36C25220R0053-007.pdf

PDF Posted

Attached to
Z2DA--Legionella Corrections, 537-18-301B
Solicitation number
36C25220R0053
Issued by

About this file

This notice is for a pre-solicitation of a construction project to eliminate dead ends prone to harboring legionella growth and install mixing valves preventing scalding at the Jesse Brown VA Medical Center in Chicago, Illinois. The contractor shall provide all tools, materials, components, labor and supervision for services. Work is to be completed within 265 calendar days of receipt of a notice to proceed. Competition is restricted to SDVOSB construction firms. The solicitation will be issued on or about February 20, 2020 with proposals due on or about March 23, 2020. It will include all drawings, plans and specifications for the requirement and be posted at SAM.gov. The project magnitude is estimated between $1,000,000 to $2,000,000. The NAICS code is 238220 for plumbing, heating and air conditioning contractors. Offerors must be registered in SAM.gov and represent that they are an eligible SDVOSB at the required size standard to receive the contract. A pre-proposal site visit will be held and attendance is encouraged.

36C25220R0053 P12 537-18-301B Construction Drawings G-125 to P-501_Pt 2 of 2.pdf

View the file

Other files

File Type Posted
36C25220R0053-0006001.docx DOCX document
36C25220R0053-0006002.xlsx XLSX spreadsheet
36C25220R0053-0006000.docx DOCX document
36C25220R0053-0005000.docx DOCX document
36C25220R0053-0005001.xlsx XLSX spreadsheet
36C25220R0053-0004007.pdf PDF
36C25220R0053-0004003.docx DOCX document
36C25220R0053-0004011.pdf PDF
36C25220R0053-0004000.docx DOCX document
36C25220R0053-0004009.pdf PDF
36C25220R0053-0004002.xlsx XLSX spreadsheet
36C25220R0053-0004010.pdf PDF
36C25220R0053-0004005.pdf PDF
36C25220R0053-0004004.pdf PDF
36C25220R0053-0004001.docx DOCX document
36C25220R0053-0004008.xlsx XLSX spreadsheet
36C25220R0053-0004006.pdf PDF
36C25220R0053-0003000.docx DOCX document
36C25220R0053-0002000.docx DOCX document
36C25220R0053-0001000.docx DOCX document
36C25220R0053-0001001.pdf PDF
36C25220R0053-003.txt TXT text file
36C25220R0053-002.docx DOCX document
36C25220R0053-006.pdf PDF
36C25220R0053-005.pdf PDF
36C25220R0053-004.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARK

STRETCH

ALCOVE

VESTIBULE

VESTIBULE

ALCOVE

ALCOVE

ALCOVE

CLINICAL NURSE

LINEN

CHUTE

66L1

OXYGEN

STORAGE

FAC

ALCOVE

COMM RM

66T1

TOILET

6535A

INFUSION /

ONCOLOGY WAITING

RM

WAITING

INFUSION / ONCOLOGY CLINIC

MENS TOILET

STORAGE

WOMENS TOILET

STAIR

NO 3

CORRIDOR

C6611

CORRIDOR

C6603

PRIVATE MS

AND N PAT RM

CORRIDOR

C6604

CONFERENCE RM

CORRIDOR

C6612

CORRIDOR

C6610

CORRIDOR

C6602

ELEVATOR LOBBY

C6608

CORRIDOR

C6606

ELEVATOR LOBBY

C6607

CORRIDOR

C6601

CORRIDOR

C6605

CORRIDOR

C6609

CORRIDOR

C6613

ALCOVE

LINEN

PANTRY

6683A

EQUIP

STORAGE

NURSE

MANAGER

ELECTRICAL RM

66E3

STAIR

NO 16

NURSE

STATION

CHARGE NURSE OFFICE

MED RM

CLEAN

SUPPLY

SOILED UTILITY

CHARTING

STAFF

LOUNGE

TOILET

6655A

ELECTRICAL RM

66E1

PM AND

R RM

PATIENT LOUNGE

6 WEST

DINING

RM

CHARTING

ELEVATOR

P-23

ELEVATOR

P-24

ELEVATOR

P-25

NURSE

STATION

TEAM RM

PANTRY

CONFERENCE RM

SPD SUPPLY

CLEAN

SUPPLY

SOILED UTILITY

SOCIAL

WORKER

OFFICE

CLEAN LINEN

ELECTRICAL RM

66E2

MED

AREA

TOILET

6619A

STAFF

LOUNGE

EQUIP

STORAGE

6621 NURSE

MANAGER

MEDICINE TEAM OFFICE 3

STAIR

NO 13

TOILET

6627A TOILET

6628A

TELEMETRY PAT RM

TELEMETRY PAT RM

TOILET

6629A

TELEMETRY PAT RM

LOCKER

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TOILET

6630A

TOILET

6632A

TOILET

6634A

TOILET

6636A

TOILET

6638A

TOILET

6642A

TOILET

6644A

ASSIST

NURSE

MGR

HAC

66H1

ANTE RM

6648A

TOILET

6646B

TOILET

6648B

TELEMETRY PAT RM

TELEMETRY PAT RM

WASTE RM

TELEMETRY PAT RM

TOILET

6650A

ELEVATOR

P-22

ELEVATOR

P-21

ELEVATOR

P-20

SEMI-PRIVATE MS AND N PAT RM

SEMI-PRIVATE MS AND N PAT RM

SEMI-PRIVATE MS AND N PAT RM

SEMI-PRIVATE MS AND N PAT RM

SEMI-PRIVATE MS AND N PAT RM

SEMI-PRIVATE MS AND N PAT RM

COMM RM

66T1A

EMS

66H2

STAIR

NO 14

MS AND N PAT

ISOLATION RM

TOILET

6658A

REHAB-TEAM RM

CLC

TEAM RM

ANTE RM

6658B

HAC

66H3

TEAM RM

MS AND N PAT

ISOLATION RM

TOILET

6659A

TOILET

6662A

ISOLATION

MS AND N

PAT RM

TOILET

6664A

TOILET

6666A

TOILET

6668A

TOILET

6670A

TOILET

6672A

TOILET

6674A

PRIVATE MS

AND N PAT RM

SEMI-PRIVATE MS AND N PAT RM

TOILET

6675A

TOILET

6676A

TOILET

6677A

PATIENT RM

ALCOVE

EQUIP STORAGE

6677B

PRIVATE MS

AND N PAT RM

PRIVATE MS

AND N PAT RM

TOILET

6678A

TOILET

6680A

PRIVATE MS

AND N PAT RM

PRIVATE MS

AND N PAT RM

TOILET

6682A

TOILET

6686A

PRIVATE MS

AND N PAT RM

TOILET

6688A

TOILET

6690A

PRIVATE MS

AND N PAT RM

PRIVATE MS

AND N PAT RM

TOILET

6692A

TOILET

6694A

PRIVATE

MS AND N

PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

TELEMETRY PAT RM

PRIVATE MS

AND N PAT RM

TOILET

6696A

TOILET

6698A

TOILET

6600A

TOILET

6600B

VISITOR

WAITING

TOILET

6602A

TOILET

6604A

TOILET

6608A

TOILET

6610A

TOILET

6612A

TOILET

6618A

TOILET

6620A

TOILET

6622A

TOILET

6624A

TOILET

6626A

TELEMETRY PAT RM

6677C

6675C

6675B

6629B

EQUIP PARK

6667A

6613A

6668B

6666B

FRS

FRS

FRS

FRS

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:3

:4

A M

G-125

BUILDING 40 - SIXTH FLOOR OVERALL

FLOOR PLAN

28 31CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

JANUARY 6, 2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 3/64" = 1'-0"

BUILDING 40 - SIXTH FLOOR OVERALL FLOOR PLAN

6 6898A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6896A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6894A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6892A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6890A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6888A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6886A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6882A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6880A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6878A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6876A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6874A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6872A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6870A Toilet lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6868A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6866A toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6864A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6862A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6859A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6858B Anteroom Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6858A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6856A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6848B Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6848A Anteroom Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6846A Anteroom Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6846A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6844A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6842A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6838A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6836A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6834A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6832A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6830A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6629A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6627A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6626A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6624A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6622A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6620A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6619A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6618A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6612A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6610A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6608A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6604A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6602A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6600B Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6600A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6896 Nurse Station Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6895 Meds Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6886 Soiled Utility Sink 2 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6861 Waste Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6856 Lounge Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6843 Pantry Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6819 Lounge sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6818 soiled Utility Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.

6 6807 Clean Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.

Floor Room Number Room Description Plumbing Fixture Type Quantity Work Scope Building 40 Sixth Floor

Chicago Jesse Brown VA Medical Center

DocuSign Envelope ID: 4EB2FA07-76F8-405A-8777-CFBD3D48E2BF

1/7/2020

ELECTRICAL FIRE CLOSET

WHEEL CHAIR PARKING

ELECTRICAL

7617A

TOILETPOD EXAM

CLEAN

SUPPLY

WAITING RM

MED TEAM

CORRIDOR

ELEVATOR

P-22

ELEVATOR

OFFICE-1

OFFICE-2

POD

POD EXAM

7668A

STAIR

NO 3

STAFF LOCKER

SHOWER

7561A

TOILET

RESIDENT OFFICE

MED TEAM

PRIVATE MH AND

B PATIENT RM

MENS TOILET

7622A

DOCTOR OFFICE

7620A

MED TEAM

TOILET

CLOSET

7621A

SEMI-PRIVATE MH

AND B PATIENT

RM

ELEVATOR LOBBY

C7604

TOILET

C7602

SEMI-PRIVATE MH

AND B PATIENT RM

P-21

MUSIC RM

QUIET RM

7612A

TOILET

OFFICE-3

OFFICE-4

ELECTRICAL RM

SEMI-PRIVATE MH AND B

PATIENT RM

76E3

LAUNDRY

STAIR

NO 16

SEMI PRIVATE

PATIENT RM

PRIVATE

PATIENT

RM

TOILET

7669A

TOILET

7611A

7670A

TOILET

7666A

TOILET

STORAGE

TOILET

7662A

PRIVATE

PATIENT RM

TOILET

7660A

TOILET

7656A

PRIVATE

PATIENT RM

CLOSET

7665A OFFICE-7

OFFICE-6

PRIVATE

PATIENT

RM

7661TOILET

7657A

TOILET

7661A

OFFICE-5

PRIVATE

PATIENT

RM

PRIVATE

PATIENT

RM

TOILET

7655A

HAC

76H3

PRIVATE

PATIENT

RM

TOILET

7651A

PHONE

CORRIDOR

C7603

DAY RM

CORRIDOR

C7607

EXAM RM

ANTE

RM

7652 TOILET

7654A

TOILET

7652A

PHONE

EXTRA-PRIVATE PATIENT RM

7652B

TOILET

7640A

STAFF LOUNGE

STRETCHER PARKING

EMS

76H2

NURSE STATION

CORRIDOR

C7605

RECYC

CONFERENCE RM

EQUIP STORAGE

ELEVATOR LOBBY

C7606VISITOR WAITING

TOILET

ELECTRICAL

RM

76E1

CLEAN LINEN

CLEAN SUPPLY

STAFF TOILET

NURSE STATION

MEDICATION RM

NURSE STATION

ELEVATOR

P-23

ELEVATOR

P-24

ELEVATOR

P-25

QUIET RM

CORRIDOR

C7601

MUSIC RM

7604 DAY RM

COMM RM

76T1A

COMM RM

76T1

LINEN CHUTE

76L1

SEMI-PRIVATE MH AND B PATIENT RM

TOILET

7630A

SEMI-PRIVATE MH AND B PATIENT RM

EXERCISE AREA

HAC

76H1

PHONE ALCOVE

SEMI-PRIVATE MH

AND B PATIENT RM

TOILET

7628A

TOILET

7626A

SEMI-PRIVATE MH

AND B PATIENT RM

PRIMARY PHYSICIAN

AND MED STUDENT

OFFICE 11

TOILET

7625A

SEMI-PRIVATE MH AND

B PATIENT RM

TOILET

SEMI-PRIVATE MH

AND B PATIENT RM

TOILET

SEMI-PRIVATE MH

AND B PATIENT RM

TOILET

TOILET

TOILET

PRIVATE

PATIENT

RM

7614A

7616A

7618A

SEMI-PRIVATE MH

AND B PATIENT RM

SEMI-PRIVATE MH

AND B PATIENT RM

LAUNDRY

NO 13

PRIVATE

PATIENT RM

TOILET

PSYCHOLOGY OFFICE-10

7613A

NURSE OFFICE-9

STAIR

TOILET

PRIVATE MH

AND B PATIENT

RM

TOILET

SEMI-PRIVATE MH AND

B PATIENT RM

7671A

SOCIAL WORK

NO 14

TOILET

ELECTRICAL RM

ELEVATOR

PRIVATE

PATIENT

RM

PRIVATE

PATIENT

RM

STAIR

P-20

7632A

76E2

RECYC GEN WASTE

ALCOVE

7619A

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:3

:4

A M

G-126

BUILDING 40 - SEVENTH FLOOR

OVERALL FLOOR PLAN

29 31CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

JANUARY 6, 2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 3/64" = 1'-0"

BUILDING 40 - SEVENTH FLOOR OVERALL FLOOR PLAN

7 7611A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7615 Laundry Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7615A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7619A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7621A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7629 Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7625A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7601 Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7630 Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7641 Waste Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7654A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7656A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7661A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7657A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7869A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7871A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7870A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7868A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7866A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7862A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7860A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7856A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7854A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7852A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7840A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7840 Lounge Sink 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7832A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7830A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7828A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7826A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7822A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7820A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7818A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7816A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7814A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

7 7812A Toilet Lavatory 1 Remove and replace temperature mixing valve. See P-501, Detail #.

Floor Room Number Room Description Plumbing Fixture Type Quantity Work Scope Building 40 Seventh Floor

Chicago Jesse Brown VA Medical Center

HAC

FIRE CLOSET

ELEVATOR

P22

ELEVATOR

P21

ELEVATOR

P20

ELEVATOR LOBBY

C8601

COMM RM

86T1

COMM RM

86T1A

STAIR

NO 14

PENTHOUSE

STAIR

NO 16

OPEN

AREA

UTILITY MECH HVAC

ELECTRICAL

RM

STAIR

NO 17

ELEVATOR

MACH RM

TEL/COMM RM

OPEN

AREA

UTILITY MECH HVAC

STAIR

NO 13

EMG/ EEG

STAIR

NO

STORAGE

STORAGE

MEN

EMG/ EEG

EMG/ EEG

EMG/ EEG

EMG/ EEG

EEG

TESTING LAB

TOILET

8556A

CLOSET

VESTIBULE

8612A

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:3

:4

A M

G-127

BUILDING 40 - EIGHTH FLOOR OVERALL

FLOOR PLAN

30 31CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

JANUARY 6, 2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 3/64" = 1'-0"

BUILDING 40 - EIGHTH FLOOR OVERALL FLOOR PLAN

TOILET

9555A

TOILET

9556A

2-BED RM

STORAGE

TOILET

9559A

2-BED RM

LINEN

1-BED

RM

1-BED RM

STORAGE

TOILET

9560A

1-BED RM

STAIR

NO

STAIR

NO 14

MACH RM

ROOF

STAIR 16

PENTHOUSE

ROOF

ROOF

PENTHOUSE

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:3

:4

A M

G-128

BUILDING 40 - NINTH FLOOR OVERALL

FLOOR PLAN

31 31CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

JANUARY 6, 2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 3/64" = 1'-0"

BUILDING 40 - NINTH FLOOR OVERALL FLOOR PLAN

UNISEX TOILET

3475A

SOILED UTILITY

ELECTRICAL CLOSET

TOILET

FAC

ELECTRICAL

34E4

BACKUP GENERATOR RM

3472C

STORAGE

3472B

STORAGE

3455A

ELECTRICAL

3495A

STORAGE

3485A

CORRIDOR

C3401

CORRIDOR

C3402

CORRIDOR

C3403

ELEVATOR LOBBY

ELEVATOR

ELEVATOR

P-4

OXYGEN TANKS

DRESSING ROOM

3475B

STORAGE

3475C

LOCKER ROOM

DOCTORS

OFFICE

STAIR

NO 5

RESIDENT

GROUP

DOCTORS

OFFICE

DOCTORS

OFFICE

CHIEF

ENT

DOCTORS

OFFICE

DOCTORS

OFFICE

3494A

DOCTORS

OFFICE

RESIDENT COORD.

DOCTORS

OFFICE

SURGERY STAFF

SECRETARY/ COPIER

HAC

BREAK ROOM

OFFICE

OFFICE

STORAGE

MECH RM

3472A

EQUIPMENT STORAGE

LAB

MECH RM

3466A

SUPPLY RM

RECEPTION

3461CHIEF OFFICE

TANK RM

3454A

STORAGE

3454B

DIALYSIS STORAGE

CARDIO STORAGE

3452NON

VA MED CARE

S-5

S-6

CORRIDOR

3468A

ELECTRICAL CLOSET

34E4

ROOF

ROOF

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:0

:3

A

M

1-A-101

THIRD FLOOR NORTH - FINISH PLAN

1 7CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

01/06/2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

Scale: 3/16" = 1'-0"

THIRD FLOOR NORTH - FINISH PLAN 0 42 8

NORTH

PLAN

01 WHERE PLUMBING FIXTURE WAS

REMOVED: PATCH AND PAINT WALL TO

MATCH EXISTING ADJACENT CONDITIONS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BUILDING 1

CEILINGS IN AREAS OF WORK ARE TO BE REMOVED

AS REQUIRED IN ORDER TO COMPLETE WORK.

REPLACE WITH GYPSUM BOARD/PLASTER

CONSTRUCTION (PAINTED TO MATCH EXISTING

ADJACENT CEILING CONDITIONS

24514

LICENSED

ARCHITECT

NEPHROLOGY DIALYSIS CONFERENCE

RM AND PATIENT EDUCATION

HAC

TOILET

3426A

STORAGE

3455A

ELECTRICAL

3495A

ELECTRICAL

34E2

TOILET

3443A

VESTIBULE

3439A

SUPPLY CLOSET

TOILET

3424A

TOILET

3428A

TOILET

3432A

STORAGE CLOSET

3434A

TOILET

3429A

TOILET

3427A

MENS SHOWER

3425A

ELECTRICAL CLOSET

34E1

FAC

TOILET

3439B

3447A

CLOSET

CORRIDOR

C3405

CORRIDOR

C3404

CORRIDOR

C3403

ELEVATOR LOBBY

ELEVATOR

ELEVATOR

P-4

TANK RM

3454A

STORAGE

3454B

DIALYSIS STORAGE

CARDIO STORAGE

3452NON

VA MED CARE

DIALYSIS RM

DIALYSIS

EQUIPMENT

FILE STORAGE

SPD SUPPLY

DIALYSIS SOLUTIONS-B

DIALYSIS SOLUTIONS-A

STORAGE

STORAGE

TEL

34T1

STAIR

NO 1

DIALYSIS WAITING

NURSE STATION

LOCKER

3439C

LOUNGE

CRASH CART

STORAGE

OFFICE CUBICLE

STAIR

NO 2

OFFICE

CUBICLE

SUPPLY

ANALYSIS

SPD

SUPERVISOR

SYSTEM

ANALYST

STORAGE

DIALYSIS RM

SOCIAL WORK

NURSE MGR

OXYGEN TANKS

IV RM

MENS TOILET

LEAD TECH

HEMO DIALYSIS DIR OFFICE

CONSL MGR

MECH RM

S-5

S-6

ELECTRICAL CLOSET

34E4

ROOF

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:0

:3

A

M

1-A-102

THIRD FLOOR SOUTH - FINISH PLAN

2 7CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

01/06/2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

01 WHERE PLUMBING FIXTURE WAS REMOVED:

PATCH WALL AND PAINT TO MATCH EXISTING

ADJACENT CONDITIONS

02 REMOVE AND REPLACE FLOORING IN TOILET

ROOM WHERE WATER CLOSET IS REMOVED.

REPLACE FLOORING WITH LUXURY VINYL

TILE (BASIS OF DESIGN: TANDUS CONTOUR).

COVER TOILET FLANGE WITH ALUMINUM

TREADPLATE TRIMMED TO FIT AND CAULK

AIR TIGHT.

Scale: 3/16" = 1'-0"

THIRD FLOOR PLUMBING SOUTH - FINISH PLAN 0 42 8

NORTH

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BUILDING 1

CEILINGS IN AREAS OF WORK ARE TO BE REMOVED

AS REQUIRED IN ORDER TO COMPLETE WORK.

REPLACE WITH GYPSUM BOARD/PLASTER

CONSTRUCTION (PAINTED TO MATCH EXISTING

ADJACENT CEILING CONDITIONS

24514

LICENSED

ARCHITECT

R O O F

SUPPLY CLOSET

FIRE CLOSET

5447A

UNISEX TOILET

ELECTRICAL CLOSET

54E1

TOILET

5434A

TOILET

5430A

DIRTY LINEN

5400B

CLEAN LINEN

5400A

TOILET

5429A

TOILET

5425A

TOILET

5423A

SOILED UTILITY

LOCKER RM

CLEAN LINEN

TOILET

5424A

TOILET

5439A

TOILET

5433A

SUPPLY CLOSET

ELECTRICAL

CLOSET

5412A

STORAGE

5496A

TELECOM CLOSET

54E2

REGISTRATION DESK

RECEPTION AREA

CORRIDOR

C5406

CORRIDOR

C5403

CORRIDOR

C5404

CORRIDOR

C5405

MENS TOILET

GROUP RM

PROCEDURE RM

RESEARCH OFFICE

MEDICINE PREP

STAIR

NO 2

TEAM RM

LOCKER

LOUNGE

TREATMENT BED-5

TREATMENT BED-4

TREATMENT BED-3

TREATMENT BED-2

TREATMENT BED-1

TOILET

5406A

WAITING

EQUIPMENT STORAGE

EXAM RM

EXAM RM

DAY SURGY

EXAM RM

PHARMACIST

OFFICE

TOILET

5435A

TOILET

5436A

OFFICE

PSYCHOLOGIST

EXAM RM

EXAM RM

NURSE STATION

BREAK RM

WAITING RM

LINEN

HAC

PATIENT EDUCATION RM

5444 CLEAN SUPPLY

TOILET

WAITING AREA

SPD SUPPLIES

P-4

ELEVATOR

S-5

ELEVATOR

S-6

TEL

54T1

STAIR

NO 1

FIRE/ELECTRICAL CLOSET

5417A

SERVICE

ELEVATOR

ELECTRICAL CLOSET

54E3

TOILET

TOILET

01 01

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:0

:3

A

M

1-A-103

FIFTH FLOOR SOUTH - FINISH PLAN

3 7CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

01/06/2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

01 WHERE PLUMING FIXTURE HAS BEEN

REMOVED: PATCH AND PAINT WALL TO

MATCH EXISTING ADJACENT CONDITIONS

02 REMOVE AND REPLACE FLOORING IN TOILET

ROOM WHERE WATER CLOSET IS REMOVED.

REPLACE FLOORING WITH LUXURY VINYL

TILE. COVER TOILET FLANGE WITH

ALUMINUM TREADPLATE TRIMMED TO FIT

AND CAULK AIR TIGHT.

Scale: 3/16" = 1'-0"

FIFTH FLOOR SOUTH - FINISH PLAN 0 42 8

NORTH

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BUILDING 1

CEILINGS IN AREAS OF WORK ARE TO BE REMOVED

AS REQUIRED IN ORDER TO COMPLETE WORK.

REPLACE WITH GYPSUM BOARD/PLASTER

CONSTRUCTION (PAINTED TO MATCH EXISTING

ADJACENT CEILING CONDITIONS

24514

LICENSED

ARCHITECT

SIMULATION LAB SUPPLY

ATTENDING

TOILET

6461A

TOILET

6457A

NURSE UNION

6483ELECTRICAL

64E4

TOILET

6471A

TOILET

6473A

TOILET

6477A

E E O STORAGE

TOILET

6468A

TOILET

6470A

TOILET

6472A

TOILET

6476A

PHONE

6453A

CLOSET

6497A

P-4

ELEVATOR

ELEVATOR

ELEVATOR LOBBY

6469A

CORRIDOR

C6402 CORRIDOR

C6401

VACANT

STORAGE

SINK RM

FILE STORAGE

STORAGE

TELE MOVE PGM OFFICE

OFFICE

HOME TELEHEALTH

BREAK ROOM

6462A

SAFETY STORAGE

STORAGE

UNISEX TOILET

STAIR

NO 5

UNION SEIU

UNASSIGNED SPACE

PRIVACY/FOIA

NURSES UNION

6493 TEAM RM

CLINIC NUTRITION

EEO FILE STORAGE

SUPPLY

EEO ASSISTANT

ETHIC CONSULTATION

CHAPLAIN OFFICE

CHAPLAIN OFFICE

LACTATION RM

CHAPLAIN OFFICE

E E O ASST OFFICE

E E O PGM MGR

SOCIAL WORKER OFFICE

CLINICAL CHAPLAIN OFFICE

CLINICAL CHAPLAIN OFFICE

HR SPECIALIST

HAC

GERIATRIC TEAM RM

ACS OFFICE

COMPLIANCE

OFFICE

ADMIN. OFFICE

6444A

CLOSET

TOILET/SHOWER

S5

S6

ELECTRICAL CLOSET

64E3

ROOF

LOCKER LOCKER

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:0

:3

A

M

1-A-104

SIXTH FLOOR NORTH - FINISH PLAN

4 7CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

01/06/2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

01 WHERE PLUMBING FIXTURES WERE

REMOIVED: PATCH AND PAINT WALL TO

MATCH EXISTING ADJACENT CONDITIONS

02 REMOVE AND REPLACE FLOORING IN TOILET

ROOM WHERE WATER CLOSET IS REMOVED.

REPLACE FLOORING WITH LUXURY VINYL

TILE. COVER TOILET FLANGE WITH

ALUMINUM TREADPLATE TRIMMED TO FIT

AND CAULK AIR TIGHT.

Scale: 3/16" = 1'-0"

SIXTH FLOOR NORTH -FINISH PLAN 0 42 8

NORTH

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BUILDING 1

CEILINGS IN AREAS OF WORK ARE TO BE REMOVED

AS REQUIRED IN ORDER TO COMPLETE WORK.

REPLACE WITH GYPSUM BOARD/PLASTER

CONSTRUCTION (PAINTED TO MATCH EXISTING

ADJACENT CEILING CONDITIONS

24514

LICENSED

ARCHITECT

STORAGE

TOILET

6423A

FAC

TOILET

6422A

TOILET

6424A

TOILET

6426A

TOILET

6430A

ELECTRICAL CLOSET

64E1

SUPPLY

TOILET

6425A

TOILET

6427A

TOILET

6431A

ELECTRICAL CLOSET

64E2

TOILET

6439A

TOILET

6435A

WATER FOUNTAIN

FAC

PHONE

6453A

CLOSET

6497A

P-4

ELEVATOR

ELEVATOR

ELEVATOR LOBBY

TEL

64T1

CORRIDOR

C6402

STORAGE

CORRIDOR

C6403

STAIR

NO 1

NURSE OFFICE

6439SOCIAL WORKER OFFICE

RECEPTION

RECEPTION

STAIR

NO 2

OFFICE

6434OFFICE

6434A

STORAGE

UNISEX STAFF TOILET

SINK RM

FILE STORAGE

STORAGE

NURSE OFFICE

NURSE OFFICE

DOCTOR OFFICE

NURSE OFFICE

6402 WAITING

INFO SECURITY OFFICE

ACS OFFICE

COMPLIANCE

OFFICE

ADMIN. OFFICE

6444A

CUSTOMER SVC

ORGAN TRANSPLANT CO-ORDR

CONFERENCE RM

FILE RM

KITCHEN

HAC

STORAGE

SUPPLY

OAA OFFICE

SAFETY SPECIALIST

SAFETY MANAGER

INFO SECURITY OFFICE

HUD VASH

NURSE OFFICE

SOCIAL WORKER OFFICE

HUD VASH

HR SPECIALIST

VASCULAR OFFICE

SOCIAL WORKER OFFICE

SOCIAL WORKER OFFICE

6435A

6447A

S5

S6

FIT TESTING

6406A

ELECTRICAL CLOSET

64E3

SHOWER

AREA

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:0

:4

A

M

1-A-105

SIXTH FLOOR SOUTH - FINISH PLAN

5 7CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

01/06/2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

Scale: 3/16" = 1'-0"

SIXTH FLOOR SOUTH -FINISH PLAN 0 42 8

NORTH

PLAN

01 WHERE PLUMBING FIXTURE HAS BEEN

REMOVED: PATCH AND PAINT WALL TO

MATCH EXISTING ADJACENT CONDITIONS

02 REMOVE AND REPLACE FLOORING IN TOILET

ROOM WHERE WATER CLOSET IS REMOVED.

REPLACE FLOORING WITH LUXURY VINYL

TILE (BASIS OF DESIGN: TANDUS CONTOUR).

COVER TOILET FLANGE WITH ALUMINUM

TREADPLATE TRIMMED TO FIT AND CAULK

AIR TIGHT.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BUILDING 1

CEILINGS IN AREAS OF WORK ARE TO BE REMOVED

AS REQUIRED IN ORDER TO COMPLETE WORK.

REPLACE WITH GYPSUM BOARD/PLASTER

CONSTRUCTION (PAINTED TO MATCH EXISTING

ADJACENT CEILING CONDITIONS

24514

LICENSED

ARCHITECT

SHOWER

7424A

TOILET

7423A

TOILET

7437A

ELECTRICAL

74E1

PHONE

CLOSET

7451B

FIRE CT

7447A

FIRE CLOSET

CORRIDOR

C7402

ELEVATOR

LOBBY

P-4

ELEVATOR

S-6

ELEVATOR

S-5

SUPPLY

SPECIALIST

74T1

STAIR

NO 1

CORRIDOR

C7403

ELECTRICAL

74E2

SUPPLY TECH

STAIR

NO 2

ICE M/C

STORAGE

MENS TOILET

STORAGE

7450A

STORAGE

WAITING RM

PATIENT EFFECTS UNIFORM EXCHANGE

SATV

BIOMED SHOP

HAC

EQUIP STORAGE

EQUIP STORAGE

EQUIP STORAGE

EQUIP STORAGE

BIOMED SHOP

TOILET

7412A

BIOMED SHOP

BIOMED SHOP

CART STORAGE

CABLE RM

REFERENCE BOOK RM

STORAGE

TOILET

7421A

BIOMED CHIEF

ICE M/C

TOILET

7422A

BIOMED SHOP

BIOMED SHOP

BIOMED SHOP

BIOMED SHOP

BIOMED SHOP

BIOMED SHOP

7430SUPV OFFICE

ELECTRIC CLOSET

74E3

BIOMED

SERVER

ROLL-UP WINDOW

01 01

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:0

:4

A

M

1-A-106

SEVENTH FLOOR SOUTH - PLAN

6 7CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

01/06/2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

REMOVE DCW AND DHW PIPING FROM

FIXTURE BACK TO MAIN. VALVE AND CAP AT

MAIN.

01 PATCH AND PAINT WALL TO MATCH EXISTING

ADJACENT CONDITIONS

02 REMOVE AND REPLACE FLOORING IN TOILET

ROOM WHERE WATER CLOSET IS REMOVED.

REPLACE FLOORING WITH LUXURY VINYL

TILE (BASIS OF DESIGN: TANDUS CONTOUR).

COVER TOILET FLANGE WITH ALUMINUM

TREADPLATE TRIMMED TO FIT AND CAULK

AIR TIGHT.

Scale: 3/16" = 1'-0"

SEVENTH FLOOR SOUTH - FINISH PLAN 0 42 8

NORTH

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BUILDING 1

CEILINGS IN AREAS OF WORK ARE TO BE REMOVED

AS REQUIRED IN ORDER TO COMPLETE WORK.

REPLACE WITH GYPSUM BOARD/PLASTER

CONSTRUCTION (PAINTED TO MATCH EXISTING

ADJACENT CEILING CONDITIONS

24514

LICENSED

ARCHITECT

CLOSET

10444

TOILET

10404A

10447

PHONE

10451BELECTRICAL

104E1

TOILET

10402A

TOILET

10421A

TOILET

10411A

10407

TOILET

10405B

CLOSET

10405A

C10405

SAFETY TRAINING

10451A

SVC ELEVATOR LOBBY

C10404

10457A

ELEVATOR

ELEVATOR

P-4

TELECOM

104T1

STAIR

NO 1

ADMIN TECH

10421SOCIAL WORKER

10417

PGM MGR

10415

TOILET

10415A

TRANSITION PATIENT

10411PSYCHOLOGIST

10409

STAIR

NO 2

PSYCHOLOGIST

10405

STORAGE

10401A

TOILET

10401B

GROUP RM

10401

WOMENS TOILET

10456

EMS STORAGE

10454

MENS TOILET

10450

CONFERENCE RM

10440RECREATION THERAPIST

10422

PHYSICIAN OFFICE

10420

DAY RM

10418

10416COPY

10414

PRIMARY CARE PHYSICIAN

10410

TOILET

10410A

NURSE PRACT.

10408CASE MGR OFFICE

10406

SOCIAL WORKER

10404

ADMIN. OFFICER

10402

DR OFFICE

10400

EMS STORAGE

10457

C10403

EMS CLOSET

FIRE CLOSET

FIRE CLOSET EMS CLOSET

CORRIDOR ELECTRICAL CLOSET

104E2

01 01

01 01

53 52

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/7

/2

:0

:4

A

M

1-A-107

TENTH FLOOR SOUTH -FINISH PLAN

7 7CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

01/06/2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

01 PATCH AND PAINT WALL TO MATCH EXISTING

ADJACENT CONDITIONS

02 REMOVE AND REPLACE FLOORING IN TOILET

ROOM WHERE WATER CLOSET IS REMOVED.

REPLACE FLOORING WITH LUXURY VINYL

TILE (BASIS OF DESIGN: TANDUS CONTOUR).

COVER TOILET FLANGE WITH ALUMINUM

TREADPLATE TRIMMED TO FIT AND CAULK

AIR TIGHT.

Scale: 3/16" = 1'-0"

TENTH FLOOR SOUTH - FINISH PLAN 0 42 8

NORTH

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BUILDING 1

CEILINGS IN AREAS OF WORK ARE TO BE REMOVED

AS REQUIRED IN ORDER TO COMPLETE WORK.

REPLACE WITH GYPSUM BOARD/PLASTER

CONSTRUCTION (PAINTED TO MATCH EXISTING

ADJACENT CEILING CONDITIONS

24514

LICENSED

ARCHITECT

ANNOTATION ABBREVIATIONS

PLUMBING ABBREVIATIONS

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALANCING/SHUTOFF VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CALIBRATED BALANCING VALVE

CONTROL VALVE

EXPANSION VALVE

GATE VALVE

GLOBE VALVE

QUICK OPEN VALVE

SAFETY RELIEF VALVE

SOLENOID VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

VACUUM RELIEF VALVE

GAS COCK

PLUG VALVE

PLUMBING SYMBOLS

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

OR

CO

PIPE SLOPE ARROW

F

P

T

M

CWR

HW

PIPING SYSTEM

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

CW DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

HW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

PLUMBING SYMBOLS

ANNOTATION SYMBOLS

(E)EXISTING

NEW KEYNOTE

DEMO KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

TEXT INDICATES EXISTING ITEM

PLUMBING EQUIPMENT DESIGNATION

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMITS OF DEMOLITION

P-###

HWR DOMESTIC HW RECIRCULATION

PLUMBING GENERAL NOTES

PLUMBING DEMOLITION GENERAL NOTES

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE

PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF

THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND

ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUDTOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND

APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES

DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW

PLUMBING AND WORK OF OTHER TRADES.

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE

GRADE FOR THE PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY

AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR

EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. AT EACH PLUMBING FIXTURE, PROVIDE A PISTON TYPE WATER HAMMER ARRESTOR SIZED ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS.

8. SANITARY DRAINAGE PIPING INDICATED IS LOCATED BELOW FLOOR SLAB OR WITHIN WALLS UNLESS NOTED OTHERWISE. SANITARY VENT PIPING INDICATED IS ABOVE THE CEILING OR WITHIN WALLS UNLESS NOTED

OTHERWISE.

9. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

10. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF

WALLS AND FLOORS.

11. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

12. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

13. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL

CODES AND APPLICABLE VA STANDARDS.

14. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

15. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING

OF PIPING WITH EXISTING CONDITIONS.

16. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND

ARRANGEMENT OF PIPING SYSTEMS.

17. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE OWNER 1

WEEK IN ADVANCE.

18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS

CONTRACT, UNLESS NOTED OTHERWISE.

19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF

PROJECT.

20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

21. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REGRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PACAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

CIRCUIT SETTER VALVE

NG

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2

N2O

MA

O2

WAGD

VAC

CO2

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/6

/2

:4

:5

A

M

1-P-001

PLUMBING GENERAL INFORMATION

1 15CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

JANUARY 6, 2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

DocuSign Envelope ID: CBF4253B-6C10-40F8-A57D-BD7CB79EDF89

1/6/2020

UNISEX TOILET

3475A

SOILED UTILITY

ELECTRICAL CLOSET

TOILET

FAC

ELECTRICAL

34E4

BACKUP GENERATOR RM

3472C

STORAGE

3472B

STORAGE

3455A

ELECTRICAL

3495A

STORAGE

3485A

CORRIDOR

C3401

CORRIDOR

C3402

CORRIDOR

C3403

ELEVATOR LOBBY

ELEVATOR

ELEVATOR

P-4

OXYGEN TANKS

DRESSING ROOM

3475B

STORAGE

3475C

LOCKER ROOM

DOCTORS

OFFICE

STAIR

NO 5

RESIDENT

GROUP

DOCTORS

OFFICE

DOCTORS

OFFICE

CHIEF

ENT

DOCTORS

OFFICE

DOCTORS

OFFICE

3494A

DOCTORS

OFFICE

RESIDENT COORD.

DOCTORS

OFFICE

SURGERY STAFF

SECRETARY/ COPIER

HAC

BREAK ROOM

OFFICE

OFFICE

STORAGE

MECH RM

3472A

EQUIPMENT STORAGE

LAB

MECH RM

3466A

SUPPLY RM

RECEPTION

3461CHIEF OFFICE

TANK RM

3454A

STORAGE

3454B

DIALYSIS STORAGE

CARDIO STORAGE

3452NON

VA MED CARE

S-5

S-6

CORRIDOR

3468A

ELECTRICAL CLOSET

34E4

ROOF

ROOF

03 03

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/6

/2

:4

:5

A

M

1-P-101

THIRD FLOOR NORTH - PLUMBING

DEMOLITION PLAN

2 15CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

JANUARY 6, 2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

Scale: 3/16" = 1'-0"

THIRD FLOOR NORTH - PLUMBING DEMOLITION PLAN 0 42 8

NORTH

PLAN

01 DEMOLISH EXISTING PLUMBING FIXTURE.

REMOVE ALL ASSOCIATED DOMESTIC WATER

PIPING BACK TO MAIN. REMOVE ALL

ASSOCIATED SANITARY AND VENT PIPING

BACK TO MAIN.

02 REMOVE FAUCET AND REPLACE WITH P-435

FAUCET IN ITS PLACE. PROGRAM NEW

FAUCET TO FLUSH PIPING 2 TIMES PER DAY

AT TIMES SELECTED BY THE COR.

03 PROVIDE THERMOSTATIC MIXING VALVE AT

FIXTURE AND CONNECT AS PER P-501

DETAIL.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BUILDING 1

CEILINGS IN AREAS OF WORK ARE TO BE REMOVED

AS REQUIRED IN ORDER TO COMPLETE WORK.

REPLACE WITH GYPSUM BOARD/PLASTER

CONSTRUCTION (PAINTED TO MATCH EXISTING

ADJACENT CEILING CONDITIONS

NEPHROLOGY DIALYSIS CONFERENCE

RM AND PATIENT EDUCATION

HAC

TOILET

3426A

STORAGE

3455A

ELECTRICAL

3495A

ELECTRICAL

34E2

TOILET

3443A

VESTIBULE

3439A

SUPPLY CLOSET

TOILET

3424A

TOILET

3428A

TOILET

3432A

STORAGE CLOSET

3434A

TOILET

3429A

TOILET

3427A

MENS SHOWER

3425A

ELECTRICAL CLOSET

34E1

FAC

TOILET

3439B

3447A

CLOSET

CORRIDOR

C3405

CORRIDOR

C3404

CORRIDOR

C3403

ELEVATOR LOBBY

ELEVATOR

ELEVATOR

P-4

TANK RM

3454A

STORAGE

3454B

DIALYSIS STORAGE

CARDIO STORAGE

3452NON

VA MED CARE

DIALYSIS RM

DIALYSIS

EQUIPMENT

FILE STORAGE

SPD SUPPLY

DIALYSIS SOLUTIONS-B

DIALYSIS SOLUTIONS-A

STORAGE

STORAGE

TEL

34T1

STAIR

NO 1

DIALYSIS WAITING

NURSE STATION

LOCKER

3439C

LOUNGE

CRASH CART

STORAGE

OFFICE CUBICLE

STAIR

NO 2

OFFICE

CUBICLE

SUPPLY

ANALYSIS

SPD

SUPERVISOR

SYSTEM

ANALYST

STORAGE

DIALYSIS RM

SOCIAL WORK

NURSE MGR

OXYGEN TANKS

IV RM

MENS TOILET

LEAD TECH

HEMO DIALYSIS DIR OFFICE

CONSL MGR

MECH RM

S-5

S-6

ELECTRICAL CLOSET

34E4

ROOF

04 04

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/6

/2

:4

:5

A

M

1-P-102

THIRD FLOOR SOUTH - PLUMBING

DEMOLITION PLAN

3 15CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

JANUARY 6, 2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

01 DEMOLISH EXISTING PLUMBING FIXTURE.

REMOVE ALL ASSOCIATED DOMESTIC WATER

PIPING BACK TO MAIN. REMOVE ALL

ASSOCIATED SANITARY AND VENT PIPING

BACK TO MAIN.

02 REMOVE AND REPLACE FLOORING IN TOILET

ROOM WHERE WATER CLOSET IS REMOVED.

REPLACE FLOORING WITH LUXURY VINYL

TILE. COVER TOILET FLANGE WITH

ALUMINUM TREADPLATE TRIMMED TO FIT

AND CAULK AIR TIGHT.

03 FAUCET AND REPLACE WITH P-435 FAUCET IN

ITS PLACE. PROGRAM NEW FAUCET TO

FLUSH PIPING 2 TIMES PER DAY AT TIMES

SELECTED BY THE COR.

04 PROVIDE THERMOSTATIC MIXING VALVE AT

FIXTURE AND CONNECT AS PER P-501

DETAIL.

Scale: 3/16" = 1'-0"

THIRD FLOOR PLUMBING SOUTH - PLUMBING DEMOLITION PLAN 0 42 8

NORTH

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BUILDING 1

CEILINGS IN AREAS OF WORK ARE TO BE REMOVED

AS REQUIRED IN ORDER TO COMPLETE WORK.

REPLACE WITH GYPSUM BOARD/PLASTER

CONSTRUCTION (PAINTED TO MATCH EXISTING

ADJACENT CEILING CONDITIONS

R O O F

SUPPLY CLOSET

FIRE CLOSET

5447A

UNISEX TOILET

ELECTRICAL CLOSET

54E1

TOILET

5434A

TOILET

5430A

DIRTY LINEN

5400B

CLEAN LINEN

5400A

TOILET

5429A

TOILET

5425A

TOILET

5423A

SOILED UTILITY

LOCKER RM

CLEAN LINEN

TOILET

5424A

TOILET

5439A

TOILET

5433A

SUPPLY CLOSET

ELECTRICAL

CLOSET

5412A

STORAGE

5496A

TELECOM CLOSET

54E2

REGISTRATION DESK

RECEPTION AREA

CORRIDOR

C5406

CORRIDOR

C5403

CORRIDOR

C5404

CORRIDOR

C5405

MENS TOILET

GROUP RM

PROCEDURE RM

RESEARCH OFFICE

MEDICINE PREP

STAIR

NO 2

TEAM RM

LOCKER

LOUNGE

TREATMENT BED-5

TREATMENT BED-4

TREATMENT BED-3

TREATMENT BED-2

TREATMENT BED-1

TOILET

5406A

WAITING

EQUIPMENT STORAGE

EXAM RM

EXAM RM

DAY SURGY

EXAM RM

PHARMACIST

OFFICE

TOILET

5435A

TOILET

5436A

OFFICE

PSYCHOLOGIST

EXAM RM

EXAM RM

NURSE STATION

BREAK RM

WAITING RM

LINEN

HAC

PATIENT EDUCATION RM

5444 CLEAN SUPPLY

TOILET

WAITING AREA

SPD SUPPLIES

P-4

ELEVATOR

S-5

ELEVATOR

S-6

TEL

54T1

STAIR

NO 1

FIRE/ELECTRICAL CLOSET

5417A

SERVICE

ELEVATOR

ELECTRICAL CLOSET

54E3

TOILET

TOILET

01 01

03 03

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

2 HR - FIRE SEPARATION

2 HR - FIRE/SMOKE SEPARATION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/6

/2

:4

:5

A

M

1-P-103

FIFTH FLOOR SOUTH - PLUMBING

DEMOLITION PLAN

4 15CC

LEGIONELLA CORRECTIONS

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE. CHICAGO, IL

JANUARY 6, 2020

ISSUED FOR BID AND CONSTRUCTION

537-18-301B19-081

RCM

01 DEMOLISH EXISTING PLUMBING FIXTURE.

REMOVE ALL ASSOCIATED DOMESTIC WATER

PIPING BACK TO MAIN. REMOVE ALL

ASSOCIATED SANITARY AND VENT PIPING

BACK TO MAIN.

02 REMOVE AND REPLACE FLOORING IN TOILET

ROOM WHERE WATER CLOSET IS REMOVED.

REPLACE FLOORING WITH LUXURY VINYL

TILE. COVER TOILET FLANGE WITH

ALUMINUM TREADPLATE TRIMMED TO FIT

AND CAULK AIR TIGHT.

03 FAUCET AND REPLACE WITH P-435 FAUCET IN

ITS PLACE. PROGRAM NEW FAUCET TO

FLUSH PIPING 2 TIMES PER DAY AT TIMES

SELECTED BY THE COR.

04 PROVIDE THERMOSTATIC MIXING VALVE AT

FIXTURE AND CONNECT AS PER P-501

DETAIL.

Scale: 3/16" = 1'-0"

FIFTH FLOOR SOUTH - PLUMBING DEMOLITION PLAN 0 42 8

NORTH

PLAN

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BUILDING 1

CE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .