This notice is for a pre-solicitation of a construction project to eliminate dead ends prone to harboring legionella growth and install mixing valves preventing scalding at the Jesse Brown VA Medical Center in Chicago, Illinois. The contractor shall provide all tools, materials, components, labor and supervision for services. Work is to be completed within 265 calendar days of receipt of a notice to proceed. Competition is restricted to SDVOSB construction firms. The solicitation will be issued on or about February 20, 2020 with proposals due on or about March 23, 2020. It will include all drawings, plans and specifications for the requirement and be posted at SAM.gov. The project magnitude is estimated between $1,000,000 to $2,000,000. The NAICS code is 238220 for plumbing, heating and air conditioning contractors. Offerors must be registered in SAM.gov and represent that they are an eligible SDVOSB at the required size standard to receive the contract. A pre-proposal site visit will be held and attendance is encouraged.
36C25220R0053 P12 537-18-301B Construction Drawings G-125 to P-501_Pt 2 of 2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25220R0053-0006001.docx | DOCX document | |
| 36C25220R0053-0006002.xlsx | XLSX spreadsheet | |
| 36C25220R0053-0006000.docx | DOCX document | |
| 36C25220R0053-0005000.docx | DOCX document | |
| 36C25220R0053-0005001.xlsx | XLSX spreadsheet | |
| 36C25220R0053-0004007.pdf | ||
| 36C25220R0053-0004003.docx | DOCX document | |
| 36C25220R0053-0004011.pdf | ||
| 36C25220R0053-0004000.docx | DOCX document | |
| 36C25220R0053-0004009.pdf | ||
| 36C25220R0053-0004002.xlsx | XLSX spreadsheet | |
| 36C25220R0053-0004010.pdf | ||
| 36C25220R0053-0004005.pdf | ||
| 36C25220R0053-0004004.pdf | ||
| 36C25220R0053-0004001.docx | DOCX document | |
| 36C25220R0053-0004008.xlsx | XLSX spreadsheet | |
| 36C25220R0053-0004006.pdf | ||
| 36C25220R0053-0003000.docx | DOCX document | |
| 36C25220R0053-0002000.docx | DOCX document | |
| 36C25220R0053-0001000.docx | DOCX document | |
| 36C25220R0053-0001001.pdf | ||
| 36C25220R0053-003.txt | TXT text file | |
| 36C25220R0053-002.docx | DOCX document | |
| 36C25220R0053-006.pdf | ||
| 36C25220R0053-005.pdf | ||
| 36C25220R0053-004.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARK
STRETCH
ALCOVE
VESTIBULE
VESTIBULE
ALCOVE
ALCOVE
ALCOVE
CLINICAL NURSE
LINEN
CHUTE
66L1
OXYGEN
STORAGE
FAC
ALCOVE
COMM RM
66T1
TOILET
6535A
INFUSION /
ONCOLOGY WAITING
RM
WAITING
INFUSION / ONCOLOGY CLINIC
MENS TOILET
STORAGE
WOMENS TOILET
STAIR
NO 3
CORRIDOR
C6611
CORRIDOR
C6603
PRIVATE MS
AND N PAT RM
CORRIDOR
C6604
CONFERENCE RM
CORRIDOR
C6612
CORRIDOR
C6610
CORRIDOR
C6602
ELEVATOR LOBBY
C6608
CORRIDOR
C6606
ELEVATOR LOBBY
C6607
CORRIDOR
C6601
CORRIDOR
C6605
CORRIDOR
C6609
CORRIDOR
C6613
ALCOVE
LINEN
PANTRY
6683A
EQUIP
STORAGE
NURSE
MANAGER
ELECTRICAL RM
66E3
STAIR
NO 16
NURSE
STATION
CHARGE NURSE OFFICE
MED RM
CLEAN
SUPPLY
SOILED UTILITY
CHARTING
STAFF
LOUNGE
TOILET
6655A
ELECTRICAL RM
66E1
PM AND
R RM
PATIENT LOUNGE
6 WEST
DINING
RM
CHARTING
ELEVATOR
P-23
ELEVATOR
P-24
ELEVATOR
P-25
NURSE
STATION
TEAM RM
PANTRY
CONFERENCE RM
SPD SUPPLY
CLEAN
SUPPLY
SOILED UTILITY
SOCIAL
WORKER
OFFICE
CLEAN LINEN
ELECTRICAL RM
66E2
MED
AREA
TOILET
6619A
STAFF
LOUNGE
EQUIP
STORAGE
6621 NURSE
MANAGER
MEDICINE TEAM OFFICE 3
STAIR
NO 13
TOILET
6627A TOILET
6628A
TELEMETRY PAT RM
TELEMETRY PAT RM
TOILET
6629A
TELEMETRY PAT RM
LOCKER
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TOILET
6630A
TOILET
6632A
TOILET
6634A
TOILET
6636A
TOILET
6638A
TOILET
6642A
TOILET
6644A
ASSIST
NURSE
MGR
HAC
66H1
ANTE RM
6648A
TOILET
6646B
TOILET
6648B
TELEMETRY PAT RM
TELEMETRY PAT RM
WASTE RM
TELEMETRY PAT RM
TOILET
6650A
ELEVATOR
P-22
ELEVATOR
P-21
ELEVATOR
P-20
SEMI-PRIVATE MS AND N PAT RM
SEMI-PRIVATE MS AND N PAT RM
SEMI-PRIVATE MS AND N PAT RM
SEMI-PRIVATE MS AND N PAT RM
SEMI-PRIVATE MS AND N PAT RM
SEMI-PRIVATE MS AND N PAT RM
COMM RM
66T1A
EMS
66H2
STAIR
NO 14
MS AND N PAT
ISOLATION RM
TOILET
6658A
REHAB-TEAM RM
CLC
TEAM RM
ANTE RM
6658B
HAC
66H3
TEAM RM
MS AND N PAT
ISOLATION RM
TOILET
6659A
TOILET
6662A
ISOLATION
MS AND N
PAT RM
TOILET
6664A
TOILET
6666A
TOILET
6668A
TOILET
6670A
TOILET
6672A
TOILET
6674A
PRIVATE MS
AND N PAT RM
SEMI-PRIVATE MS AND N PAT RM
TOILET
6675A
TOILET
6676A
TOILET
6677A
PATIENT RM
ALCOVE
EQUIP STORAGE
6677B
PRIVATE MS
AND N PAT RM
PRIVATE MS
AND N PAT RM
TOILET
6678A
TOILET
6680A
PRIVATE MS
AND N PAT RM
PRIVATE MS
AND N PAT RM
TOILET
6682A
TOILET
6686A
PRIVATE MS
AND N PAT RM
TOILET
6688A
TOILET
6690A
PRIVATE MS
AND N PAT RM
PRIVATE MS
AND N PAT RM
TOILET
6692A
TOILET
6694A
PRIVATE
MS AND N
PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
TELEMETRY PAT RM
PRIVATE MS
AND N PAT RM
TOILET
6696A
TOILET
6698A
TOILET
6600A
TOILET
6600B
VISITOR
WAITING
TOILET
6602A
TOILET
6604A
TOILET
6608A
TOILET
6610A
TOILET
6612A
TOILET
6618A
TOILET
6620A
TOILET
6622A
TOILET
6624A
TOILET
6626A
TELEMETRY PAT RM
6677C
6675C
6675B
6629B
EQUIP PARK
6667A
6613A
6668B
6666B
FRS
FRS
FRS
FRS
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:3
:4
A M
G-125
BUILDING 40 - SIXTH FLOOR OVERALL
FLOOR PLAN
28 31CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
JANUARY 6, 2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 3/64" = 1'-0"
BUILDING 40 - SIXTH FLOOR OVERALL FLOOR PLAN
6 6898A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6896A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6894A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6892A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6890A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6888A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6886A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6882A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6880A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6878A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6876A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6874A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6872A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6870A Toilet lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6868A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6866A toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6864A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6862A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6859A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6858B Anteroom Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6858A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6856A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6848B Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6848A Anteroom Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6846A Anteroom Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6846A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6844A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6842A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6838A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6836A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6834A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6832A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6830A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6629A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6627A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6626A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6624A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6622A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6620A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6619A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6618A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6612A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6610A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6608A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6604A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6602A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6600B Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6600A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6896 Nurse Station Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6895 Meds Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6886 Soiled Utility Sink 2 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6861 Waste Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6856 Lounge Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6843 Pantry Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6819 Lounge sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6818 soiled Utility Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.
6 6807 Clean Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.
Floor Room Number Room Description Plumbing Fixture Type Quantity Work Scope Building 40 Sixth Floor
Chicago Jesse Brown VA Medical Center
DocuSign Envelope ID: 4EB2FA07-76F8-405A-8777-CFBD3D48E2BF
1/7/2020
ELECTRICAL FIRE CLOSET
WHEEL CHAIR PARKING
ELECTRICAL
7617A
TOILETPOD EXAM
CLEAN
SUPPLY
WAITING RM
MED TEAM
CORRIDOR
ELEVATOR
P-22
ELEVATOR
OFFICE-1
OFFICE-2
POD
POD EXAM
7668A
STAIR
NO 3
STAFF LOCKER
SHOWER
7561A
TOILET
RESIDENT OFFICE
MED TEAM
PRIVATE MH AND
B PATIENT RM
MENS TOILET
7622A
DOCTOR OFFICE
7620A
MED TEAM
TOILET
CLOSET
7621A
SEMI-PRIVATE MH
AND B PATIENT
RM
ELEVATOR LOBBY
C7604
TOILET
C7602
SEMI-PRIVATE MH
AND B PATIENT RM
P-21
MUSIC RM
QUIET RM
7612A
TOILET
OFFICE-3
OFFICE-4
ELECTRICAL RM
SEMI-PRIVATE MH AND B
PATIENT RM
76E3
LAUNDRY
STAIR
NO 16
SEMI PRIVATE
PATIENT RM
PRIVATE
PATIENT
RM
TOILET
7669A
TOILET
7611A
7670A
TOILET
7666A
TOILET
STORAGE
TOILET
7662A
PRIVATE
PATIENT RM
TOILET
7660A
TOILET
7656A
PRIVATE
PATIENT RM
CLOSET
7665A OFFICE-7
OFFICE-6
PRIVATE
PATIENT
RM
7661TOILET
7657A
TOILET
7661A
OFFICE-5
PRIVATE
PATIENT
RM
PRIVATE
PATIENT
RM
TOILET
7655A
HAC
76H3
PRIVATE
PATIENT
RM
TOILET
7651A
PHONE
CORRIDOR
C7603
DAY RM
CORRIDOR
C7607
EXAM RM
ANTE
RM
7652 TOILET
7654A
TOILET
7652A
PHONE
EXTRA-PRIVATE PATIENT RM
7652B
TOILET
7640A
STAFF LOUNGE
STRETCHER PARKING
EMS
76H2
NURSE STATION
CORRIDOR
C7605
RECYC
CONFERENCE RM
EQUIP STORAGE
ELEVATOR LOBBY
C7606VISITOR WAITING
TOILET
ELECTRICAL
RM
76E1
CLEAN LINEN
CLEAN SUPPLY
STAFF TOILET
NURSE STATION
MEDICATION RM
NURSE STATION
ELEVATOR
P-23
ELEVATOR
P-24
ELEVATOR
P-25
QUIET RM
CORRIDOR
C7601
MUSIC RM
7604 DAY RM
COMM RM
76T1A
COMM RM
76T1
LINEN CHUTE
76L1
SEMI-PRIVATE MH AND B PATIENT RM
TOILET
7630A
SEMI-PRIVATE MH AND B PATIENT RM
EXERCISE AREA
HAC
76H1
PHONE ALCOVE
SEMI-PRIVATE MH
AND B PATIENT RM
TOILET
7628A
TOILET
7626A
SEMI-PRIVATE MH
AND B PATIENT RM
PRIMARY PHYSICIAN
AND MED STUDENT
OFFICE 11
TOILET
7625A
SEMI-PRIVATE MH AND
B PATIENT RM
TOILET
SEMI-PRIVATE MH
AND B PATIENT RM
TOILET
SEMI-PRIVATE MH
AND B PATIENT RM
TOILET
TOILET
TOILET
PRIVATE
PATIENT
RM
7614A
7616A
7618A
SEMI-PRIVATE MH
AND B PATIENT RM
SEMI-PRIVATE MH
AND B PATIENT RM
LAUNDRY
NO 13
PRIVATE
PATIENT RM
TOILET
PSYCHOLOGY OFFICE-10
7613A
NURSE OFFICE-9
STAIR
TOILET
PRIVATE MH
AND B PATIENT
RM
TOILET
SEMI-PRIVATE MH AND
B PATIENT RM
7671A
SOCIAL WORK
NO 14
TOILET
ELECTRICAL RM
ELEVATOR
PRIVATE
PATIENT
RM
PRIVATE
PATIENT
RM
STAIR
P-20
7632A
76E2
RECYC GEN WASTE
ALCOVE
7619A
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:3
:4
A M
G-126
BUILDING 40 - SEVENTH FLOOR
OVERALL FLOOR PLAN
29 31CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
JANUARY 6, 2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 3/64" = 1'-0"
BUILDING 40 - SEVENTH FLOOR OVERALL FLOOR PLAN
7 7611A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7615 Laundry Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7615A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7619A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7621A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7629 Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7625A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7601 Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7630 Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7641 Waste Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7654A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7656A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7661A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7657A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7869A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7871A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7870A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7868A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7866A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7862A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7860A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7856A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7854A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7852A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7840A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7840 Lounge Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7832A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7830A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7828A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7826A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7822A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7820A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7818A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7816A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7814A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
7 7812A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.
Floor Room Number Room Description Plumbing Fixture Type Quantity Work Scope Building 40 Seventh Floor
Chicago Jesse Brown VA Medical Center
HAC
FIRE CLOSET
ELEVATOR
P22
ELEVATOR
P21
ELEVATOR
P20
ELEVATOR LOBBY
C8601
COMM RM
86T1
COMM RM
86T1A
STAIR
NO 14
PENTHOUSE
STAIR
NO 16
OPEN
AREA
UTILITY MECH HVAC
ELECTRICAL
RM
STAIR
NO 17
ELEVATOR
MACH RM
TEL/COMM RM
OPEN
AREA
UTILITY MECH HVAC
STAIR
NO 13
EMG/ EEG
STAIR
NO
STORAGE
STORAGE
MEN
EMG/ EEG
EMG/ EEG
EMG/ EEG
EMG/ EEG
EEG
TESTING LAB
TOILET
8556A
CLOSET
VESTIBULE
8612A
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:3
:4
A M
G-127
BUILDING 40 - EIGHTH FLOOR OVERALL
FLOOR PLAN
30 31CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
JANUARY 6, 2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 3/64" = 1'-0"
BUILDING 40 - EIGHTH FLOOR OVERALL FLOOR PLAN
TOILET
9555A
TOILET
9556A
2-BED RM
STORAGE
TOILET
9559A
2-BED RM
LINEN
1-BED
RM
1-BED RM
STORAGE
TOILET
9560A
1-BED RM
STAIR
NO
STAIR
NO 14
MACH RM
ROOF
STAIR 16
PENTHOUSE
ROOF
ROOF
PENTHOUSE
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:3
:4
A M
G-128
BUILDING 40 - NINTH FLOOR OVERALL
FLOOR PLAN
31 31CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
JANUARY 6, 2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 3/64" = 1'-0"
BUILDING 40 - NINTH FLOOR OVERALL FLOOR PLAN
UNISEX TOILET
3475A
SOILED UTILITY
ELECTRICAL CLOSET
TOILET
FAC
ELECTRICAL
34E4
BACKUP GENERATOR RM
3472C
STORAGE
3472B
STORAGE
3455A
ELECTRICAL
3495A
STORAGE
3485A
CORRIDOR
C3401
CORRIDOR
C3402
CORRIDOR
C3403
ELEVATOR LOBBY
ELEVATOR
ELEVATOR
P-4
OXYGEN TANKS
DRESSING ROOM
3475B
STORAGE
3475C
LOCKER ROOM
DOCTORS
OFFICE
STAIR
NO 5
RESIDENT
GROUP
DOCTORS
OFFICE
DOCTORS
OFFICE
CHIEF
ENT
DOCTORS
OFFICE
DOCTORS
OFFICE
3494A
DOCTORS
OFFICE
RESIDENT COORD.
DOCTORS
OFFICE
SURGERY STAFF
SECRETARY/ COPIER
HAC
BREAK ROOM
OFFICE
OFFICE
STORAGE
MECH RM
3472A
EQUIPMENT STORAGE
LAB
MECH RM
3466A
SUPPLY RM
RECEPTION
3461CHIEF OFFICE
TANK RM
3454A
STORAGE
3454B
DIALYSIS STORAGE
CARDIO STORAGE
3452NON
VA MED CARE
S-5
S-6
CORRIDOR
3468A
ELECTRICAL CLOSET
34E4
ROOF
ROOF
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:0
:3
A
M
1-A-101
THIRD FLOOR NORTH - FINISH PLAN
1 7CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
01/06/2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
Scale: 3/16" = 1'-0"
THIRD FLOOR NORTH - FINISH PLAN 0 42 8
NORTH
PLAN
01 WHERE PLUMBING FIXTURE WAS
REMOVED: PATCH AND PAINT WALL TO
MATCH EXISTING ADJACENT CONDITIONS
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING 1
CEILINGS IN AREAS OF WORK ARE TO BE REMOVED
AS REQUIRED IN ORDER TO COMPLETE WORK.
REPLACE WITH GYPSUM BOARD/PLASTER
CONSTRUCTION (PAINTED TO MATCH EXISTING
ADJACENT CEILING CONDITIONS
24514
LICENSED
ARCHITECT
NEPHROLOGY DIALYSIS CONFERENCE
RM AND PATIENT EDUCATION
HAC
TOILET
3426A
STORAGE
3455A
ELECTRICAL
3495A
ELECTRICAL
34E2
TOILET
3443A
VESTIBULE
3439A
SUPPLY CLOSET
TOILET
3424A
TOILET
3428A
TOILET
3432A
STORAGE CLOSET
3434A
TOILET
3429A
TOILET
3427A
MENS SHOWER
3425A
ELECTRICAL CLOSET
34E1
FAC
TOILET
3439B
3447A
CLOSET
CORRIDOR
C3405
CORRIDOR
C3404
CORRIDOR
C3403
ELEVATOR LOBBY
ELEVATOR
ELEVATOR
P-4
TANK RM
3454A
STORAGE
3454B
DIALYSIS STORAGE
CARDIO STORAGE
3452NON
VA MED CARE
DIALYSIS RM
DIALYSIS
EQUIPMENT
FILE STORAGE
SPD SUPPLY
DIALYSIS SOLUTIONS-B
DIALYSIS SOLUTIONS-A
STORAGE
STORAGE
TEL
34T1
STAIR
NO 1
DIALYSIS WAITING
NURSE STATION
LOCKER
3439C
LOUNGE
CRASH CART
STORAGE
OFFICE CUBICLE
STAIR
NO 2
OFFICE
CUBICLE
SUPPLY
ANALYSIS
SPD
SUPERVISOR
SYSTEM
ANALYST
STORAGE
DIALYSIS RM
SOCIAL WORK
NURSE MGR
OXYGEN TANKS
IV RM
MENS TOILET
LEAD TECH
HEMO DIALYSIS DIR OFFICE
CONSL MGR
MECH RM
S-5
S-6
ELECTRICAL CLOSET
34E4
ROOF
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:0
:3
A
M
1-A-102
THIRD FLOOR SOUTH - FINISH PLAN
2 7CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
01/06/2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
01 WHERE PLUMBING FIXTURE WAS REMOVED:
PATCH WALL AND PAINT TO MATCH EXISTING
ADJACENT CONDITIONS
02 REMOVE AND REPLACE FLOORING IN TOILET
ROOM WHERE WATER CLOSET IS REMOVED.
REPLACE FLOORING WITH LUXURY VINYL
TILE (BASIS OF DESIGN: TANDUS CONTOUR).
COVER TOILET FLANGE WITH ALUMINUM
TREADPLATE TRIMMED TO FIT AND CAULK
AIR TIGHT.
Scale: 3/16" = 1'-0"
THIRD FLOOR PLUMBING SOUTH - FINISH PLAN 0 42 8
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING 1
CEILINGS IN AREAS OF WORK ARE TO BE REMOVED
AS REQUIRED IN ORDER TO COMPLETE WORK.
REPLACE WITH GYPSUM BOARD/PLASTER
CONSTRUCTION (PAINTED TO MATCH EXISTING
ADJACENT CEILING CONDITIONS
24514
LICENSED
ARCHITECT
R O O F
SUPPLY CLOSET
FIRE CLOSET
5447A
UNISEX TOILET
ELECTRICAL CLOSET
54E1
TOILET
5434A
TOILET
5430A
DIRTY LINEN
5400B
CLEAN LINEN
5400A
TOILET
5429A
TOILET
5425A
TOILET
5423A
SOILED UTILITY
LOCKER RM
CLEAN LINEN
TOILET
5424A
TOILET
5439A
TOILET
5433A
SUPPLY CLOSET
ELECTRICAL
CLOSET
5412A
STORAGE
5496A
TELECOM CLOSET
54E2
REGISTRATION DESK
RECEPTION AREA
CORRIDOR
C5406
CORRIDOR
C5403
CORRIDOR
C5404
CORRIDOR
C5405
MENS TOILET
GROUP RM
PROCEDURE RM
RESEARCH OFFICE
MEDICINE PREP
STAIR
NO 2
TEAM RM
LOCKER
LOUNGE
TREATMENT BED-5
TREATMENT BED-4
TREATMENT BED-3
TREATMENT BED-2
TREATMENT BED-1
TOILET
5406A
WAITING
EQUIPMENT STORAGE
EXAM RM
EXAM RM
DAY SURGY
EXAM RM
PHARMACIST
OFFICE
TOILET
5435A
TOILET
5436A
OFFICE
PSYCHOLOGIST
EXAM RM
EXAM RM
NURSE STATION
BREAK RM
WAITING RM
LINEN
HAC
PATIENT EDUCATION RM
5444 CLEAN SUPPLY
TOILET
WAITING AREA
SPD SUPPLIES
P-4
ELEVATOR
S-5
ELEVATOR
S-6
TEL
54T1
STAIR
NO 1
FIRE/ELECTRICAL CLOSET
5417A
SERVICE
ELEVATOR
ELECTRICAL CLOSET
54E3
TOILET
TOILET
01 01
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:0
:3
A
M
1-A-103
FIFTH FLOOR SOUTH - FINISH PLAN
3 7CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
01/06/2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
01 WHERE PLUMING FIXTURE HAS BEEN
REMOVED: PATCH AND PAINT WALL TO
MATCH EXISTING ADJACENT CONDITIONS
02 REMOVE AND REPLACE FLOORING IN TOILET
ROOM WHERE WATER CLOSET IS REMOVED.
REPLACE FLOORING WITH LUXURY VINYL
TILE. COVER TOILET FLANGE WITH
ALUMINUM TREADPLATE TRIMMED TO FIT
AND CAULK AIR TIGHT.
Scale: 3/16" = 1'-0"
FIFTH FLOOR SOUTH - FINISH PLAN 0 42 8
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING 1
CEILINGS IN AREAS OF WORK ARE TO BE REMOVED
AS REQUIRED IN ORDER TO COMPLETE WORK.
REPLACE WITH GYPSUM BOARD/PLASTER
CONSTRUCTION (PAINTED TO MATCH EXISTING
ADJACENT CEILING CONDITIONS
24514
LICENSED
ARCHITECT
SIMULATION LAB SUPPLY
ATTENDING
TOILET
6461A
TOILET
6457A
NURSE UNION
6483ELECTRICAL
64E4
TOILET
6471A
TOILET
6473A
TOILET
6477A
E E O STORAGE
TOILET
6468A
TOILET
6470A
TOILET
6472A
TOILET
6476A
PHONE
6453A
CLOSET
6497A
P-4
ELEVATOR
ELEVATOR
ELEVATOR LOBBY
6469A
CORRIDOR
C6402 CORRIDOR
C6401
VACANT
STORAGE
SINK RM
FILE STORAGE
STORAGE
TELE MOVE PGM OFFICE
OFFICE
HOME TELEHEALTH
BREAK ROOM
6462A
SAFETY STORAGE
STORAGE
UNISEX TOILET
STAIR
NO 5
UNION SEIU
UNASSIGNED SPACE
PRIVACY/FOIA
NURSES UNION
6493 TEAM RM
CLINIC NUTRITION
EEO FILE STORAGE
SUPPLY
EEO ASSISTANT
ETHIC CONSULTATION
CHAPLAIN OFFICE
CHAPLAIN OFFICE
LACTATION RM
CHAPLAIN OFFICE
E E O ASST OFFICE
E E O PGM MGR
SOCIAL WORKER OFFICE
CLINICAL CHAPLAIN OFFICE
CLINICAL CHAPLAIN OFFICE
HR SPECIALIST
HAC
GERIATRIC TEAM RM
ACS OFFICE
COMPLIANCE
OFFICE
ADMIN. OFFICE
6444A
CLOSET
TOILET/SHOWER
S5
S6
ELECTRICAL CLOSET
64E3
ROOF
LOCKER LOCKER
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:0
:3
A
M
1-A-104
SIXTH FLOOR NORTH - FINISH PLAN
4 7CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
01/06/2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
01 WHERE PLUMBING FIXTURES WERE
REMOIVED: PATCH AND PAINT WALL TO
MATCH EXISTING ADJACENT CONDITIONS
02 REMOVE AND REPLACE FLOORING IN TOILET
ROOM WHERE WATER CLOSET IS REMOVED.
REPLACE FLOORING WITH LUXURY VINYL
TILE. COVER TOILET FLANGE WITH
ALUMINUM TREADPLATE TRIMMED TO FIT
AND CAULK AIR TIGHT.
Scale: 3/16" = 1'-0"
SIXTH FLOOR NORTH -FINISH PLAN 0 42 8
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING 1
CEILINGS IN AREAS OF WORK ARE TO BE REMOVED
AS REQUIRED IN ORDER TO COMPLETE WORK.
REPLACE WITH GYPSUM BOARD/PLASTER
CONSTRUCTION (PAINTED TO MATCH EXISTING
ADJACENT CEILING CONDITIONS
24514
LICENSED
ARCHITECT
STORAGE
TOILET
6423A
FAC
TOILET
6422A
TOILET
6424A
TOILET
6426A
TOILET
6430A
ELECTRICAL CLOSET
64E1
SUPPLY
TOILET
6425A
TOILET
6427A
TOILET
6431A
ELECTRICAL CLOSET
64E2
TOILET
6439A
TOILET
6435A
WATER FOUNTAIN
FAC
PHONE
6453A
CLOSET
6497A
P-4
ELEVATOR
ELEVATOR
ELEVATOR LOBBY
TEL
64T1
CORRIDOR
C6402
STORAGE
CORRIDOR
C6403
STAIR
NO 1
NURSE OFFICE
6439SOCIAL WORKER OFFICE
RECEPTION
RECEPTION
STAIR
NO 2
OFFICE
6434OFFICE
6434A
STORAGE
UNISEX STAFF TOILET
SINK RM
FILE STORAGE
STORAGE
NURSE OFFICE
NURSE OFFICE
DOCTOR OFFICE
NURSE OFFICE
6402 WAITING
INFO SECURITY OFFICE
ACS OFFICE
COMPLIANCE
OFFICE
ADMIN. OFFICE
6444A
CUSTOMER SVC
ORGAN TRANSPLANT CO-ORDR
CONFERENCE RM
FILE RM
KITCHEN
HAC
STORAGE
SUPPLY
OAA OFFICE
SAFETY SPECIALIST
SAFETY MANAGER
INFO SECURITY OFFICE
HUD VASH
NURSE OFFICE
SOCIAL WORKER OFFICE
HUD VASH
HR SPECIALIST
VASCULAR OFFICE
SOCIAL WORKER OFFICE
SOCIAL WORKER OFFICE
6435A
6447A
S5
S6
FIT TESTING
6406A
ELECTRICAL CLOSET
64E3
SHOWER
AREA
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:0
:4
A
M
1-A-105
SIXTH FLOOR SOUTH - FINISH PLAN
5 7CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
01/06/2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
Scale: 3/16" = 1'-0"
SIXTH FLOOR SOUTH -FINISH PLAN 0 42 8
NORTH
PLAN
01 WHERE PLUMBING FIXTURE HAS BEEN
REMOVED: PATCH AND PAINT WALL TO
MATCH EXISTING ADJACENT CONDITIONS
02 REMOVE AND REPLACE FLOORING IN TOILET
ROOM WHERE WATER CLOSET IS REMOVED.
REPLACE FLOORING WITH LUXURY VINYL
TILE (BASIS OF DESIGN: TANDUS CONTOUR).
COVER TOILET FLANGE WITH ALUMINUM
TREADPLATE TRIMMED TO FIT AND CAULK
AIR TIGHT.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING 1
CEILINGS IN AREAS OF WORK ARE TO BE REMOVED
AS REQUIRED IN ORDER TO COMPLETE WORK.
REPLACE WITH GYPSUM BOARD/PLASTER
CONSTRUCTION (PAINTED TO MATCH EXISTING
ADJACENT CEILING CONDITIONS
24514
LICENSED
ARCHITECT
SHOWER
7424A
TOILET
7423A
TOILET
7437A
ELECTRICAL
74E1
PHONE
CLOSET
7451B
FIRE CT
7447A
FIRE CLOSET
CORRIDOR
C7402
ELEVATOR
LOBBY
P-4
ELEVATOR
S-6
ELEVATOR
S-5
SUPPLY
SPECIALIST
74T1
STAIR
NO 1
CORRIDOR
C7403
ELECTRICAL
74E2
SUPPLY TECH
STAIR
NO 2
ICE M/C
STORAGE
MENS TOILET
STORAGE
7450A
STORAGE
WAITING RM
PATIENT EFFECTS UNIFORM EXCHANGE
SATV
BIOMED SHOP
HAC
EQUIP STORAGE
EQUIP STORAGE
EQUIP STORAGE
EQUIP STORAGE
BIOMED SHOP
TOILET
7412A
BIOMED SHOP
BIOMED SHOP
CART STORAGE
CABLE RM
REFERENCE BOOK RM
STORAGE
TOILET
7421A
BIOMED CHIEF
ICE M/C
TOILET
7422A
BIOMED SHOP
BIOMED SHOP
BIOMED SHOP
BIOMED SHOP
BIOMED SHOP
BIOMED SHOP
7430SUPV OFFICE
ELECTRIC CLOSET
74E3
BIOMED
SERVER
ROLL-UP WINDOW
01 01
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:0
:4
A
M
1-A-106
SEVENTH FLOOR SOUTH - PLAN
6 7CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
01/06/2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
REMOVE DCW AND DHW PIPING FROM
FIXTURE BACK TO MAIN. VALVE AND CAP AT
MAIN.
01 PATCH AND PAINT WALL TO MATCH EXISTING
ADJACENT CONDITIONS
02 REMOVE AND REPLACE FLOORING IN TOILET
ROOM WHERE WATER CLOSET IS REMOVED.
REPLACE FLOORING WITH LUXURY VINYL
TILE (BASIS OF DESIGN: TANDUS CONTOUR).
COVER TOILET FLANGE WITH ALUMINUM
TREADPLATE TRIMMED TO FIT AND CAULK
AIR TIGHT.
Scale: 3/16" = 1'-0"
SEVENTH FLOOR SOUTH - FINISH PLAN 0 42 8
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING 1
CEILINGS IN AREAS OF WORK ARE TO BE REMOVED
AS REQUIRED IN ORDER TO COMPLETE WORK.
REPLACE WITH GYPSUM BOARD/PLASTER
CONSTRUCTION (PAINTED TO MATCH EXISTING
ADJACENT CEILING CONDITIONS
24514
LICENSED
ARCHITECT
CLOSET
10444
TOILET
10404A
10447
PHONE
10451BELECTRICAL
104E1
TOILET
10402A
TOILET
10421A
TOILET
10411A
10407
TOILET
10405B
CLOSET
10405A
C10405
SAFETY TRAINING
10451A
SVC ELEVATOR LOBBY
C10404
10457A
ELEVATOR
ELEVATOR
P-4
TELECOM
104T1
STAIR
NO 1
ADMIN TECH
10421SOCIAL WORKER
10417
PGM MGR
10415
TOILET
10415A
TRANSITION PATIENT
10411PSYCHOLOGIST
10409
STAIR
NO 2
PSYCHOLOGIST
10405
STORAGE
10401A
TOILET
10401B
GROUP RM
10401
WOMENS TOILET
10456
EMS STORAGE
10454
MENS TOILET
10450
CONFERENCE RM
10440RECREATION THERAPIST
10422
PHYSICIAN OFFICE
10420
DAY RM
10418
10416COPY
10414
PRIMARY CARE PHYSICIAN
10410
TOILET
10410A
NURSE PRACT.
10408CASE MGR OFFICE
10406
SOCIAL WORKER
10404
ADMIN. OFFICER
10402
DR OFFICE
10400
EMS STORAGE
10457
C10403
EMS CLOSET
FIRE CLOSET
FIRE CLOSET EMS CLOSET
CORRIDOR ELECTRICAL CLOSET
104E2
01 01
01 01
53 52
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/7
/2
:0
:4
A
M
1-A-107
TENTH FLOOR SOUTH -FINISH PLAN
7 7CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
01/06/2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
01 PATCH AND PAINT WALL TO MATCH EXISTING
ADJACENT CONDITIONS
02 REMOVE AND REPLACE FLOORING IN TOILET
ROOM WHERE WATER CLOSET IS REMOVED.
REPLACE FLOORING WITH LUXURY VINYL
TILE (BASIS OF DESIGN: TANDUS CONTOUR).
COVER TOILET FLANGE WITH ALUMINUM
TREADPLATE TRIMMED TO FIT AND CAULK
AIR TIGHT.
Scale: 3/16" = 1'-0"
TENTH FLOOR SOUTH - FINISH PLAN 0 42 8
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING 1
CEILINGS IN AREAS OF WORK ARE TO BE REMOVED
AS REQUIRED IN ORDER TO COMPLETE WORK.
REPLACE WITH GYPSUM BOARD/PLASTER
CONSTRUCTION (PAINTED TO MATCH EXISTING
ADJACENT CEILING CONDITIONS
24514
LICENSED
ARCHITECT
ANNOTATION ABBREVIATIONS
PLUMBING ABBREVIATIONS
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALANCING/SHUTOFF VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CALIBRATED BALANCING VALVE
CONTROL VALVE
EXPANSION VALVE
GATE VALVE
GLOBE VALVE
QUICK OPEN VALVE
SAFETY RELIEF VALVE
SOLENOID VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
VACUUM RELIEF VALVE
GAS COCK
PLUG VALVE
PLUMBING SYMBOLS
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT - ROUND OR SQUARE
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
OR
CO
PIPE SLOPE ARROW
F
P
T
M
CWR
HW
PIPING SYSTEM
NG NATURAL GAS
ST STORM
PD PUMP DISCHARGE
OFD OVERFLOW STORM DRAIN
GW GREASE WASTE
OW OIL WASTE
SAN SANITARY WASTE
CD CONDENSATE DRAIN
CA COMPRESSED AIR
AW ACID WASTE
N2 NITROGEN
N2O NITROUS OXIDE
MA MEDICAL AIR
O2 OXYGEN
WAGD WASTE ANESTHETIC GAS DISPOSAL
VAC VACUUM
V SANITARY VENT
OV OIL VENT
AV ACID VENT
NPCW NONPOTABLE COLD WATER
DI DE-IONIZED WATER
SCW SOFTENED COLD WATER
CW DOMESTIC COLD WATER
RO REVERSE OSMOSIS WATER
DOMESTIC CW RECIRCULATION
DOMESTIC HOT WATER
CO2 CARBON DIOXIDE
HW 140 DOMESTIC HOT WATER (OTHER TEMP)
PG PROPANE GAS
PLUMBING SYMBOLS
ANNOTATION SYMBOLS
(E)EXISTING
NEW KEYNOTE
DEMO KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
TEXT INDICATES EXISTING ITEM
PLUMBING EQUIPMENT DESIGNATION
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMITS OF DEMOLITION
P-###
HWR DOMESTIC HW RECIRCULATION
PLUMBING GENERAL NOTES
PLUMBING DEMOLITION GENERAL NOTES
1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE
PROCEEDING WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF
THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND
ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUDTOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND
APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES
DAMAGED AT NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW
PLUMBING AND WORK OF OTHER TRADES.
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA
STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE
GRADE FOR THE PURPOSES INTENDED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY
AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR
EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS.
8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED
OTHERWISE.
9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF
WALLS AND FLOORS.
11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL
CODES AND APPLICABLE VA STANDARDS.
14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING
OF PIPING WITH EXISTING CONDITIONS.
16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND
ARRANGEMENT OF PIPING SYSTEMS.
17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE OWNER 1
WEEK IN ADVANCE.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS
CONTRACT, UNLESS NOTED OTHERWISE.
19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF
PROJECT.
20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
21. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
AFG ABOVE FINISHED GRADE
ASD ADJUSTABLE SPEED DRIVE
ASHRAE AMERICAN SOCIETY HEATING,
REGRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BH BOOSTER HEATER
BHP BREAK HORSEPOWER
BJ BETWEEN JOISTS
BOP BOTTOM OF PIPE
BSP BLACK STEEL PIPE
BT BATHTUB
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CF COMBINATION FIXTURE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
COND CONDENSATE
CP CONDENSATE PUMP
CS CLINICAL SINK
CV CONTROL VALVE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYEWASH STATION
EX EXISTING
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GD GARBAGE DISPOSAL
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SINK BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PACAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TDL TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WHD WALL HYDRANT
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
CIRCUIT SETTER VALVE
NG
ST
PD
OFD
GW
OW
SAN
CD
CA
AW
N2
N2O
MA
O2
WAGD
VAC
CO2
PG
V
OV
AV
HW 140
SCW
NPCW
DI
RO
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:4
:5
A
M
1-P-001
PLUMBING GENERAL INFORMATION
1 15CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
JANUARY 6, 2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
DocuSign Envelope ID: CBF4253B-6C10-40F8-A57D-BD7CB79EDF89
1/6/2020
UNISEX TOILET
3475A
SOILED UTILITY
ELECTRICAL CLOSET
TOILET
FAC
ELECTRICAL
34E4
BACKUP GENERATOR RM
3472C
STORAGE
3472B
STORAGE
3455A
ELECTRICAL
3495A
STORAGE
3485A
CORRIDOR
C3401
CORRIDOR
C3402
CORRIDOR
C3403
ELEVATOR LOBBY
ELEVATOR
ELEVATOR
P-4
OXYGEN TANKS
DRESSING ROOM
3475B
STORAGE
3475C
LOCKER ROOM
DOCTORS
OFFICE
STAIR
NO 5
RESIDENT
GROUP
DOCTORS
OFFICE
DOCTORS
OFFICE
CHIEF
ENT
DOCTORS
OFFICE
DOCTORS
OFFICE
3494A
DOCTORS
OFFICE
RESIDENT COORD.
DOCTORS
OFFICE
SURGERY STAFF
SECRETARY/ COPIER
HAC
BREAK ROOM
OFFICE
OFFICE
STORAGE
MECH RM
3472A
EQUIPMENT STORAGE
LAB
MECH RM
3466A
SUPPLY RM
RECEPTION
3461CHIEF OFFICE
TANK RM
3454A
STORAGE
3454B
DIALYSIS STORAGE
CARDIO STORAGE
3452NON
VA MED CARE
S-5
S-6
CORRIDOR
3468A
ELECTRICAL CLOSET
34E4
ROOF
ROOF
03 03
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:4
:5
A
M
1-P-101
THIRD FLOOR NORTH - PLUMBING
DEMOLITION PLAN
2 15CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
JANUARY 6, 2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
Scale: 3/16" = 1'-0"
THIRD FLOOR NORTH - PLUMBING DEMOLITION PLAN 0 42 8
NORTH
PLAN
01 DEMOLISH EXISTING PLUMBING FIXTURE.
REMOVE ALL ASSOCIATED DOMESTIC WATER
PIPING BACK TO MAIN. REMOVE ALL
ASSOCIATED SANITARY AND VENT PIPING
BACK TO MAIN.
02 REMOVE FAUCET AND REPLACE WITH P-435
FAUCET IN ITS PLACE. PROGRAM NEW
FAUCET TO FLUSH PIPING 2 TIMES PER DAY
AT TIMES SELECTED BY THE COR.
03 PROVIDE THERMOSTATIC MIXING VALVE AT
FIXTURE AND CONNECT AS PER P-501
DETAIL.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING 1
CEILINGS IN AREAS OF WORK ARE TO BE REMOVED
AS REQUIRED IN ORDER TO COMPLETE WORK.
REPLACE WITH GYPSUM BOARD/PLASTER
CONSTRUCTION (PAINTED TO MATCH EXISTING
ADJACENT CEILING CONDITIONS
NEPHROLOGY DIALYSIS CONFERENCE
RM AND PATIENT EDUCATION
HAC
TOILET
3426A
STORAGE
3455A
ELECTRICAL
3495A
ELECTRICAL
34E2
TOILET
3443A
VESTIBULE
3439A
SUPPLY CLOSET
TOILET
3424A
TOILET
3428A
TOILET
3432A
STORAGE CLOSET
3434A
TOILET
3429A
TOILET
3427A
MENS SHOWER
3425A
ELECTRICAL CLOSET
34E1
FAC
TOILET
3439B
3447A
CLOSET
CORRIDOR
C3405
CORRIDOR
C3404
CORRIDOR
C3403
ELEVATOR LOBBY
ELEVATOR
ELEVATOR
P-4
TANK RM
3454A
STORAGE
3454B
DIALYSIS STORAGE
CARDIO STORAGE
3452NON
VA MED CARE
DIALYSIS RM
DIALYSIS
EQUIPMENT
FILE STORAGE
SPD SUPPLY
DIALYSIS SOLUTIONS-B
DIALYSIS SOLUTIONS-A
STORAGE
STORAGE
TEL
34T1
STAIR
NO 1
DIALYSIS WAITING
NURSE STATION
LOCKER
3439C
LOUNGE
CRASH CART
STORAGE
OFFICE CUBICLE
STAIR
NO 2
OFFICE
CUBICLE
SUPPLY
ANALYSIS
SPD
SUPERVISOR
SYSTEM
ANALYST
STORAGE
DIALYSIS RM
SOCIAL WORK
NURSE MGR
OXYGEN TANKS
IV RM
MENS TOILET
LEAD TECH
HEMO DIALYSIS DIR OFFICE
CONSL MGR
MECH RM
S-5
S-6
ELECTRICAL CLOSET
34E4
ROOF
04 04
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:4
:5
A
M
1-P-102
THIRD FLOOR SOUTH - PLUMBING
DEMOLITION PLAN
3 15CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
JANUARY 6, 2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
01 DEMOLISH EXISTING PLUMBING FIXTURE.
REMOVE ALL ASSOCIATED DOMESTIC WATER
PIPING BACK TO MAIN. REMOVE ALL
ASSOCIATED SANITARY AND VENT PIPING
BACK TO MAIN.
02 REMOVE AND REPLACE FLOORING IN TOILET
ROOM WHERE WATER CLOSET IS REMOVED.
REPLACE FLOORING WITH LUXURY VINYL
TILE. COVER TOILET FLANGE WITH
ALUMINUM TREADPLATE TRIMMED TO FIT
AND CAULK AIR TIGHT.
03 FAUCET AND REPLACE WITH P-435 FAUCET IN
ITS PLACE. PROGRAM NEW FAUCET TO
FLUSH PIPING 2 TIMES PER DAY AT TIMES
SELECTED BY THE COR.
04 PROVIDE THERMOSTATIC MIXING VALVE AT
FIXTURE AND CONNECT AS PER P-501
DETAIL.
Scale: 3/16" = 1'-0"
THIRD FLOOR PLUMBING SOUTH - PLUMBING DEMOLITION PLAN 0 42 8
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING 1
CEILINGS IN AREAS OF WORK ARE TO BE REMOVED
AS REQUIRED IN ORDER TO COMPLETE WORK.
REPLACE WITH GYPSUM BOARD/PLASTER
CONSTRUCTION (PAINTED TO MATCH EXISTING
ADJACENT CEILING CONDITIONS
R O O F
SUPPLY CLOSET
FIRE CLOSET
5447A
UNISEX TOILET
ELECTRICAL CLOSET
54E1
TOILET
5434A
TOILET
5430A
DIRTY LINEN
5400B
CLEAN LINEN
5400A
TOILET
5429A
TOILET
5425A
TOILET
5423A
SOILED UTILITY
LOCKER RM
CLEAN LINEN
TOILET
5424A
TOILET
5439A
TOILET
5433A
SUPPLY CLOSET
ELECTRICAL
CLOSET
5412A
STORAGE
5496A
TELECOM CLOSET
54E2
REGISTRATION DESK
RECEPTION AREA
CORRIDOR
C5406
CORRIDOR
C5403
CORRIDOR
C5404
CORRIDOR
C5405
MENS TOILET
GROUP RM
PROCEDURE RM
RESEARCH OFFICE
MEDICINE PREP
STAIR
NO 2
TEAM RM
LOCKER
LOUNGE
TREATMENT BED-5
TREATMENT BED-4
TREATMENT BED-3
TREATMENT BED-2
TREATMENT BED-1
TOILET
5406A
WAITING
EQUIPMENT STORAGE
EXAM RM
EXAM RM
DAY SURGY
EXAM RM
PHARMACIST
OFFICE
TOILET
5435A
TOILET
5436A
OFFICE
PSYCHOLOGIST
EXAM RM
EXAM RM
NURSE STATION
BREAK RM
WAITING RM
LINEN
HAC
PATIENT EDUCATION RM
5444 CLEAN SUPPLY
TOILET
WAITING AREA
SPD SUPPLIES
P-4
ELEVATOR
S-5
ELEVATOR
S-6
TEL
54T1
STAIR
NO 1
FIRE/ELECTRICAL CLOSET
5417A
SERVICE
ELEVATOR
ELECTRICAL CLOSET
54E3
TOILET
TOILET
01 01
03 03
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
2 HR - FIRE SEPARATION
2 HR - FIRE/SMOKE SEPARATION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:4
:5
A
M
1-P-103
FIFTH FLOOR SOUTH - PLUMBING
DEMOLITION PLAN
4 15CC
LEGIONELLA CORRECTIONS
JESSE BROWN VA MEDICAL CENTER
820 S DAMEN AVE. CHICAGO, IL
JANUARY 6, 2020
ISSUED FOR BID AND CONSTRUCTION
537-18-301B19-081
RCM
01 DEMOLISH EXISTING PLUMBING FIXTURE.
REMOVE ALL ASSOCIATED DOMESTIC WATER
PIPING BACK TO MAIN. REMOVE ALL
ASSOCIATED SANITARY AND VENT PIPING
BACK TO MAIN.
02 REMOVE AND REPLACE FLOORING IN TOILET
ROOM WHERE WATER CLOSET IS REMOVED.
REPLACE FLOORING WITH LUXURY VINYL
TILE. COVER TOILET FLANGE WITH
ALUMINUM TREADPLATE TRIMMED TO FIT
AND CAULK AIR TIGHT.
03 FAUCET AND REPLACE WITH P-435 FAUCET IN
ITS PLACE. PROGRAM NEW FAUCET TO
FLUSH PIPING 2 TIMES PER DAY AT TIMES
SELECTED BY THE COR.
04 PROVIDE THERMOSTATIC MIXING VALVE AT
FIXTURE AND CONNECT AS PER P-501
DETAIL.
Scale: 3/16" = 1'-0"
FIFTH FLOOR SOUTH - PLUMBING DEMOLITION PLAN 0 42 8
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING 1
CE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .