36C25618B0375-006.pdf
PDF 720 KB Posted
- Solicitation number
- 36C25618B0375
About this file
36C25618B0375 60_FP_VACLC_2018 01 11_IFB.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25618B0375-00004000.docx | DOCX document | |
| 36C25618B0375-00004003.pdf | ||
| 36C25618B0375-00004005.pdf | ||
| 36C25618B0375-00004004.pdf | ||
| 36C25618B0375-00004001.pdf | ||
| 36C25618B0375-00004006.pdf | ||
| 36C25618B0375-00004002.pdf | ||
| 36C25618B0375-00003000.docx | DOCX document | |
| 36C25618B0375-00002000.docx | DOCX document | |
| 36C25618B0375-00002001.pdf | ||
| 36C25618B0375-00001000.docx | DOCX document | |
| 36C25618B0375-001.docx | DOCX document | |
| 36C25618B0375-009.pdf | ||
| 36C25618B0375-010.pdf | ||
| 36C25618B0375-007.pdf | ||
| 36C25618B0375-003.pdf | ||
| 36C25618B0375-004.pdf | ||
| 36C25618B0375-008.pdf | ||
| 36C25618B0375-005.pdf | ||
| 36C25618B0375-002.pdf | ||
| 36C25618B0375-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6B
GENERAL NOTES
9A
ABBREVIATIONS
PRESSURE SWITCH
RISER INDICATOR / DETAIL NO.
TOP INDICATES TYPE OF RISER / DETAIL NO.
BOTTOM INDICATES RISER NUMBER / DWG NO.
RISER INDICATOR -
TOP INDICATES TYPE OF RISER,
BOTTOM INDICATES RISER NUMBER
(ARROW INDICATES DIRECTIONAL VIEW OF
ISOMETRIC RISERS)
CHECK VALVE (SHOWN W/FLOW)
OS&Y VALVE
DIRECTION OF FLOW
PIPE ANCHOR
UNION
VALVE
FSA
CP
A
P
O
R
I
UV
RATE OF RISE DETECTOR
ULTRA VIOLET DETECTOR
IONIZATION DETECTOR (SMOKE)
PHOTOELECTRIC DETECTOR
MANUAL PULL STATION
HORN
HORN W/ STROBE LIGHT
ABORT SWITCH (DEADMAN TYPE)
ROTATING BEACON
CONTROL PANEL
FIRE STATUS ANNUNCIATOR
BACKFLOW PREVENTER (BFP)
SECURITY PENDENT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
CONCEALED SPRINKLER HEAD
PENDENT SPRINKLER HEAD
PENDENT ON/OFF SPRINKLER HEAD
FIRE PROTECTION PIPING (FP) EXISTING
FIRE PROTECTION PIPING (FP)
FIRE PROTECTION PIPING (FP) DEMO
EX. FP
FP
FP
FP
SEMI RECESSED SPRINKLER HEAD
7A
SYMBOLS
AC AIR COMPRESSOR
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AP ACCESS PANEL
ARCH ARCHITECTURE
ASSY ASSEMBLY
ATM ARMOSPHERE
AUTO AUTOMATIC
AUX AUXILLARY
BOB BOTTOM OF BEAM
BOP BOTTOM OF PIPE
CA COMPRESSED AIR OR CLEAN AGENT
CALCS CALCULATIONS
CAP CAPACITY
CC CEILING COLUMN
CCD CHICAGO CITY DATUM
CLG CEILING
cm CENTIMETER
CO2 CARBON DIOXIDE
COL COLUMN
CONC CONCRETE
CONN. CONNECTION
CONT. CONTINUED
CSP COMBINED STANDPIPE/SPRINKLER SYSTEM
CV CHECK VALVE
DCV DOUBLE CHECK VALVE
DDCV DOUBLE DETECTOR CHECK VALVE
DIA DIAMETER
DIM DIMENSION
DN DOWN
DR DRAIN
DPV DRY PIPE VALVE
DV DRAIN VALVE
DWG DRAWING
EA EACH
ELEV. ELEVATION
ELEC ELECTRICAL
EQUIP EQUIPMENT
EX EXISTING
EXIST EXISTING
EXP EXPANSION
F FARENHEIT
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FBO FURNISHED BY OTHERS
FD1,2,3... FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDV FIRE DEPARTMENT VALVE
FEC FIRE EXTINGUISHER CABINET
FIN FINISHED
FH FIRE HOSE
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FLR FLOOR
FP FIRE PROTECTION
FPC FIRE PUMP CONTROLLER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTC FIRE PUMP TEST CONNECTION
FS FLOW SWITCH
FT FEET
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
IN INCHES
ITC INSPECTORS TEST CONNECTION
MD MAIN DRAIN
N&C NIPPLE AND CAP
NA NOT APPLICABLE
N.C. NORMALLY CLOSED
NIC NOT IN CONTRACT
NO. NUMBER
N.O. NORMALLY OPEN
NS NOT SPRINKLERED
NTS NOT TO SCALE
OSW OPEN SITE WASTE
OS&Y OUTSIDE SCREW AND YOKE
P PUMP
PG PRESSURE GAUGE
PIV POST INDICATOR VALVE
PKG PACKAGE
POC POINT OF CONNECTION
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
RN RISER NIPPLE
RPM REVOLUTIONS PER MINUTE
SCV SECTIONAL CONTROL VALVE W/ TAMPER SWITCH
SP STANDPIPE
SPKR SPRINKLER
SUB-CONTR. SUB CONTRACTOR
SYS SYSTEM
TB THRUST BLOCK
TEMP TEMPERATURE
TH THERMOMETER
TS TAMPER SWITCH
TYP TYPICAL
UG UNDERGROUND
UNO UNLESS OTHERWISE NOTED
VEL VELOCITY
VERT VERTICAL
VIF VERIFY IN FIELD
W/ WITH
W/O WITHOUT
WIP WALL INDICATOR POST
6A
DEMOLITION NOTES
POST INDICATOR VALVE
DRY PIPE VALVE
DPV
PIV
SOLENOID VALVE
CONTROL VALVE
D DELUGE VALVE
ELBOW DOWN
ELBOW UP
PUMP (SCHEMATIC)
BOTTOM DROP
FLOW SWITCH
FIRE DEPARTMENT VALVE
FIRE HOSE CABINET
FIRE DEPARTMENT HOSE VALVE
FIRE DEPARTMENT CONNECTION
FREE-STANDING FIRE DEPARTMENT CONNECTION
FLUSH FIRE PUMP TEST HEADER
FREE-STANDING FIRE PUMP TEST HEADER
HEAT DETECTOR
CEILING CLEAN AGENT NOZZLE
SUB-FLOOR CLEAN AGENT NOZZLE
WARNING LIGHT
CLEAN AGENT STORAGE TANK
LASER COMPACT
LASER PLUS
LASER SCANNER
POWER SUPPLY
REMOTE DISPLAY
AIR SAMPLING NOZZLE
AIR SAMPLING PORT
POINT OF CONNECTION (NEW TO EXISTING)
POINT OF CONNECTION (NEW TO EXISTING)
KEYED NOTE TAG
NEW EQUIPMENT TAGXX
(E)XXX
EXISTING EQUIPMENT TAG
EXISTING
AREA MATCHLINE
F101
1 SECTION INDICATOR
TOP INDICATES SECTION NUMBER
BOTTOM INDICATES DRAWING NUMBER
VLC
VLP
VLS
VPS
VRD
U
D
T
FDV
FHC
FDC
CAPPED PIPING
FPT
1. DEMOLITION INFORMATION SHOWN ON THE DRAWINGS IS BASED ON SHOP
DRAWINGS AND A PRELIMINARY REVIEW OF THE EXISTING CONDITIONS.
PERFORM ALL WORK OF A DEMOLITION NATURE THAT MAY BE REQUIRED
OR NECESSARY FOR A FULL AND COMPLETE EXECUTION OF THE WORK,
WHETHER OR NOT SHOWN OR SPECIFIED. THE EXACT EXTENT OF
DEMOLITION MAY NOT BE FULLY INDICATED ON THE DRAWINGS.
CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS PRIOR TO BIDS
AND CONFIRM COMPLETE EXTENT OF DEMOLITION REQUIRED.
2. MATERIALS AND EQUIPMENT TO BE SALVAGED OR REUSED SHALL BE
IDENTIFIED BY THE OWNER. THESE ITEMS ARE THE PROPERTY OF THE
OWNER AND SHALL BE RETURNED TO THE OWNERS DESIGNATED
STORAGE AREA. WHERE REMOVAL IS REQUIRED THE CONTRACTOR
SHALL BE RESPONSIBLE FOR CARE TAKEN DURING THE HANDLING OF
THESE ITEMS.
3. DEMOLISHED MATERIALS AND EQUIPMENT NOT BEING SALVAGED OR
REUSED, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND
REMOVED FROM THE SITE AND LEGALLY DISPOSED OF.
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND MAY NOT SHOW EXACT
ROUTING OR ALL REQUIRED OFFSETS, ACCESSORIES OR APPURTENANCES.
CONTRACTOR SHALL PROVIDE AS REQUIRED TO INSTALL A COMPLETE AND
COORDINATED JOB, INCLUDING ANY ADDITIONAL ITEMS REQUIRED TO MEET
ACTUAL FIELD CONDITIONS AND EQUIPMENT SELECTED.
2. THIS IS A GENERAL LIST OF ABBREVIATIONS AND SYMBOLS ON THIS SHEET.
SOME ABBREVIATIONS AND SYMBOLS MAY NOT BE APPLICABLE TO THIS
PROJECT.
3. FIRE PROTECTION CONTRACTOR SHALL COORDINATE LOCATION OF ALL
SPRINKLER HEADS AND PIPING WITH STRUCTURAL ELEMENTS, MECHANICAL,
PLUMBING, ELECTRICAL EQUIPMENT AND CEILING CONFIGURATION
INDICATED ON DRAWINGS. WHERE NECESSARY SPRINKLER CONTRACTOR
SHALL PROVIDE ADDITIONAL SPRINKLERS TO ASSURE REQUIRED DISCHARGE
PATTERNS AROUND OBTRUCTIONS AND DIFFERENT CEILING ELEVATIONS
TO YIELD A PROPER DENSITY (gpm / sq. ft.) FOR THE DESIGNED HAZARD.
4. ALL PIPING, FITTINGS AND JOINTS IN SPRINKLER AND STANDPIPE SYSTEMS
SHALL CONFORM TO NFPA 13 & 14, NON-METALLIC PIPE AND FITTINGS ARE
UNACCEPTABLE.
5. ALL VALVES WILL BE READILY ACCESSIBLE FROM A SAFE HEIGHT ON A SIX
FOOT LADDER AND TO BE CLEAR OF ALL OBSTRUCTIONS AND THEIR
OPERATION SHALL NOT BE ENCUMBERED BY ANY DEVICE OR EQUIPMENT.
6. INSTALL ALL OVERHEAD HANGERS AND SUPPORTS PRIOR TO SPRAY
FIREPROOFING OR DRYWALL CEILING.
7. DO NOT SUPPORT SPRINKLER PIPING FROM METAL DECK.
8. ALL SPRINKLER SYSTEMS SHALL BE EQUIPPED WITH A BACKFLOW
PREVENTION DEVICE OF THE TYPE REQUIRED FOR THE GIVEN CONDITIONS IN
ACCORDANCE WITH ALL NFPA REQUIREMENTS. AS A MINIMUM, A DOUBLE
CHECK VALVE TYPE DEVICE IS REQUIRED. THE DEVICE SHALL BE INSTALLED
WITHIN 36 INCHES FROM WHERE THE FIRE SERVICE ENTERS THE FACILITY.
ALL BACKFLOW PREVENTERS SHALL BE ELECTRICALLY SUPERVISED BY THE
FIRE ALARM CONTROL PANEL. PIPE SLEEVING SHALL BE IN ACCORDANCE
WITH NFPA FOR EARTHQUAKE REQUIREMENTS.
9. PROTECT ELEVATOR MACHINE ROOMS AND ELEVATOR SHAFTS.
10. SPRINKLER PIPING IS TO BE BRACED AND RESTRAINED (BRANCH LINES) IN
ACCORDANCE WITH NFPA 13 FOR SEISMIC REQUIREMENTS.
11. EXTENDED COVERAGE SPRINKLERS WILL BE ACCEPTABLE.
12. THE ENTIRE LEVEL 00 CLC RENOVATION SHALL BE COMPLETELY SPRINKLERED
WITH A WET PIPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 FOR
LIGHT/ORDINARY HAZARD OCCUPANCY.
13. SPRINKLER SYSTEM SHALL BE ZONED AS SHOWN ON DRAWINGS.
14. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR SPRINKLER
HEAD LOCATIONS.
15. THE SPACE ABOVE THE CEILING IS LIMITED AND THE INSTALLATION OF WORK
WILL BE TIGHT. DUE TO THIS, IT IS IMPORTANT THAT THE TRADE
CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THEIR WORK WITH
THE CEILING SYSTEM HEIGHT AND CONSTRUCTION OF THE STRUCTURAL
SYSTEM, THE LIGHTING FIXTURES, THE SPRINKLER HEADS/MAINS AND THE
PLUMBING PIPES. ROUTE PIPING AS HIGH AS POSSIBLE. MAINTAIN PROPER
SERVICE ACCESS CLEARANCES. ACCURATE SHOP DRAWINGS SHALL BE
SUBMITTED FOR APPROVAL PRIOR TO FIELD INSTALLATION.
16. THE SECOND FLOOR SPRINKLERS SHALL BE KEPT ACTIVE DURING BOTH
DEMOLITION AND NEW WORK PHASES ON FIRST FLOOR.
2A
SCHEDULES
2B
DETAILS
DESIGNATION
LIGHT
SYSTEM TYPE
HAZARD
COMMODITY
MINIMUM
DENSITY
REMOTE
AREA
HOSE
ALLOWANCE
REMARKS
WET LIGHT HAZARD 0.10 GPM/S.F. 1,500 S.F. 100 GPM --
DESIGN CRITERIA
OG1 WET ORDINARY HAZARD 1 0.15 GPM/S.F. 1,500 S.F. 250 GPM --
ABBREV.
A
B
STYLE
TEMPERATURE
CLASSIFICATION
FINISH
CENTER OF TILE
(FOR LAY-IN CEILINGS)
SEMI-RECESSED
UPRIGHT
ORDINARY BRASS YES
SPRINKLER REQUIREMENTS
BRASS N/A
C CONCEALED BRASS YES
ORDINARY
ORDINARY
TYPICAL INSTALLATION
1" X 1/2 " REDUCER
RETAINING CLIP
ASSEMBLY
ENCLOSURE
1/2" ORIFICE PENDENT
SPRINKLER (WHITE
FINISH)
SOLDER
TYPICAL INSTALLATION
1" X 1/2 " REDUCER
RETAINING CLIP
ASSEMBLY
ENCLOSURE
/3
G A
P
4" DIAM. COVER PLATE
PENDENT SPRINKLER
1/2 " ORIFICE
COVER PLATE SHALL BE COORDINATED
WITH CEILING / CEILING TILE COLORS
PER ARCHITECTURAL PLANS.
CONTRACTOR TO SUBMIT SAMPLE
FOR APPROVAL.
PIPE WITH 1" OUTLET TEES
TYPICAL SPRINKLER BRANCH
REQUIRED
1" RISER NIPPLE
REQUIRED TYPICAL
HEAD TEMP AS
UPRIGHT SPRINKLER
1"x1/2"REDUCING
COUPLING
LENGTH AS
3" RADIUS TOLERANCE (TYP.)
SPRINKLER (TYP.)
IN THE SAME DIRECTION.
THE ROW SHALL BE OFFSET BY THE SAME DISTANCE
TOLERANCE BE USED, THEN ALL THE SPRINKLERS IN
3" TOLERANCE. HOWEVER, SHOULD ANY PART OF THE
SPRINKLERS SHALL BE POSITIONED AS SHOWN WITH A
NOTE:
1'-0"
1'-0"
2'-0"
2'-0"
1'-0"1'-0"
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 81Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106LEGENDS, SYMBOLS &
ABBREVIATIONS
FX0001
JJS RJL
NTS
1C
SEMI-RECCESSED SPRINKLER HEAD DETAIL
NTS
3C
CONCEALED SPRINKLER HEAD DETAIL
NTS
1E
UPRIGHT SPRINKLER HEAD DETAIL
NTS
3E
SPRINKLER LAYOUT
VUTR S W
PONMKJH
FD ECBA
E X
F S
E X
F P
E X
F S
E X
F
PE
X
F S
E X
F P
E X
F S
EX FSEX FSEX FSEX FSEX FSEX FSEX FS
EX FP
EX FP
EX FS
EX FP
EX FS
EX FP
EX FS
EX FP
EX FS
EX FP
EX FP EX FP
INCOMING FIRE PROTECTION
I.E. 338.00'
DEMO EX. FHC
DEMO EX. FHC
DEMO EX. FHC
DEMO EX. FHC
DEMOLISH ALL SRINKLER PIPING, HEADS AND ACCESSORIES
CONNECTED TO FIRE PROTECTION ON LEVEL 00.
FIRE PROTECTION SYSTEM FOR LEVEL 01 SHALL REMAIN ACTIVE
DURING CONSTRUCTION. IF A SHUT DOWN IS REQUIRED
IT SHALL BE SCHEDULED WITH THE OWNER 14 DAYS
IN ADVANCE.
DEMOLISH ALL SRINKLER PIPING, HEADS AND ACCESSORIES
CONNECTED TO FIRE PROTECTION ON LEVEL 00.
FIRE PROTECTION SYSTEM FOR LEVEL 01 SHALL REMAIN ACTIVE
DURING CONSTRUCTION. IF A SHUT DOWN IS REQUIRED
IT SHALL BE SCHEDULED WITH THE OWNER 14 DAYS
IN ADVANCE.
DEMOLISH ALL SRINKLER PIPING, HEADS AND ACCESSORIES
CONNECTED TO FIRE PROTECTION ON LEVEL 00.
FIRE PROTECTION SYSTEM FOR LEVEL 01 SHALL REMAIN ACTIVE
DURING CONSTRUCTION. IF A SHUT DOWN IS REQUIRED
IT SHALL BE SCHEDULED WITH THE OWNER 14 DAYS
IN ADVANCE.
THIS AREA REMAINS
UNTOUCHED AND
SPRINKLERS SHALL
REMAIN IN
OPERATION DURING
CONSTRUCTION.
EX FP EX FP EX FP EX FPEX FPEX FP EX FP
EX FS
EX FP
E X
F P
E X
F S
EX FS
EX FP
DEMO EX. FS
DEMO EX. FP
DEMO EX. FS DEMO EX. FP
DEMO EX. FS
DEMO EX. FP
DEMO EX. FP
DEMO EX. FS
EXISTING FHV, FLOW AND
TAMPER TO REMAIN
EXISTING FHV, FLOW AND
TAMPER TO REMAIN
DEMO FIRE PROTECTION
TO THIS POINT
EXISTING FHV, FLOW AND
TAMPER TO REMAIN
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 81Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106LEVEL 00 FIRE PROTECTION DEMO
PLAN
FD100
JJS RJL
1/8" = 1'-0" 4F
LEVEL 00 FIRE PROTECTION DEMO PLAN
T L
T -0
B N
TLT-01
B N
TLT-01
VUTR S W
PONMKJH
FD ECBA
INCOMING EXISTING FIRE PROTECTION
I.E. 338.00'
FIRE SPRINKLER PIPING SHALL
BE FIELD VERIFIED PRIOR TO
DEMOLITION. CONTRACTOR
TO MODIFY SPRINKLER LAYOUT AND
COVERAGE TO NEW ROOM LAYOUTS
AND DENSITIES PER NFPA 13.
CONTRACTOR TO COORDINATE
ANY SHUTDOWNS WITH OWNER
14 DAYS PRIOR.
FIRE SPRINKLER PIPING SHALL
BE FIELD VERIFIED PRIOR TO
DEMOLITION. CONTRACTOR
TO MODIFY SPRINKLER LAYOUT AND
COVERAGE TO NEW ROOM LAYOUTS
AND DENSITIES PER NFPA 13.
CONTRACTOR TO COORDINATE
ANY SHUTDOWNS WITH OWNER
14 DAYS PRIOR.
FIRE SPRINKLER PIPING SHALL
BE FIELD VERIFIED PRIOR TO
DEMOLITION. CONTRACTOR
TO MODIFY SPRINKLER LAYOUT AND
COVERAGE TO NEW ROOM LAYOUTS
AND DENSITIES PER NFPA 13.
CONTRACTOR TO COORDINATE
ANY SHUTDOWNS WITH OWNER
14 DAYS PRIOR.
THIS AREA REMAINS
UNTOUCHED AND
SPRINKLERS SHALL
REMAIN IN
OPERATION DURING
CONSTRUCTION.
Bedroom, Bariatric
G141
Bath Suite
G154
Bedroom, Bariatric
G161
Soiled Utility
G174
Clean Utility
G173
Bedroom
G172
Bedroom
G171
Bedroom
G170
Bedroom
G169
Bedroom
G168
Bedroom
G166
Bedroom
G165
Bedroom
G164
Bedroom
G163
Bedroom
G162
Office
G123
Family Lounge
G107
Medicine Storage
G106
Telecom Closet
G113
Conference
G131Staff Lounge
G126
Office
G127
Office
G128
Mechanical (E)
G132
Mechanical (E)
G132.1
Concierge Station
G105
Sitting Area
G104
Multi-Purpose Area
G112
Laundry
G109
Alcove
G160.5
Elec
G160.2
Shared Office
G129
Toilet
G172.1
Toilet
G171.1 Toilet
G170.1
Toilet
G169.1 Toilet
G168.1
Toilet
G166.1
Toilet
G165.1
Toilet
G164.1
Toilet
G163.1
Toilet
G161.1
Corridor
G140
Corridor
G160
Stairs
G167
Stairs
G133
Lobby
G103
Oxygen Storage- Empty
G121
Elevator
C1-G
Elevator
C2-G
Locker Room
G130
Storage/Linen Storage
G110
Kitchen
G111
Office
G124
Closet
G114
Multi-Purpose Area
G102
Storage
G160.3
Elec
G120.1
Toilet
G130.2
House Keeping
G122
Bedroom
G148
Bedroom
G149
Bedroom
G150
Bedroom
G151
Bedroom
G152
Bedroom
G153
Bedroom
G142
Bedroom
G143
Bedroom
G144
Bedroom
G145
Bedroom
G146
Alcove
G140.5
Storage
G140.2
Storage
G140.1
Storage
G160.4
Toilet
G148.1
Toilet
G149.1
Toilet
G150.1
Toilet
G151.1
Toilet
G152.1
Toilet
G153.1
Toilet
G146.1
Toilet
G145.1
Toilet
G144.1
Toilet
G143.1
Toilet
G142.1
Toilet
G141.1 Stairs
G147
Elec Closet
G140.4
Storage
G140.3
Corridor
G175
Toilet
G130.1
CONNECT NEW
4" FP TO
EXITING 4" FP
RISER AT
CEILING
CONNECT NEW
4" FP AND NEW
BFP TO
EXISTING 4" FP
CONNECT NEW
4" FP TO
EXITING 4" FP
RISER AT
CEILING TO
LEVEL 01
CONNECT NEW
4" FP TO
EXITING 4" FP
RISER AT
CEILING TO
LEVEL 01
F P
FP
F P
FS
FP
FS
FP
FS
FS
FP
FS
FP
FS
FP
F S
FS
F S
F S
F S
Office
G125
Corridor
G175
Public Toilet
G108
LIGHT A
LIGHT A
OR1 B
OR1 B OR1 B
OR1 B
OR1 B OR1 B
OR1 B
LIGHT A
LIGHT A
OR1 A
LIGHT A
LIGHT A
OR1 B
OR1 A
OR1 A
OR1 A
LIGHT C
OR1 B
MATCH EXISTING SPRINKLER TYPE
IN THIS ROOM. CONTRACTOR SHALL
FIELD VERIFY
PROVIDE NEW
BFP-2 IN PIPE
BASEMENT
EX. FDC
INSTALL
ALARM AND
CHECK VALVE
EXISTING FHV, FLOW
AND TAMPER TO REMAIN
EXISTING FHV, FLOW
AND TAMPER TO REMAIN
1100 Clark Avenue St. Louis, Missouri 63102
T: 314.241.6250 F: 314.241.2570
JACKSON, MS
CANNON DESIGN PROJECT NO. 03640.61
© CannonDesign 2017 - All rights reserved. No part of this document may be reproduced or utilized in any form, without prior written authorization by the Cannon Corporation.
JAN 12, 2018
NOT FOR CONSTRUCTION
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 81Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
COMMUNITY LIVING CENTER
RENOVATION
586-16-106LEVEL 00 FIRE PROTECTION PLAN
FX100
JJS RJL
1/8" = 1'-0" 4F
LEVEL 00 FIRE PROTECTION PLAN