This pre-solicitation notice provides details for a construction project to eliminate Legionella growth hazards and install mixing valves at a VA medical center. The project value is between $1,000,000 to $2,000,000, with a NAICS code of 238220 and size standard of $16.5 million. The solicitation will be issued on February 20, 2020 via SAM.gov, with proposals due on March 23, 2020. The project must be completed within 265 days of a notice to proceed. The opportunity is set aside for SDVOSBs, who must represent their status at submission and prior to award. A pre-proposal site visit will be held, with attendance encouraged. The Department of Veterans Affairs Veterans Health Administration VISN 12 is the contracting agency.

36C25220R0053 0004 Atch 09 Jesse Brown VAMC Asbestos Reinspection Report - 2019.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Legionella Corrections, 537-18-301B, newest first.
File Type Posted
36C25220R0053-0006001.docx DOCX document
36C25220R0053-0006002.xlsx XLSX spreadsheet
36C25220R0053-0006000.docx DOCX document
36C25220R0053-0005000.docx DOCX document
36C25220R0053-0005001.xlsx XLSX spreadsheet
36C25220R0053-0004004.pdf PDF
36C25220R0053-0004001.docx DOCX document
36C25220R0053-0004008.xlsx XLSX spreadsheet
36C25220R0053-0004006.pdf PDF
36C25220R0053-0004007.pdf PDF
36C25220R0053-0004003.docx DOCX document
36C25220R0053-0004011.pdf PDF
36C25220R0053-0004000.docx DOCX document
36C25220R0053-0004002.xlsx XLSX spreadsheet
36C25220R0053-0004010.pdf PDF
36C25220R0053-0004005.pdf PDF
36C25220R0053-0003000.docx DOCX document
36C25220R0053-0002000.docx DOCX document
36C25220R0053-0001000.docx DOCX document
36C25220R0053-0001001.pdf PDF
36C25220R0053-003.txt TXT text file
36C25220R0053-002.docx DOCX document
36C25220R0053-007.pdf PDF
36C25220R0053-006.pdf PDF
36C25220R0053-005.pdf PDF
36C25220R0053-004.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS REINSPECTION REPORT

LOCATION:

JESSE BROWN VA MEDICAL CENTER

820 S DAMEN AVE.

CHICAGO, IL 60612

PROJECT NO.: 537-19-122

TASK ORDER: 36C25219F0327

INSPECTION DATES:

SEPTEMBER 3-6, 2019

PRIME CONTRACTOR:

CASTLE HILL ASSOCIATES, LLC

218-A MECHANIC ST.

WATERVILLE, OH 43566

567-952-0212

JESSE BROWN VA MEDICAL CENTER – CHICAGO, IL

SEPTEMBER 2019

TABLE OF CONTENTS

1.0 ASBESTOS INSPECTION REPORT

• Table 1 – List of Acronyms

• Table 2 - Removal Priority Protocols

2.0 APPENDICES

Appendix A – Asbestos Sampling Data

Appendix B – Asbestos Quantities, Assessments, & Remediation Cost Estimate

Appendix C – Photographs of Asbestos Materials

Appendix D – Asbestos Laboratory Reports

Appendix E - Inspector Certifications

Appendix F - Lab Certifications

Appendix G – Asbestos Locations and Sample Location Drawings

Appendix H – O&M Plan (Operations & Maintenance)

1.0 EXECUTIVE SUMMARY

From September 3-6, 2019, Castle Hill Associates, LLC was contracted by the US Department of Veterans Affairs (VA) to perform asbestos re-inspections of buildings 1A, 1B, 11A, and 11B on the site of the Jesse Brown VA Medical Center in Chicago, IL. The survey was performed as part of the VA Project Number 537- 19-122 under Task Order 36C25219F0327. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos survey.

The inspection was conducted by Brett Brumbaugh and Sam Ansara. The project manager was Mr.

Brumbaugh who has been conducting asbestos surveys, sampling, and consulting work since 1987. He is a State of Illinois certified Asbestos Inspector. Sam Ansara has been conducting asbestos surveys, sampling, and consulting work since 1989. There was a previous asbestos reinspection and sampling conducted at the facility most recently in 2007 and those reports were reviewed and utilized by Castle Hill prior to this inspection.

There were no limitations or exceptions to the PWS for the surveys conducted.

All accessible functional areas in the buildings were surveyed. All previous asbestos survey information and sampling conducted at the facilities were evaluated and incorporated into this survey. All confirmed asbestos-containing materials were verified. This report can be incorporated into the facility’s management plan for asbestos-containing materials.

2.0 STATE AND LOCAL REGULATIONS

The State of Illinois asbestos inspection and licensing regulations are similar to the Federal regulations. State asbestos regulations include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements.

3.0 ANALYTICAL METHODS AND LIMITATIONS

3.1 Asbestos Sampling Protocol

EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos. The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5- 85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).

The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect

ACBM.

All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMSL Analytical in Plymouth, MI who accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.

4.0 SUMMARY OF FINDINGS

4.1 Asbestos-Containing Building Materials

The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:

Building 1A – Damen Pavillion

Asbestos Containing Materials Locations

(see Appendix G for exact locations) Quantity

Pipe insulation Inaccessible wall and ceiling chases (above/behind hard plaster); Mech.

Rm. P400; Basement hall by B403

460 lf known Unknown LF in chases

Mud fittings on fiberglass insulated pipe

Hall by 1510-15; 12th floor elev. mech.

room

46 fittings known Unknown # in chases

12” vinyl floor tile (all colors) and/or black mastic

1st through 10th floors 76,588 sf

9” vinyl floor tile and black mastic 9th floor 580 sf

Transite cement sheets behind radiators

7th through 10th floors 2,760 sf

Building 1B – Damen Pavillion

(see Appendix G for exact locations) Quantity

Pipe insulation Inaccessible wall and ceiling chases (above/behind hard plaster)

420 lf known Unknown LF in chases

Mud fittings on fiberglass insulated pipe

Room 10503; Inaccessible wall and ceiling chases (above/behind hard plaster)

8 fittings known Unknown # in chases

12” vinyl floor tile (all colors) and/or black mastic

1st, 2nd, 3rd, 4th, 6th, 8th, and 10th floors 38,340 sf

Building 11A – Taylor Building

(see Appendix G for exact locations) Quantity

Pipe insulation Inaccessible wall and ceiling chases (above/behind hard plaster)

Unknown LF in chases

Mud fittings on fiberglass insulated pipe

Inaccessible wall and ceiling chases (above/behind hard plaster)

8 fittings known Unknown # in chases

12” vinyl floor tile (all colors) and/or black mastic

6th floor 3,640 sf

Laboratory Fume Hoods (Transite) 6219, 6220, 6221, 6256, 6260, 6261, 6273, 6281, 6283, 6285, 7203, 7211, 7218, 7235, 7237, 7239, 7241, 7275, 7281, 7282, 7283, 7287, 7288, 7290, 7288, 7292, 7293, 7298, 7299

2,240 sf

Lab Table Tops, Sinks, and Drying Racks (Ebony Transite)

6219, 6220, 6221, 6256, 6260, 6261, 6273, 6281, 6283, 6285, 7203, 7211, 7218, 7235, 7237, 7239, 7241, 7275, 7281, 7282, 7283, 7287, 7288, 7290, 7288, 7292, 7293, 7298, 7299

5,670 sf 78 sinks

Transite sheets in stairwells Stairwell 11 to 8th floor penthouse 70 sf

Building 11B – Ogden Building

(see Appendix G for exact locations on each floor)

Quantity

Contaminated soil in crawl space Crawl spaces 2,376 sf

12” vinyl floor tile (all colors) and black mastic

3rd floor 3,318 sf

Pipe insulation Vertical pipe chases Unknown quantity

Mud fittings on fiberglass insulated pipe

Vertical pipe chases Unknown quantity

Transite sheets in stairwells Stairwell 7 (basement and 7th floors) 320 sf

5.0 Explanation of Assessment of Asbestos Containing Materials

Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.

The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:

• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)

• Material Type - Friable (F); Non-Fable (NF)

• Condition of Material - Good; Fair; Poor

• Potential for Damage - Low; Medium; High

• Physical Assessment - Low; Medium; High

• Recommended Response Action - 1 through 7

Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)

• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.

• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.

• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.

Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.

• Condition of Material - Good; Fair; Poor

• Potential for Damage - Low; Medium; High

• Physical Assessment - Low; Medium; High

Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.

1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints. Asbestos debris originating from the ACBM in question may also indicate damage.

2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.

3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.

4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities.

Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.

5. ACBM with Potential for Damage - Potential damage means circumstances in which:

(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.

(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.

6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:

(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.

(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.

7. Any remaining friable ACBM or Friable Suspected ACBM

6.0 EXPLANATION OF REMEDIATION COST ESTIMATES

All remediation cost (removal and repair) estimates are based upon RS Means data. Since RS Means does not account for work in VA Medical Centers, all cost estimates are adjusted to reflect the VA specific requirements for abatement. In addition, the cost estimates reflect the quantity and location of the asbestos materials. For example, abatement work in crawl spaces is expected to be much costlier than work in more accessible areas of building. Also, the costs for each material in each building are intended to be for “stand alone” projects and the combination of areas for removal will reduce the costs due to an economy of scale.

7.0 CONCLUSION/RECOMMENDATIONS

An operations and maintenance (O&M) program has been developed by the VAMC specifically for the positively identified ACBM in the facilities. Any renovation/demolition work which may impact these positive materials should be conducted in accordance with the O&M program and all applicable Federal, state, and local regulations by appropriately trained and VA-approved personnel and contractors. Since demolition was not performed as part of the inspection work at the facilities, certain areas such as pipe chases and areas above fixed permanent ceilings, fire-door interiors, and vault/safe wall and door linings were not inspected or tested. Prior to renovation and alteration work which could impact these areas, Castle Hill recommends that exploratory demolition be performed and a qualified inspector be utilized to examine the areas and collect samples as needed. Castle Hill recommends sampling of roofing materials and electrical components (not specifically examined as part of this survey) if renovation activities are planned which may disturb these materials.

Respectfully Submitted:

Brett L. Brumbaugh, REPA, CESCO State of Illinois Asbestos Inspector License Number 100-09972

TABLE 1

LIST OF ACRONYMS

ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction

TABLE 2

ASBESTOS REMOVAL PRIORITY PROTOCOLS

HAZARD

RANK

REMOVAL

PRIORITY

AHERA

CATEGORY

RESPONSE ACTION

RECOMMENDATION

7 1 Significantly Damaged

Evacuate or isolate the area.

Remove or repair if feasible.

O&M for all friable ACM.

6 2 Damaged with potential for significant damage

Evacuate or isolate the area.

Remove, encapsulate, or repair if feasible. O&M for all friable

ACM.

5 3 Damaged with potential for damage

Remove, encapsulate, or repair. O&M for all friable ACM.

4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.

3 5 Potential for significant damage

Take steps to reduce potential for damage. O&M for all friable

ACM.

2 6 Potential for damage O&M for all friable ACM.

1 7 No problem O&M for all friable ACM.

APPENDIX A

ASBESTOS BULK SAMPLING DATA

ASBESTOS BULK SAMPLING INFORMATION

Facility: Jesse Brown VAMC - Chicago, IL Buildings: Buildings 1A, 1B, 11A, and 11B Sampling Dates: September 3-4, 2019 Analysis Dates: September 14-16, 2019 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-0 Sampler: Brett Brumbaugh Accreditation: State of Illinois – Asbestos Inspector #100-09972

PLM Laboratory Analysis Result

BLDG.

SAMPLE

NUMBER

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

11B 1 Spray-on fireproofing Basement – B301 No Asbestos Detected

11B 2 Spray-on fireproofing Basement – B301 No Asbestos Detected

11B 3 Spray-on fireproofing Basement – B301 No Asbestos Detected

11B 4 Transite wall paneling Basement – Stairwell 7 15% Chrysotile Asbestos

1A 5 Spray-on fireproofing Elev. Mech. Room 12th Fl. No Asbestos Detected

1A 6 Spray-on fireproofing Elev. Mech. Room 12th Fl. No Asbestos Detected

1A 7 Spray-on fireproofing Elev. Mech. Room 12th Fl. No Asbestos Detected

11B 8 Spray-on fireproofing 8th floor penthouse No Asbestos Detected

11B 9 Spray-on fireproofing 8th floor penthouse No Asbestos Detected

11B 10 Spray-on fireproofing 8th floor penthouse No Asbestos Detected

11A 11 Spray-on fireproofing 8th floor penthouse No Asbestos Detected 11A 12 Spray-on fireproofing 8th floor penthouse No Asbestos Detected

11A 13 Spray-on fireproofing 8th floor penthouse No Asbestos Detected

11A 14 Tan duct seam mastic 8th floor penthouse No Asbestos Detected

11A 15 Tan duct seam mastic 8th floor penthouse No Asbestos Detected

11A 16 Spray-on fireproofing 8th floor penthouse No Asbestos Detected

11A 17 Spray-on fireproofing 8th floor penthouse No Asbestos Detected

11A 18 Spray-on fireproofing 8th floor penthouse No Asbestos Detected

11A 19a 12” white/blue/green floor tile Room 7221 No Asbestos Detected

11A 19b Black mastic “” No Asbestos Detected

11A 20a 12” white/blue/green floor tile Hall by Room 6233 No Asbestos Detected 11A 20b Yellow mastic “” No Asbestos Detected

11A 21a 12” tan floor tile Hall by Room 6239 3% Chrysotile Asbestos

11A 21b Black mastic “” 5% Chrysotile Asbestos

11A 22a 12” tan floor tile Hall by Room 6249 3% Chrysotile Asbestos

11A 22b Black mastic “” 5% Chrysotile Asbestos

11A 23a 12” white/blue/green floor tile Hall by Room 4203 No Asbestos Detected

11A 23b Yellow mastic “” No Asbestos Detected

11A 24a 12” gray floor tile Hall by Room 4289 No Asbestos Detected

11A 24b Yellow mastic “” No Asbestos Detected

11A 25a 12” beige/brown floor tile Hall by room 3260 No Asbestos Detected

11A 25b Yellow mastic “” No Asbestos Detected 11A 26a 12” beige/brown floor tile Hall by Room 3229a No Asbestos Detected

11A 26b Yellow mastic “” No Asbestos Detected

11A 27a 12” Gray/white floor tile Room 2214 No Asbestos Detected

11A 27b Yellow mastic “” No Asbestos Detected

11A 28a 12” White floor tile Hall by Room 2277 No Asbestos Detected

11A 28b Yellow mastic “” No Asbestos Detected

11A 29 12” tan/blue/green floor tile Room 2280 No Asbestos Detected

11A 30 Spray-on fireproofing on column Mech. room 1280 No Asbestos Detected

ASBESTOS BULK SAMPLING INFORMATION

Buildings: Buildings 1A, 1B, 11A, and 11B Sampling Dates: September 3-4, 2019 Analysis Dates: September 14-16, 2019 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-0

PLM Laboratory Analysis Result

BLDG.

SAMPLE

NUMBER

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

11A 31 Spray-on fireproofing on column Mech. room 1280 No Asbestos Detected

11A 32 Spray-on fireproofing on column Mech. room 1280 No Asbestos Detected

1A 40a 12” tan floor tile Room 10503 No Asbestos Detected

1A 40b Black mastic “” 4% Chrysotile Asbestos 1A 41a 12” tan floor tile Hall by 10440 No Asbestos Detected

1A 41b Black mastic “” 3% Chrysotile Asbestos

1B 42a 12” light tan floor tile Hall by 10503 2% Chrysotile Asbestos

1B 42b Black mastic “” 5% Chrysotile Asbestos

1B 43a 12” light tan floor tile Hall by 10520 3% Chrysotile Asbestos

1B 43b Black mastic “” 4% Chrysotile Asbestos

1A 44a 12” green floor tile Hall by 9463A No Asbestos Detected

1A 44b Black mastic “” 2% Chrysotile Asbestos

1A 45a 12” tan floor tile Hall by 9435 No Asbestos Detected

1A 45b Black mastic “” No Asbestos Detected

1A 46a 9” tan floor tile Room 9495 3% Chrysotile Asbestos 1A 46b Black mastic “” 4% Chrysotile Asbestos

1B 47a 12” tan/black floor tile Room 8560 7% Chrysotile Asbestos

1B 47b Black mastic “” 5% Chrysotile Asbestos

1A 48a 12” tan/black floor tile Room 8425 No Asbestos Detected

1A 48b 12” tan/black floor tile “” 3% Chrysotile Asbestos

1A 49a 12” gray floor tile Room 7406 4% Chrysotile Asbestos

1A 49b Black mastic “” 3% Chrysotile Asbestos

1A 50a 12” tan/brown floor tile Room 7498 No Asbestos Detected

1A 50b Black mastic “” 3% Chrysotile Asbestos

1A 51a 12” tan/blue/green floor tile Hall by Rom 3467 No Asbestos Detected

1A 51b Yellow mastic “” No Asbestos Detected 1B 52a 12” tan/black floor tile Hall by 2580 No Asbestos Detected

1B 52b Black mastic “” 3% Chrysotile Asbestos

11B 53a 12” blue floor tile Elevator lobby No Asbestos Detected

11B 53b Black mastic “” No Asbestos Detected

11B 54a 12” tan floor tile Elevator lobby No Asbestos Detected

11B 54b Black and yellow mastic “” No Asbestos Detected

11B 55a 12” gray floor tile (bottom layer) Hall by Room 4301 No Asbestos Detected

11B 55b Black mastic (bottom layer) “” No Asbestos Detected

11B 55c 12” brown wood pattern floor tile Hall by Room 4301 No Asbestos Detected

11B 55d Yellow mastic “” No Asbestos Detected

11B 56a 12” tan/brown floor tile Room 3375 No Asbestos Detected 11B 56b Black mastic “” 2% Chrysotile Asbestos

11B 57a 12” olive floor tile Room 3303 No Asbestos Detected

11B 57b Black mastic “” No Asbestos Detected

• EPA Definition of an asbestos containing material: Greater than 1% asbestos

ASBESTOS IN SOILS BULK SAMPLING INFORMATION

Buildings: Buildings 11A and 11B Sampling Dates: September 4, 2019 Analysis Dates: September 11, 2019 Laboratory: EMSL Analytical, Inc. – Cinnaminson, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 101048-0

PLM Qualitative Laboratory Analysis Result (Asbestos in Soils)

SAMPLE

NUMBER

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

33 Loose soil in crawl space Crawl space under 11A No Asbestos Detected 34 Loose soil in crawl space Crawl space under 11A No Asbestos Detected 35 Loose soil in crawl space Crawl space under 11A No Asbestos Detected

36 Loose soil in crawl space Crawl space under 11B Chrysotile Asbestos Present 37 Loose soil in crawl space Crawl space under 11B No Asbestos Detected

38 Loose soil in crawl space Crawl space under 11B Chrysotile Asbestos Present

39 Loose soil in crawl space Crawl space under 11B No Asbestos Detected

58 Loose soil in crawl space Crawl space under 11B Chrysotile Asbestos Present

OSHA Definition of an asbestos containing soil: Any percentage of asbestos present

APPENDIX B

Asbestos Quantities, Assessments, & Remediation Cost Estimates

Jesse Brown VAMC - Chicago, IL

Building 1A

Asbestos Assessments and Cost Estimates

September 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation

Inaccessible wall and ceiling chases

(above/behind hard plaster); Mech. Rm. P400;

Basement hall by B403

14220 lf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $497,000

Mud fittings on fiberglass insulated pipe Hall by 1510-15; 12th floor elev. mech. room 1330 ea TSI Friable 0% 1 O&M; Remove at renovation or demolition 1 No damage $99,750

12” vinyl floor tile (all colors) and/or black mastic 1st through 10th floors 76,588 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $459,000

9” vinyl floor tile and black mastic 9th floor 580 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $6,970

Transite cement sheets behind radiators 7th through 10th floors 2,760 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $69,000

TOTALS 0 $1,131,720

Building 1B

Asbestos Assessments and Cost Estimates

September 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation

Inaccessible wall and ceiling chases

(above/behind hard plaster); Mech. Rm. P400;

Basement hall by B403

11,260 sf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $480,000

Mud fittings on fiberglass insulated pipe Hall by 1510-15; 12th floor elev. mech. room 940 ea TSI Friable 0% 1 O&M; Remove at renovation or demolition 1 No damage $70,500

12” vinyl floor tile (all colors) and/or black mastic 1st through 10th floors 38,340 sf MISC Non-friable

0% 1 O&M; Remove at renovation or demolition 7 No damage $268,000

TOTALS 0 $818,500

Building 11A

Asbestos Assessments and Cost Estimates

September 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Pipe insulation Inaccessible wall and ceiling chases

(above/behind hard plaster) 9670 lf TSI Friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $531,000

Mud fittings on fiberglass insulated pipe Inaccessible wall and ceiling chases

(above/behind hard plaster) 340 ea TSI Friable 0% 1

O&M; Remove at renovation or demolition 1 No damage $25,500

12” vinyl floor tile (all colors) and/or black mastic 6th floor 3,640 sf MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $21,840

Laboratory Fume Hoods (Transite)

6219, 6220, 6221, 6256, 6260, 6261, 6273, 6281, 6283, 6285, 7203, 7211, 7218, 7235, 7237, 7239, 7241, 7275, 7281, 7282, 7283, 7287, 7288, 7290, 7288, 7292, 7293, 7298, 2,240 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $56,000

Lab Table Tops, Sinks, and Drying Racks

(Ebony Transite)

6219, 6220, 6221, 6256, 6260, 6261, 6273, 6281, 6283, 6285, 7203, 7211, 7218, 7235, 7237, 7239, 7241, 7275, 7281, 7282, 7283, 7287, 7288, 7290, 7288, 7292, 7293, 7298, 5,670 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $56,700

Transite sheets in stairwells Stairwell 11 to 8th floor penthouse 78 sinks MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $15,600

TOTALS 0 $706,640

Building 11B

Asbestos Assessments and Cost Estimates

September 2019

Asbestos Material Locations Quantity

AHERA

Category

Friability

%Damage

AHERA

Assessment Recommendation

Removal

Priority

Repair Cost

Estimate

Removal Cost

Estimate

Asbestos debris in soil Crawlspace 2376 sf TSI Friable 100% 7

Isolate crawl spaces and place signs at all entrances.

Require PPE for entrance to crawl. Encapsulate soil with spray foam or lightweight concrete, or remove soil to depth of 3".

1 $89,000 $220,000

12” vinyl floor tile (all colors) and black mastic 3rd floor 3,318 sf MISC Non-friable 0% 1

O&M; Remove at renovation or demolition 7 No damage $25,480

Pipe insulation Inaccessible wall & ceiling chases 2,000 lf TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $210,000

Mud fittings on fiberglass insulated pipe Inaccessible wall & ceiling chases 1500 ea TSI Friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $30,000

Transite sheets in stairwells Stairwell 7 (basement and 7th floors) 320 sf MISC Non-friable 0% 1 O&M; Remove at renovation or demolition 7 No damage $6,000

TOTALS $89,000 $491,480

APPENDIX C

PHOTOGRAPHS OF ASBESTOS MATERIALS

BUILDING 1A

Photo 1A-1 Pipe insulation

Photo 1A-2 Pipe insulation

Photo 1A-3

Pipe insulation mud fittings on fiberglass

Mud fittings on fiberglass insulated pipe 12” vinyl floor tile (all colors) and/or black mastic

Photo 1A-4 Pipe insulation and mud fittings on fiberglass

BUILDING 1A

Photo 1A-5 12” vinyl floor tile and/or black mastic

Photo 1A-6 9” vinyl floor tile and/or black

Photo 1A-7

Photo 1A-8 Transite cement sheets behind radiators

BUILDING 1B

Photo 1B-1 Mud fittings on fiberglass insulated pipe

Photo 1B-2

Photo 1B-3

Photo 1B-4

BUILDING 11A

Photo 11A-1

Photo 11A-2

Photo 11A-3

Laboratory Fume Hoods (Transite)

Photo 11A-4

Lab Table Tops (Ebony Transite)

BUILDING 11A

Photo 11A-5 Lab Table Sinks and Drying

Racks (Ebony Transite)

Photo 11A-6

Transite sheets in stairwells

Photo 11A-7

BUILDING 11B

Photo 11B-1 Contaminated soil in crawl space

Photo 11B-2

Contaminated soil in crawl space

Photo 11B-3 12” vinyl floor tile and black

Photo 11B-4

APPENDIX D

ASBESTOS LABORATORY REPORTS

EMSL Analytical, Inc.

200 Route 130 North Cinnaminson, NJ 08077

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

041926209EMSL Order:

Customer ID: CHAS42

Customer PO: JB

Project ID:

Attention: Phone:Brett Brumbaugh (567) 952-0212

Fax:Castle Hill Associates, LLC

Received Date:218-A Mechanic St. 09/06/2019 9:10 AM

Analysis Date:Waterville, OH 43566 09/14/2019 - 09/16/2019

Collected Date: 09/03/2019 - 09/04/2019

Project: Jesse Brown VAMC / Chicago, IL

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

041926209-0001

None DetectedVermiculite

Non-fibrous (Other)

15%

60%

Cellulose

Glass

15%

10%

Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0002

None DetectedVermiculite

Non-fibrous (Other)

10%

60%

Cellulose

Glass

20%

10%

Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0003

None DetectedNon-fibrous (Other)20%Min. Wool80%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0004

15% ChrysotileNon-fibrous (Other)85%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0005

None DetectedNon-fibrous (Other)70%Cellulose

Glass

15%

15%

Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0006

None DetectedVermiculite

Non-fibrous (Other)

10%

65%

Cellulose

Glass

15%

10%

Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0007

None DetectedVermiculite

Non-fibrous (Other)

10%

65%

Cellulose

Glass

15%

10%

Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0008

None DetectedVermiculite

Non-fibrous (Other)

10%

55%

Cellulose

Glass

20%

15%

Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0009

None DetectedVermiculite

Non-fibrous (Other)

10%

55%

Cellulose

Glass

20%

15%

Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0010

None DetectedVermiculite

Non-fibrous (Other)

10%

65%

Cellulose

Glass

15%

10%

Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0011

None DetectedNon-fibrous (Other)15%Min. Wool85%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0012

None DetectedNon-fibrous (Other)10%Min. Wool90%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0013

None DetectedNon-fibrous (Other)10%Min. Wool90%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0014

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0015

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0016

None DetectedNon-fibrous (Other)20%Min. Wool80%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

Initial report from: 09/14/2019 07:38:45

Page 1 of 5ASB_PLM_0008_0001 - 1.78 Printed: 9/16/2019 12:29 PM

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

041926209EMSL Order:

Customer ID: CHAS42

Customer PO: JB

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

041926209-0017

None DetectedNon-fibrous (Other)10%Min. Wool90%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0018

None DetectedNon-fibrous (Other)10%Min. Wool90%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

19-Floor Tile

041926209-0019

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

19-Mastic

041926209-0019A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

20-Floor Tile

041926209-0020

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

20-Mastic

041926209-0020A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

21-Floor Tile

041926209-0021

3% ChrysotileNon-fibrous (Other)97%Beige

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

21-Mastic

041926209-0021A

5% ChrysotileNon-fibrous (Other)95%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

22-Floor Tile

041926209-0022

3% ChrysotileNon-fibrous (Other)97%Beige

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

22-Mastic

041926209-0022A

5% ChrysotileNon-fibrous (Other)95%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

23-Floor Tile

041926209-0023

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

23-Mastic

041926209-0023A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

24-Floor Tile

041926209-0024

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

24-Mastic

041926209-0024A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

25-Floor Tile

041926209-0025

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

25-Mastic

041926209-0025A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

26-Floor Tile

041926209-0026

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

26-Mastic

041926209-0026A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

27-Floor Tile

041926209-0027

None DetectedNon-fibrous (Other)100%Green

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

Page 2 of 5ASB_PLM_0008_0001 - 1.78 Printed: 9/16/2019 12:29 PM

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

041926209EMSL Order:

Customer ID: CHAS42

Customer PO: JB

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

27-Mastic

041926209-0027A

None DetectedNon-fibrous (Other)100%Gray/Black

Non-Fibrous

Heterogeneous

Bldgs 1A,1B,11A,11B

Mastic and leveler are inseparable, sample analyzed as a composite

28-Floor Tile

041926209-0028

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

28-Mastic

041926209-0028A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0029

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0030

None DetectedNon-fibrous (Other)10%Min. Wool90%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0031

None DetectedNon-fibrous (Other)15%Min. Wool85%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

041926209-0032

None DetectedNon-fibrous (Other)10%Min. Wool90%Gray

Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

40-Floor Tile

041926209-0033

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

40-Mastic

041926209-0033A

4% ChrysotileNon-fibrous (Other)96%Gray/Black

Non-Fibrous

Heterogeneous

Bldgs 1A,1B,11A,11B

Mastic and leveler are inseparable, sample analyzed as a composite

41-Floor Tile

041926209-0034

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

41-Mastic

041926209-0034A

3% ChrysotileNon-fibrous (Other)97%Gray/Black

Non-Fibrous

Heterogeneous

Bldgs 1A,1B,11A,11B

Mastic and leveler are inseparable, sample analyzed as a composite

42-Floor Tile

041926209-0035

2% ChrysotileNon-fibrous (Other)98%Beige

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

42-Mastic

041926209-0035A

5% ChrysotileNon-fibrous (Other)95%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

43-Floor Tile

041926209-0036

3% ChrysotileNon-fibrous (Other)97%Beige

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

43-Mastic

041926209-0036A

4% ChrysotileNon-fibrous (Other)96%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

44-Floor Tile

041926209-0037

None DetectedNon-fibrous (Other)100%Green

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

44-Mastic

041926209-0037A

2% ChrysotileNon-fibrous (Other)95%Cellulose3%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

45-Floor Tile

041926209-0038

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

Page 3 of 5ASB_PLM_0008_0001 - 1.78 Printed: 9/16/2019 12:29 PM

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

041926209EMSL Order:

Customer ID: CHAS42

Customer PO: JB

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

45-Mastic

041926209-0038A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

46-Floor Tile

041926209-0039

3% ChrysotileNon-fibrous (Other)97%Beige

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

46-Mastic

041926209-0039A

4% ChrysotileNon-fibrous (Other)96%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

47-Floor Tile

041926209-0040

7% ChrysotileNon-fibrous (Other)93%White/Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

47-Mastic

041926209-0040A

5% ChrysotileNon-fibrous (Other)95%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

48-Floor Tile

041926209-0041

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

48-Mastic

041926209-0041A

3% ChrysotileNon-fibrous (Other)97%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

49-Floor Tile

041926209-0042

4% ChrysotileNon-fibrous (Other)96%Gray/White

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

49-Mastic

041926209-0042A

3% ChrysotileNon-fibrous (Other)93%Cellulose4%Black/Yellow

Non-Fibrous

Heterogeneous

Bldgs 1A,1B,11A,11B

50-Floor Tile

041926209-0043

None DetectedNon-fibrous (Other)100%Tan/White

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

50-Mastic

041926209-0043A

3% ChrysotileNon-fibrous (Other)97%Black/Yellow

Non-Fibrous

Heterogeneous

Bldgs 1A,1B,11A,11B

51-Floor Tile

041926209-0044

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

51-Mastic

041926209-0044A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

52-Floor Tile

041926209-0045

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

52-Mastic

041926209-0045A

3% ChrysotileNon-fibrous (Other)97%Black/Yellow

Non-Fibrous

Heterogeneous

Bldgs 1A,1B,11A,11B

53-Floor Tile

041926209-0046

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

53-Mastic

041926209-0046A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

54-Floor Tile

041926209-0047

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

54-Mastic

041926209-0047A

None DetectedNon-fibrous (Other)97%Cellulose3%White/Black/Yellow

Non-Fibrous

Heterogeneous

Bldgs 1A,1B,11A,11B

Page 4 of 5ASB_PLM_0008_0001 - 1.78 Printed: 9/16/2019 12:29 PM

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

041926209EMSL Order:

Customer ID: CHAS42

Customer PO: JB

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

Mastic and leveler are inseparable, sample analyzed as a composite.

55-Floor Tile

041926209-0048

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

55-Mastic

041926209-0048A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

55-Floor Tile 2

041926209-0048B

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

55-Mastic 2

041926209-0048C

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

56-Floor Tile

041926209-0049

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

56-Mastic

041926209-0049A

2% ChrysotileNon-fibrous (Other)98%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

57-Floor Tile

041926209-0050

None DetectedNon-fibrous (Other)100%Tan/Beige

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

57-Mastic

041926209-0050A

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Bldgs 1A,1B,11A,11B

Analyst(s)

Amy Johnson (50)

Olufunke Akintunde (24)

Seri Smith (6)

Benjamin Ellis, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis . The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 "Interim

Method"), but augmented with procedures outlined in the 1993 ("final") version of the method. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . Interpretation and use of test results are the responsibility of the client. All samples received in acceptable condition unless otherwise noted. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. EMSL recommends gravimetric reduction for all non -friable organically bound materials prior to analysis. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP 10872, NJ DEP 03036, PA ID# 68-00367, LA #04127

Page 5 of 5ASB_PLM_0008_0001 - 1.78 Printed: 9/16/2019 12:29 PM

Sample Description Appearance Result Notes

Test Report: Qualitative asbestos analysis of soils using the EPA 600/R-93/116 method

Attn: Brett Brumbaugh Castle Hill Associates, LLC

218-A Mechanic St.

Waterville, OH 43566

Received: 09/06/19 9:10 AM

Jess Brown VAMC / Chicago, IL

Fax:

Phone: (567) 952-2012

Project:

9/11/2019Analysis Date:

9/4/2019Collected:

EMSL Analytical, Inc.

200 Route 130 North, Cinnaminson, NJ 08077 Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com cinnasblab@EMSL.com

041926203 CustomerID: CHAS42 CustomerPO: JB ProjectID:

EMSL Order:

041926203-0001

Building 11A - Crawl Space Soil

Brown None Detected Fibrous Homogeneous

041926203-0002

Building 11A - Crawl Space Soil

Brown None Detected Fibrous Homogeneous

041926203-0003

Building 11A - Crawl Space Soil

Brown/White None Detected Fibrous Homogeneous

041926203-0004

Building 11B - Crawl Space Soil

Brown Fibrous Homogeneous

Chrysotile

041926203-0005

Building 11B - Crawl Space Soil

Brown None Detected Fibrous Homogeneous

041926203-0006

Building 11B - Crawl Space Soil

Brown Fibrous Homogeneous

Chrysotile

041926203-0007

Building 11B - Crawl Space Soil

Brown None Detected Fibrous Homogeneous

041926203-0008

Building 11B - Crawl Space Soil

Brown Fibrous Homogeneous

Chrysotile

Qualitative analysis of soil samples without matrix modification does not include the examination of the entire sample material for the identification of asbestos. Data from these samples may be biased low and subject to false negative results.

Benjamin Ellis, Laboratory Manager or other approved signatory

1Test Report PLMQualw/Types-7.21.0 Printed: 9/11/2019 10:35:11 PM

Analyst(s)

THIS IS THE LAST PAGE OF THE REPORT.

Soil is a problem matrix due to its inherent heterogeneity and there is a likelihood for false negatives with this analysis. EMSL recommends more specialized methodologies such as the EPA 600/R-93/116 with milling preparation. EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples received in good condition unless otherwise noted.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ

Will DiBella (8)

Initial report from 09/11/2019 22:35:11

OrderID: 041926209

OrderID: 041926203

APPENDIX E

INSPECTOR CERTIFICATIONS

APPENDIX F

LAB CERTIFICATIONS

APPENDIX G

ASBESTOS LOCATIONS & SAMPLE LOCATION DRAWINGS

CASTLE HILL ASSOCIATES, LLC.

DEPARTMENT OF VETERANS AFFAIRS

JESSE BROWN VA MEDICAL CENTER

CHICAGO, ILLINOIS

2019 ASBESTOS REINSPECTION

VA CONTRACT NUMBER: 36C24619N0872

LEGEND

ABC

TASK ORDER: 36C25219F0327

BUILDING 1 A&B BUILDING 11 A&B

ABC

AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three-eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one and one-half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text three-quarters inch = one foot

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved : Division Chief

AutoCAD SHX Text Approved : Service Director

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Building Number

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Checked

AutoCAD SHX Text Department of

AutoCAD SHX Text Office of Facilities

AutoCAD SHX Text

AutoCAD SHX Text Drawn

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Date

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text Sheet 01 of 24

AutoCAD SHX Text Revisions

AutoCAD SHX Text Professional Seal:

AutoCAD SHX Text FACILITY ASBESTOS RE-SURVEY VETERANS ADMINISTRATION MEDICAL CENTER CHICAGO, ILLINOIS

AutoCAD SHX Text 537-19-122

AutoCAD SHX Text

SEPTEMBER 2019

AutoCAD SHX Text

AFS

AutoCAD SHX Text

BLB

AutoCAD SHX Text

CHICAGO, ILLINOIS

AutoCAD SHX Text Dates

AutoCAD SHX Text

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text North:

AutoCAD SHX Text

CS

AutoCAD SHX Text

ASBESTOS-CONTAINING PIPE INSULATION

AutoCAD SHX Text

ASBESTOS-CONTAINING MUDDED FITTINGS ON FIBERGLASS INSULATED PIPES

AutoCAD SHX Text

ASBESTOS-CONTAINING PIPE INSULATION DEBRIS IN SOIL/DIRT IN CRAWL SPACE

AutoCAD SHX Text

ASBESTOS-CONTAINING 12" VINYL FLOOR TILE (ALL COLORS) AND/OR BLACK MASTIC

AutoCAD SHX Text

ASBESTOS-CONTAINING EBONY TRANSITE LAB TABLE TOPS, SINKS, AND DRYING RACKS

AutoCAD SHX Text

ASBESTOS-CONTAINING TRANSITE SHEETS IN STAIRWELLS

AutoCAD SHX Text

ASBESTOS-CONTAINING 9" VINYL FLOOR TILE AND BLACK MASTIC

AutoCAD SHX Text

ASBESTOS-CONTAINING TRANSITE CEMENT SHEETS BEHIND RADIATORS

AutoCAD SHX Text

ASBESTOS-CONTAINING PIPE INSULATION

AutoCAD SHX Text

ASBESTOS-CONTAINING MUDDED FITTINGS ON FIBERGLASS INSULATED PIPES

AutoCAD SHX Text

ASBESTOS-CONTAINING 12" VINYL FLOOR TILE (ALL COLORS) AND/OR BLACK MASTIC

AutoCAD SHX Text

ASBESTOS-CONTAINING TRANSITE LABORATORY FUME HOODS

UP STAIR

B330

WATER

MAIN

TRENCH

BUILDING 1A

B400

B440

UP

PIPE TUNNEL

LOUVER

WINDOW

CRAWL SPACE

B500

CRAWL SPACE

OPEN TO

CROSS PIPE

UP

DN

STAIR

UP

UP

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

STAIR

UP

STAIRUP

STAIR UP

NO 5

NO 14

NO 3

NO 2

NO 6

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

LOUVER

WINDOW

DN

PIPE BASEMENT

CONNECTING TO

BUILDING 2

CB-1

CB-2

B409

P27

NO 13

B462

B443

B441

B460

B456

B452

B451

P1

P2

P3

P4

S5

S6

B402

NO 1

B401

B403

B411

S10B

P9B

P8BP7B

NO 7

P6B B300A

NO P7

CASTLE HILL ASSOCIATES, LLC.

N

S

W

E

LEGEND

KEY PLAN

BUILDING # 1A & 1B - BASEMENT

FLOOR PLAN

1A

1B

11A 11B

AutoCAD SHX Text ENVIRONMENTAL CONSULTANT: 218-A MECHANIC STREET, WATERVILLE, OHIO 43566 Tel: (567) 952-0212

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three-eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one and one-half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text three-quarters inch = one foot

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .