36C25219B0038-0006000.docx
DOCX document 21 KB Posted
- Attached to
- 556-305, Construct New Parking Garage Federal contract opportunity
- Solicitation number
- 36C25219B0038
About this file
36C25219B0038 0006 36C25219B0038 0006.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25219B0038-0007001.pdf | ||
| 36C25219B0038-0007000.docx | DOCX document | |
| 36C25219B0038-0005000.docx | DOCX document | |
| 36C25219B0038-0005001.pdf | ||
| 36C25219B0038-0005002.pdf | ||
| 36C25219B0038-0004000.docx | DOCX document | |
| 36C25219B0038-0003005.pdf | ||
| 36C25219B0038-0003008.pdf | ||
| 36C25219B0038-0003002.pdf | ||
| 36C25219B0038-0003001.pdf | ||
| 36C25219B0038-0003004.pdf | ||
| 36C25219B0038-0003006.pdf | ||
| 36C25219B0038-0003009.pdf | ||
| 36C25219B0038-0003010.pdf | ||
| 36C25219B0038-0003000.docx | DOCX document | |
| 36C25219B0038-0003007.pdf | ||
| 36C25219B0038-0003003.pdf | ||
| 36C25219B0038-0002000.docx | DOCX document | |
| 36C25219B0038-0001001.pdf | ||
| 36C25219B0038-0001000.docx | DOCX document | |
| 36C25219B0038-003.pdf | ||
| 36C25219B0038-005.pdf | ||
| 36C25219B0038-004.pdf | ||
| 36C25219B0038-001.docx | DOCX document | |
| 36C25219B0038-006.pdf | ||
| 36C25219B0038-002.pdf | ||
| 36C25219B0038-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Responses to Bidder Inquiries/RFI Questions 67-69 556-305: Construct New Parking Garage
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 05-15-2019 556-305 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Rd Bldg 1, Rm 329 North Chicago
IL
60064 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 3001 Green Bay Rd Bldg 1, Rm 329 North Chicago
IL
60064 To all Offerors/Bidders
36C25219B0038 03-14-2019
X X X
X
556-305 CONSTRUCT NEW PARKING GARAGE
The purpose of this amendment is to:
1) Publish government responses to bidder inquiries/RFI questions # 67-69.
Jason Hardy Contracting Officer
VA-VHA-SAOC-2019-2BB29B17
| RFI |
| Specifications |
| Drawing |
| Question |
| Response |
We are having a problem finding a product which meets the specification for ‘backwater valve’;
Could the VA provide a product which meets the spec?
No, we do not recommend a specific product. The standard is ASME A112.14.1-2003. Contractor to provide recommendation for variance for review.
| See attached submittal; 15” pipe is not available as a PVC product; 14”, and 16” are available; Does the VA wish to use 14” or 16” in lieu of the 15” pipe shown on the plans? |
| 16” is an acceptable alternative |
Double Tee with topping slab vs. pre-topped
Both require a caulk joint as part of finished project approx. 8200LF
The topping slab version will require a sealing of the gaps between Ts and edge walls, again approx. 8200LF. This is a doubling of effort and or may involve different joint design and or products.
Q: will the VA request GCs to provide alternate pricing for pre-topped vs. topping slab design and if so is there a sealant joint design change also. Historically, some projects have a change, and some do not.
The quantity of joints requiring sealant is the same in both the field-topped and pre-topped versions. Sealant joint geometry will change. In the field-topped version, tooled joints in the topping slab are required over the double tee flange joints (see details 4/SF531 & 4/SF541). In the pre-topped version, backer rod and sealant will be required in the open joints created by the pre-topped precast (see detail 19/SF541).