/4"

1 1/4"

1 1/2" 1 1/4"

1" 1"

2" 2"

1 1/4"1 1/4"

1"

3/4"3/4"

1"

3" GR

3"

3/4" 3/4" 3/4" 3/4"

3/4" 3/4"

1" 1"

3/4" 3/4"

3/4" 3/4"

3/4"3/4" 3/4"

3/4"

3/4" 3/4" 3/4" 3/4"

3/4" 3/4"

3/4"

3/4"

3/4" 3/4"

3/4" 3/4"

3/4" 3/4" 3/4" 3/4"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4" 3/4"

3/4" 3/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4"3/4"

3/4" 3/4"

3/4"

3/4"

1"

1"

3/4" 3/4"

3/4" 3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

3/4" 3/4"

3/4" 3/4" 3/4"

3/4"

3/4" 3/4"

3/4" 3/4"

3/4" 3/4" 1"

1"

3/4" 3/4"

3/4" 3/4" 3/4" 3/4" 3/4"

3/4" 3/4" 3/4" 3/4"

3/4" 3/4" 3/4" 3/4"

3/4"

3/4" 3/4" 3/4"

3/4" 3/4"

3/4" 3/4"

3/4" 3/4"

3/4"

3/4"

3/4"

3/4"

1"

3/4"3/4"

3/4" 3/4"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4" 3/4"

3/4"3/4"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4"

3/4" 3/4"

1"

1" 3/4"

1" 1"

1 1/4" 1 1/4"

1" 1"

Office

G125

3/4"

HWR

HWS

CHWR

CHWS

3/4"

1" 1"

HWR

HWS

3/4"

3/4"

1"

H W

R H

W S

H W

R H

W S

3/4" 3/4"

CD

CD

2"

2"

EF-2

FCU-27

/4

/4

3/4" CD

5 5

1"

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106GROUND FLOOR - HVAC PIPING PLAN

M0201

MEM CKH

1/8" = 1'-0" 4F

M0201 - HVAC PIPING PLAN - GROUND FLOOR

KEYED NOTES

1. PROVIDE SHUT OFF VALVES AND CAP 1-1/2" HWS/R FOR FUTURE CONNECTIONS.

2. PROVIDE SHUT OFF VALVES AND CAP 1-1/2" CHWS/R FOR FUTURE CONNECTIONS.

3. INSTALL PUMPS INSIDE INSULATED HEATED ENCLOSURE. PROVIDE 4" HOUSEKEEPING PAD,

EXTEND HOUSEKEEPING PAD 6" BEYOND ENCLOSURE. PROVIDE 1" THICK MINIMUM

INSULATED ENCLOSURE, 1.5 KW 120V WALL HEATER. HUBBELL POWER SYSTEMS SINGLE

ALUMINUM HOT BOX OR EQUAL. CONTRACTOR PROVIDE SIZE BASED ON FINAL LAYOUT.

MAINTAIN MINIMUM MANUFACTURER EQUIPMENT MAINTANCE ACCESS.

4. ROUTE 2" CD DN PIPING CHASE TO PIPE BASEMENT.

5. HOT WATER SYSTEM DIFFERENTIAL PRESSURE SENSOR LOCATION.

D

K

M

N

O

P

P

L

AHU-02

EX-AHU-01

VAV-22

Mechanical (E)

G132.1

Mechanical (E)

G132

48x28

44x20

13" CHWR

3" CHWS

2" HWS

2" HWR

HWP-2 HWP-1

HX-2 HX-1

3" HWS

ET-1

ET-2

x

1 1/2"

1 1/2" 2"

2 1/2"

2 1/2"

1 1/2"

/2

3" HWR

/2

H W

S

H W

R

2 1/2" CHWS

C H

W S

C H

W R

3" 3"

3" GS/GR DN TO PIPE

BASEMENT.

2"

1 1/2"

2"

/2

/2

/2

1 1/2"

HWP-4

HWP-3

HWP-5

4" MPS

M P

S

2 1/2"

/2

2" PCD DN TO

EXISTING.

/2

/2

/2

SD

1 1/2"

2 1/2"

3"

EX-AHU-03

/4

H

W R

H W

S

C D

/2

M P

S

H W

S

4" MPS

/2

H W

R

H W

S x

/4

AS-1

AS-2

/2

V

CRU-1

SD

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106ENLARGED PLANS AND SECTIONS

M0301

MEM CKH

1/4" = 1'-0" 4E

ENLARGED MECHANICAL ROOM - NEW HEAT EXCHANGER

KEYED NOTES:

1. 40"x14" RA UP FROM PIPE BASEMENT BELOW. INSTALL FIRE

DAMPER AT FLOOR. COORDINATE DUCT WITH OPENING IN

FLOOR.

2. ROUTE 1" CONDENSATE DRAIN TO NEAREST FLOOR DRAIN.

3. ROUTE 1 1/2" CONDENSATE VENT TO EXTERIOR. TERMINATE

IN GOOSENECK.

4. PROVIDE SCREEN ON VAV OUTLET.

5. PROVIDE SMOKE DAMPER AT AHU-03 OUTLET.

CONNECT DUCT TO EXISTING LOUVER

K M N O P

AHU-02

EX-AHU-03

EX-AHU-01

VAV-22

GS

GR

Mechanical (E)

G132.1

Mechanical (E)

G132

40x22

48x28

44x20

CHWR

CHWS

HWS

HWR

EX PHWR

EX HWR

EX PHWS

EX HWR

EX HWR

E X

P H

W S

E X

H W

R

E X

M P

S

AS-1

1" CD

EX MPS

ET-1

CONNECT DUCT TO EXISTING LOUVER

C H

W R

C H

W S

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106ENLARGED PLANS AND SECTIONS -

DEDUCT ALTERNATE

M0302

MEM CKH

1/4" = 1'-0" 4F

ENLARGED MECHANICAL ROOM - DEDUCT ALTERNATE

KEYED NOTES:

1. 40"x14" RA UP FROM PIPE BASEMENT BELOW. INSTALL FIRE

DAMPER AT FLOOR. COORDINATE DUCT WITH OPENING IN

FLOOR.

2. PROVIDE SCREEN ON VAV OUTLET.

3. PROVIDE SMOKE DETECTOR AT AHU-03 OUTLET.

GROUND FLOOR

FIRST FLOOR

PIPE BASEMENT

MECHANICAL ROOM

CHWS

CHWR

HWS

HWR

EX-CHWS

EX-CHWR

EX-HWS

EX-HWR

ERS

ERR

ERS

ERR

ERS

ERR

ERU-1

CHWS/R AND

HWS/R, TO AND

FROM NEW

VAV/FCU

EXISTING CHWS/R

AND HWS/R

BUILDING

EXTERIOR

BUILDING

INTERIOR

EX-CHWS

EX-CHWR

EX-HPS

EX-PCD

EX-CHWS/R,

HPS, AND PCD

TO AND FROM

CUP

GROUND FLOOR

FIRST FLOOR

PIPE BASEMENT

MECHANICAL ROOM

MA SA

MA RA

OA

EX-MA SA

EX-MA RA

EX-OA

EX-EA

ERU-1

MA SA, MA RA, OA,

AND EA TO/FROM

GROUND FLOOR

EXISTING MA SA,

MA RA, OA, AND EA

BUILDING

EXTERIOR

BUILDING

INTERIOR

EA

EAMA RA

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106RISER DIAGRAMS

M0401

MEM CKH

NTS

4C

HYDRONIC RISER DIAGRAM

NTS

4E

AIR SYSTEM RISER DIAGRAM

AIR DEVICE SCHEDULE

TYPE

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

SERVICE STYLE

SUPPLY

RETURN/EXHAUST

PLAQUE

FACE

SIZE (IN)

24 x 24

NECK

SIZE (IN)

6" Ø

AIR FLOW

RANGE (CFM)

0 - 100

REMARKS

24 x 24 8" Ø 101 - 175

24 x 24 10" Ø 176 - 250

24 x 24 12" Ø 251 - 350

24 x 24 14" Ø 351 - 450

RETURN/EXHAUST

RETURN/EXHAUST

RETURN/EXHAUST

RETURN/EXHAUST

24 x 24

24 x 24

24 x 24

24 x 24

12 x 12

10" Ø

12" Ø

14" Ø

15 x 15

6" Ø

201 - 325

326 - 450

451 - 600

601 - 950

0 - 100

15 RETURN/EXHAUST LOUVERED 8 x 8 8 x 8 0 - 100

15 RETURN/EXHAUST 12 x 8 12 x 8 101 - 200

15 RETURN/EXHAUST 14 x 10 201 - 400

15 RETURN/EXHAUST 16 x 12 401 - 600

LOUVERED

LOUVERED

LOUVERED

14 x 10

16 x 12

5 RETURN/EXHAUST 12 x 12 8" Ø 101 - 200

SUPPLY

SUPPLY

SUPPLY

SUPPLY

NOTES:

1. ALL BRANCH DUCTWORK TAPS CONNECTING TO DIFFUSERS SHALL BE EQUAL TO DIFFUSER

NECK SIZE AS SPECIFICED IN THE AIR DEVICE SCHEDULE.

PLAQUE

PLAQUE

PLAQUE

PLAQUE

PLAQUE

PLAQUE

PLAQUE

PLAQUE

PLAQUE

PLAQUE

15 LOUVERED 6 x 6 6 x 6 0 - 100 1RETURN/EXHAUST

1100 Clark Avenue St. Louis, Missouri 63102

T: 314.241.6250 F: 314.241.2570

JACKSON, MS

CANNON DESIGN PROJECT NO. 03640.61

© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.

JAN 12, 2018

NOT FOR CONSTRUCTION

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of 66Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

COMMUNITY LIVING CENTER

RENOVATION

586-16-106SCHEDULES

M0501

MEM CKH

VAV TERMINAL UNIT SCHEDULE

MARK SIZE AIRFLOW

(CFM)

MIN AIRFLOW

(CFM)

HEATING

AIRFLOW

(CFM)

REHEAT COIL

REMARKSCAPACITY

(MBH)

EAT (°F) LAT (°F) EWT (°F) LWT (°F) GPM

VAV-01 12 575 275 275 9.0 55 85 180 150 0.7 1,2

VAV-02 8 350 175 175 5.7 55 85 180 150 0.4 1,2

VAV-03 8 525 525 525 17.1 55 85 180 150 1.2 1,2

VAV-04 8 325 175 175 5.7 55 85 180 150 0.4 1,2

VAV-05 10 325 175 175 5.7 55 85 180 150 0.4 1,2

VAV-06 8 125 125 125 4.1 55 85 180 150 0.3 1,2

VAV-07 10 550 250 250 8.2 55 85 180 150 0.6 1,2

VAV-08 8 100 100 100 3.3 55 85 180 150 0.3 1,2

VAV-09 6 50 50 50 1.7 55 85 180 150 0.2 1,2

VAV-10 6 150 100 100 3.3 55 85 180 150 0.3 1,2

VAV-11 8 400 125 125 4.1 55 85 180 150 0.3 1,2

VAV-12 12 875 825 825 26.9 55 85 180 150 1.9 1,2

VAV-13 12 750 500 500 16.3 55 85 180 150 1.1 1,2

VAV-14 12 575 450 450 14.7 55 85 180 150 1.0 1,2

VAV-15 12 750 500 500 16.3 55 85 180 150 1.1 1,2

VAV-16 8 300 675 675 22.0 55 85 180 150 1.5 1,2

VAV-17 6 300 50 50 1.7 55 85 180 150 0.2 1,2

VAV-18 10 825 250 250 8.2 55 85 180 150 0.6 1,2

VAV-19 8 100 300 300 9.8 55 85 180 150 0.7 1,2

VAV-20 10 475 800 800 26.1 55 85 180 150 1.8 1,2

VAV-21 8 1650 1650 1650 53.8 55 85 180 150 3.7 1,2

VAV-22 10 1550 1500 1500 48.9 55 85 180 150 3.3 1,2

FOUR-PIPE FAN COIL UNIT SCHEDULE

UNIT NO. CONFIG.

COOLING

AIRFLOW

(CFM)

HEATING

AIRFLOW

(CFM)

ESP

(IN. WG)

COOLING COIL HEATING COIL ELECTRICAL

EMERGENCY

POWER

FILTER

REMARKS

TOTAL

COOLING

CAPACITY

(MBH)

SENSIBLE

COOLING

CAPACITY

(MBH) EAT (ºF)

LAT

(ºF)

EST.

FLOW

(GPM)

EWT

(ºF)

LWT

(ºF)

MAX

WPD

(FT)

HEATING

CAPACITY

(MBH)

EAT

(ºF)

LAT

(ºF)

EST.

FLOW

(GPM)

EWT

(ºF)

LWT

(ºF)

MAX

WPD

(FT) MCA V/PH/HZ MERV

FCU-01 HORIZONTAL 575 250 0.5 13.24 12.88 70/58 49.54 2.64 43 53 3.3 8 70 92.3 0.9 180 150 0.59 4.7 277/1/60 N 8 1

FCU-02 HORIZONTAL 300 125 0.5 6.49 6.35 70/58 49.98 1.29 43 53 0.84 4 70 95.5 0.6 180 150 0.21 4.7 277/1/60 N 8 1

FCU-03 HORIZONTAL 335 190 0.5 7.25 7.08 70/58 50 1.45 43 53 1.02 6 70 94.2 0.6 180 150 0.23 4.7 277/1/60 N 8 1

FCU-04 HORIZONTAL 300 125 0.5 6.49 6.35 70/58 49.98 1.29 43 53 0.84 4 70 95.5 0.6 180 150 0.21 4.7 277/1/60 N 8 1

FCU-05 HORIZONTAL 300 125 0.5 6.49 6.35 70/58 49.98 1.29 43 53 0.84 4 70 95.5 0.6 180 150 0.21 4.7 277/1/60 N 8 1

FCU-06 HORIZONTAL 335 155 0.5 7.25 7.8 70/58 50 1.45 43 53 1.02 5 70 94.2 0.6 180 150 0.23 4.7 277/1/60 N 8 1

FCU-07 HORIZONTAL 385 125 0.5 8.28 8.8 70/58 50.09 1.65 43 53 1.29 4 70 92.7 0.6 180 150 0.27 4.7 277/1/60 N 8 1

FCU-08 HORIZONTAL 525 190 0.5 12.27 11.86 70/58 49.36 2.44 43 53 2.87 6 70 93.4 0.9 180 150 0.54 4.7 277/1/60 N 8 1

FCU-09 HORIZONTAL 335 125 0.5 7.25 7.08 70/58 50 1.45 43 53 1.02 4 70 94.2 0.6 180 150 0.23 4.7 277/1/60 N 8 1

FCU-10 HORIZONTAL 385 125 0.5 8.28 8.08 70/58 50.09 1.65 43 53 1.29 4 70 92.7 0.6 180 150 0.27 4.7 277/1/60 N 8 1

FCU-11 HORIZONTAL 385 155 0.5 8.28 8.08 70/58 50.09 1.65 43 53 1.29 5 70 92.7 0.6 180 150 0.27 4.7 277/1/60 N 8 1

FCU-12 HORIZONTAL 900 280 0.5 24.92 22.04 70/58 47.63 4.97 43 53 5.91 9 70 101.7 2.1 180 150 4.12 4.7 277/1/60 N 8 1